PREPARING ROW
|
STA
|
66.400
|
$4,000.000
|
$32,059.367
|
$50,000.000
|
$40,163.540
|
$40,000.000
|
$25,000.000
|
$51,920.916
|
|
|
REMOV CONC (RIPRAP)
|
SY
|
1,832.000
|
$25.000
|
$30.000
|
$10.000
|
$29.700
|
$12.000
|
$75.000
|
$24.811
|
|
|
REMOV CONC (DRIVEWAYS)
|
SY
|
137.000
|
$20.000
|
$24.000
|
$25.000
|
$29.700
|
$12.000
|
$60.000
|
$24.811
|
|
|
OBLITERATING ABANDONED ROAD
|
SY
|
11,045.000
|
$15.000
|
$8.940
|
$6.800
|
$12.100
|
$1.900
|
$9.000
|
$47.334
|
|
|
EXCAV (ROADWAY)
|
CY
|
21,426.000
|
$18.000
|
$12.910
|
$18.000
|
$27.500
|
$11.000
|
$15.000
|
$30.494
|
|
|
EMBANK (FNL)(OC)(TY C)
|
CY
|
17,402.000
|
$23.000
|
$14.210
|
$85.000
|
$33.000
|
$8.000
|
$40.000
|
$50.509
|
|
|
BLADING
|
HR
|
28.000
|
$120.000
|
$500.000
|
$130.000
|
$132.000
|
$550.000
|
$220.000
|
$126.988
|
|
|
BROADCAST SEED (PERM_RURAL_CLAY)
|
SY
|
46,925.000
|
$0.750
|
$0.210
|
$0.450
|
$0.230
|
$0.240
|
$0.300
|
$0.211
|
|
|
BROADCAST SEED (TEMP_WARM)
|
SY
|
11,731.000
|
$0.750
|
$0.360
|
$0.350
|
$0.400
|
$0.380
|
$0.520
|
$0.362
|
|
|
BROADCAST SEED (TEMP_COOL)
|
SY
|
11,731.000
|
$0.750
|
$0.370
|
$0.350
|
$0.410
|
$0.380
|
$0.530
|
$0.372
|
|
|
VEGETATIVE WATERING
|
TGL
|
396.000
|
$50.000
|
$47.680
|
$30.000
|
$25.300
|
$48.000
|
$68.680
|
$48.050
|
|
|
FL BS (CMP IN PLC)(TYE GR1-2)(FNAL POS)
|
CY
|
3,404.000
|
$125.000
|
$132.090
|
$135.000
|
$106.420
|
$135.000
|
$149.510
|
$57.079
|
|
|
LIME (COM OR QK)(SLURRY) OR QK(DRY)
|
TON
|
292.000
|
$330.000
|
$360.000
|
$360.000
|
$346.500
|
$375.000
|
$565.430
|
$361.726
|
|
|
LIME TRT (EXIST MATL & NEW BASE)(8")
|
SY
|
16,231.000
|
$4.000
|
$8.000
|
$3.900
|
$2.910
|
$3.250
|
$6.810
|
$12.294
|
|
|
ASPH (RC-250)
|
GAL
|
3,063.000
|
$5.000
|
$6.000
|
$5.200
|
$5.170
|
$7.000
|
$20.000
|
$5.744
|
|
|
AGGR (TY-E, GR-5)(SAC-B)
|
CY
|
109.000
|
$725.000
|
$590.000
|
$280.000
|
$173.600
|
$210.000
|
$400.000
|
$302.329
|
|
|
AGGR (TY-PE, GR-4)(SAC-B)
|
CY
|
181.000
|
$725.000
|
$350.000
|
$280.000
|
$174.240
|
$140.000
|
$400.000
|
$256.979
|
|
|
ASPH (AC 20-5TR OR AC-20XP OR CRS-2P)
|
GAL
|
6,127.000
|
$5.000
|
$8.000
|
$8.000
|
$3.910
|
$5.000
|
$20.000
|
$5.290
|
|
|
D-GR HMA TY-B PG64-22
|
TON
|
2,426.000
|
$115.000
|
$130.000
|
$195.000
|
$119.900
|
$220.000
|
$250.000
|
$149.058
|
|
|
D-GR HMA TY-D PG70-22 (LEVEL-UP)
|
TON
|
81.000
|
$150.000
|
$158.000
|
$245.000
|
$145.200
|
$325.000
|
$350.000
|
$100.524
|
|
|
D-GR HMA TY-D SAC-B PG76-22
|
TON
|
2,865.000
|
$120.000
|
$160.000
|
$225.000
|
$132.000
|
$250.000
|
$250.000
|
$141.721
|
|
|
TACK COAT
|
GAL
|
2,910.000
|
$3.500
|
$4.750
|
$5.200
|
$3.080
|
$8.000
|
$15.000
|
$3.325
|
|
|
CEM STABIL BKFL
|
CY
|
252.000
|
$215.000
|
$198.000
|
$175.000
|
$200.000
|
$400.000
|
$300.000
|
$169.566
|
|
|
TEMPORARY SPL SHORING
|
SF
|
3,378.000
|
$30.000
|
$60.000
|
$60.000
|
$66.000
|
$1.000
|
$78.530
|
$51.960
|
|
|
PRESTR CONC PIL (18 IN SQ)
|
LF
|
176.000
|
$200.000
|
$199.010
|
$150.000
|
$350.000
|
$280.000
|
$600.000
|
$276.550
|
|
|
PRESTR CONC PIL (24 IN SQ)
|
LF
|
14,492.000
|
$245.000
|
$262.910
|
$175.000
|
$360.000
|
$290.000
|
$454.260
|
$673.377
|
|
|
CL B CONC (FLUME)
|
CY
|
11.600
|
$1,100.000
|
$1,996.820
|
$715.000
|
$900.000
|
$1,750.000
|
$1,000.000
|
$342.770
|
|
|
CL C CONC (ABUT)
|
CY
|
56.800
|
$1,600.000
|
$1,639.920
|
$1,200.000
|
$3,000.000
|
$2,250.000
|
$2,500.000
|
$11,119.953
|
|
|
CL C CONC (CAP)
|
CY
|
644.800
|
$1,500.000
|
$2,307.190
|
$1,100.000
|
$3,000.000
|
$2,250.000
|
$3,500.000
|
$1,768.060
|
|
|
REINF CONC SLAB
|
SF
|
117,760.000
|
$20.000
|
$23.750
|
$24.000
|
$36.000
|
$33.000
|
$48.000
|
$52.907
|
|
|
APPROACH SLAB
|
CY
|
70.600
|
$875.000
|
$1,086.500
|
$625.000
|
$1,000.000
|
$1,050.000
|
$1,000.000
|
$3,024.267
|
|
|
PRESTR CONC GIRDER (TX34)
|
LF
|
15,264.000
|
$205.000
|
$175.150
|
$192.000
|
$247.000
|
$353.500
|
$325.000
|
$188.824
|
|
|
RIPRAP (STONE PROTECTION)(18 IN)
|
CY
|
1,988.000
|
$120.000
|
$200.000
|
$225.000
|
$320.000
|
$235.000
|
$225.000
|
$277.961
|
|
|
RAIL (TY SSTR)
|
LF
|
5,172.000
|
$140.000
|
$72.980
|
$63.000
|
$120.000
|
$80.000
|
$92.000
|
$112.446
|
|
|
SEALED EXPANSION JOINT (4 IN) (SEJ - M)
|
LF
|
516.000
|
$250.000
|
$237.500
|
$205.000
|
$250.000
|
$400.000
|
$265.230
|
$172.327
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
310.000
|
$125.000
|
$90.000
|
$80.000
|
$74.710
|
$125.000
|
$183.340
|
$453.483
|
|
|
SET (TY II) (18 IN) (CMP) (6: 1) (P)
|
EA
|
12.000
|
$1,500.000
|
$2,500.000
|
$1,380.000
|
$3,923.540
|
$3,200.000
|
$1,679.510
|
$1,726.752
|
|
|
REMOV STR (BRIDGE 1000 FT OR GREATER)
|
EA
|
1.000
|
$1,500,000.000
|
$1,733,054.280
|
$1,100,000.000
|
$600,000.000
|
$2,000,000.000
|
$300,000.000
|
$1,201,829.089
|
|
|
REMOV STR (SMALL)
|
EA
|
7.000
|
$1,600.000
|
$1,101.530
|
$620.000
|
$1,710.700
|
$2,400.000
|
$1,460.620
|
$1,267.413
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$1,620,000.000
|
$2,128,742.011
|
$2,300,000.000
|
$2,670,088.840
|
$2,700,000.000
|
$3,348,000.000
|
$3,464,960.706
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
22.000
|
$9,000.000
|
$15,416.237
|
$104,000.000
|
$27,855.000
|
$20,000.000
|
$50,000.000
|
$12,093.160
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$8,500.000
|
$8,500.000
|
$45,500.000
|
$11,272.460
|
$29,715.000
|
$42,000.000
|
$18,083.306
|
|
|
TMA (STATIONARY)
|
DAY
|
20.000
|
$500.000
|
$550.000
|
$450.000
|
$394.540
|
$800.000
|
$300.000
|
$122.433
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
20.000
|
$300.000
|
$550.000
|
$750.000
|
$845.430
|
$1,300.000
|
$1,200.000
|
$113.373
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 1)
|
CY
|
13.000
|
$45.000
|
$374.620
|
$45.000
|
$412.080
|
$55.000
|
$500.000
|
$377.528
|
|
|
SANDBAGS FOR EROSION CONTROL
|
EA
|
142.000
|
$18.000
|
$21.730
|
$3.000
|
$23.900
|
$8.000
|
$26.330
|
$21.898
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
946.000
|
$4.000
|
$6.370
|
$4.250
|
$7.010
|
$8.000
|
$10.000
|
$6.419
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
946.000
|
$1.500
|
$1.170
|
$2.500
|
$1.290
|
$2.600
|
$1.000
|
$1.179
|
|
|
PORT CTB (FUR & INST)(SGL SLOPE)(TY 1)
|
LF
|
1,260.000
|
$50.000
|
$50.000
|
$100.000
|
$75.000
|
$128.000
|
$1,200.000
|
$80.842
|
|
|
PORT CTB (REMOVE)(SGL SLP)(TY 1)
|
LF
|
1,260.000
|
$18.000
|
$20.000
|
$15.000
|
$50.000
|
$32.000
|
$20.000
|
$20.618
|
|
|
DRIVEWAYS (CONC)
|
SY
|
137.000
|
$140.000
|
$120.000
|
$115.000
|
$200.000
|
$119.000
|
$197.590
|
$285.076
|
|
|
DRIVEWAYS (SURF TREAT)
|
SY
|
968.000
|
$30.000
|
$35.490
|
$65.000
|
$39.600
|
$50.000
|
$35.620
|
$26.201
|
|
|
MILL RUMBLE STRIPS (ASPHALT) (SHLDR)
|
LF
|
8,080.000
|
$0.300
|
$1.000
|
$0.500
|
$0.590
|
$0.330
|
$0.930
|
$0.655
|
|
|
MILL RUMBLE STRIPS (ASPH) (CENTERLINE)
|
LF
|
4,040.000
|
$0.300
|
$1.000
|
$0.920
|
$0.790
|
$0.450
|
$1.530
|
$0.806
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
300.000
|
$30.000
|
$33.500
|
$33.500
|
$30.550
|
$31.000
|
$46.780
|
$23.480
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
6.000
|
$2,500.000
|
$1,944.000
|
$1,944.000
|
$2,825.890
|
$2,250.000
|
$3,118.890
|
$1,889.556
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
474.000
|
$3.000
|
$4.250
|
$4.250
|
$5.500
|
$10.000
|
$3.120
|
$10.077
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
4.000
|
$3,400.000
|
$3,343.000
|
$3,343.000
|
$3,814.780
|
$3,510.000
|
$6,000.000
|
$2,967.863
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
4.000
|
$300.000
|
$380.000
|
$380.000
|
$302.500
|
$350.000
|
$155.950
|
$277.134
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
2.000
|
$1,500.000
|
$4,100.000
|
$1,350.000
|
$1,127.490
|
$2,000.000
|
$4,000.000
|
$1,133.733
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
2.000
|
$1,000.000
|
$2,500.000
|
$1,350.000
|
$1,099.990
|
$1,000.000
|
$3,000.000
|
$944.778
|
|
|
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
|
EA
|
2.000
|
$10,000.000
|
$10,298.000
|
$15,000.000
|
$9,267.450
|
$15,000.000
|
$12,787.450
|
$6,891.086
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
6.000
|
$900.000
|
$890.000
|
$890.000
|
$979.000
|
$725.000
|
$923.610
|
$1,158.927
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
|
EA
|
1.000
|
$800.000
|
$1,270.000
|
$1,270.000
|
$1,396.990
|
$850.000
|
$1,378.520
|
$1,259.704
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
7.000
|
$100.000
|
$95.000
|
$95.000
|
$104.500
|
$100.000
|
$165.420
|
$151.164
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)CTB (BI)
|
EA
|
102.000
|
$29.000
|
$21.000
|
$21.000
|
$23.100
|
$25.000
|
$34.460
|
$35.271
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
|
EA
|
12.000
|
$35.000
|
$35.000
|
$35.000
|
$38.500
|
$40.000
|
$55.140
|
$45.349
|
|
|
WK ZN PAV MRK REMOV (W)6"(SLD)
|
LF
|
7,350.000
|
$1.500
|
$0.850
|
$0.850
|
$0.460
|
$0.440
|
$0.580
|
$0.423
|
|
|
WK ZN PAV MRK REMOV (Y)6"(SLD)
|
LF
|
6,990.000
|
$1.500
|
$0.850
|
$0.850
|
$0.460
|
$0.440
|
$0.580
|
$0.423
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y
|
EA
|
350.000
|
$2.000
|
$1.250
|
$1.000
|
$1.830
|
$7.150
|
$3.100
|
$1.360
|
|
RE PROFILE PM TY I(W)6"(SLD)(100MIL)
|
LF
|
5,200.000
|
$1.200
|
$1.550
|
$1.550
|
$1.260
|
$1.200
|
$2.680
|
$1.158
|
|
RE PROFILE PM TY I(Y)6"(SLD)(100MIL)
|
LF
|
5,200.000
|
$1.000
|
$1.550
|
$1.550
|
$1.260
|
$1.200
|
$2.680
|
$1.158
|
|
REFL PAV MRK TY I (W)6"(SLD)(100MIL)
|
LF
|
8,805.000
|
$0.500
|
$0.910
|
$0.910
|
$1.080
|
$1.050
|
$1.350
|
$0.987
|
|
REFL PAV MRK TY I (Y)6"(BRK)(100MIL)
|
LF
|
1,755.000
|
$0.500
|
$0.950
|
$0.950
|
$2.200
|
$2.150
|
$2.760
|
$2.015
|
|
REFL PAV MRK TY I (Y)6"(SLD)(100MIL)
|
LF
|
7,050.000
|
$0.500
|
$0.910
|
$0.910
|
$1.080
|
$1.050
|
$1.350
|
$0.987
|
|
|
PAV SURF PREP FOR MRK (6")
|
LF
|
10,400.000
|
$0.040
|
$0.200
|
$0.200
|
$0.110
|
$0.110
|
$1.000
|
$0.100
|
|
Totals: |
$17,962,824.250
|
$21,288,201.984
|
$23,746,416.550
|
$26,862,178.116
|
$27,298,997.910
|
$33,412,147.180
|
$34,823,497.972
|