JACKSON SH 172 (0420-01-051)

Items: 108

County: JACKSON
Length: 0.5010 MILES (0.0487 MILES)
Highway: SH 172
District: YOAKUM
Control Number: 0420-01-051
DBE Goal: 0.0%
Project: STP 2026(952)HES
Guaranty: $100,000.00
Time: 180 WORKING DAYS
Engineer's Estimate: $5,670,190.45
Date: 08/06/2026 1:00 PM CDT (6 weeks ago)
Contract Number: 8263216
Type: EMISSIONS REDUCTION
Project ID: A00207005
Contract Type: FEDERAL
Project Description: CONSTRUCT ROUNDABOUT INCLUDING WIDEN PAVEMENT, REALIGN OF ROADWAY, MEDIAN CONSTRUCTION, PLACEMENT OF ACP, CONSTRUCT TURN LANES, UPGRADE TO STANDARD, AND PROPOSED DRAINAGE MODIFICATIONS
Mail/Deliver Bids To:
TEXAS DEPARTMENT OF TRANSPORTATION
ATTN: CONSTRUCTION DIVISION - RM M1C3.02
6230 E STASSNEY LN, AUSTIN, TX 78744
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Documents 2 files available
Bidders (3)
E
Engineer's Estimate
$5,670,190.45
1
Awarded
$5,347,066.95
Over/Under Est: -5.7% -$323,123.50
Over/Under Est: 9.28% $526,337.29
Amt Left: 15.89% $849,460.79
Over/Under Est: 38.73% $2,196,076.85
Amt Left: 47.11% $2,519,200.35
Delta: -26.95% -$1,669,739.56

Bid Items & Bid Tabulations

108 Total 0 of 108
JACKSON  |  SH 172  |  YOAKUM  |  0420-01-051  |  08/06/2026 1:00 PM CDT  |  $5,670,190.45  |  STP 2026(952)HES  |  EMISSIONS REDUCTION  |  180 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
STX CIVIL
HUNTER INDUSTRIES, LTD.
E-Z BEL CONSTRUCTION, LLC
PREPARING ROW
STA 5.000 $2,500.000 $1,764.450 $1,814.850 $17,000.000
REMOV CONC (PAV)
SY 3,964.000 $16.000 $21.250 $21.820 $3.000
OBLITERATING ABANDONED ROAD
SY 5,752.000 $6.500 $12.920 $8.740 $2.000
EXCAV (ROADWAY)
CY 7,109.000 $18.000 $8.590 $19.680 $21.000
EMBANK (FNL)(DC)(TY C)
CY 4,347.000 $18.000 $13.430 $19.680 $4.000
BACKFILL (TY A)
STA 21.050 $200.000 $237.780 $130.750 $500.000
BLADING
STA 8.750 $100.000 $115.130 $362.970 $250.000
BLADING
HR 50.000 $120.000 $76.100 $99.000 $250.000
BROADCAST SEED (PERM_RURAL_CLAY)
SY 65,100.000 $0.300 $0.230 $0.190 $0.190
BROADCAST SEED (TEMP_WARM)
SY 16,275.000 $0.500 $0.230 $0.190 $0.190
BROADCAST SEED (TEMP_COOL)
SY 16,275.000 $0.500 $0.230 $0.190 $0.190
VEGETATIVE WATERING
TGL 548.770 $25.000 $42.280 $22.960 $50.000
FL BS (RDWY DEL)(TY E GR 1-2)(FNL POS)
CY 2,030.000 $85.000 $121.560 $100.240 $195.000
LIME (COM OR QK)(SLURRY) OR QK(DRY)
TON 152.000 $360.000 $330.020 $351.000 $490.000
LIME TRT (EXIST MATL)(6")
SY 13,128.000 $5.000 $2.050 $3.300 $6.000
CEMENT
TON 111.000 $215.000 $185.000 $216.000 $265.000
CEMENT TRT (NEW BASE)(6")
SY 12,178.000 $3.500 $2.670 $2.200 $6.000
PRIME COAT (MC-30)
GAL 2,436.000 $5.750 $6.480 $5.640 $9.750
AGGR (TY-PE, GR-3)(SAC-B)
CY 143.000 $125.000 $168.360 $165.970 $412.000
AGGR (TY-PE, GR-4)(SAC-B)
CY 242.000 $140.000 $145.870 $165.360 $281.000
ASPH (AC 20-5TR OR AC-20XP OR CRS-2P)
GAL 15,599.000 $4.000 $4.670 $4.230 $6.000
D-GR HMA TY-B PG64-22
TON 404.000 $110.000 $111.500 $106.190 $163.000
D-GR HMA TY-D SAC-B PG70-22
TON 4,444.000 $125.000 $118.440 $110.430 $165.000
TACK COAT
GAL 1,640.000 $3.750 $5.980 $3.460 $4.750
FLEXIBLE PAVEMENT STRUCTURE REPAIR(8")
SY 300.000 $60.000 $90.750 $103.700 $120.000
CONC PVMT (CRCP) (10")
SY 10,309.000 $115.000 $115.790 $137.000 $153.000
CONC PVMT (CRCP) (13")
SY 607.000 $175.000 $137.260 $178.000 $265.000
CONC PVMT(TRANSITION SLAB) (10")
SY 320.000 $180.000 $115.510 $165.000 $265.000
CUT & RESTORING PAV
SY 57.000 $115.000 $89.030 $185.050 $170.000
CEM STABIL BKFL
CY 112.000 $190.000 $10.950 $158.720 $240.000
DRILL SHAFT (HIGH MAST POLE) (60 IN)
LF 46.000 $750.000 $1,403.670 $1,200.000 $980.000
DRILL SHAFT (RDWY ILL POLE) (30 IN)
LF 100.000 $300.000 $496.480 $250.000 $375.000
RIPRAP (CONC)(5 IN)
CY 90.000 $625.000 $581.340 $650.000 $650.000
RIPRAP (CONC) (CL B) (4 IN)
CY 6.000 $750.000 $1,062.190 $900.000 $1,000.000
CONC BOX CULV (6 FT X 2 FT)
LF 69.000 $650.000 $635.530 $590.000 $620.000
CONC BOX CULV (6 FT X 3 FT)
LF 72.000 $700.000 $710.920 $750.000 $750.000
RC PIPE (CL III)(18 IN)
LF 128.000 $110.000 $84.390 $100.000 $200.000
RC PIPE (CL III)(24 IN)
LF 138.000 $125.000 $106.800 $130.000 $220.000
SET (TY I)(S= 6 FT)(HW= 3 FT)(4:1)(C)
EA 2.000 $10,000.000 $10,677.480 $9,000.000 $12,000.000
SET (TY I)(S= 6 FT)(HW= 4 FT)(4:1)(C)
EA 2.000 $11,000.000 $12,423.380 $14,000.000 $15,000.000
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 10.000 $2,000.000 $1,118.780 $3,100.000 $4,000.000
SET (TY II) (24 IN) (RCP) (6: 1) (P)
EA 8.000 $2,200.000 $1,236.870 $3,900.000 $4,500.000
REMOV STR (SMALL)
EA 9.000 $1,200.000 $627.000 $1,137.690 $460.000
MOBILIZATION
LS 1.000 $511,000.000 $288,562.440 $622,212.120 $650,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 12.000 $4,000.000 $3,170.950 $6,000.000 $5,000.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 8.000 $7,500.000 $5,113.240 $8,443.500 $3,500.000
TMA (STATIONARY)
DAY 20.000 $250.000 $103.450 $108.250 $350.000
TMA (MOBILE OPERATION)
DAY 20.000 $400.000 $199.870 $119.070 $400.000
ROCK FILTER DAMS (INSTALL) (TY 1)
LF 100.000 $50.000 $33.450 $60.130 $60.000
ROCK FILTER DAMS (REMOVE)
LF 100.000 $10.000 $0.010 $22.990 $22.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 665.000 $5.000 $3.010 $6.370 $6.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 665.000 $2.000 $0.010 $1.190 $1.000
CONSTRUCTING DETOURS
SY 10,389.000 $60.000 $54.240 $80.600 $135.000
COLORED TEXTURED CONC (5")
SY 1,323.000 $120.000 $118.020 $115.000 $112.000
CONC CURB (TY II)
LF 7,356.000 $30.000 $16.580 $28.000 $10.000
CONC CURB (MONO) (TY I)
LF 364.000 $18.000 $19.780 $22.000 $15.000
DRIVEWAYS (SURF TREAT)
SY 1,125.000 $40.000 $34.060 $33.730 $15.000
MAILBOX INSTALL-S (WC-POST) TY 3
EA 2.000 $220.000 $603.990 $250.000 $250.000
MAILBOX INSTALL-D (WC-POST) TY 3
EA 1.000 $250.000 $603.990 $300.000 $300.000
IN RD IL (TY SA) 50T-10 (400W EQ) LED
EA 10.000 $5,000.000 $7,599.410 $6,100.000 $7,000.000
HI MST IL POLE (150 FT)(100 MPH)
EA 1.000 $53,000.000 $74,653.250 $66,000.000 $105,000.000
LED HI MST IL ASM (6 FIXT) (TY A)
EA 1.000 $27,000.000 $55,581.640 $47,500.000 $53,000.000
TEMP RD IL SETUP AND REMOVE
EA 27.000 $7,600.000 $6,480.820 $3,500.000 $16,500.000
TEMP RD IL MAINTAIN SYSTEM
MO 8.000 $360.000 $7,059.450 $1,900.000 $4,600.000
CONDT (PVC) (SCH 80) (2")
LF 7,150.000 $15.000 $14.250 $15.000 $8.000
CONDT (PVC) (SCH 80) (2") (BORE)
LF 565.000 $26.000 $19.090 $30.000 $43.000
ELEC CONDR (NO.8) BARE
LF 7,715.000 $2.000 $2.360 $2.000 $1.450
ELEC CONDR (NO.8) INSULATED
LF 19,935.000 $2.250 $2.720 $2.050 $1.780
GROUND BOX TY A (122311)W/APRON
EA 11.000 $1,500.000 $1,499.100 $965.000 $1,200.000
REMOVE ELECTRICAL SERVICES
EA 1.000 $700.000 $2,104.310 $1,200.000 $390.000
ELC SRV TY A 240/480 060(NS)SS(E)SP(O)
EA 1.000 $10,500.000 $13,645.360 $8,000.000 $10,000.000
ELC SRV TY D 120/240 060(NS)SS(E)SP(O)
EA 2.000 $9,500.000 $14,280.760 $7,800.000 $10,000.000
ALUMINUM SIGNS (TY A)
SF 64.000 $45.000 $48.320 $30.000 $50.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 6.000 $800.000 $905.990 $1,050.000 $1,050.000
IN SM RD SN SUP&AM TYS80(1)SA(P)
EA 1.000 $900.000 $1,026.780 $1,200.000 $1,200.000
IN SM RD SN SUP&AM TYS80(1)SA(U-WC)
EA 12.000 $1,200.000 $1,147.580 $1,600.000 $1,600.000
IN SM RD SN SUP&AM TYTWT(1)WS(P)
EA 16.000 $450.000 $513.390 $525.000 $525.000
IN SM RD SN SUP&AM TYTWT(1)WS(T)
EA 12.000 $600.000 $573.790 $675.000 $675.000
REMOVE SM RD SN SUP&AM
EA 31.000 $85.000 $102.680 $95.000 $95.000
INSTL OM ASSM (OM-2Z)(YFLX)GNDHH(BI)
EA 4.000 $75.000 $380.000 $375.000 $375.000
WK ZN PAV MRK NON-REMOV (W)6"(SLD)
LF 10,699.000 $0.300 $0.580 $0.480 $0.480
WK ZN PAV MRK NON-REMOV (Y)6"(SLD)
LF 12,941.000 $0.300 $0.580 $0.480 $0.480
WK ZN PAV MRK REMOV (W)6"(SLD)
LF 21,662.000 $0.700 $0.420 $0.350 $0.350
WK ZN PAV MRK REMOV (Y)6"(SLD)
LF 27,866.000 $0.700 $0.420 $0.350 $0.350
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 494.000 $1.000 $1.210 $1.630 $1.000
TY I HIGH PERF PM (W)6"(SLD)(100MIL)
LF 10,699.000 $0.550 $1.180 $0.980 $0.980
TY I HIGH PERF PM (Y)6"(SLD)(100MIL)
LF 12,941.000 $0.850 $1.180 $0.980 $0.980
TY I HIGH PERF PM(W)8"(SLD)(100 MIL)
LF 238.000 $2.500 $6.040 $5.000 $5.000
PRFB RUMBLE STRIP (BLK)(4')(TRANSVERSE)
LF 480.000 $30.000 $19.330 $16.000 $16.000
PREFAB PM TY C (W)(DBL ARROW)CONTRAST
EA 4.000 $400.000 $905.990 $750.000 $750.000
PREFAB PM TY C (Y)(24")(SLD)
LF 552.000 $12.000 $21.740 $18.000 $18.000
PREFAB PM TY C(W)(6")(DOT)CONTRAST
LF 90.000 $8.000 $60.400 $50.000 $50.000
PREFAB PM TY C(W)(36")(YLD TRI)CONTRAST
EA 24.000 $75.000 $60.400 $50.000 $50.000
REFL PAV MRKR TY II-A-A
EA 315.000 $7.000 $14.500 $12.000 $12.000
ELIM EXT PM & MRKS (6")
LF 5,255.000 $0.450 $1.030 $0.850 $0.850
PAV SURF PREP FOR MRK (4")
LF 40.000 $1.000 $0.240 $0.200 $0.200
PAV SURF PREP FOR MRK (6")
LF 7,932.000 $0.150 $0.360 $0.300 $0.300
PAV SURF PREP FOR MRK (8")
LF 238.000 $0.250 $0.480 $0.400 $0.400
PAV SURF PREP FOR MRK (10")
LF 90.000 $0.250 $0.600 $0.500 $0.500
PAV SURF PREP FOR MRK (24")
LF 68.000 $1.500 $2.420 $2.000 $2.000
PAV SURF PREP FOR MRK (DBL ARROW)
EA 4.000 $30.000 $24.160 $20.000 $20.000
PAV SURF PREP FOR MRK (36")(YLD TRI)
EA 24.000 $20.000 $24.160 $20.000 $20.000
PAV SURF PREP FOR MRK (RPM)
EA 16.000 $2.000 $12.080 $10.000 $10.000
REMOVING TRAFFIC SIGNALS
EA 1.000 $4,900.000 $6,973.670 $3,500.000 $6,400.000
VEH SIG SEC (12")LED(YEL)
EA 8.000 $350.000 $427.630 $365.000 $370.000
INSTALL RDSD FLASH BEACON ASSEMBLY
EA 4.000 $4,500.000 $6,489.280 $6,000.000 $5,300.000
REMOV RDSD FLSH BCN AM (SOLAR PWRD)
EA 4.000 $1,200.000 $736.870 $660.000 $1,200.000
TMSP RADAR SPEED CONTROL MONITOR
EA 4.000 $8,000.000 $10,148.250 $8,118.750 $3,700.000
Totals: $5,670,190.450 $5,347,066.942 $6,196,527.734 $7,866,267.300
INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS:
Description Amount
LAW ENFORCEMENT: CONTRACTOR FORCE ACCOUNT WORK (PART) $50,000.00
EROSION CONTROL MAINTENANCE: CONTRACTOR FORCE ACCOUNT WORK (PART) $500.00
SAFETY CONTINGENCY: CONTRACTOR FORCE ACCOUNT WORK (PART) $1,000.00
Total: $51,500.00