PREPARING ROW
|
STA
|
5.000
|
$2,500.000
|
$1,764.450
|
$1,814.850
|
$17,000.000
|
|
|
REMOV CONC (PAV)
|
SY
|
3,964.000
|
$16.000
|
$21.250
|
$21.820
|
$3.000
|
|
|
OBLITERATING ABANDONED ROAD
|
SY
|
5,752.000
|
$6.500
|
$12.920
|
$8.740
|
$2.000
|
|
|
EXCAV (ROADWAY)
|
CY
|
7,109.000
|
$18.000
|
$8.590
|
$19.680
|
$21.000
|
|
|
EMBANK (FNL)(DC)(TY C)
|
CY
|
4,347.000
|
$18.000
|
$13.430
|
$19.680
|
$4.000
|
|
|
BACKFILL (TY A)
|
STA
|
21.050
|
$200.000
|
$237.780
|
$130.750
|
$500.000
|
|
|
BLADING
|
STA
|
8.750
|
$100.000
|
$115.130
|
$362.970
|
$250.000
|
|
|
BLADING
|
HR
|
50.000
|
$120.000
|
$76.100
|
$99.000
|
$250.000
|
|
|
BROADCAST SEED (PERM_RURAL_CLAY)
|
SY
|
65,100.000
|
$0.300
|
$0.230
|
$0.190
|
$0.190
|
|
|
BROADCAST SEED (TEMP_WARM)
|
SY
|
16,275.000
|
$0.500
|
$0.230
|
$0.190
|
$0.190
|
|
|
BROADCAST SEED (TEMP_COOL)
|
SY
|
16,275.000
|
$0.500
|
$0.230
|
$0.190
|
$0.190
|
|
|
VEGETATIVE WATERING
|
TGL
|
548.770
|
$25.000
|
$42.280
|
$22.960
|
$50.000
|
|
|
FL BS (RDWY DEL)(TY E GR 1-2)(FNL POS)
|
CY
|
2,030.000
|
$85.000
|
$121.560
|
$100.240
|
$195.000
|
|
|
LIME (COM OR QK)(SLURRY) OR QK(DRY)
|
TON
|
152.000
|
$360.000
|
$330.020
|
$351.000
|
$490.000
|
|
|
LIME TRT (EXIST MATL)(6")
|
SY
|
13,128.000
|
$5.000
|
$2.050
|
$3.300
|
$6.000
|
|
|
CEMENT
|
TON
|
111.000
|
$215.000
|
$185.000
|
$216.000
|
$265.000
|
|
|
CEMENT TRT (NEW BASE)(6")
|
SY
|
12,178.000
|
$3.500
|
$2.670
|
$2.200
|
$6.000
|
|
|
PRIME COAT (MC-30)
|
GAL
|
2,436.000
|
$5.750
|
$6.480
|
$5.640
|
$9.750
|
|
|
AGGR (TY-PE, GR-3)(SAC-B)
|
CY
|
143.000
|
$125.000
|
$168.360
|
$165.970
|
$412.000
|
|
|
AGGR (TY-PE, GR-4)(SAC-B)
|
CY
|
242.000
|
$140.000
|
$145.870
|
$165.360
|
$281.000
|
|
|
ASPH (AC 20-5TR OR AC-20XP OR CRS-2P)
|
GAL
|
15,599.000
|
$4.000
|
$4.670
|
$4.230
|
$6.000
|
|
|
D-GR HMA TY-B PG64-22
|
TON
|
404.000
|
$110.000
|
$111.500
|
$106.190
|
$163.000
|
|
|
D-GR HMA TY-D SAC-B PG70-22
|
TON
|
4,444.000
|
$125.000
|
$118.440
|
$110.430
|
$165.000
|
|
|
TACK COAT
|
GAL
|
1,640.000
|
$3.750
|
$5.980
|
$3.460
|
$4.750
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(8")
|
SY
|
300.000
|
$60.000
|
$90.750
|
$103.700
|
$120.000
|
|
|
CONC PVMT (CRCP) (10")
|
SY
|
10,309.000
|
$115.000
|
$115.790
|
$137.000
|
$153.000
|
|
|
CONC PVMT (CRCP) (13")
|
SY
|
607.000
|
$175.000
|
$137.260
|
$178.000
|
$265.000
|
|
|
CONC PVMT(TRANSITION SLAB) (10")
|
SY
|
320.000
|
$180.000
|
$115.510
|
$165.000
|
$265.000
|
|
|
CUT & RESTORING PAV
|
SY
|
57.000
|
$115.000
|
$89.030
|
$185.050
|
$170.000
|
|
|
CEM STABIL BKFL
|
CY
|
112.000
|
$190.000
|
$10.950
|
$158.720
|
$240.000
|
|
|
DRILL SHAFT (HIGH MAST POLE) (60 IN)
|
LF
|
46.000
|
$750.000
|
$1,403.670
|
$1,200.000
|
$980.000
|
|
|
DRILL SHAFT (RDWY ILL POLE) (30 IN)
|
LF
|
100.000
|
$300.000
|
$496.480
|
$250.000
|
$375.000
|
|
|
RIPRAP (CONC)(5 IN)
|
CY
|
90.000
|
$625.000
|
$581.340
|
$650.000
|
$650.000
|
|
|
RIPRAP (CONC) (CL B) (4 IN)
|
CY
|
6.000
|
$750.000
|
$1,062.190
|
$900.000
|
$1,000.000
|
|
|
CONC BOX CULV (6 FT X 2 FT)
|
LF
|
69.000
|
$650.000
|
$635.530
|
$590.000
|
$620.000
|
|
|
CONC BOX CULV (6 FT X 3 FT)
|
LF
|
72.000
|
$700.000
|
$710.920
|
$750.000
|
$750.000
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
128.000
|
$110.000
|
$84.390
|
$100.000
|
$200.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
138.000
|
$125.000
|
$106.800
|
$130.000
|
$220.000
|
|
|
SET (TY I)(S= 6 FT)(HW= 3 FT)(4:1)(C)
|
EA
|
2.000
|
$10,000.000
|
$10,677.480
|
$9,000.000
|
$12,000.000
|
|
|
SET (TY I)(S= 6 FT)(HW= 4 FT)(4:1)(C)
|
EA
|
2.000
|
$11,000.000
|
$12,423.380
|
$14,000.000
|
$15,000.000
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
10.000
|
$2,000.000
|
$1,118.780
|
$3,100.000
|
$4,000.000
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
8.000
|
$2,200.000
|
$1,236.870
|
$3,900.000
|
$4,500.000
|
|
|
REMOV STR (SMALL)
|
EA
|
9.000
|
$1,200.000
|
$627.000
|
$1,137.690
|
$460.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$511,000.000
|
$288,562.440
|
$622,212.120
|
$650,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
12.000
|
$4,000.000
|
$3,170.950
|
$6,000.000
|
$5,000.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
8.000
|
$7,500.000
|
$5,113.240
|
$8,443.500
|
$3,500.000
|
|
|
TMA (STATIONARY)
|
DAY
|
20.000
|
$250.000
|
$103.450
|
$108.250
|
$350.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
20.000
|
$400.000
|
$199.870
|
$119.070
|
$400.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 1)
|
LF
|
100.000
|
$50.000
|
$33.450
|
$60.130
|
$60.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
100.000
|
$10.000
|
$0.010
|
$22.990
|
$22.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
665.000
|
$5.000
|
$3.010
|
$6.370
|
$6.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
665.000
|
$2.000
|
$0.010
|
$1.190
|
$1.000
|
|
|
CONSTRUCTING DETOURS
|
SY
|
10,389.000
|
$60.000
|
$54.240
|
$80.600
|
$135.000
|
|
|
COLORED TEXTURED CONC (5")
|
SY
|
1,323.000
|
$120.000
|
$118.020
|
$115.000
|
$112.000
|
|
|
CONC CURB (TY II)
|
LF
|
7,356.000
|
$30.000
|
$16.580
|
$28.000
|
$10.000
|
|
|
CONC CURB (MONO) (TY I)
|
LF
|
364.000
|
$18.000
|
$19.780
|
$22.000
|
$15.000
|
|
|
DRIVEWAYS (SURF TREAT)
|
SY
|
1,125.000
|
$40.000
|
$34.060
|
$33.730
|
$15.000
|
|
|
MAILBOX INSTALL-S (WC-POST) TY 3
|
EA
|
2.000
|
$220.000
|
$603.990
|
$250.000
|
$250.000
|
|
|
MAILBOX INSTALL-D (WC-POST) TY 3
|
EA
|
1.000
|
$250.000
|
$603.990
|
$300.000
|
$300.000
|
|
|
IN RD IL (TY SA) 50T-10 (400W EQ) LED
|
EA
|
10.000
|
$5,000.000
|
$7,599.410
|
$6,100.000
|
$7,000.000
|
|
|
HI MST IL POLE (150 FT)(100 MPH)
|
EA
|
1.000
|
$53,000.000
|
$74,653.250
|
$66,000.000
|
$105,000.000
|
|
|
LED HI MST IL ASM (6 FIXT) (TY A)
|
EA
|
1.000
|
$27,000.000
|
$55,581.640
|
$47,500.000
|
$53,000.000
|
|
|
TEMP RD IL SETUP AND REMOVE
|
EA
|
27.000
|
$7,600.000
|
$6,480.820
|
$3,500.000
|
$16,500.000
|
|
|
TEMP RD IL MAINTAIN SYSTEM
|
MO
|
8.000
|
$360.000
|
$7,059.450
|
$1,900.000
|
$4,600.000
|
|
|
CONDT (PVC) (SCH 80) (2")
|
LF
|
7,150.000
|
$15.000
|
$14.250
|
$15.000
|
$8.000
|
|
|
CONDT (PVC) (SCH 80) (2") (BORE)
|
LF
|
565.000
|
$26.000
|
$19.090
|
$30.000
|
$43.000
|
|
|
ELEC CONDR (NO.8) BARE
|
LF
|
7,715.000
|
$2.000
|
$2.360
|
$2.000
|
$1.450
|
|
|
ELEC CONDR (NO.8) INSULATED
|
LF
|
19,935.000
|
$2.250
|
$2.720
|
$2.050
|
$1.780
|
|
|
GROUND BOX TY A (122311)W/APRON
|
EA
|
11.000
|
$1,500.000
|
$1,499.100
|
$965.000
|
$1,200.000
|
|
|
REMOVE ELECTRICAL SERVICES
|
EA
|
1.000
|
$700.000
|
$2,104.310
|
$1,200.000
|
$390.000
|
|
|
ELC SRV TY A 240/480 060(NS)SS(E)SP(O)
|
EA
|
1.000
|
$10,500.000
|
$13,645.360
|
$8,000.000
|
$10,000.000
|
|
|
ELC SRV TY D 120/240 060(NS)SS(E)SP(O)
|
EA
|
2.000
|
$9,500.000
|
$14,280.760
|
$7,800.000
|
$10,000.000
|
|
|
ALUMINUM SIGNS (TY A)
|
SF
|
64.000
|
$45.000
|
$48.320
|
$30.000
|
$50.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
6.000
|
$800.000
|
$905.990
|
$1,050.000
|
$1,050.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(P)
|
EA
|
1.000
|
$900.000
|
$1,026.780
|
$1,200.000
|
$1,200.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U-WC)
|
EA
|
12.000
|
$1,200.000
|
$1,147.580
|
$1,600.000
|
$1,600.000
|
|
|
IN SM RD SN SUP&AM TYTWT(1)WS(P)
|
EA
|
16.000
|
$450.000
|
$513.390
|
$525.000
|
$525.000
|
|
|
IN SM RD SN SUP&AM TYTWT(1)WS(T)
|
EA
|
12.000
|
$600.000
|
$573.790
|
$675.000
|
$675.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
31.000
|
$85.000
|
$102.680
|
$95.000
|
$95.000
|
|
|
INSTL OM ASSM (OM-2Z)(YFLX)GNDHH(BI)
|
EA
|
4.000
|
$75.000
|
$380.000
|
$375.000
|
$375.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)6"(SLD)
|
LF
|
10,699.000
|
$0.300
|
$0.580
|
$0.480
|
$0.480
|
|
|
WK ZN PAV MRK NON-REMOV (Y)6"(SLD)
|
LF
|
12,941.000
|
$0.300
|
$0.580
|
$0.480
|
$0.480
|
|
|
WK ZN PAV MRK REMOV (W)6"(SLD)
|
LF
|
21,662.000
|
$0.700
|
$0.420
|
$0.350
|
$0.350
|
|
|
WK ZN PAV MRK REMOV (Y)6"(SLD)
|
LF
|
27,866.000
|
$0.700
|
$0.420
|
$0.350
|
$0.350
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
494.000
|
$1.000
|
$1.210
|
$1.630
|
$1.000
|
|
TY I HIGH PERF PM (W)6"(SLD)(100MIL)
|
LF
|
10,699.000
|
$0.550
|
$1.180
|
$0.980
|
$0.980
|
|
TY I HIGH PERF PM (Y)6"(SLD)(100MIL)
|
LF
|
12,941.000
|
$0.850
|
$1.180
|
$0.980
|
$0.980
|
|
TY I HIGH PERF PM(W)8"(SLD)(100 MIL)
|
LF
|
238.000
|
$2.500
|
$6.040
|
$5.000
|
$5.000
|
|
PRFB RUMBLE STRIP (BLK)(4')(TRANSVERSE)
|
LF
|
480.000
|
$30.000
|
$19.330
|
$16.000
|
$16.000
|
|
PREFAB PM TY C (W)(DBL ARROW)CONTRAST
|
EA
|
4.000
|
$400.000
|
$905.990
|
$750.000
|
$750.000
|
|
PREFAB PM TY C (Y)(24")(SLD)
|
LF
|
552.000
|
$12.000
|
$21.740
|
$18.000
|
$18.000
|
|
PREFAB PM TY C(W)(6")(DOT)CONTRAST
|
LF
|
90.000
|
$8.000
|
$60.400
|
$50.000
|
$50.000
|
|
PREFAB PM TY C(W)(36")(YLD TRI)CONTRAST
|
EA
|
24.000
|
$75.000
|
$60.400
|
$50.000
|
$50.000
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
315.000
|
$7.000
|
$14.500
|
$12.000
|
$12.000
|
|
|
ELIM EXT PM & MRKS (6")
|
LF
|
5,255.000
|
$0.450
|
$1.030
|
$0.850
|
$0.850
|
|
|
PAV SURF PREP FOR MRK (4")
|
LF
|
40.000
|
$1.000
|
$0.240
|
$0.200
|
$0.200
|
|
|
PAV SURF PREP FOR MRK (6")
|
LF
|
7,932.000
|
$0.150
|
$0.360
|
$0.300
|
$0.300
|
|
|
PAV SURF PREP FOR MRK (8")
|
LF
|
238.000
|
$0.250
|
$0.480
|
$0.400
|
$0.400
|
|
|
PAV SURF PREP FOR MRK (10")
|
LF
|
90.000
|
$0.250
|
$0.600
|
$0.500
|
$0.500
|
|
|
PAV SURF PREP FOR MRK (24")
|
LF
|
68.000
|
$1.500
|
$2.420
|
$2.000
|
$2.000
|
|
|
PAV SURF PREP FOR MRK (DBL ARROW)
|
EA
|
4.000
|
$30.000
|
$24.160
|
$20.000
|
$20.000
|
|
|
PAV SURF PREP FOR MRK (36")(YLD TRI)
|
EA
|
24.000
|
$20.000
|
$24.160
|
$20.000
|
$20.000
|
|
|
PAV SURF PREP FOR MRK (RPM)
|
EA
|
16.000
|
$2.000
|
$12.080
|
$10.000
|
$10.000
|
|
|
REMOVING TRAFFIC SIGNALS
|
EA
|
1.000
|
$4,900.000
|
$6,973.670
|
$3,500.000
|
$6,400.000
|
|
|
VEH SIG SEC (12")LED(YEL)
|
EA
|
8.000
|
$350.000
|
$427.630
|
$365.000
|
$370.000
|
|
|
INSTALL RDSD FLASH BEACON ASSEMBLY
|
EA
|
4.000
|
$4,500.000
|
$6,489.280
|
$6,000.000
|
$5,300.000
|
|
|
REMOV RDSD FLSH BCN AM (SOLAR PWRD)
|
EA
|
4.000
|
$1,200.000
|
$736.870
|
$660.000
|
$1,200.000
|
|
|
TMSP RADAR SPEED CONTROL MONITOR
|
EA
|
4.000
|
$8,000.000
|
$10,148.250
|
$8,118.750
|
$3,700.000
|
|
Totals: |
$5,670,190.450
|
$5,347,066.942
|
$6,196,527.734
|
$7,866,267.300
|