|
|
PREPARING ROW
|
STA
|
0.500
|
$10,000.000
|
$10,000.000
|
$3,702.960
|
$11,400.000
|
$5,000.000
|
$10,000.000
|
$3,000.000
|
|
|
REMOVING CONC (PAV)
|
SY
|
133.000
|
$15.000
|
$19.890
|
$16.650
|
$19.250
|
$50.000
|
$23.000
|
$50.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
2,675.000
|
$12.000
|
$12.220
|
$19.980
|
$12.000
|
$30.000
|
$11.500
|
$12.000
|
|
|
SUBGRADE WIDENING (ORD COMP)
|
STA
|
187.490
|
$450.000
|
$434.690
|
$741.000
|
$190.000
|
$400.000
|
$267.000
|
$850.000
|
|
|
EMBANKMENT (VEHICLE)(ORD COMP)(TY C)
|
CY
|
1,776.000
|
$25.000
|
$22.130
|
$19.710
|
$12.000
|
$15.000
|
$16.000
|
$16.000
|
|
|
BLADING
|
HR
|
75.000
|
$100.000
|
$125.000
|
$102.600
|
$100.000
|
$130.000
|
$94.000
|
$115.000
|
|
|
DRILL SEEDING (PERM) (RURAL) (CLAY)
|
SY
|
62,897.000
|
$0.300
|
$0.200
|
$0.210
|
$0.200
|
$0.150
|
$0.170
|
$0.170
|
|
|
DRILL SEEDING (TEMP) (WARM)
|
SY
|
15,724.000
|
$0.150
|
$0.150
|
$0.160
|
$0.200
|
$0.140
|
$0.160
|
$0.160
|
|
|
DRILL SEEDING (TEMP) (COOL)
|
SY
|
15,724.000
|
$0.150
|
$0.150
|
$0.160
|
$0.200
|
$0.140
|
$0.160
|
$0.160
|
|
|
VEGETATIVE WATERING
|
MG
|
529.420
|
$25.000
|
$22.000
|
$16.650
|
$45.000
|
$16.000
|
$20.000
|
$10.000
|
|
|
FL BS (CMP IN PLC)(TYE GR1-2)(FNAL POS)
|
CY
|
14,836.000
|
$80.000
|
$85.060
|
$84.100
|
$105.100
|
$85.000
|
$106.740
|
$120.500
|
|
|
FL BS (RDWY DEL)(TY E GR 1-2)(FNL POS)
|
CY
|
1,144.000
|
$70.000
|
$82.390
|
$84.090
|
$92.000
|
$80.000
|
$106.740
|
$105.000
|
|
|
LIME TRT (EXST MATL) (6")
|
SY
|
12,324.000
|
$2.500
|
$6.390
|
$3.190
|
$3.000
|
$3.000
|
$3.300
|
$8.000
|
|
|
LIME (HYD, COM OR QK)(SLURRY)
|
TON
|
112.000
|
$200.000
|
$176.000
|
$173.250
|
$250.000
|
$240.000
|
$153.750
|
$200.000
|
|
|
CEMENT
|
TON
|
501.000
|
$200.000
|
$170.000
|
$176.220
|
$181.000
|
$175.000
|
$167.120
|
$220.000
|
|
|
CEMENT TREAT (MX EXST MTL & NW BS) (6")
|
SY
|
54,991.000
|
$3.000
|
$1.470
|
$2.280
|
$1.450
|
$1.250
|
$1.460
|
$1.750
|
|
|
ASPH (RC-250)
|
GAL
|
11,912.000
|
$4.500
|
$4.000
|
$4.590
|
$3.950
|
$4.500
|
$6.300
|
$4.500
|
|
|
AGGR(TY-E GR-5 SAC-B)
|
CY
|
426.000
|
$105.000
|
$150.000
|
$86.180
|
$207.000
|
$145.000
|
$115.000
|
$102.000
|
|
|
AGGR(TY-PE GR-3 SAC-B)
|
CY
|
701.000
|
$100.000
|
$127.000
|
$100.630
|
$133.000
|
$130.000
|
$110.000
|
$110.000
|
|
|
AGGR(TY-PE GR-4 SAC-B)
|
CY
|
556.000
|
$100.000
|
$119.480
|
$100.630
|
$120.000
|
$105.000
|
$110.000
|
$110.000
|
|
|
ASPH (AC-15P OR AC-10-2TR OR CRS-2P)
|
GAL
|
48,422.000
|
$4.000
|
$3.410
|
$3.950
|
$3.850
|
$3.500
|
$4.670
|
$3.350
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(8")
|
SY
|
15.000
|
$65.000
|
$400.000
|
$192.720
|
$90.000
|
$500.000
|
$100.000
|
$225.000
|
|
|
PLANE ASPH CONC PAV (6")
|
SY
|
13,730.000
|
$6.000
|
$6.000
|
$3.900
|
$3.900
|
$3.750
|
$5.250
|
$2.000
|
|
|
CEM STABIL BKFL
|
CY
|
42.700
|
$120.000
|
$95.000
|
$238.860
|
$114.000
|
$200.000
|
$164.000
|
$150.000
|
|
|
CUT & RESTORING PAV
|
SY
|
104.000
|
$150.000
|
$50.000
|
$300.000
|
$56.000
|
$125.000
|
$200.000
|
$200.000
|
|
|
FLOWABLE BACKFILL
|
CY
|
5.000
|
$250.000
|
$292.000
|
$252.960
|
$108.000
|
$300.000
|
$300.000
|
$300.000
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
120.000
|
$8.000
|
$20.000
|
$42.290
|
$23.000
|
$10.000
|
$15.000
|
$15.000
|
|
|
RIPRAP (CONC)(5 IN)
|
CY
|
8.000
|
$475.000
|
$495.000
|
$843.710
|
$415.000
|
$600.000
|
$650.000
|
$650.000
|
|
|
RAIL (TY T631)
|
LF
|
332.680
|
$125.000
|
$77.000
|
$98.350
|
$97.500
|
$150.000
|
$100.000
|
$100.000
|
|
|
CMP (GAL STL 24 IN)
|
LF
|
12.000
|
$135.000
|
$126.670
|
$131.120
|
$95.000
|
$140.000
|
$125.000
|
$125.000
|
|
|
CMP (GAL STL 15 IN)
|
LF
|
20.000
|
$100.000
|
$118.000
|
$97.430
|
$70.000
|
$105.000
|
$85.000
|
$85.000
|
|
|
CONC BOX CULV (4 FT X 2 FT)
|
LF
|
80.000
|
$450.000
|
$541.890
|
$735.280
|
$332.000
|
$650.000
|
$800.000
|
$800.000
|
|
|
CONC BOX CULV (5 FT X 3 FT)
|
LF
|
40.000
|
$570.000
|
$709.500
|
$886.010
|
$495.000
|
$775.000
|
$900.000
|
$900.000
|
|
|
RC PIPE (CL III)(15 IN)
|
LF
|
120.000
|
$95.000
|
$87.410
|
$76.130
|
$63.000
|
$85.000
|
$60.000
|
$60.000
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
68.000
|
$110.000
|
$118.280
|
$81.180
|
$68.000
|
$90.000
|
$70.000
|
$70.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
84.000
|
$120.000
|
$129.270
|
$106.170
|
$78.000
|
$115.000
|
$145.000
|
$145.000
|
|
|
JCTBOX(COMPL)(PJB)(3FTX3FT)
|
EA
|
1.000
|
$6,000.000
|
$3,775.000
|
$4,529.020
|
$4,220.000
|
$5,500.000
|
$5,500.000
|
$5,500.000
|
|
|
INLET(COMPL)(PSL)(SFG)(3FTX3FT-3FTX3FT)
|
EA
|
1.000
|
$6,500.000
|
$3,338.000
|
$5,911.710
|
$5,175.000
|
$6,500.000
|
$5,000.000
|
$5,000.000
|
|
|
SET (TY I)(S= 4 FT)(HW= 3 FT)(4:1) (C)
|
EA
|
4.000
|
$6,500.000
|
$8,757.500
|
$10,334.150
|
$5,620.000
|
$11,000.000
|
$8,500.000
|
$8,500.000
|
|
|
SET (TY I)(S= 5 FT)(HW= 4 FT)(4:1) (C)
|
EA
|
2.000
|
$7,000.000
|
$10,949.500
|
$13,285.290
|
$7,740.000
|
$15,000.000
|
$10,000.000
|
$10,000.000
|
|
|
SET (TY II) (15 IN) (CMP) (6: 1) (P)
|
EA
|
4.000
|
$950.000
|
$1,325.000
|
$1,531.120
|
$1,140.000
|
$1,700.000
|
$1,000.000
|
$1,000.000
|
|
|
SET (TY II) (15 IN) (RCP) (6: 1) (P)
|
EA
|
10.000
|
$1,000.000
|
$1,325.000
|
$1,519.380
|
$1,105.000
|
$1,700.000
|
$1,200.000
|
$1,200.000
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
8.000
|
$1,800.000
|
$1,412.500
|
$1,913.400
|
$1,305.000
|
$2,100.000
|
$1,600.000
|
$1,600.000
|
|
|
SET (TY II) (24 IN) (CMP) (6: 1) (P)
|
EA
|
2.000
|
$2,100.000
|
$1,500.000
|
$2,039.780
|
$1,415.000
|
$2,300.000
|
$2,000.000
|
$2,000.000
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
8.000
|
$2,250.000
|
$1,500.000
|
$2,220.330
|
$1,460.000
|
$2,500.000
|
$2,500.000
|
$2,500.000
|
|
|
REMOV STR (INLET)
|
EA
|
1.000
|
$600.000
|
$480.000
|
$975.750
|
$1,025.000
|
$1,500.000
|
$750.000
|
$750.000
|
|
|
REMOV STR (SMALL)
|
EA
|
9.000
|
$1,500.000
|
$540.000
|
$1,393.990
|
$815.000
|
$1,500.000
|
$1,000.000
|
$1,000.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$343,000.000
|
$209,400.000
|
$380,765.100
|
$363,000.000
|
$350,000.000
|
$334,000.000
|
$250,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
12.000
|
$4,500.000
|
$3,200.000
|
$5,800.000
|
$750.000
|
$10,000.000
|
$2,100.000
|
$3,000.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 1)
|
LF
|
390.000
|
$50.000
|
$33.000
|
$35.470
|
$26.750
|
$33.000
|
$25.000
|
$25.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
390.000
|
$15.000
|
$12.000
|
$12.900
|
$9.600
|
$12.000
|
$9.000
|
$9.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
490.000
|
$5.000
|
$5.000
|
$5.370
|
$4.250
|
$5.000
|
$4.000
|
$4.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
490.000
|
$2.000
|
$2.000
|
$2.150
|
$1.100
|
$2.000
|
$1.000
|
$1.000
|
|
|
DRIVEWAYS (CONC)
|
SY
|
133.000
|
$95.000
|
$88.180
|
$97.330
|
$81.000
|
$125.000
|
$150.000
|
$150.000
|
|
|
DRIVEWAYS (SURF TREAT)
|
SY
|
1,436.000
|
$35.000
|
$38.460
|
$30.660
|
$28.500
|
$25.000
|
$35.000
|
$23.250
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
1,042.320
|
$32.000
|
$25.250
|
$24.860
|
$29.600
|
$30.000
|
$26.000
|
$26.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
1,025.000
|
$4.000
|
$1.250
|
$1.310
|
$2.600
|
$2.000
|
$0.950
|
$0.950
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
8.000
|
$2,900.000
|
$3,240.000
|
$2,814.680
|
$3,535.000
|
$3,500.000
|
$3,250.000
|
$3,250.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
8.000
|
$250.000
|
$350.000
|
$328.900
|
$335.000
|
$400.000
|
$160.000
|
$160.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
1.000
|
$600.000
|
$735.000
|
$735.000
|
$790.000
|
$850.000
|
$742.000
|
$750.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
|
EA
|
1.000
|
$750.000
|
$795.000
|
$795.000
|
$850.000
|
$925.000
|
$850.000
|
$850.000
|
|
|
IN SM RD SN SUP&AM TYTWT(1)WS(P)
|
EA
|
61.000
|
$450.000
|
$400.000
|
$400.000
|
$428.000
|
$500.000
|
$365.000
|
$365.000
|
|
|
IN SM RD SN SUP&AM TYTWT(1)WS(T)
|
EA
|
6.000
|
$500.000
|
$480.000
|
$480.000
|
$515.000
|
$550.000
|
$460.000
|
$460.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
69.000
|
$100.000
|
$75.000
|
$75.000
|
$80.250
|
$100.000
|
$60.000
|
$60.000
|
|
|
INSTL OM ASSM (OM-2Y)(WC)GND
|
EA
|
6.000
|
$75.000
|
$65.000
|
$65.000
|
$70.000
|
$115.000
|
$65.000
|
$65.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
|
EA
|
40.000
|
$35.000
|
$32.000
|
$32.000
|
$34.000
|
$50.000
|
$40.000
|
$40.000
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(BRK)
|
LF
|
16,233.000
|
$0.250
|
$0.340
|
$0.150
|
$0.500
|
$0.500
|
$0.300
|
$0.150
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
|
LF
|
16,041.000
|
$0.250
|
$0.340
|
$0.150
|
$0.500
|
$0.500
|
$0.300
|
$0.150
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
5,675.000
|
$2.000
|
$1.500
|
$1.610
|
$1.700
|
$0.750
|
$1.500
|
$1.000
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
|
LF
|
7,880.000
|
$0.350
|
$0.380
|
$0.520
|
$0.600
|
$0.650
|
$0.500
|
$0.520
|
|
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
|
LF
|
986.000
|
$0.350
|
$0.380
|
$0.540
|
$0.600
|
$0.650
|
$0.500
|
$0.540
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
1,425.000
|
$0.350
|
$0.380
|
$0.520
|
$0.600
|
$0.650
|
$0.500
|
$0.520
|
|
|
REF PROF PAV MRK TY I(W)4"(SLD)(100MIL)
|
LF
|
37,680.000
|
$0.800
|
$0.620
|
$0.720
|
$0.900
|
$0.900
|
$1.150
|
$0.720
|
|
|
REF PROF PAV MRK TY I(Y)4"(BRK)(100MIL)
|
LF
|
4,425.000
|
$0.800
|
$0.750
|
$0.790
|
$0.900
|
$0.900
|
$1.150
|
$0.790
|
|
|
REF PROF PAV MRK TY I(Y)4"(SLD)(100MIL)
|
LF
|
3,922.000
|
$0.800
|
$0.750
|
$0.720
|
$0.900
|
$0.900
|
$1.150
|
$0.720
|
|
PREFAB PAV MRK TY C (W) (24") (SLD)
|
LF
|
80.000
|
$20.000
|
$13.400
|
$17.000
|
$16.000
|
$20.000
|
$10.000
|
$17.000
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
337.000
|
$4.500
|
$3.900
|
$4.400
|
$5.400
|
$5.500
|
$5.000
|
$4.400
|
|
|
D-GR HMA TY-B SAC-B PG64-22
|
TON
|
3,021.000
|
$125.000
|
$120.000
|
$81.420
|
$114.000
|
$135.000
|
$122.000
|
$110.000
|
|
|
D-GR HMA TY-D SAC-B PG70-22
|
TON
|
1,511.000
|
$125.000
|
$135.000
|
$95.070
|
$133.000
|
$145.000
|
$122.000
|
$117.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$10,000.000
|
$12,500.000
|
$7,698.010
|
$7,500.000
|
$7,500.000
|
$8,500.000
|
$5,000.000
|
|
|
TMA (STATIONARY)
|
DAY
|
20.000
|
$250.000
|
$200.000
|
$513.200
|
$315.000
|
$300.000
|
$750.000
|
$275.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
20.000
|
$250.000
|
$150.000
|
$769.800
|
$375.000
|
$100.000
|
$750.000
|
$275.000
|
|
Totals: |
$3,826,643.990
|
$3,684,181.708
|
$3,811,239.258
|
$3,991,328.122
|
$4,022,270.040
|
$4,176,129.240
|
$4,270,150.020
|