JASPER FM 1131 (0784-02-011)

Items: 64

County: JASPER
Length: 3.2530 MILES (3.0808 MILES)
Highway: FM 1131
District: BEAUMONT
Control Number: 0784-02-011
DBE Goal: 0.0%
Project: F 2026(914)
Guaranty: $75,000.00
Time: 91 WORKING DAYS
Engineer's Estimate: $3,763,963.81
Date: 08/05/2026 1:00 PM CDT (6 weeks ago)
Contract Number: 8263024
Type: PREVENTIVE MAINTENANCE
Project ID: A00219820
Contract Type: FEDERAL
Project Description: FM 1131-(FM 2246 SOUTH TO FM 105) OVERLAY
Mail/Deliver Bids To:
TEXAS DEPARTMENT OF TRANSPORTATION
ATTN: CONSTRUCTION DIVISION - RM M1C3.02
6230 E STASSNEY LN, AUSTIN, TX 78744
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Documents 2 files available
Bidders (1)
E
Engineer's Estimate
$3,763,963.81
$3,276,380.72
Over/Under Est: -12.95% -$487,583.09

Bid Items & Bid Tabulations

64 Total 0 of 64
JASPER  |  FM 1131  |  BEAUMONT  |  0784-02-011  |  08/05/2026 1:00 PM CDT  |  $3,763,963.81  |  F 2026(914)  |  PREVENT MAINT  |  91 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
TEXAS MATERIALS GROUP, INC.
PREPARING ROW
STA 165.000 $400.000 $720.500
SUBGR WIDEN (OC)
STA 106.000 $300.000 $261.350
EMBANK (FNL)(OC)(TY C)
CY 30.000 $30.000 $153.320
BACKFILL (TY A OR B)
STA 165.000 $200.000 $172.340
BLADING
HR 131.000 $150.000 $175.560
SPEC EXCAV WORK (HYD EXCAVATOR)
HR 10.000 $175.000 $183.700
BROADCAST SEED (TEMP_WARM)
SY 7,427.000 $0.200 $0.240
BROADCAST SEED (TEMP_COOL)
SY 7,427.000 $0.200 $0.240
HYDRO MULCH SEED (PERM_RURAL_CLAY)
SY 14,854.000 $0.450 $0.450
VEGETATIVE WATERING
TGL 128.000 $10.000 $660.000
ASPH (AC-20-5TR)
GAL 23,150.000 $4.000 $6.110
AGGR (TY-PB OR PL, GR-4)(SAC-B)
CY 495.000 $160.000 $292.550
D-GR HMA TY-B PG64-22 (EXEMPT)
TON 4,169.000 $300.000 $138.630
TACK COAT
GAL 948.000 $4.000 $4.130
SP MIXES SP-C SAC-A PG76-22
TON 7,073.000 $150.000 $160.410
TACK COAT
GAL 3,858.000 $3.000 $4.130
FLEXIBLE PAVEMENT STRUCTURE REPAIR(8")
SY 643.000 $100.000 $121.580
PLANE & TEXT ASPH CONC PAV(0" TO 2")
SY 4,995.000 $12.310 $5.750
CL C CONC (RAC-R)
CY 7.500 $1,929.870 $1,815.000
RIPRAP (MOW STRIP)(4 IN)
CY 49.000 $1,200.000 $830.500
RAIL (TY T223)
LF 50.000 $150.000 $357.500
RC PIPE (CL III)(15 IN)
LF 92.000 $63.000 $60.500
RC PIPE (CL III)(18 IN)
LF 196.000 $97.000 $77.000
SET (TY II) (15 IN) (RCP) (6: 1) (P)
EA 12.000 $900.000 $880.000
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 90.000 $1,134.000 $973.500
SET (TY II) (24 IN) (RCP) (6: 1) (C)
EA 5.000 $1,800.000 $1,540.000
SET (TY II) (24 IN) (RCP) (6: 1) (P)
EA 34.000 $2,000.000 $1,650.000
SET (TY II) (30 IN) (RCP) (6: 1) (P)
EA 4.000 $3,000.000 $2,420.000
SET (TY II) (36 IN) (RCP) (6: 1) (P)
EA 2.000 $6,400.000 $6,270.000
REMOV STR (PIPE)
LF 143.000 $30.000 $13.200
MOBILIZATION
LS 1.000 $276,130.890 $124,557.850
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 7.000 $3,000.000 $2,640.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 93.000 $62.000 $70.990
TMA (STATIONARY)
DAY 91.000 $413.000 $284.070
TMA (MOBILE OPERATION)
DAY 6.000 $274.000 $71.020
ROCK FILTER DAMS (INSTALL) (TY 1)
LF 80.000 $41.640 $49.500
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 120.000 $12.710 $5.500
DRIVEWAYS (CONC)
SY 93.000 $180.000 $166.100
DRIVEWAYS (ACP)
SY 874.000 $61.000 $30.400
DRIVEWAYS (BASE)
SY 4,465.000 $20.000 $45.670
MILL RUMBLE STRIPS (ASPHALT) (SHLDR)
LF 32,890.000 $0.200 $0.350
MILL RUMBLE STRIPS (ASPH) (CENTERLINE)
LF 16,545.000 $0.260 $0.350
MTL W-BEAM GD FEN (TIM POST)
LF 200.000 $25.000 $31.900
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 3.000 $2,000.000 $2,117.500
GUARDRAIL END TREATMENT (INSTALL)
EA 3.000 $3,100.000 $3,382.500
CRASH CUSH ATTEN (INSTL)(L)(N)(TL3)
EA 1.000 $25,500.000 $30,250.000
MAILBOX INSTALL-S (TWW-POST) TY 4
EA 24.000 $240.000 $302.500
MAILBOX INSTALL-D (TWW-POST) TY 4
EA 5.000 $275.000 $302.500
MAILBOX INSTALL-M (TWW-POST) TY 4
EA 3.000 $700.000 $654.500
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 12.000 $713.000 $660.000
IN SM RD SN SUP&AM TYS80(1)SA(U)
EA 1.000 $1,100.000 $1,248.500
REMOVE SM RD SN SUP&AM
EA 9.000 $119.000 $104.500
INSTL DEL ASSM (D-SW)SZ 1(BRF)CTB (BI)
EA 4.000 $26.000 $16.500
INSTL DEL ASSM (D-DW)SZ 1(BRF)GF2
EA 3.000 $45.000 $36.300
INSTL OM ASSM (OM-2Z)(WFLX)GND
EA 4.000 $105.000 $82.500
INSTL OM ASSM (OM-2Z)(WFLX)GND(BI)
EA 6.000 $100.000 $82.500
INSTL OM SM RD SIGN (1-OM-PW)R
EA 4.000 $28.060 $30.250
REFL PAV MRK TY I (W)6"(SLD)(090MIL)
LF 34,446.000 $1.000 $0.770
REFL PAV MRK TY I (Y)6"(BRK)(090MIL)
LF 7,020.000 $0.900 $0.770
REFL PAV MRK TY I (Y)6"(SLD)(090MIL)
LF 20,125.000 $0.900 $0.770
PREFAB PM TY C (W)(24")(SLD)
LF 155.000 $14.000 $8.800
PREFAB PM TY C (W)(RR XING)
EA 2.000 $638.610 $687.500
PREFAB PM TY C (W)(36")(YLD TRI)
EA 34.000 $61.920 $27.500
REFL PAV MRKR TY II-A-A
EA 504.000 $4.000 $5.500
Totals: $3,763,963.805 $3,276,380.720
INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS:
Description Amount
EROSION CONTROL MAINTENANCE: CONTRACTOR FORCE ACCOUNT WORK (PART) $5,000.00
SAFETY CONTINGENCY: CONTRACTOR FORCE ACCOUNT WORK (PART) $10,000.00
Total: $15,000.00