|
|
REMOVING CONC (PAV)
|
SY
|
1,047.000
|
$8.500
|
$15.000
|
$14.000
|
$29.000
|
$20.000
|
|
|
REMOVING CONC (CURB)
|
LF
|
476.000
|
$6.000
|
$5.050
|
$6.000
|
$15.000
|
$20.000
|
|
|
OBLITERATING ABANDONED ROAD
|
SY
|
2,547.000
|
$15.000
|
$9.000
|
$6.010
|
$10.000
|
$20.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
1,124.000
|
$15.000
|
$16.000
|
$45.000
|
$25.000
|
$20.000
|
|
|
BACKFILL (TY A OR B)
|
STA
|
10.410
|
$180.000
|
$340.000
|
$150.000
|
$400.000
|
$450.000
|
|
|
BLADING
|
HR
|
40.000
|
$150.000
|
$144.000
|
$100.000
|
$200.000
|
$200.000
|
|
|
CELL FBR MLCH SEED(PERM)(RURAL)(CLAY)
|
SY
|
1,652.000
|
$0.400
|
$1.030
|
$2.200
|
$2.000
|
$2.000
|
|
|
CELL FBR MLCH SEED(TEMP)(WARM)
|
SY
|
2,342.000
|
$0.400
|
$1.030
|
$1.370
|
$2.000
|
$2.000
|
|
|
VEGETATIVE WATERING
|
MG
|
13.800
|
$15.000
|
$70.000
|
$75.000
|
$10.000
|
$250.000
|
|
|
LIME TRT (SUBGRADE)(6")
|
SY
|
1,804.000
|
$5.000
|
$14.000
|
$9.000
|
$12.000
|
$15.000
|
|
|
PRIME COAT & BLOTTER (AE-P)
|
GAL
|
410.000
|
$6.000
|
$7.100
|
$6.000
|
$8.000
|
$10.000
|
|
|
D-GR HMA(SQ) TY-B PG64-22
|
TON
|
378.000
|
$100.000
|
$107.000
|
$150.000
|
$90.000
|
$100.000
|
|
|
D-GR HMA(SQ) TY-D PG64-22
|
TON
|
73.000
|
$100.000
|
$130.000
|
$220.000
|
$100.000
|
$140.000
|
|
|
CONC PVMT (CONT REINF - CRCP) (9")
|
SY
|
1,848.000
|
$80.000
|
$78.000
|
$115.000
|
$160.000
|
$85.000
|
|
|
CONC PVMT (CONT REINF)(FAST TRK)(14")
|
SY
|
1,288.000
|
$115.000
|
$119.000
|
$138.000
|
$165.000
|
$165.000
|
|
|
RIPRAP (STONE COMMON)(DRY)(6 IN)
|
CY
|
456.000
|
$180.000
|
$87.000
|
$175.000
|
$200.000
|
$185.000
|
|
|
BEDDING MATERIAL (3 IN)
|
CY
|
191.000
|
$82.000
|
$130.000
|
$20.000
|
$250.000
|
$80.000
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
226.000
|
$85.000
|
$98.000
|
$80.000
|
$75.000
|
$18.000
|
|
|
JCTBOX(COMPL)(PJB)(4FTX4FT)
|
EA
|
2.000
|
$3,900.000
|
$7,050.000
|
$5,000.000
|
$6,000.000
|
$6,500.000
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
1.000
|
$1,605.000
|
$1,510.000
|
$1,500.000
|
$900.000
|
$1,850.000
|
|
|
ADJUSTING MANHOLES & INLETS
|
EA
|
2.000
|
$1,000.000
|
$3,525.000
|
$1,000.000
|
$1,500.000
|
$2,500.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$100,000.000
|
$96,500.000
|
$140,000.000
|
$60,000.000
|
$170,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
5.000
|
$5,000.000
|
$1,800.000
|
$30,000.000
|
$8,500.000
|
$8,500.000
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
210.000
|
$4.500
|
$5.050
|
$11.600
|
$9.000
|
$18.000
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
210.000
|
$1.300
|
$1.030
|
$4.990
|
$2.000
|
$9.000
|
|
|
CONSTRUCTING DETOURS
|
SY
|
200.000
|
$80.000
|
$90.000
|
$50.000
|
$80.000
|
$45.000
|
|
|
PORT CTB (FUR & INST)(LOW PROF)(TY 1)
|
LF
|
580.000
|
$30.000
|
$71.000
|
$50.000
|
$95.000
|
$85.000
|
|
|
PORT CTB (FUR & INST)(LOW PROF)(TY 2)
|
LF
|
60.000
|
$30.000
|
$77.000
|
$55.000
|
$105.000
|
$85.000
|
|
|
PORT CTB (MOVE)(LOW PROF)(TY 1)
|
LF
|
580.000
|
$10.000
|
$8.000
|
$10.000
|
$9.000
|
$20.000
|
|
|
PORT CTB (MOVE)(LOW PROF)(TY 2)
|
LF
|
60.000
|
$10.000
|
$15.000
|
$10.000
|
$9.000
|
$20.000
|
|
|
PORT CTB (REMOVE)(LOW PROF)(TY 1)
|
LF
|
580.000
|
$10.000
|
$17.000
|
$11.000
|
$15.000
|
$20.000
|
|
|
PORT CTB (REMOVE)(LOW PROF)(TY 2)
|
LF
|
60.000
|
$10.000
|
$19.000
|
$11.000
|
$15.000
|
$20.000
|
|
|
COLORED TEXTURED CONC (6")
|
SY
|
2,312.000
|
$95.000
|
$106.000
|
$115.000
|
$90.000
|
$115.000
|
|
|
CONC CURB (TY I)
|
LF
|
1,041.000
|
$20.000
|
$21.500
|
$8.000
|
$35.000
|
$35.000
|
|
|
CONC CURB (TY II)
|
LF
|
1,769.000
|
$20.000
|
$21.500
|
$11.000
|
$50.000
|
$35.000
|
|
|
CURB RAMPS (TY 1)
|
EA
|
4.000
|
$2,000.000
|
$1,390.000
|
$1,400.000
|
$2,000.000
|
$2,500.000
|
|
|
CURB RAMPS (TY 21)
|
SY
|
2.000
|
$2,500.000
|
$2,325.000
|
$2,000.000
|
$3,000.000
|
$2,850.000
|
|
|
CONC DIRECTIONAL ISLAND
|
SY
|
231.000
|
$50.000
|
$104.000
|
$70.000
|
$120.000
|
$125.000
|
|
|
REMOVE RD IL ASM (U/P)
|
EA
|
8.000
|
$200.000
|
$255.000
|
$159.000
|
$250.000
|
$500.000
|
|
|
IN RD IL (U/P) (TY 1) (150W EQ) LED
|
EA
|
8.000
|
$1,000.000
|
$1,080.000
|
$777.000
|
$1,600.000
|
$6,500.000
|
|
|
CONDT (PVC) (SCH 80) (2")
|
LF
|
585.000
|
$8.000
|
$12.250
|
$15.390
|
$20.000
|
$15.000
|
|
|
CONDT (PVC) (SCH 80) (2") (BORE)
|
LF
|
162.000
|
$20.000
|
$18.250
|
$17.440
|
$60.000
|
$40.000
|
|
|
CONDT (RM) (3/4")
|
LF
|
360.000
|
$18.000
|
$32.500
|
$14.580
|
$38.000
|
$65.000
|
|
|
ELEC CONDR (NO.10) BARE
|
LF
|
360.000
|
$2.000
|
$1.480
|
$1.200
|
$2.200
|
$3.000
|
|
|
ELEC CONDR (NO.10) INSULATED
|
LF
|
720.000
|
$1.000
|
$1.630
|
$1.220
|
$2.800
|
$3.000
|
|
|
ELEC CONDR (NO.8) BARE
|
LF
|
814.000
|
$1.050
|
$1.680
|
$1.210
|
$2.250
|
$3.000
|
|
|
ELEC CONDR (NO.8) INSULATED
|
LF
|
1,628.000
|
$1.300
|
$1.980
|
$1.510
|
$2.300
|
$3.000
|
|
|
GROUND BOX TY A (122311)W/APRON
|
EA
|
10.000
|
$800.000
|
$860.000
|
$631.000
|
$1,300.000
|
$1,120.000
|
|
|
ELC SRV TY A 240/480 060(NS)SS(T)TP(O)
|
EA
|
1.000
|
$7,000.000
|
$6,400.000
|
$4,523.000
|
$10,000.000
|
$8,500.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
14.000
|
$500.000
|
$610.000
|
$500.000
|
$750.000
|
$850.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
12.000
|
$580.000
|
$710.000
|
$620.000
|
$800.000
|
$850.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
|
EA
|
2.000
|
$750.000
|
$730.000
|
$740.000
|
$1,000.000
|
$850.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U-BM)
|
EA
|
4.000
|
$850.000
|
$1,100.000
|
$1,065.000
|
$1,200.000
|
$850.000
|
|
|
IN BRIDGE MNT CLEARANCE SGN ASSM(TY N)
|
EA
|
2.000
|
$1,700.000
|
$1,775.000
|
$2,100.000
|
$3,200.000
|
$1,500.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
14.000
|
$80.000
|
$76.000
|
$60.000
|
$100.000
|
$150.000
|
|
|
INSTL OM ASSM (OM-2Z)(WFLX)GND
|
EA
|
4.000
|
$50.000
|
$77.250
|
$80.000
|
$110.000
|
$100.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
|
LF
|
7,451.000
|
$0.420
|
$0.300
|
$0.290
|
$0.250
|
$1.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)8"(SLD)
|
LF
|
1,775.000
|
$0.420
|
$0.610
|
$0.600
|
$0.700
|
$6.000
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
|
LF
|
7,451.000
|
$0.420
|
$0.300
|
$0.290
|
$0.250
|
$1.000
|
|
REFL PAV MRK TY I (W)8"(DOT)(090MIL)
|
LF
|
35.000
|
$2.500
|
$1.480
|
$1.470
|
$2.200
|
$6.000
|
|
REFL PAV MRK TY I (W)8"(SLD)(090MIL)
|
LF
|
1,775.000
|
$1.000
|
$1.480
|
$1.470
|
$2.000
|
$6.000
|
|
|
PAVEMENT SEALER 4"
|
LF
|
4,042.000
|
$0.240
|
$0.200
|
$0.190
|
$0.200
|
$1.000
|
|
|
PAVEMENT SEALER 8"
|
LF
|
1,775.000
|
$0.300
|
$0.380
|
$0.370
|
$0.400
|
$5.000
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(090MIL)
|
LF
|
1,853.000
|
$0.350
|
$0.750
|
$0.740
|
$0.400
|
$1.000
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(090MIL)
|
LF
|
2,189.000
|
$0.250
|
$0.750
|
$0.740
|
$0.420
|
$1.000
|
|
PREFAB PAV MRK TY C (W) (24") (SLD)
|
LF
|
144.000
|
$14.000
|
$17.100
|
$17.040
|
$20.000
|
$20.000
|
|
PREFAB PAV MRK TY C (W) (ARROW)
|
EA
|
8.000
|
$200.000
|
$269.000
|
$267.450
|
$250.000
|
$250.000
|
|
PREFAB PAV MRK TY C (W) (DBL ARROW)
|
EA
|
3.000
|
$340.000
|
$500.000
|
$498.090
|
$500.000
|
$500.000
|
|
PREFAB PAV MRK TY C (W) (UTURN ARROW)
|
EA
|
2.000
|
$330.000
|
$515.000
|
$510.260
|
$450.000
|
$250.000
|
|
PREFAB PAV MRK TY C (W) (WORD)
|
EA
|
8.000
|
$360.000
|
$385.000
|
$382.910
|
$300.000
|
$250.000
|
|
PREFAB PAV MRK TY C (W) (36")(YLD TRI)
|
EA
|
20.000
|
$32.000
|
$33.000
|
$32.880
|
$40.000
|
$250.000
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
112.000
|
$3.100
|
$2.870
|
$2.840
|
$4.400
|
$5.000
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
13,192.000
|
$0.400
|
$0.560
|
$0.550
|
$0.500
|
$1.000
|
|
|
ELIM EXT PAV MRK & MRKS (8")
|
LF
|
3,130.000
|
$0.600
|
$1.120
|
$1.100
|
$1.000
|
$1.000
|
|
|
TMA (STATIONARY)
|
DAY
|
150.000
|
$240.000
|
$265.000
|
$150.000
|
$150.000
|
$250.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
5.000
|
$220.000
|
$101.000
|
$250.000
|
$300.000
|
$850.000
|
|
Totals: |
$1,163,978.220
|
$1,241,805.440
|
$1,486,172.460
|
$1,602,762.680
|
$1,699,819.500
|