REMOVING CONC (RIPRAP)
|
SY
|
51.000
|
$12.000
|
$150.000
|
$225.000
|
$600.000
|
$10.000
|
|
|
REMOVING CONC (COPING)
|
LF
|
90.000
|
$30.000
|
$150.000
|
$60.000
|
$260.000
|
$10.000
|
|
|
BACKFILL (TY B)
|
STA
|
167.800
|
$150.000
|
$170.000
|
$890.000
|
$350.000
|
$150.000
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(14")
|
SY
|
29,830.000
|
$55.000
|
$98.000
|
$86.680
|
$91.500
|
$150.000
|
|
|
CEM STABIL BKFL
|
CY
|
2,010.000
|
$80.000
|
$70.000
|
$230.000
|
$90.000
|
$220.000
|
|
|
FLOWABLE BACKFILL
|
CY
|
7.000
|
$200.000
|
$1,000.000
|
$300.000
|
$980.000
|
$200.000
|
|
|
TEMPORARY SPL SHORING
|
SF
|
1,847.000
|
$18.000
|
$150.000
|
$60.500
|
$80.000
|
$12.000
|
|
|
CL C CONC (ABUT)(EXTEND)
|
CY
|
117.400
|
$1,800.000
|
$1,000.000
|
$4,510.000
|
$2,500.000
|
$850.000
|
|
|
CL C CONC (COPING)
|
CY
|
11.200
|
$600.000
|
$1,000.000
|
$1,100.000
|
$2,500.000
|
$675.000
|
|
|
CL K CONC (PEDESTAL)
|
EA
|
64.000
|
$1,500.000
|
$2,000.000
|
$1,270.000
|
$3,150.000
|
$800.000
|
|
|
CL S CONC(APPR SLAB)(MOD)
|
CY
|
831.000
|
$1,200.000
|
$1,000.000
|
$920.000
|
$800.000
|
$850.000
|
|
|
PENETRATING CONCRETE SURFACE TREATMENT
|
SY
|
1,365.000
|
$8.000
|
$10.000
|
$41.000
|
$23.000
|
$15.000
|
|
|
CONC STR REPAIR(CLEAN & COAT WTH EPOXY)
|
SF
|
23.000
|
$250.000
|
$1,000.000
|
$200.000
|
$110.000
|
$3,500.000
|
|
|
CONC STR REPAIR (VERTICAL & OVERHEAD)
|
SF
|
77.000
|
$250.000
|
$1,000.000
|
$215.000
|
$165.000
|
$200.000
|
|
|
RIPRAP (CONC)(4 IN)
|
CY
|
8.100
|
$400.000
|
$1,000.000
|
$1,600.000
|
$3,700.000
|
$450.000
|
|
|
ELASTOMERIC BEARING (SPECIAL)
|
EA
|
64.000
|
$2,500.000
|
$1,500.000
|
$1,650.000
|
$4,000.000
|
$1,521.000
|
|
|
MULTI-LAYER POLYMER OVERLAY
|
SY
|
4,484.000
|
$60.000
|
$55.000
|
$38.000
|
$88.000
|
$112.000
|
|
|
CLEAN & PAINT EXIST STR (SYSTEM II)
|
LS
|
1.000
|
$750,000.000
|
$240,000.000
|
$1,604,000.000
|
$481,000.000
|
$3,420,000.000
|
|
|
RETROFIT RAIL (TY T552)
|
LF
|
1,272.000
|
$250.000
|
$350.000
|
$187.000
|
$410.000
|
$420.000
|
|
|
SHOT BLASTING
|
SY
|
4,484.000
|
$10.000
|
$8.000
|
$5.000
|
$7.000
|
$20.000
|
|
|
RAISING EXIST STRUCT
|
LS
|
1.000
|
$225,000.000
|
$240,000.000
|
$300,000.000
|
$250,000.000
|
$10,000.000
|
|
|
REMOV STR (BACKWALL)
|
EA
|
12.000
|
$8,000.000
|
$10,000.000
|
$27,500.000
|
$7,300.000
|
$1,000.000
|
|
|
REMOV STR (APPROACH SLAB)
|
EA
|
12.000
|
$10,000.000
|
$10,000.000
|
$35,000.000
|
$7,300.000
|
$800.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$633,496.440
|
$600,000.000
|
$865,000.000
|
$1,694,000.000
|
$950,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
11.000
|
$5,000.000
|
$5,000.000
|
$8,000.000
|
$105,000.000
|
$3,500.000
|
|
|
PORT CTB (FUR & INST)(SGL SLOPE)(TY 2)
|
LF
|
5,260.000
|
$40.000
|
$75.000
|
$92.000
|
$89.000
|
$75.000
|
|
|
PORT CTB (MOVE)(SGL SLP)(TY 2)
|
LF
|
15,520.000
|
$8.000
|
$5.000
|
$7.000
|
$25.000
|
$25.000
|
|
|
PORT CTB (REMOVE)(SGL SLP)(TY 2)
|
LF
|
5,260.000
|
$12.000
|
$5.000
|
$25.000
|
$32.000
|
$35.000
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
4,975.000
|
$20.000
|
$25.000
|
$22.550
|
$27.000
|
$22.000
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
11.000
|
$1,800.000
|
$2,500.000
|
$1,798.500
|
$2,100.000
|
$2,000.000
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
12.000
|
$1,000.000
|
$2,500.000
|
$1,089.000
|
$1,400.000
|
$1,350.000
|
|
|
MTL BM GD FEN TRANS (NON - SYM)
|
EA
|
12.000
|
$1,100.000
|
$2,500.000
|
$1,257.300
|
$1,300.000
|
$1,000.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
4,975.000
|
$3.000
|
$5.000
|
$2.750
|
$4.000
|
$3.500
|
|
|
REMOVE TERMINAL ANCHOR SECTION
|
EA
|
12.000
|
$225.000
|
$1,000.000
|
$275.000
|
$120.000
|
$300.000
|
|
|
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
|
EA
|
12.000
|
$300.000
|
$1,000.000
|
$275.000
|
$280.000
|
$600.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
11.000
|
$2,300.000
|
$3,500.000
|
$2,530.000
|
$2,500.000
|
$2,500.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
11.000
|
$350.000
|
$2,500.000
|
$275.000
|
$280.000
|
$300.000
|
|
|
CRASH CUSH ATTEN (INSTL)
|
EA
|
3.000
|
$13,000.000
|
$25,000.000
|
$10,000.000
|
$20,000.000
|
$10,500.000
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
5.000
|
$2,000.000
|
$2,500.000
|
$1,800.000
|
$1,600.000
|
$5,000.000
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
3.000
|
$1,000.000
|
$2,500.000
|
$1,000.000
|
$890.000
|
$2,500.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BR)
|
EA
|
31.000
|
$25.000
|
$32.000
|
$29.700
|
$50.000
|
$50.000
|
|
|
INSTL DEL ASSM (D-SY)SZ 1(BRF)GF2(BR)
|
EA
|
31.000
|
$25.000
|
$30.000
|
$29.700
|
$50.000
|
$50.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BR)
|
EA
|
18.000
|
$25.000
|
$42.000
|
$16.500
|
$31.000
|
$50.000
|
|
|
INSTL DEL ASSM (D-SY)SZ (BRF)CTB (BR)
|
EA
|
18.000
|
$25.000
|
$53.000
|
$16.500
|
$33.000
|
$50.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(BRK)
|
LF
|
2,560.000
|
$0.350
|
$0.500
|
$0.220
|
$0.220
|
$1.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
|
LF
|
24,865.000
|
$0.350
|
$0.200
|
$0.210
|
$0.200
|
$1.000
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
|
LF
|
24,865.000
|
$0.350
|
$0.200
|
$0.210
|
$0.200
|
$1.000
|
|
|
PAVEMENT SEALER 4"
|
LF
|
24,886.000
|
$0.350
|
$0.200
|
$0.060
|
$0.060
|
$0.150
|
|
|
REF PROF PAV MRK TY I(W)4"(SLD)(090MIL)
|
LF
|
9,653.000
|
$0.600
|
$0.500
|
$0.830
|
$0.800
|
$1.000
|
|
|
REF PROF PAV MRK TY I(Y)4"(SLD)(090MIL)
|
LF
|
9,653.000
|
$0.600
|
$0.500
|
$0.830
|
$0.800
|
$1.000
|
|
RE PM W/RET REQ TY I (W)4"(BRK)(090MIL)
|
LF
|
5,580.000
|
$0.500
|
$0.500
|
$0.440
|
$0.450
|
$1.000
|
|
PREFAB PAV MRK TY C (W) (8") (SLD)
|
LF
|
2,100.000
|
$4.000
|
$10.000
|
$2.750
|
$2.800
|
$1.000
|
|
PREFAB PAV MRK TY C (W) (24") (SLD)
|
LF
|
170.000
|
$14.000
|
$15.000
|
$13.200
|
$13.000
|
$1.000
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
70.000
|
$4.000
|
$5.000
|
$4.400
|
$4.500
|
$3.500
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
77,176.000
|
$0.500
|
$1.000
|
$0.390
|
$0.370
|
$1.000
|
|
|
ELIM EXT PAV MRK & MRKS (8")
|
LF
|
2,100.000
|
$0.750
|
$1.000
|
$0.830
|
$0.800
|
$1.000
|
|
|
ELIM EXT PAV MRK & MRKS (24")
|
LF
|
170.000
|
$3.000
|
$5.000
|
$2.310
|
$2.200
|
$1.000
|
|
|
PAV SURF PREP FOR MRK (4")
|
LF
|
52,290.000
|
$0.080
|
$0.500
|
$0.020
|
$0.020
|
$1.000
|
|
|
CONC RAIL REPAIR(REMOVE AND REPL RAIL)
|
LF
|
68.000
|
$200.000
|
$1,000.000
|
$765.000
|
$530.000
|
$300.000
|
|
|
BRIDGE JOINT REPLACEMENT (SEJ)
|
LF
|
700.000
|
$500.000
|
$400.000
|
$350.000
|
$500.000
|
$375.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
DAY
|
40.000
|
$100.000
|
$500.000
|
$200.000
|
$120.000
|
$100.000
|
|
|
TMA (STATIONARY)
|
DAY
|
106.000
|
$200.000
|
$500.000
|
$250.000
|
$475.000
|
$200.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
20.000
|
$200.000
|
$500.000
|
$250.000
|
$950.000
|
$400.000
|
|
Totals: |
$7,023,460.840
|
$8,319,407.200
|
$10,337,837.880
|
$11,275,590.080
|
$13,400,758.400
|