REMOVING CONCRETE(MOW STRIP)
|
LF
|
10,037.000
|
$4.000
|
$5.700
|
$9.500
|
$12.000
|
|
|
|
CELL FBR MLCH SEED(PERM)(RURAL)(CLAY)
|
SY
|
321.000
|
$0.300
|
$3.120
|
$5.500
|
$5.000
|
|
|
|
VEGETATIVE WATERING
|
MG
|
2.700
|
$20.000
|
$180.000
|
$45.000
|
$100.000
|
|
|
|
D-GR HMA (SQ) TY-D PG64_22(LEVEL-UP)
|
TON
|
2,796.000
|
$80.000
|
$100.000
|
$110.000
|
$170.000
|
|
|
|
TACK COAT
|
GAL
|
1,736.000
|
$4.000
|
$5.400
|
$3.100
|
$4.000
|
|
|
|
STONE-MTRX-ASPH SMAR-F SAC-A
|
TON
|
18,070.000
|
$100.000
|
$0.000
|
$0.000
|
$0.000
|
|
|
|
TACK COAT
|
GAL
|
23,340.000
|
$4.000
|
$3.800
|
$3.150
|
$4.000
|
|
|
|
PLANE ASPH CONC PAV(0" TO 3")
|
SY
|
200,630.000
|
$1.500
|
$2.150
|
$2.230
|
$2.000
|
|
|
|
FULL - DEPTH REPAIR CRCP (8")
|
SY
|
500.000
|
$250.000
|
$400.000
|
$497.000
|
$135.000
|
|
|
|
FULL - DEPTH REPAIR CPJR (10")
|
SY
|
500.000
|
$250.000
|
$500.000
|
$610.000
|
$150.000
|
|
|
|
CL C CONC (RAIL FOUNDATION)
|
CY
|
96.000
|
$400.000
|
$650.000
|
$795.000
|
$650.000
|
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
323.000
|
$400.000
|
$590.000
|
$640.000
|
$700.000
|
|
|
|
CLEANING AND SEALING JOINTS
|
LF
|
3,581.000
|
$15.000
|
$13.500
|
$25.000
|
$37.000
|
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$500,000.000
|
$247,000.000
|
$600,000.000
|
$700,000.000
|
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
12.000
|
$2,500.000
|
$1,200.000
|
$900.000
|
$20,000.000
|
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (18")
|
LF
|
1,000.000
|
$5.000
|
$5.700
|
$6.800
|
$6.000
|
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
1,000.000
|
$1.000
|
$1.040
|
$1.100
|
$1.000
|
|
|
|
PERM CTB (SGL SLOPE) (TY 1) (42 )
|
LF
|
25,380.000
|
$50.000
|
$86.000
|
$86.000
|
$50.000
|
|
|
|
PERM CTB (SGL SLOPE)(TY 1)(TRANSITION)
|
LF
|
577.000
|
$200.000
|
$150.000
|
$210.000
|
$80.000
|
|
|
|
RUMBLE STRIPS (SHOULDER)
|
LF
|
73,233.000
|
$0.200
|
$0.270
|
$0.320
|
$0.280
|
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
5,000.000
|
$20.000
|
$24.000
|
$25.000
|
$21.000
|
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
9.000
|
$1,800.000
|
$1,350.000
|
$1,725.000
|
$1,510.000
|
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
24.000
|
$1,200.000
|
$1,050.000
|
$1,490.000
|
$1,100.000
|
|
|
|
MTL BM GD FEN TRANS (NON - SYM)
|
EA
|
9.000
|
$800.000
|
$710.000
|
$910.000
|
$900.000
|
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
6,650.000
|
$2.500
|
$3.100
|
$4.250
|
$2.000
|
|
|
|
REMOVE TERMINAL ANCHOR SECTION
|
EA
|
32.000
|
$250.000
|
$205.000
|
$142.000
|
$180.000
|
|
|
|
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
|
EA
|
18.000
|
$250.000
|
$305.000
|
$285.000
|
$210.000
|
|
|
|
REMOVE CABLE BARRIER
|
LF
|
23,683.000
|
$2.500
|
$7.900
|
$3.200
|
$2.000
|
|
|
|
REMOVE CABLE BARRIER TERMINAL SECTION
|
EA
|
18.000
|
$500.000
|
$380.000
|
$510.000
|
$400.000
|
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
25.000
|
$2,500.000
|
$2,400.000
|
$2,810.000
|
$300.000
|
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
33.000
|
$250.000
|
$375.000
|
$284.000
|
$400.000
|
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)GF1
|
EA
|
47.000
|
$30.000
|
$15.100
|
$17.000
|
$30.000
|
|
|
|
INSTL DEL ASSM (D-SY)SZ (BRF)GF1
|
EA
|
30.000
|
$30.000
|
$15.100
|
$17.000
|
$30.000
|
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
|
EA
|
25.000
|
$30.000
|
$28.000
|
$36.000
|
$31.000
|
|
|
|
INSTL DEL ASSM (D-SY)SZ 1(BRF)GF2
|
EA
|
22.000
|
$30.000
|
$28.000
|
$36.000
|
$31.000
|
|
|
|
INSTL DEL ASSM (D-DY)SZ 1(BRF)GF2
|
EA
|
8.000
|
$30.000
|
$28.000
|
$45.000
|
$31.000
|
|
|
|
WK ZN PAV MRK SHT TERM (TAB)TY W
|
EA
|
4,170.000
|
$1.000
|
$1.550
|
$1.000
|
$1.500
|
|
|
|
REFL PAV MRK TY I (W)4"(DOT)(090MIL)
|
LF
|
456.000
|
$1.000
|
$1.040
|
$1.150
|
$1.000
|
|
|
|
REFL PAV MRK TY I (W)8"(SLD)(090MIL)
|
LF
|
10,433.000
|
$0.800
|
$0.700
|
$1.000
|
$1.000
|
|
|
|
REFL PAV MRK TY I (W)12"(LNDP)(090MIL)
|
LF
|
450.000
|
$2.000
|
$2.050
|
$3.400
|
$2.000
|
|
|
|
REFL PAV MRK TY I (W)12"(SLD)(090MIL)
|
LF
|
829.000
|
$2.000
|
$1.550
|
$2.900
|
$1.500
|
|
|
|
PAVEMENT SEALER 4"
|
LF
|
14,559.000
|
$0.200
|
$0.210
|
$0.300
|
$0.250
|
|
|
|
RE PM W/RET REQ TY I (W)4"(BRK)(090MIL)
|
LF
|
1,390.000
|
$0.350
|
$0.380
|
$0.600
|
$0.400
|
|
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(090MIL)
|
LF
|
56,311.000
|
$0.300
|
$0.380
|
$0.480
|
$0.400
|
|
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(090MIL)
|
LF
|
55,582.000
|
$0.300
|
$0.380
|
$0.480
|
$0.400
|
|
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
1,660.000
|
$3.500
|
$4.050
|
$3.900
|
$4.000
|
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
14,559.000
|
$0.500
|
$0.660
|
$0.500
|
$0.750
|
|
|
|
PAV SURF PREP FOR MRK (4")
|
LF
|
14,559.000
|
$0.500
|
$0.020
|
$0.060
|
$0.030
|
|
|
|
TMA (STATIONARY)
|
DAY
|
180.000
|
$250.000
|
$380.000
|
$250.000
|
$250.000
|
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
40.000
|
$250.000
|
$208.000
|
$125.000
|
$250.000
|
|
1
|
|
STONE-MTRX-ASPH SMA-D SAC-A PG76-22
|
TON
|
18,070.000
|
$100.000
|
$106.000
|
$141.100
|
$200.000
|
|
Totals: |
$7,137,697.000
|
$6,712,910.470
|
$7,885,791.540
|
$7,955,812.710
|