|
|
REMOVING CONC (CURB)
|
LF
|
300.000
|
$15.000
|
$4.000
|
$18.000
|
|
|
BACKFILL (TY A OR B)
|
STA
|
79.000
|
$500.000
|
$225.000
|
$550.000
|
|
|
ASPH (AC-20-5TR)
|
GAL
|
27,091.000
|
$5.000
|
$7.500
|
$8.000
|
|
|
AGGR (TY-PB GR-4 OR TY-PL GR-4 SAC-A)
|
CY
|
394.000
|
$180.000
|
$215.000
|
$600.000
|
|
|
PLANE ASPH CONC PAV(0" TO 2")
|
SY
|
42,151.000
|
$3.500
|
$3.000
|
$3.300
|
|
|
PLANE CONC PAV(0" TO 1-1/2")
|
SY
|
4,079.000
|
$7.000
|
$5.750
|
$7.500
|
|
|
FULL - DEPTH REPAIR CPJR (9")
|
SY
|
600.000
|
$340.000
|
$450.000
|
$700.000
|
|
|
CLEANING AND SEALING EXISTING JOINTS
|
LF
|
83,736.000
|
$5.000
|
$4.100
|
$2.500
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$969,337.940
|
$655,000.000
|
$470,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
6.000
|
$6,000.000
|
$52,000.000
|
$7,000.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
120.000
|
$2.250
|
$0.500
|
$4.700
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
500.000
|
$6.000
|
$5.000
|
$8.500
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
500.000
|
$1.500
|
$1.000
|
$3.500
|
|
|
TEMP SDMT CONT FENCE (INLET PROTECTION)
|
LF
|
120.000
|
$10.000
|
$15.000
|
$13.000
|
|
|
CONC CURB (TY II)
|
LF
|
300.000
|
$22.500
|
$32.000
|
$22.000
|
|
|
DRIVEWAYS (ACP)
|
SY
|
388.000
|
$140.000
|
$55.000
|
$100.000
|
|
|
DRIVEWAYS (BASE)
|
SY
|
1,071.000
|
$53.000
|
$35.000
|
$35.000
|
|
|
GUARDRAIL END TRTMNT(RETRO)(STEEL POST)
|
EA
|
2.000
|
$3,000.000
|
$4,335.000
|
$4,600.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
78.000
|
$550.000
|
$500.000
|
$750.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
7.000
|
$740.000
|
$550.000
|
$900.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
|
EA
|
7.000
|
$590.000
|
$715.000
|
$1,200.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
92.000
|
$45.000
|
$50.000
|
$175.000
|
|
|
INSTL OM ASSM (OM-2Z)(WFLX)GND
|
EA
|
10.000
|
$48.000
|
$85.000
|
$290.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)6"(BRK)
|
LF
|
7,800.000
|
$0.400
|
$0.500
|
$0.580
|
|
|
WK ZN PAV MRK NON-REMOV (W)6"(SLD)
|
LF
|
17,000.000
|
$0.650
|
$0.490
|
$0.600
|
|
|
WK ZN PAV MRK NON-REMOV (W)8"(SLD)
|
LF
|
2,336.000
|
$1.000
|
$0.800
|
$0.950
|
|
|
WK ZN PAV MRK NON-REMOV (W)24"(SLD)
|
LF
|
633.000
|
$4.000
|
$8.000
|
$4.850
|
|
|
WK ZN PAV MRK NON-REMOV (W)(ARROW)
|
EA
|
21.000
|
$92.000
|
$150.000
|
$120.000
|
|
|
WK ZN PAV MRK NON-REMOV (Y)6"(BRK)
|
LF
|
1,050.000
|
$0.300
|
$0.500
|
$0.750
|
|
|
WK ZN PAV MRK NON-REMOV (Y)6"(SLD)
|
LF
|
12,800.000
|
$0.350
|
$0.490
|
$0.750
|
|
WK ZN PAV MRK SHT TERM (TAB)TY W
|
EA
|
2,006.000
|
$3.000
|
$0.500
|
$5.810
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
328.000
|
$0.400
|
$0.500
|
$6.000
|
|
REFL PAV MRK TY I (W)8"(SLD)(090MIL)
|
LF
|
2,336.000
|
$1.500
|
$1.200
|
$1.700
|
|
RE PM W/RET REQ TY I (W)6"(BRK)(090MIL)
|
LF
|
7,800.000
|
$1.250
|
$0.700
|
$1.200
|
|
RE PM W/RET REQ TY I (W)6"(SLD)(090MIL)
|
LF
|
17,000.000
|
$1.000
|
$0.670
|
$1.200
|
|
RE PM W/RET REQ TY I (Y)6"(BRK)(090MIL)
|
LF
|
1,050.000
|
$1.000
|
$0.700
|
$1.100
|
|
RE PM W/RET REQ TY I (Y)6"(SLD)(090MIL)
|
LF
|
12,800.000
|
$1.000
|
$0.670
|
$1.900
|
|
PREFAB PAV MRK TY C (W) (24") (SLD)
|
LF
|
663.000
|
$15.000
|
$17.500
|
$20.000
|
|
PREFAB PAV MRK TY C (W) (ARROW)
|
EA
|
21.000
|
$210.000
|
$270.000
|
$330.000
|
|
PREFAB PAV MRK TY C (W) (WORD)
|
EA
|
5.000
|
$300.000
|
$400.000
|
$470.000
|
|
PREFAB PAV MRK TY C (W) (36")(YLD TRI)
|
EA
|
39.000
|
$56.000
|
$65.000
|
$76.000
|
|
PREFAB PAV MRK TY C (Y) (24") (SLD)
|
LF
|
252.000
|
$14.500
|
$18.000
|
$21.000
|
|
REFL PAV MRKR TY I-C
|
EA
|
52.000
|
$7.500
|
$6.000
|
$5.750
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
240.000
|
$4.150
|
$6.000
|
$5.750
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
288.000
|
$7.000
|
$6.000
|
$7.000
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
1,950.000
|
$1.100
|
$0.500
|
$1.000
|
|
|
PAV SURF PREP FOR MRK (6")
|
LF
|
1,950.000
|
$1.000
|
$0.350
|
$0.900
|
|
|
SPALLING REPAIR (HYDRAULIC CEMENT)
|
CF
|
960.000
|
$190.000
|
$140.000
|
$295.000
|
|
|
SPALLING REPAIR (POLYMERIC) (SEMIRIGID)
|
GAL
|
7,181.000
|
$87.000
|
$60.000
|
$80.000
|
|
|
CONTINUOUS DIAMOND GRINDING CONC PVMT
|
SY
|
28,932.000
|
$10.000
|
$20.000
|
$17.000
|
|
|
DOWEL BAR RETROFIT
|
EA
|
5,616.000
|
$95.000
|
$95.000
|
$175.000
|
|
|
TOM-C PG76-22 SAC-A
|
TON
|
6,327.000
|
$260.000
|
$365.000
|
$330.000
|
|
|
TACK COAT
|
GAL
|
11,199.000
|
$10.000
|
$15.000
|
$12.000
|
|
|
SOIL DENS.AND RAISING CONC.SLABS(HDPF)
|
LB
|
2,754.000
|
$10.000
|
$6.000
|
$7.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$9,800.000
|
$24,000.000
|
$10,000.000
|
|
|
TMA (STATIONARY)
|
DAY
|
75.000
|
$115.000
|
$275.000
|
$450.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
15.000
|
$360.000
|
$300.000
|
$200.000
|
|
|
SOLAR POWERED LED ROADSIDE SIGN
|
EA
|
12.000
|
$5,000.000
|
$4,000.000
|
$4,700.000
|
|
Totals: |
$5,853,727.640
|
$6,555,483.350
|
$6,836,413.610
|