REMOVING CONC (PAV)
|
CY
|
265.000
|
$15.000
|
$22.000
|
$59.000
|
$2.500
|
$35.000
|
$22.000
|
$22.500
|
|
|
REMOVING CONC (RIPRAP)
|
SY
|
100.000
|
$5.000
|
$29.740
|
$41.000
|
$1,550.000
|
$8.000
|
$22.000
|
$10.000
|
|
|
REMOVING STAB BASE AND ASPH PAV(4"-16")
|
SY
|
1,680.000
|
$12.000
|
$7.000
|
$6.000
|
$7.500
|
$5.000
|
$12.000
|
$8.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
154.000
|
$12.000
|
$47.460
|
$25.000
|
$18.000
|
$85.000
|
$25.000
|
$40.000
|
|
|
EMBANKMENT (FINAL)(ORD COMP)(TY C)
|
CY
|
410.000
|
$16.000
|
$19.060
|
$40.000
|
$56.000
|
$12.000
|
$25.000
|
$20.000
|
|
|
BROADCAST SEED (TEMP) (WARM)
|
SY
|
1,112.000
|
$0.240
|
$1.260
|
$0.710
|
$0.170
|
$1.430
|
$1.000
|
$1.120
|
|
|
BROADCAST SEED (TEMP) (COOL)
|
SY
|
1,112.000
|
$0.240
|
$1.260
|
$0.710
|
$0.110
|
$1.430
|
$1.000
|
$1.120
|
|
|
CELL FBR MLCH SEED(PERM)(URBAN)(CLAY)
|
SY
|
2,224.000
|
$0.370
|
$2.000
|
$0.710
|
$0.330
|
$1.570
|
$2.650
|
$2.010
|
|
|
VEGETATIVE WATERING
|
MG
|
18.700
|
$15.000
|
$100.000
|
$70.000
|
$13.000
|
$20.000
|
$25.000
|
$40.000
|
|
|
FL BS (CMP IN PLC)(TYD GR1-2)(FNAL POS)
|
CY
|
235.000
|
$36.000
|
$91.000
|
$81.000
|
$90.000
|
$95.000
|
$87.000
|
$125.000
|
|
|
CEM TRT(PLNT MX) (CL L)(TYA)(GR1-2)(6")
|
SY
|
1,408.000
|
$8.000
|
$16.000
|
$19.000
|
$16.000
|
$20.000
|
$46.000
|
$20.000
|
|
|
PRIME COAT (AE-P)
|
GAL
|
259.000
|
$10.000
|
$63.160
|
$6.250
|
$5.550
|
$10.000
|
$18.000
|
$5.000
|
|
|
D-GR HMA(SQ) TY-D PG64-22
|
TON
|
77.400
|
$125.000
|
$430.000
|
$150.000
|
$125.000
|
$200.000
|
$295.000
|
$200.000
|
|
|
TACK COAT
|
GAL
|
84.000
|
$5.000
|
$8.720
|
$8.000
|
$6.000
|
$10.000
|
$12.000
|
$5.000
|
|
|
CONC PVMT (CONT REINF - CRCP) (9")
|
SY
|
1,289.000
|
$36.000
|
$83.890
|
$68.000
|
$79.000
|
$65.000
|
$97.000
|
$95.000
|
|
|
CEM STABIL BKFL
|
CY
|
343.000
|
$85.000
|
$70.000
|
$50.000
|
$44.000
|
$65.000
|
$365.000
|
$135.000
|
|
|
FLOWABLE BACKFILL
|
CY
|
20.000
|
$150.000
|
$100.000
|
$175.000
|
$3,000.000
|
$150.000
|
$365.000
|
$375.000
|
|
|
DRILL SHAFT (48 IN)
|
LF
|
1,600.000
|
$425.000
|
$607.000
|
$459.000
|
$445.000
|
$480.000
|
$515.000
|
$725.000
|
|
|
CL C CONC (ABUT)
|
CY
|
117.200
|
$1,400.000
|
$400.000
|
$1,055.000
|
$630.000
|
$600.000
|
$1,225.000
|
$1,200.000
|
|
|
CL C CONC (BENT)
|
CY
|
96.200
|
$1,600.000
|
$600.000
|
$1,219.000
|
$620.000
|
$775.000
|
$1,465.000
|
$1,200.000
|
|
|
REINF CONC SLAB
|
SF
|
12,258.000
|
$20.000
|
$20.000
|
$25.000
|
$17.000
|
$17.400
|
$18.950
|
$27.500
|
|
|
APPROACH SLAB
|
CY
|
140.000
|
$350.000
|
$350.000
|
$425.000
|
$586.000
|
$495.000
|
$660.000
|
$550.000
|
|
|
PRESTR CONC GIRDER (TX28)
|
LF
|
1,911.000
|
$155.000
|
$144.000
|
$133.000
|
$148.000
|
$130.000
|
$210.000
|
$225.000
|
|
|
RIPRAP (CONC)(CL B)(5 IN)
|
CY
|
20.000
|
$370.000
|
$568.000
|
$861.000
|
$3,000.000
|
$465.000
|
$600.000
|
$600.000
|
|
|
RIPRAP (STONE PROTECTION)(18 IN)
|
CY
|
351.000
|
$140.000
|
$143.000
|
$178.000
|
$200.000
|
$125.000
|
$167.000
|
$55.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
12.000
|
$438.000
|
$300.000
|
$616.000
|
$720.000
|
$480.000
|
$525.000
|
$650.000
|
|
|
STR STEEL (MISC NON - BRIDGE)
|
LB
|
250.000
|
$75.000
|
$31.960
|
$29.000
|
$18.000
|
$16.500
|
$35.000
|
$20.000
|
|
|
RAIL (TY T223)
|
LF
|
500.000
|
$140.000
|
$71.000
|
$125.000
|
$88.000
|
$85.000
|
$135.000
|
$150.000
|
|
|
RAIL (TY PR11)
|
LF
|
262.400
|
$90.000
|
$154.000
|
$110.000
|
$73.000
|
$70.000
|
$165.000
|
$155.000
|
|
|
SEALED EXPANSION JOINT (4 IN) (SEJ - M)
|
LF
|
121.000
|
$110.000
|
$66.000
|
$151.000
|
$100.000
|
$115.000
|
$105.000
|
$165.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
40.000
|
$77.000
|
$107.000
|
$107.000
|
$110.000
|
$100.000
|
$85.000
|
$145.000
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
2.000
|
$1,200.000
|
$2,847.000
|
$3,500.000
|
$1,300.000
|
$1,650.000
|
$1,600.000
|
$1,725.000
|
|
|
REMOV STR (SET)
|
EA
|
2.000
|
$350.000
|
$390.000
|
$300.000
|
$980.000
|
$450.000
|
$500.000
|
$500.000
|
|
|
REMOV STR (PIPE)
|
LF
|
40.000
|
$14.000
|
$63.000
|
$30.000
|
$30.000
|
$13.000
|
$10.000
|
$35.000
|
|
|
REMOV STR (BRIDGE 100 - 499 FT LENGTH)
|
EA
|
1.000
|
$70,000.000
|
$100,000.000
|
$120,000.000
|
$200,000.000
|
$744,000.000
|
$245,000.000
|
$365,000.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$220,000.000
|
$250,000.000
|
$266,400.000
|
$280,000.000
|
$300,000.000
|
$300,000.000
|
$190,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
9.000
|
$4,000.000
|
$800.000
|
$2,000.000
|
$10,000.000
|
$2,500.000
|
$2,600.000
|
$15,000.000
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
75.000
|
$32.000
|
$18.000
|
$190.000
|
$22.000
|
$83.760
|
$45.000
|
$66.750
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
75.000
|
$10.000
|
$10.000
|
$98.000
|
$7.000
|
$14.980
|
$12.000
|
$11.940
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
306.000
|
$2.750
|
$3.000
|
$3.100
|
$10.000
|
$4.920
|
$3.000
|
$3.920
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
306.000
|
$1.000
|
$1.000
|
$1.260
|
$1.000
|
$1.310
|
$1.000
|
$1.040
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (8")
|
LF
|
91.000
|
$7.750
|
$11.000
|
$5.100
|
$5.000
|
$4.590
|
$9.000
|
$3.660
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
91.000
|
$2.000
|
$1.000
|
$1.020
|
$1.000
|
$1.310
|
$4.000
|
$1.040
|
|
|
DRIVEWAYS (ACP)
|
SY
|
343.000
|
$35.000
|
$35.000
|
$49.000
|
$65.000
|
$25.000
|
$65.000
|
$138.970
|
|
|
CONC SIDEWALKS (4")
|
SY
|
249.000
|
$100.000
|
$60.000
|
$47.000
|
$52.000
|
$50.000
|
$18.000
|
$113.810
|
|
|
MTL W-BEAM GD FEN (STEEL POST)
|
LF
|
150.000
|
$27.000
|
$20.000
|
$32.500
|
$50.000
|
$30.000
|
$26.000
|
$30.000
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
2.000
|
$1,750.000
|
$2,072.000
|
$1,800.000
|
$1,800.000
|
$2,000.000
|
$1,600.000
|
$2,000.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
150.000
|
$3.000
|
$8.000
|
$2.550
|
$1.250
|
$5.000
|
$2.000
|
$20.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
2.000
|
$2,750.000
|
$2,971.000
|
$2,450.000
|
$2,300.000
|
$2,800.000
|
$2,600.000
|
$2,800.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
4.000
|
$410.000
|
$195.000
|
$252.000
|
$214.000
|
$250.000
|
$300.000
|
$250.000
|
|
|
CRASH CUSH ATTEN (INSTL)(R)(N)(TL3)
|
EA
|
2.000
|
$15,000.000
|
$28,000.000
|
$23,900.000
|
$24,000.000
|
$14,651.070
|
$10,875.000
|
$27,900.000
|
|
|
MAILBOX INSTALL-S (TWW-POST) TY 4
|
EA
|
1.000
|
$305.000
|
$300.000
|
$280.500
|
$445.000
|
$170.000
|
$600.000
|
$700.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)GF1 (BI)
|
EA
|
6.000
|
$22.000
|
$5.000
|
$15.250
|
$27.000
|
$13.000
|
$45.000
|
$28.000
|
|
|
INSTL OM ASSM (OM-2Z)(FLX)GND
|
EA
|
10.000
|
$65.000
|
$22.000
|
$54.500
|
$70.000
|
$29.000
|
$45.000
|
$65.000
|
|
REFL PAV MRK TY I (W)8"(DOT)(090MIL)
|
LF
|
119.000
|
$1.600
|
$2.530
|
$2.120
|
$2.100
|
$1.850
|
$2.000
|
$1.850
|
|
REFL PAV MRK TY I (W)8"(SLD)(090MIL)
|
LF
|
202.000
|
$1.000
|
$2.530
|
$2.030
|
$2.100
|
$1.500
|
$2.000
|
$1.500
|
|
REFL PAV MRK TY I (W)24"(SLD)(090MIL)
|
LF
|
26.000
|
$6.000
|
$11.370
|
$12.500
|
$9.500
|
$5.500
|
$6.000
|
$5.500
|
|
|
PAVEMENT SEALER 4"
|
LF
|
2,605.000
|
$0.200
|
$1.010
|
$0.260
|
$0.850
|
$0.150
|
$1.000
|
$0.150
|
|
|
PAVEMENT SEALER 8"
|
LF
|
321.000
|
$0.500
|
$1.010
|
$0.510
|
$0.850
|
$0.300
|
$2.000
|
$0.300
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(090MIL)
|
LF
|
1,243.000
|
$0.450
|
$1.890
|
$1.020
|
$1.600
|
$0.450
|
$2.000
|
$0.450
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(090MIL)
|
LF
|
1,362.000
|
$0.250
|
$1.890
|
$1.020
|
$1.600
|
$0.450
|
$2.000
|
$0.450
|
|
PREFAB PAV MRK TY B (W)(ARROW)
|
EA
|
2.000
|
$500.000
|
$600.000
|
$628.000
|
$505.000
|
$220.000
|
$150.000
|
$220.000
|
|
PREFAB PAV MRK TY B (W)(WORD)
|
EA
|
2.000
|
$480.000
|
$631.000
|
$798.000
|
$530.000
|
$300.000
|
$150.000
|
$300.000
|
|
REFL PAV MRKR TY I-C
|
EA
|
10.000
|
$4.000
|
$5.050
|
$4.050
|
$4.250
|
$3.500
|
$10.000
|
$3.500
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
38.000
|
$3.150
|
$5.050
|
$4.050
|
$4.250
|
$3.500
|
$10.000
|
$3.500
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
369.000
|
$0.300
|
$1.260
|
$1.010
|
$1.100
|
$0.400
|
$1.000
|
$0.400
|
|
|
ELIM EXT PAV MRK & MRKS (8")
|
LF
|
104.000
|
$0.600
|
$2.150
|
$2.010
|
$1.800
|
$0.800
|
$2.000
|
$0.800
|
|
|
ELIM EXT PAV MRK & MRKS (24")
|
LF
|
26.000
|
$3.000
|
$2.530
|
$6.050
|
$2.100
|
$1.500
|
$3.000
|
$1.500
|
|
|
ELIM EXT PAV MRK & MRKS (ARROW)
|
EA
|
1.000
|
$44.000
|
$94.740
|
$45.500
|
$80.000
|
$50.000
|
$50.000
|
$50.000
|
|
|
PAV SURF PREP FOR MRK (4")
|
LF
|
2,605.000
|
$0.050
|
$0.510
|
$0.020
|
$0.500
|
$0.050
|
$1.000
|
$0.050
|
|
|
PAV SURF PREP FOR MRK (8")
|
LF
|
321.000
|
$0.120
|
$0.870
|
$0.060
|
$0.750
|
$0.100
|
$1.000
|
$0.100
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
5.000
|
$9,000.000
|
$16,000.000
|
$11,980.000
|
$13,000.000
|
$7,500.000
|
$15,000.000
|
$20,000.000
|
|
|
TMA (STATIONARY)
|
DAY
|
135.000
|
$175.000
|
$100.000
|
$350.000
|
$200.000
|
$200.000
|
$165.000
|
$250.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
10.000
|
$150.000
|
$300.000
|
$51.000
|
$480.000
|
$100.000
|
$400.000
|
$450.000
|
|
Totals: |
$2,417,380.210
|
$2,659,519.150
|
$2,670,934.950
|
$2,861,291.180
|
$3,025,042.720
|
$3,227,759.200
|
$3,736,539.830
|