|
|
REMOVING CONCRETE(MOW STRIP)
|
LF
|
230.000
|
$2.650
|
$9.150
|
$15.000
|
|
|
REMOVING STAB BASE AND ASPH PAV (0-4")
|
SY
|
350.000
|
$2.850
|
$23.600
|
$2.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
27.000
|
$6.210
|
$51.000
|
$15.000
|
|
|
FURNISHING AND PLACING TOPSOIL (4")
|
SY
|
350.000
|
$0.650
|
$6.000
|
$10.000
|
|
|
BLOCK SODDING
|
SY
|
350.000
|
$4.600
|
$4.100
|
$6.000
|
|
|
VEGETATIVE WATERING
|
MG
|
0.010
|
$20.080
|
$47,500.000
|
$20,000.000
|
|
|
AGGR (TY-PB GR-4 OR TY-PL GR-4 SAC-A)
|
CY
|
810.000
|
$160.000
|
$185.000
|
$200.000
|
|
|
ASPH (AC-20XP, AC-10-2TR, OR AC-20-5TR)
|
GAL
|
37,900.000
|
$2.860
|
$3.400
|
$3.700
|
|
|
STONE-MTRX-ASPH SMA-D SAC-A PG76-22
|
TON
|
11,539.000
|
$114.360
|
$119.000
|
$150.000
|
|
|
PLANE ASPH CONC PAV(1" TO 2")
|
SY
|
1,532.000
|
$1.940
|
$9.500
|
$6.000
|
|
|
PLANE ASPH CONC PAV(2" TO 4 1/2" MICRO)
|
SY
|
103,744.000
|
$1.240
|
$2.480
|
$2.500
|
|
|
FULL - DEPTH REPAIR CPCD (11")
|
SY
|
200.000
|
$63.290
|
$300.000
|
$420.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
20.000
|
$445.110
|
$610.000
|
$800.000
|
|
|
HEADER TYPE EXPANSION JOINT (SPL)
|
CF
|
24.000
|
$330.840
|
$875.000
|
$1,200.000
|
|
|
REMOV STR (PIPE)
|
LF
|
50.000
|
$16.760
|
$53.000
|
$35.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$190,872.230
|
$132,500.000
|
$100,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
6.000
|
$14,459.490
|
$1,300.000
|
$6,000.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
1,580.000
|
$2.370
|
$4.500
|
$3.500
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
1,580.000
|
$0.490
|
$1.300
|
$0.500
|
|
|
RUMBLE STRIPS (SHOULDER)
|
LF
|
29,129.000
|
$0.190
|
$0.170
|
$0.500
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
325.000
|
$20.930
|
$22.750
|
$26.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
225.000
|
$2.830
|
$3.150
|
$5.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
1.000
|
$2,445.710
|
$2,894.000
|
$4,000.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
2.000
|
$397.710
|
$1,560.000
|
$500.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
3.000
|
$75.000
|
$483.000
|
$75.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)GF1
|
EA
|
655.000
|
$25.020
|
$16.000
|
$16.000
|
|
|
INSTL DEL ASSM (D-SY)SZ (BRF)CTB
|
EA
|
355.000
|
$16.540
|
$13.750
|
$15.000
|
|
|
REMOVE DELIN & OBJECT MARKER ASSMS
|
EA
|
3.000
|
$10.090
|
$583.000
|
$70.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(BRK)
|
LF
|
3,695.000
|
$0.300
|
$0.700
|
$0.700
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
|
LF
|
10,898.000
|
$0.300
|
$0.680
|
$0.700
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
|
LF
|
10,867.000
|
$0.300
|
$0.680
|
$0.700
|
|
WK ZN PAV MRK SHT TERM (TAB)TY W
|
EA
|
4,743.000
|
$1.450
|
$1.450
|
$0.700
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y
|
EA
|
1,230.000
|
$1.830
|
$1.600
|
$0.700
|
|
|
WK ZN PAV MRK NON-REMOV (W)12"(DOT)
|
LF
|
1,173.000
|
$0.750
|
$2.080
|
$2.150
|
|
REFL PAV MRK TY I (W)8"(LNDP)(090MIL)
|
LF
|
24,655.000
|
$0.310
|
$0.110
|
$0.120
|
|
REFL PAV MRK TY I (W)8"(SLD)(090MIL)
|
LF
|
1,358.000
|
$0.650
|
$1.000
|
$1.000
|
|
REFL PAV MRK TY I (W)12"(SLD)(090MIL)
|
LF
|
700.000
|
$2.000
|
$2.340
|
$2.700
|
|
RE PM W/RET REQ TY I (W)4"(BRK)(090MIL)
|
LF
|
4,180.000
|
$0.300
|
$0.310
|
$0.350
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(090MIL)
|
LF
|
24,586.000
|
$0.320
|
$0.310
|
$0.350
|
|
REFL PAV MRK TY I (W)12"(DOT)(090MIL)
|
LF
|
564.000
|
$1.000
|
$2.600
|
$2.750
|
|
PREFAB PAV MRK TY C (W) (ARROW)
|
EA
|
1.000
|
$218.390
|
$210.000
|
$220.000
|
|
PREFAB PAV MRK TY C (W) (UTURN ARROW)
|
EA
|
2.000
|
$408.830
|
$378.000
|
$400.000
|
|
PREFAB PAV MRK TY C (W) (NUMBER)
|
EA
|
2.000
|
$250.000
|
$375.000
|
$400.000
|
|
PREFAB PAV MRK TY C (W) (WORD)
|
EA
|
3.000
|
$295.680
|
$315.000
|
$330.000
|
|
PREFAB PAV MRK TY C (W) (SYMBOL)
|
EA
|
4.000
|
$392.780
|
$2,600.000
|
$2,500.000
|
|
REFL PAV MRKR TY I-A
|
EA
|
83.000
|
$3.000
|
$4.150
|
$4.000
|
|
REFL PAV MRKR TY I-C
|
EA
|
90.000
|
$2.940
|
$4.100
|
$4.000
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
406.000
|
$2.550
|
$4.100
|
$4.000
|
|
|
POST AND CABLE FENCE (NEW INSTALLATION)
|
LF
|
200.000
|
$20.480
|
$31.000
|
$35.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
3.000
|
$10,743.340
|
$6,500.000
|
$3,000.000
|
|
|
PREFORMED IN-LANE(TRANS) RUMBLE STRIP
|
LF
|
80.000
|
$2.930
|
$41.000
|
$5.000
|
|
|
TMA (STATIONARY)
|
EA
|
1.000
|
$1,500.000
|
$29,000.000
|
$2,500.000
|
|
|
TMA (MOBILE OPERATION)
|
HR
|
616.000
|
$98.000
|
$100.000
|
$30.000
|
|
Totals: |
$2,185,265.891
|
$2,402,166.150
|
$2,725,093.250
|