PREPARING ROW
|
STA
|
3.000
|
$3,000.000
|
$1,100.000
|
$6,000.000
|
$11,000.000
|
$95,000.000
|
|
|
TREE PROTECTION (INSTALL)
|
EA
|
3.000
|
$185.000
|
$1.100
|
$600.000
|
$385.000
|
$885.000
|
|
|
TREE PROTECTION (REMOVE)
|
EA
|
3.000
|
$25.000
|
$1.100
|
$300.000
|
$165.000
|
$375.000
|
|
|
REMOV CONC (PAV)
|
SY
|
234.000
|
$10.000
|
$34.100
|
$45.000
|
$25.830
|
$30.000
|
|
|
REMOV CONC (DRIVEWAYS)
|
SY
|
2,358.000
|
$30.000
|
$23.690
|
$21.000
|
$28.050
|
$28.000
|
|
|
REMOV CONC (SIDEWALK, RAMP OR SUP)
|
SY
|
358.000
|
$30.000
|
$22.290
|
$21.000
|
$38.500
|
$22.000
|
|
|
REMOV CONC (CURB OR CURB & GUTTER)
|
LF
|
1,971.000
|
$25.000
|
$12.150
|
$14.000
|
$36.890
|
$10.000
|
|
|
REMOV CONC (MISC)
|
SY
|
46.000
|
$30.000
|
$34.700
|
$30.000
|
$86.900
|
$55.000
|
|
|
RMV (2"-6") TRT/UNTRT BASE & ASPH PAV
|
SY
|
29.000
|
$10.000
|
$55.030
|
$14.000
|
$50.080
|
$24.000
|
|
|
FURN & PLACE TOPSOIL (4")
|
SY
|
212.000
|
$8.000
|
$3.760
|
$5.000
|
$9.350
|
$13.000
|
|
|
BLOCK SODDING
|
SY
|
212.000
|
$8.000
|
$11.000
|
$8.000
|
$16.500
|
$15.000
|
|
|
PRESTR CONC PIL (16 IN SQ)
|
LF
|
344.000
|
$160.000
|
$264.000
|
$393.000
|
$174.340
|
$245.000
|
|
|
DRILL SHAFT (30 IN)
|
LF
|
8.000
|
$325.000
|
$255.150
|
$350.000
|
$255.150
|
$183.000
|
|
|
CL A CONC (FLUME)
|
CY
|
0.370
|
$1,500.000
|
$2,202.220
|
$2,000.000
|
$770.000
|
$2,400.000
|
|
|
CL C CONC (ABUT)
|
CY
|
16.800
|
$2,000.000
|
$2,420.000
|
$1,200.000
|
$1,430.000
|
$1,500.000
|
|
|
CL C CONC (ABUT)(EXTEND)
|
CY
|
1.400
|
$5,500.000
|
$3,300.000
|
$3,000.000
|
$2,750.000
|
$5,500.000
|
|
|
REINF CONC SLAB (EXTEND SLAB)
|
SF
|
569.000
|
$50.000
|
$66.000
|
$31.000
|
$40.700
|
$100.000
|
|
|
RIPRAP (CONC)(5 IN)
|
CY
|
44.000
|
$950.000
|
$1,100.000
|
$750.000
|
$770.000
|
$725.000
|
|
|
STR STEEL (MISC NON-BRIDGE)
|
LB
|
115.000
|
$25.000
|
$5.500
|
$185.000
|
$35.200
|
$65.000
|
|
|
RAIL (TY PR11)
|
LF
|
157.200
|
$200.000
|
$161.700
|
$210.000
|
$161.700
|
$150.000
|
|
|
RAIL (HANDRAIL)(TY B)
|
LF
|
160.000
|
$200.000
|
$143.000
|
$210.000
|
$143.000
|
$150.000
|
|
|
RAIL (HANDRAIL)(TY F)
|
LF
|
76.000
|
$200.000
|
$176.000
|
$210.000
|
$176.000
|
$225.000
|
|
|
GRATE
|
EA
|
8.000
|
$5,000.000
|
$2,202.220
|
$5,000.000
|
$2,750.000
|
$2,600.000
|
|
|
ADJUSTING MANHOLES
|
EA
|
43.000
|
$2,000.000
|
$185.580
|
$2,200.000
|
$2,420.000
|
$1,200.000
|
|
|
ADJUSTING INLETS
|
EA
|
1.000
|
$1,400.000
|
$7,980.000
|
$3,500.000
|
$1,872.940
|
$1,275.000
|
|
|
REMOV STR (BRIDGE SLAB)
|
EA
|
1.000
|
$45,000.000
|
$99,000.000
|
$25,000.000
|
$44,000.000
|
$400,000.000
|
|
|
REMOVE STR (RAIL)
|
LF
|
110.000
|
$300.000
|
$110.000
|
$50.000
|
$44.000
|
$75.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$298,437.600
|
$285,610.070
|
$270,000.000
|
$427,346.000
|
$350,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
23.000
|
$5,000.000
|
$2,200.000
|
$5,000.000
|
$11,000.000
|
$7,500.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
DAY
|
337.000
|
$170.000
|
$1.100
|
$100.000
|
$148.500
|
$50.000
|
|
|
TMA (STATIONARY)
|
DAY
|
337.000
|
$300.000
|
$1.100
|
$190.000
|
$361.050
|
$50.000
|
|
|
TEMP SDMT CONT FENCE (INLET PROTECTION)
|
LF
|
167.000
|
$11.000
|
$1.100
|
$11.000
|
$12.100
|
$5.000
|
|
|
CONC CURB (TY II)
|
LF
|
596.000
|
$47.000
|
$49.640
|
$35.000
|
$54.320
|
$17.000
|
|
|
CONC CURB (TY F1)
|
LF
|
119.000
|
$150.000
|
$163.800
|
$325.000
|
$104.500
|
$210.000
|
|
|
DRIVEWAYS (CONC)
|
SY
|
2,358.000
|
$200.000
|
$122.460
|
$165.000
|
$121.000
|
$150.000
|
|
|
CONC SIDEWALKS (4")
|
SY
|
5,236.000
|
$110.000
|
$111.030
|
$110.000
|
$104.500
|
$62.000
|
|
|
CURB RAMPS (TY 1)
|
EA
|
9.000
|
$2,500.000
|
$2,003.070
|
$3,500.000
|
$2,970.000
|
$2,100.000
|
|
|
CURB RAMPS (TY 2)
|
EA
|
1.000
|
$2,600.000
|
$2,003.070
|
$3,500.000
|
$3,190.000
|
$2,500.000
|
|
|
CURB RAMPS (TY 5)
|
EA
|
5.000
|
$3,400.000
|
$2,003.070
|
$3,500.000
|
$2,970.000
|
$2,300.000
|
|
|
CURB RAMPS (TY 6)
|
EA
|
8.000
|
$3,000.000
|
$2,003.070
|
$3,500.000
|
$2,970.000
|
$1,650.000
|
|
|
CURB RAMPS (TY 7)
|
EA
|
25.000
|
$2,900.000
|
$2,003.070
|
$3,500.000
|
$3,300.000
|
$2,500.000
|
|
|
CURB RAMPS (TY 10)
|
EA
|
1.000
|
$2,700.000
|
$2,003.070
|
$3,500.000
|
$3,630.000
|
$3,050.000
|
|
|
CONC SIDEWALKS (SPECIAL)
|
SY
|
13.000
|
$500.000
|
$539.420
|
$350.000
|
$275.000
|
$3,500.000
|
|
|
RELOCATE EXISTING MAILBOX
|
EA
|
1.000
|
$500.000
|
$357.500
|
$350.000
|
$357.500
|
$325.000
|
|
|
RELOCATE RD IL ASM (TRANS-BASE)
|
EA
|
1.000
|
$4,000.000
|
$4,344.150
|
$5,141.000
|
$4,344.150
|
$2,617.000
|
|
|
CONDT (PVC) (SCH 40) (2")
|
LF
|
10.000
|
$26.000
|
$45.820
|
$55.000
|
$45.820
|
$13.850
|
|
|
CONDT (PVC) (SCH 80) (3")
|
LF
|
155.000
|
$20.000
|
$36.230
|
$43.000
|
$36.230
|
$22.650
|
|
|
ELEC CONDR (NO.8) BARE
|
LF
|
155.000
|
$2.000
|
$1.550
|
$2.000
|
$1.550
|
$2.000
|
|
|
ELEC CONDR (NO.6) BARE
|
LF
|
10.000
|
$3.000
|
$1.720
|
$2.000
|
$1.720
|
$2.000
|
|
|
ELEC CONDR (NO.6) INSULATED
|
LF
|
80.000
|
$3.000
|
$2.010
|
$3.000
|
$2.010
|
$2.310
|
|
|
GROUND BOX TY A (122311)W/APRON
|
EA
|
1.000
|
$1,500.000
|
$3,401.170
|
$4,025.000
|
$3,401.170
|
$1,223.000
|
|
|
GROUND BOX TY D (162922)W/APRON
|
EA
|
2.000
|
$1,500.000
|
$2,755.190
|
$3,261.000
|
$2,755.190
|
$1,241.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
4.000
|
$900.000
|
$715.000
|
$800.000
|
$715.000
|
$650.000
|
|
|
RELOCATE SM RD SN SUP&AM TY 10BWG
|
EA
|
12.000
|
$550.000
|
$517.000
|
$550.000
|
$517.000
|
$470.000
|
|
|
REMOVE SM RD SN (FOUNDATION ONLY)
|
EA
|
2.000
|
$130.000
|
$104.500
|
$200.000
|
$104.500
|
$1,115.820
|
|
REFL PAV MRK TY I (W)8"(SLD)(090MIL)
|
LF
|
13.000
|
$2.000
|
$22.000
|
$26.500
|
$22.000
|
$20.000
|
|
RE PM TY II (W) 4" (SLD)
|
LF
|
15.000
|
$2.000
|
$11.000
|
$13.500
|
$11.000
|
$10.000
|
|
RE PM TY II (W) 8" (SLD)
|
LF
|
13.000
|
$2.000
|
$22.000
|
$26.500
|
$22.000
|
$20.000
|
|
RE PM TY II (Y) 4" (SLD)
|
LF
|
13.000
|
$2.000
|
$11.000
|
$13.500
|
$11.000
|
$10.000
|
|
REFL PAV MRK TY I (W)4"(SLD)(090MIL)
|
LF
|
15.000
|
$6.000
|
$11.000
|
$13.500
|
$11.000
|
$10.000
|
|
REFL PAV MRK TY I (Y)4"(SLD)(090MIL)
|
LF
|
13.000
|
$6.000
|
$11.000
|
$13.500
|
$11.000
|
$10.000
|
|
PREFAB PM TY C (W)(24")(SLD)
|
LF
|
2,424.000
|
$20.000
|
$8.970
|
$11.000
|
$8.970
|
$8.150
|
|
|
ELIM EXT PM & MRKS (4")
|
LF
|
97.000
|
$1.000
|
$1.100
|
$1.500
|
$1.100
|
$1.000
|
|
|
ELIM EXT PM & MRKS (8")
|
LF
|
6.000
|
$1.000
|
$2.200
|
$3.000
|
$2.200
|
$2.000
|
|
|
ELIM EXT PM & MRKS (24")
|
LF
|
359.000
|
$7.000
|
$3.300
|
$4.000
|
$3.300
|
$3.000
|
|
|
PAV SURF PREP FOR MRK (4")
|
LF
|
28.000
|
$1.000
|
$1.100
|
$1.500
|
$1.100
|
$1.000
|
|
|
PAV SURF PREP FOR MRK (8")
|
LF
|
13.000
|
$1.000
|
$2.200
|
$3.000
|
$2.200
|
$2.000
|
|
|
PAV SURF PREP FOR MRK (24")
|
LF
|
2,424.000
|
$1.000
|
$1.100
|
$1.500
|
$1.100
|
$1.000
|
|
|
INSTALL HWY TRF SIG (ISOLATED)
|
EA
|
4.000
|
$15,000.000
|
$26,505.270
|
$31,400.000
|
$26,505.270
|
$22,783.000
|
|
|
PED SIG SEC (LED)(COUNTDOWN)
|
EA
|
28.000
|
$730.000
|
$1,063.020
|
$1,258.000
|
$1,063.020
|
$590.000
|
|
|
TRF SIG CBL (TY A)(14 AWG)(5 CONDR)
|
LF
|
3,965.000
|
$3.000
|
$2.880
|
$3.500
|
$2.882
|
$2.200
|
|
|
TRF SIG CBL (TY C)(14 AWG)(2 CONDR)
|
LF
|
3,845.000
|
$3.000
|
$1.400
|
$2.000
|
$1.400
|
$1.800
|
|
|
PED POLE ASSEMBLY
|
EA
|
12.000
|
$2,000.000
|
$2,268.960
|
$2,685.000
|
$2,268.960
|
$3,817.000
|
|
|
PED DETECT PUSH BUTTON (APS)
|
EA
|
28.000
|
$1,000.000
|
$1,268.380
|
$1,525.000
|
$1,268.380
|
$797.000
|
|
|
PED DETECTOR CONTROLLER UNIT
|
EA
|
4.000
|
$3,200.000
|
$4,546.010
|
$5,380.000
|
$4,546.010
|
$3,767.000
|
|
|
SHRUB PLANTING AND REMOVAL
|
EA
|
8.000
|
$200.000
|
$605.000
|
$500.000
|
$82.500
|
$450.000
|
|
|
PREFAB PED STL TRUSS BRG SPAN (155 FT)
|
EA
|
1.000
|
$355,000.000
|
$495,000.000
|
$327,500.000
|
$225,500.000
|
$750,000.000
|
|
Totals: |
$3,021,840.600
|
$2,688,466.621
|
$2,969,542.000
|
$2,999,598.990
|
$3,594,489.290
|