PREPARING ROW
|
STA
|
23.500
|
$1,000.000
|
$15,000.000
|
$60,000.000
|
$33,000.000
|
$42,000.000
|
$100,000.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
10,238.000
|
$10.000
|
$12.000
|
$18.000
|
$14.000
|
$11.000
|
$42.930
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY A)
|
CY
|
4,052.000
|
$20.000
|
$15.000
|
$30.000
|
$22.000
|
$28.000
|
$42.930
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY B)
|
CY
|
4,444.000
|
$5.000
|
$15.000
|
$40.000
|
$55.000
|
$28.000
|
$42.930
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY C)
|
CY
|
2,934.000
|
$12.000
|
$15.000
|
$50.000
|
$19.000
|
$29.000
|
$42.930
|
|
|
BLADING
|
HR
|
40.000
|
$70.000
|
$75.000
|
$25.000
|
$150.000
|
$160.000
|
$250.000
|
|
|
FURNISHING AND PLACING TOPSOIL (4")
|
SY
|
1,074.000
|
$1.000
|
$1.500
|
$2.500
|
$0.780
|
$5.600
|
$3.000
|
|
|
BROADCAST SEED (TEMP) (WARM)
|
SY
|
1,074.000
|
$0.300
|
$0.200
|
$0.200
|
$0.750
|
$0.800
|
$1.000
|
|
|
BROADCAST SEED (TEMP) (COOL)
|
SY
|
1,074.000
|
$0.300
|
$0.200
|
$0.250
|
$0.750
|
$0.800
|
$1.000
|
|
|
CELL FBR MLCH SEED(PERM)(RURAL)(CLAY)
|
SY
|
2,148.000
|
$0.300
|
$0.350
|
$0.300
|
$0.750
|
$0.800
|
$1.000
|
|
|
VEGETATIVE WATERING
|
MG
|
9.000
|
$15.000
|
$20.000
|
$150.000
|
$10.560
|
$250.000
|
$50.000
|
|
|
SOIL RETENTION BLANKETS (CL 1) (TY A)
|
SY
|
1,074.000
|
$1.000
|
$1.500
|
$2.000
|
$1.000
|
$1.050
|
$2.500
|
|
|
PROOF ROLLING
|
HR
|
40.000
|
$70.000
|
$75.000
|
$25.000
|
$60.000
|
$92.000
|
$150.000
|
|
|
FL BS (CMP IN PLC)(TYA GR1-2)(FNAL POS)
|
CY
|
1,690.000
|
$105.000
|
$75.000
|
$75.000
|
$85.000
|
$112.000
|
$100.000
|
|
|
ASPH (AC-20-5TR OR AC-20XP)
|
GAL
|
2,190.000
|
$3.050
|
$4.000
|
$4.500
|
$5.240
|
$11.000
|
$7.000
|
|
|
AGGR(TY-PD GR-4 OR TY-PL GR-4)
|
CY
|
48.000
|
$170.000
|
$200.000
|
$125.000
|
$104.740
|
$1,140.000
|
$135.000
|
|
|
D-GR HMA(SQ) TY-D PG76-22
|
TON
|
697.000
|
$170.000
|
$180.000
|
$100.000
|
$128.830
|
$175.000
|
$115.000
|
|
|
PLANE ASPH CONC PAV(0" TO 2")
|
SY
|
824.000
|
$2.000
|
$3.000
|
$4.600
|
$5.250
|
$6.650
|
$7.000
|
|
|
PLANE ASPH CONC PAV(8" TO 10")
|
SY
|
4,458.000
|
$3.000
|
$3.000
|
$6.250
|
$6.500
|
$7.100
|
$12.000
|
|
|
CEM STABIL BKFL
|
CY
|
161.100
|
$60.000
|
$65.000
|
$80.000
|
$85.000
|
$110.000
|
$60.000
|
|
|
TEMPORARY SPL SHORING
|
SF
|
23,570.000
|
$15.000
|
$1.000
|
$5.000
|
$8.000
|
$22.000
|
$20.000
|
|
|
FOUNDATION LOAD TEST (D4945) (PILE)
|
EA
|
6.000
|
$2,500.000
|
$50,000.000
|
$5,500.000
|
$20,000.000
|
$6,725.000
|
$15,000.000
|
|
|
SHEET PILING (PZ - 27)
|
SF
|
47,261.000
|
$35.000
|
$63.000
|
$45.000
|
$58.000
|
$44.000
|
$125.000
|
|
|
SHEET PILING (PZ - 40)
|
SF
|
15,589.000
|
$50.000
|
$80.000
|
$51.000
|
$80.000
|
$70.000
|
$130.000
|
|
|
PRESTR CONC PIL (16 IN SQ)
|
LF
|
1,364.000
|
$90.000
|
$50.000
|
$85.000
|
$160.000
|
$156.000
|
$150.000
|
|
|
PRESTR CONC PIL (24 IN SQ)
|
LF
|
10,688.000
|
$120.000
|
$80.000
|
$105.000
|
$182.000
|
$160.000
|
$150.000
|
|
|
CL C CONC (ABUT)
|
CY
|
63.300
|
$840.000
|
$1,400.000
|
$1,000.000
|
$1,125.000
|
$1,800.000
|
$1,500.000
|
|
|
CL C CONC (CAP)
|
CY
|
565.800
|
$965.000
|
$1,400.000
|
$1,200.000
|
$1,070.000
|
$1,860.000
|
$1,500.000
|
|
|
REINF CONC SLAB
|
SF
|
72,240.000
|
$17.000
|
$22.000
|
$20.000
|
$21.000
|
$37.000
|
$25.000
|
|
|
APPROACH SLAB
|
CY
|
102.600
|
$450.000
|
$500.000
|
$390.000
|
$500.000
|
$1,190.000
|
$400.000
|
|
|
PRESTR CONC GIRDER (TX28)
|
LF
|
3,336.600
|
$110.000
|
$170.000
|
$170.000
|
$195.000
|
$160.000
|
$125.000
|
|
|
PRESTR CONC GIRDER (TX34)
|
LF
|
6,916.920
|
$130.000
|
$190.000
|
$175.000
|
$195.000
|
$160.000
|
$135.000
|
|
|
RIPRAP (CONC)(4 IN)
|
CY
|
161.000
|
$375.000
|
$300.000
|
$375.000
|
$400.000
|
$640.000
|
$550.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
16.000
|
$500.000
|
$400.000
|
$420.000
|
$400.000
|
$730.000
|
$550.000
|
|
|
STR STEEL (MISC NON - BRIDGE)
|
LB
|
105,000.000
|
$7.000
|
$4.000
|
$1.500
|
$6.250
|
$3.500
|
$3.000
|
|
|
RAIL (TY T223)
|
LF
|
2,632.000
|
$100.000
|
$90.000
|
$80.000
|
$100.000
|
$180.000
|
$65.000
|
|
|
SEALED EXPANSION JOINT (4 IN) (SEJ - A)
|
LF
|
386.200
|
$92.000
|
$200.000
|
$75.000
|
$110.000
|
$105.000
|
$100.000
|
|
|
REMOV STR (BRIDGE 500 - 999 FT LENGTH)
|
EA
|
1.000
|
$400,000.000
|
$750,000.000
|
$1,500,000.000
|
$280,000.000
|
$580,000.000
|
$689,176.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$515,318.110
|
$1,475,000.000
|
$1,500,000.000
|
$1,600,000.000
|
$1,601,000.000
|
$2,600,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
31.000
|
$5,750.000
|
$1,100.000
|
$19,250.000
|
$1,500.000
|
$5,100.000
|
$15,000.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 1)
|
LF
|
200.000
|
$28.000
|
$30.000
|
$28.000
|
$32.500
|
$33.000
|
$50.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
200.000
|
$7.750
|
$8.000
|
$8.000
|
$8.000
|
$8.100
|
$10.000
|
|
|
BACKHOE WORK (EROSION & SEDMT CONT)
|
HR
|
40.000
|
$75.000
|
$110.000
|
$25.000
|
$125.000
|
$195.000
|
$150.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
3,086.000
|
$2.750
|
$6.000
|
$2.250
|
$2.750
|
$2.800
|
$5.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
3,086.000
|
$0.850
|
$2.000
|
$1.000
|
$0.750
|
$0.800
|
$1.000
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (8")
|
LF
|
180.000
|
$4.500
|
$7.000
|
$4.000
|
$4.500
|
$4.550
|
$10.000
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
180.000
|
$1.500
|
$2.000
|
$1.000
|
$1.000
|
$1.050
|
$2.000
|
|
|
CONSTRUCTING DETOURS
|
SY
|
552.000
|
$50.000
|
$100.000
|
$75.000
|
$120.000
|
$80.000
|
$100.000
|
|
|
ONE-WAY TRAF CONT (FLAGGER CONT)
|
HR
|
16.000
|
$60.000
|
$50.000
|
$150.000
|
$65.000
|
$56.000
|
$183.000
|
|
|
ONE-WAY TRAF CONT (PORT TRAF SIG)
|
MO
|
1.000
|
$1,000.000
|
$10,000.000
|
$10,000.000
|
$8,000.000
|
$6,360.000
|
$9,720.000
|
|
|
PORT CTB (FUR & INST)(SGL SLOPE)(TY 1)
|
LF
|
3,120.000
|
$35.000
|
$70.000
|
$68.000
|
$70.000
|
$65.000
|
$50.000
|
|
|
PORT CTB (MOVE)(SGL SLP)(TY 1)
|
LF
|
4,200.000
|
$20.000
|
$8.000
|
$5.000
|
$9.000
|
$6.500
|
$7.000
|
|
|
PORT CTB (STKPL)(SGL SLP)(TY 1)
|
LF
|
3,120.000
|
$5.500
|
$8.000
|
$6.000
|
$9.000
|
$15.000
|
$7.000
|
|
|
MTL W-BEAM GD FEN (STEEL POST)
|
LF
|
1,650.000
|
$22.000
|
$26.500
|
$26.500
|
$23.500
|
$24.000
|
$26.000
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
4.000
|
$1,650.000
|
$1,854.000
|
$1,854.000
|
$1,635.000
|
$1,650.000
|
$1,900.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
714.000
|
$3.500
|
$4.000
|
$4.000
|
$2.500
|
$2.650
|
$5.500
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
4.000
|
$2,250.000
|
$2,275.000
|
$2,275.000
|
$2,300.000
|
$2,400.000
|
$2,500.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
4.000
|
$400.000
|
$250.000
|
$250.000
|
$275.000
|
$280.000
|
$425.000
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
8.000
|
$1,750.000
|
$2,500.000
|
$2,047.440
|
$1,500.000
|
$1,510.000
|
$3,000.000
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
8.000
|
$1,000.000
|
$1,500.000
|
$911.190
|
$900.000
|
$910.000
|
$800.000
|
|
|
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
|
EA
|
8.000
|
$10,000.000
|
$9,000.000
|
$9,100.000
|
$8,500.000
|
$8,600.000
|
$8,500.000
|
|
|
CONDT (HDPE) (4") BORE
|
LF
|
1,900.000
|
$25.000
|
$45.960
|
$20.000
|
$35.000
|
$21.000
|
$125.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
2.000
|
$450.000
|
$500.000
|
$474.470
|
$446.000
|
$450.000
|
$1,000.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
2.000
|
$565.000
|
$700.000
|
$564.190
|
$475.000
|
$480.000
|
$1,200.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
4.000
|
$95.000
|
$90.000
|
$95.440
|
$75.000
|
$78.000
|
$250.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
|
EA
|
28.000
|
$20.000
|
$28.000
|
$28.000
|
$15.000
|
$21.000
|
$10.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
|
EA
|
20.000
|
$30.000
|
$45.000
|
$45.000
|
$27.500
|
$41.000
|
$20.000
|
|
|
WK ZN PAV MRK REMOV (REFL) TY II-A-A
|
EA
|
420.000
|
$3.500
|
$0.300
|
$3.490
|
$3.000
|
$3.050
|
$6.000
|
|
|
WK ZN PAV MRK REMOV (W)4"(SLD)
|
LF
|
13,552.000
|
$0.600
|
$0.600
|
$0.650
|
$0.420
|
$0.450
|
$1.500
|
|
|
WK ZN PAV MRK REMOV (W)24"(SLD)
|
LF
|
20.000
|
$5.000
|
$20.000
|
$7.510
|
$6.000
|
$6.100
|
$9.000
|
|
|
WK ZN PAV MRK REMOV (Y)4"(SLD)
|
LF
|
16,752.000
|
$0.650
|
$0.700
|
$0.640
|
$0.420
|
$0.450
|
$1.500
|
|
|
PAVEMENT SEALER 4"
|
LF
|
530.000
|
$0.250
|
$0.300
|
$0.130
|
$0.150
|
$0.160
|
$0.380
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(090MIL)
|
LF
|
2,757.000
|
$0.350
|
$0.400
|
$0.280
|
$0.410
|
$0.430
|
$0.750
|
|
RE PM W/RET REQ TY I (Y)4"(BRK)(090MIL)
|
LF
|
2,000.000
|
$0.350
|
$0.400
|
$0.300
|
$0.410
|
$0.430
|
$0.750
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(090MIL)
|
LF
|
12,840.000
|
$0.350
|
$0.400
|
$0.310
|
$0.380
|
$0.400
|
$0.750
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
530.000
|
$3.750
|
$4.000
|
$2.980
|
$3.000
|
$3.100
|
$4.500
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
8,160.000
|
$0.500
|
$0.600
|
$0.350
|
$0.350
|
$0.370
|
$1.500
|
|
|
PAV SURF PREP FOR MRK (4")
|
LF
|
7,980.000
|
$0.130
|
$0.020
|
$0.050
|
$0.010
|
$0.010
|
$0.380
|
|
|
WICK DRAINS
|
LF
|
107,445.000
|
$3.000
|
$0.750
|
$1.250
|
$0.630
|
$3.000
|
$4.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$8,750.000
|
$10,000.000
|
$16,000.000
|
$18,000.000
|
$22,635.000
|
$10.000
|
|
|
TMA (STATIONARY)
|
DAY
|
11.000
|
$220.000
|
$175.000
|
$175.000
|
$360.000
|
$750.000
|
$458.000
|
|
|
TMA (MOBILE OPERATION)
|
HR
|
24.000
|
$25.000
|
$40.000
|
$125.000
|
$70.000
|
$47.000
|
$126.000
|
|
Totals: |
$10,999,930.360
|
$14,655,685.450
|
$15,413,053.210
|
$16,016,151.690
|
$17,431,319.310
|
$23,706,870.990
|