|
|
PLANE ASPH CONC PAV (1.5")
|
SY
|
32,996.000
|
$2.000
|
$2.900
|
$3.000
|
|
|
FULL-DEPTH REPAIR CPJR (VAR DEPTH)
|
CY
|
20.000
|
$1,850.000
|
$3,172.000
|
$3,500.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
48.000
|
$1,250.000
|
$1,500.000
|
$1,650.000
|
|
|
CLEANING AND SEALING EXISTING JOINTS
|
LF
|
15,475.000
|
$5.000
|
$2.600
|
$2.900
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$90,805.140
|
$100,000.000
|
$130,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
3.000
|
$7,300.000
|
$4,000.000
|
$10,500.000
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
440.000
|
$25.000
|
$27.750
|
$32.000
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
4.000
|
$1,500.000
|
$1,950.000
|
$2,090.000
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
4.000
|
$1,200.000
|
$1,675.000
|
$1,870.000
|
|
|
MTL BM GD FEN TRANS (NON - SYM)
|
EA
|
4.000
|
$800.000
|
$975.000
|
$1,100.000
|
|
|
MTL BM GD FEN TRANS (ANCHOR PLATE)
|
EA
|
8.000
|
$1,000.000
|
$950.000
|
$974.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
753.000
|
$3.000
|
$4.000
|
$3.300
|
|
|
REMOVE TERMINAL ANCHOR SECTION
|
EA
|
7.000
|
$400.000
|
$150.000
|
$275.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
4.000
|
$3,500.000
|
$3,000.000
|
$3,190.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
1.000
|
$300.000
|
$250.000
|
$275.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
|
EA
|
8.000
|
$40.000
|
$45.000
|
$41.250
|
|
|
INSTL DEL ASSM (D-SY)SZ (BRF)CTB (BI)
|
EA
|
8.000
|
$25.000
|
$55.000
|
$16.500
|
|
|
WK ZN PAV MRK NON-REMOV (W)6"(SLD)
|
LF
|
9,152.000
|
$2.000
|
$0.510
|
$0.560
|
|
|
WK ZN PAV MRK NON-REMOV (W)8"(SLD)
|
LF
|
120.000
|
$0.600
|
$1.750
|
$1.930
|
|
|
WK ZN PAV MRK NON-REMOV (W)24"(SLD)
|
LF
|
250.000
|
$2.500
|
$12.400
|
$13.600
|
|
|
WK ZN PAV MRK NON-REMOV (W)(ARROW)
|
EA
|
7.000
|
$200.000
|
$162.000
|
$179.000
|
|
|
WK ZN PAV MRK NON-REMOV(W)(WORD)
|
EA
|
1.000
|
$120.000
|
$350.000
|
$385.000
|
|
|
WK ZN PAV MRK NON-REMOV (Y)6"(SLD)
|
LF
|
6,166.000
|
$2.000
|
$0.510
|
$0.560
|
|
|
WK ZN PAV MRK REMOV (W)6"(BRK)
|
LF
|
3,240.000
|
$2.000
|
$0.680
|
$0.750
|
|
WK ZN PAV MRK SHT TERM (TAB)TY W
|
EA
|
809.000
|
$2.000
|
$1.000
|
$3.370
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
485.000
|
$2.000
|
$1.000
|
$12.000
|
|
REFL PAV MRK TY I (W)8"(SLD)(090MIL)
|
LF
|
120.000
|
$1.000
|
$3.950
|
$4.350
|
|
REFL PAV MRK TY I (W)(WORD)(090MIL)
|
EA
|
1.000
|
$360.000
|
$360.000
|
$396.000
|
|
RE PM W/RET REQ TY I (W)6"(BRK)(090MIL)
|
LF
|
3,240.000
|
$0.600
|
$0.900
|
$0.990
|
|
RE PM W/RET REQ TY I (W)6"(SLD)(090MIL)
|
LF
|
9,152.000
|
$1.500
|
$0.620
|
$0.680
|
|
RE PM W/RET REQ TY I (Y)6"(SLD)(090MIL)
|
LF
|
6,802.000
|
$1.500
|
$0.850
|
$0.940
|
|
PREFAB PAV MRK TY C (W) (24") (SLD)
|
LF
|
250.000
|
$12.000
|
$17.000
|
$18.700
|
|
PREFAB PAV MRK TY C (W) (ARROW)
|
EA
|
7.000
|
$220.000
|
$320.000
|
$352.000
|
|
REFL PAV MRKR TY I-C
|
EA
|
25.000
|
$5.000
|
$5.000
|
$5.500
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
164.000
|
$5.210
|
$5.000
|
$5.500
|
|
|
SPALLING REPAIR (HYDRAULIC CEMENT)
|
CF
|
50.000
|
$200.000
|
$160.000
|
$176.000
|
|
|
SPALLING REPAIR (POLYMERIC) (SEMIRIGID)
|
GAL
|
250.000
|
$100.000
|
$195.000
|
$214.500
|
|
|
SP MIXES SP-D SAC-A PG76-22
|
TON
|
2,797.000
|
$150.000
|
$185.000
|
$260.000
|
|
|
TACK COAT
|
GAL
|
1,980.000
|
$7.000
|
$4.000
|
$12.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
DAY
|
88.000
|
$350.000
|
$110.000
|
$173.960
|
|
|
TMA (STATIONARY)
|
DAY
|
44.000
|
$350.000
|
$100.000
|
$450.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
10.000
|
$450.000
|
$100.000
|
$450.000
|
|
Totals: |
$998,856.580
|
$1,074,624.720
|
$1,417,343.230
|