REMOVING CONC (RIPRAP)
|
SY
|
4.000
|
$100.000
|
$50.000
|
$60.000
|
$100.000
|
$22.880
|
$20.000
|
|
|
CONC STR REPR(REMOV AND REPL WINGWALL)
|
CY
|
2.000
|
$5,000.000
|
$800.000
|
$1,250.000
|
$1,500.000
|
$621.340
|
$3,000.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
9.000
|
$1,000.000
|
$480.000
|
$550.000
|
$600.000
|
$708.450
|
$600.000
|
|
|
RETROFIT RAIL (TY T131RC)
|
LF
|
115.000
|
$350.000
|
$50.000
|
$30.000
|
$50.000
|
$278.510
|
$350.000
|
|
|
MOBILIZATION (CALLOUT)
|
EA
|
113.000
|
$1,000.000
|
$1.000
|
$1.000
|
$100.000
|
$81.050
|
$2,500.000
|
|
|
MOBILIZATION (EMERGENCY)
|
EA
|
5.000
|
$2,500.000
|
$300.000
|
$1,000.000
|
$500.000
|
$1,621.150
|
$3,000.000
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
8.000
|
$50.000
|
$60.000
|
$40.000
|
$100.000
|
$43.000
|
$32.000
|
|
|
MTL THRIE-BEAM GD FEN (TIM POST)
|
LF
|
4.000
|
$100.000
|
$66.000
|
$150.000
|
$100.000
|
$141.000
|
$60.000
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
1.000
|
$5,000.000
|
$1,800.000
|
$2,000.000
|
$1,800.000
|
$4,680.000
|
$2,200.000
|
|
|
MTL BEAM GD FEN TRANS (TL2)
|
EA
|
2.000
|
$2,000.000
|
$500.000
|
$700.000
|
$800.000
|
$2,572.000
|
$1,200.000
|
|
|
MTL BEAM GD FEN TRANS (T101)
|
EA
|
1.000
|
$2,000.000
|
$500.000
|
$700.000
|
$800.000
|
$2,679.000
|
$1,400.000
|
|
|
MTL BEAM GD FEN TRANS (T6)
|
EA
|
1.000
|
$500.000
|
$400.000
|
$750.000
|
$800.000
|
$2,043.000
|
$800.000
|
|
|
MTL W-BEAM GD FEN ADJUSTMENT
|
LF
|
1.000
|
$100.000
|
$89.000
|
$40.000
|
$200.000
|
$24.000
|
$15.000
|
|
|
MTL THRIE-BEAM GD FEN ADJUSTMENT
|
LF
|
1.000
|
$150.000
|
$89.000
|
$200.000
|
$200.000
|
$109.000
|
$25.000
|
|
|
TERMINAL ANCHOR SECTION ADJUSTMENT
|
EA
|
1.000
|
$400.000
|
$87.000
|
$1.000
|
$200.000
|
$656.000
|
$400.000
|
|
|
TRANSITION ADJUSTMENT
|
EA
|
2.000
|
$600.000
|
$108.000
|
$500.000
|
$200.000
|
$3,279.000
|
$425.000
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
2.000
|
$2,200.000
|
$5,000.000
|
$4,500.000
|
$5,000.000
|
$2,688.000
|
$1,200.000
|
|
|
MTL BM GD FEN (LONG SPAN SYSTEM)
|
LF
|
4.000
|
$45.000
|
$55.000
|
$60.000
|
$100.000
|
$83.000
|
$25.000
|
|
|
MTL BM GD FEN TRANS (31"-28")
|
EA
|
1.000
|
$1,200.000
|
$1,000.000
|
$400.000
|
$700.000
|
$2,043.000
|
$650.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
40.000
|
$5.000
|
$25.000
|
$10.000
|
$30.000
|
$3.750
|
$4.000
|
|
|
REMOVE TERMINAL ANCHOR SECTION
|
EA
|
4.000
|
$300.000
|
$100.000
|
$1.000
|
$100.000
|
$656.000
|
$225.000
|
|
|
GUARDRAIL END TREATMENT (MOVE & RESET)
|
EA
|
2.000
|
$500.000
|
$300.000
|
$600.000
|
$250.000
|
$1,640.000
|
$1,500.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
2.000
|
$500.000
|
$300.000
|
$3,000.000
|
$100.000
|
$656.000
|
$250.000
|
|
|
GUARDRAIL END TRTMNT(RETRO)(STEEL POST)
|
EA
|
1.000
|
$5,000.000
|
$2,000.000
|
$500.000
|
$2,300.000
|
$3,172.000
|
$2,200.000
|
|
|
GUARDRAIL END TRTMNT(RETRO)(WOOD POST)
|
EA
|
1.000
|
$5,200.000
|
$2,000.000
|
$500.000
|
$2,400.000
|
$3,287.000
|
$2,400.000
|
|
|
GDRL END TRMT(RETRO W/O HEAD)(STL POST)
|
EA
|
1.000
|
$900.000
|
$2,000.000
|
$500.000
|
$1,200.000
|
$2,181.000
|
$1,500.000
|
|
|
GDRL END TRTMT(RETRO W/O HEAD)(WD POST)
|
EA
|
1.000
|
$900.000
|
$2,000.000
|
$500.000
|
$1,700.000
|
$2,295.000
|
$1,800.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)GF1
|
EA
|
4.000
|
$80.000
|
$29.000
|
$10.000
|
$50.000
|
$28.400
|
$25.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)GF1 (BI)
|
EA
|
4.000
|
$55.000
|
$29.000
|
$10.000
|
$50.000
|
$28.400
|
$25.000
|
|
|
INSTL DEL ASSM (D-SY)SZ (BRF)GF1
|
EA
|
35.000
|
$40.000
|
$25.000
|
$20.000
|
$50.000
|
$28.400
|
$25.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
|
EA
|
9.000
|
$40.000
|
$750.000
|
$100.000
|
$200.000
|
$54.000
|
$25.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BR)
|
EA
|
2.000
|
$40.000
|
$55.000
|
$100.000
|
$100.000
|
$58.000
|
$25.000
|
|
|
REPAIR RAIL ELEMENT (W - BEAM)
|
LF
|
3,750.000
|
$35.000
|
$40.000
|
$30.000
|
$42.000
|
$35.000
|
$80.000
|
|
|
REPAIR RAIL ELEMENT (THRIE - BEAM)
|
LF
|
1.000
|
$100.000
|
$100.000
|
$100.000
|
$200.000
|
$25.000
|
$540.000
|
|
|
REP RAIL ELMNT(THRIE-BM TRANS TO W -BM)
|
LF
|
8.000
|
$80.000
|
$50.000
|
$80.000
|
$200.000
|
$66.000
|
$500.000
|
|
|
REPAIR RAIL ELEMENT (CURVED RAIL)
|
LF
|
8.000
|
$80.000
|
$30.000
|
$80.000
|
$200.000
|
$56.000
|
$400.000
|
|
|
REM / REPL TIMBER/STL POST W/O CONC FND
|
EA
|
75.000
|
$50.000
|
$150.000
|
$100.000
|
$100.000
|
$61.000
|
$40.000
|
|
|
REM / REPL TIMBER / STL POST W/CONC FND
|
EA
|
38.000
|
$150.000
|
$100.000
|
$80.000
|
$100.000
|
$185.000
|
$75.000
|
|
|
REM / REPL STEEL POST W / CONC FND
|
EA
|
4.000
|
$200.000
|
$100.000
|
$80.000
|
$100.000
|
$103.000
|
$75.000
|
|
|
REPAIR STEEL POST WITH BASE PLATE
|
EA
|
6.000
|
$600.000
|
$100.000
|
$125.000
|
$150.000
|
$720.000
|
$500.000
|
|
|
REALIGN POSTS
|
EA
|
750.000
|
$20.000
|
$0.500
|
$1.000
|
$15.000
|
$16.000
|
$20.000
|
|
|
REMOVE & REPLACE BLOCKOUT
|
EA
|
150.000
|
$20.000
|
$100.000
|
$70.000
|
$350.000
|
$24.000
|
$25.000
|
|
|
REPLACE SINGLE GDRAIL TERMINAL RAIL
|
LF
|
750.000
|
$20.000
|
$1.000
|
$48.000
|
$55.000
|
$49.000
|
$39.000
|
|
|
REPLACE SINGLE GDRAIL TERMINAL POST
|
EA
|
132.000
|
$90.000
|
$1.000
|
$20.000
|
$100.000
|
$62.000
|
$80.000
|
|
|
REPAIR OF TERMINAL ANCHORS POSTS
|
EA
|
4.000
|
$50.000
|
$1.000
|
$50.000
|
$100.000
|
$51.000
|
$50.000
|
|
|
REPLACE TERMINAL ANCHOR POSTS
|
EA
|
4.000
|
$350.000
|
$1.000
|
$250.000
|
$500.000
|
$51.000
|
$400.000
|
|
|
REMOVE GDRAIL END TRT / REPL WITH SGT
|
EA
|
12.000
|
$5,000.000
|
$6,425.000
|
$8,000.000
|
$6,500.000
|
$6,233.000
|
$3,900.000
|
|
|
REPL SINGLE GDRAIL TERM IMPACT HEAD
|
EA
|
23.000
|
$1,800.000
|
$500.000
|
$750.000
|
$1,200.000
|
$1,962.000
|
$1,400.000
|
|
|
REM & RESET SGT IMPACT HEAD
|
EA
|
8.000
|
$250.000
|
$500.000
|
$250.000
|
$400.000
|
$547.000
|
$200.000
|
|
|
REPLACE SGT CABLE ASSEMBLY
|
EA
|
23.000
|
$150.000
|
$1.000
|
$1.000
|
$200.000
|
$244.000
|
$80.000
|
|
|
REPLACE SGT STRUT
|
EA
|
23.000
|
$100.000
|
$1.000
|
$1.000
|
$150.000
|
$146.000
|
$20.000
|
|
|
REPLACE SGT OBJECT MARKER
|
EA
|
15.000
|
$35.000
|
$1.000
|
$1.000
|
$50.000
|
$39.000
|
$20.000
|
|
|
REPAIR STEEL POST WITH BASE PLATE
|
EA
|
1.000
|
$300.000
|
$100.000
|
$100.000
|
$250.000
|
$720.000
|
$500.000
|
|
|
REPAIR (SMTC)(N)(BAY)
|
EA
|
4.000
|
$550.000
|
$500.000
|
$550.000
|
$2,000.000
|
$1,296.000
|
$350.000
|
|
|
REPLACE POSTS (TL-4)
|
EA
|
578.000
|
$330.000
|
$1.000
|
$100.000
|
$250.000
|
$296.000
|
$250.000
|
|
|
CABLE SPLICE / TURNBUCKLE (TL-4)
|
EA
|
8.000
|
$450.000
|
$50.000
|
$1.000
|
$150.000
|
$706.000
|
$400.000
|
|
|
REPAIR CONCRETE FOUNDATION (TL-4)
|
EA
|
2.000
|
$500.000
|
$50.000
|
$1.000
|
$1.000
|
$707.000
|
$25.000
|
|
|
REPR OR REPLC CABLE BARR TERM SEC(TL-4)
|
EA
|
15.000
|
$1,500.000
|
$1.000
|
$300.000
|
$500.000
|
$8,554.000
|
$2,500.000
|
|
|
REPLACE CABLE (TL-4)
|
LF
|
150.000
|
$10.000
|
$3.000
|
$2.000
|
$1.000
|
$13.000
|
$4.000
|
|
|
CHECK / RE-TENSION CABLE
|
EA
|
30.000
|
$600.000
|
$1.000
|
$10.000
|
$300.000
|
$820.000
|
$400.000
|
|
|
REPLACE POSTS (TL-4)(FURN)
|
EA
|
19.000
|
$150.000
|
$50.000
|
$20.000
|
$75.000
|
$109.000
|
$200.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
DAY
|
4.000
|
$300.000
|
$5,200.000
|
$5,250.000
|
$3,500.000
|
$811.540
|
$350.000
|
|
|
TMA (STATIONARY)
|
DAY
|
113.000
|
$350.000
|
$1.000
|
$1.000
|
$200.000
|
$2,500.000
|
$400.000
|
|
Totals: |
$808,935.000
|
$349,447.000
|
$422,982.000
|
$681,027.000
|
$1,077,793.660
|
$1,085,376.000
|