PREPARING ROW
|
STA
|
22.000
|
$14,098.439
|
$3,000.000
|
$6,500.000
|
$13,000.000
|
$24,500.000
|
|
|
REMOV CONC (DRIVEWAYS)
|
SY
|
334.000
|
$13.140
|
$25.000
|
$7.950
|
$83.370
|
$50.000
|
|
|
REMOV CONC (CURB)
|
LF
|
10.000
|
$8.170
|
$20.000
|
$7.970
|
$29.050
|
$300.000
|
|
|
REMOV CONC (CURB & GUTTER)
|
LF
|
2,434.000
|
$2.500
|
$20.000
|
$7.950
|
$29.050
|
$15.000
|
|
|
REMOV CONC (GUTTER)
|
LF
|
319.000
|
$5.000
|
$24.000
|
$7.950
|
$29.050
|
$25.000
|
|
|
REMOVING STAB BASE & ASPH PAV(12"-27")
|
SY
|
7,107.000
|
$6.320
|
$20.000
|
$45.960
|
$42.460
|
$15.000
|
|
|
EXCAV (ROADWAY)
|
CY
|
5,544.000
|
$8.000
|
$26.000
|
$15.610
|
$59.370
|
$30.000
|
|
|
EXCAV (SPECIAL)
|
CY
|
845.000
|
$33.180
|
$90.000
|
$15.610
|
$28.170
|
$35.000
|
|
|
EMBANK (FNL)(DC)(TY C)
|
CY
|
6,898.000
|
$5.280
|
$40.000
|
$15.510
|
$18.630
|
$30.000
|
|
|
HYDRO MULCH SEED (TEMP_WARM_COOL)
|
SY
|
3,575.000
|
$1.000
|
$2.000
|
$1.120
|
$0.820
|
$1.650
|
|
|
FL BS (CMP IN PLC)(TY E GR 4)(FNAL POS)
|
CY
|
2,139.000
|
$110.000
|
$60.000
|
$40.590
|
$96.870
|
$100.000
|
|
|
CEMENT
|
TON
|
150.000
|
$202.280
|
$380.000
|
$219.520
|
$205.000
|
$250.000
|
|
|
CEMENT TRT (NEW BASE)(8")
|
SY
|
3,443.000
|
$3.500
|
$8.000
|
$5.400
|
$18.420
|
$25.000
|
|
|
CEMENT TRT (NEW BASE)(12")
|
SY
|
4,110.000
|
$13.290
|
$12.000
|
$8.930
|
$28.580
|
$20.000
|
|
|
CEMENT TRT (SUBGRADE)(12")
|
SY
|
7,825.000
|
$50.380
|
$8.000
|
$5.180
|
$22.520
|
$10.000
|
|
|
PRIME COAT (MC-30)
|
GAL
|
1,339.000
|
$5.000
|
$9.000
|
$8.260
|
$23.380
|
$15.000
|
|
|
ASPH (TIER II)
|
GAL
|
2,009.000
|
$5.000
|
$8.000
|
$5.430
|
$89.540
|
$15.000
|
|
|
AGGR (TY-D GR-4P) (SAC B)
|
CY
|
33.000
|
$110.000
|
$900.000
|
$1,729.340
|
$230.380
|
$500.000
|
|
|
SP MIXES SP-B SAC-B PG76-22
|
TON
|
575.000
|
$120.000
|
$250.000
|
$291.200
|
$282.100
|
$400.000
|
|
|
SP MIXES SP-C SAC-A PG76-22
|
TON
|
740.000
|
$125.000
|
$180.000
|
$216.160
|
$209.410
|
$425.000
|
|
|
STONE-MTRX-ASPH SMA-C SAC-A PG76-22
|
TON
|
728.000
|
$164.780
|
$280.000
|
$305.760
|
$296.210
|
$450.000
|
|
|
TACK COAT
|
GAL
|
669.000
|
$4.530
|
$6.000
|
$6.720
|
$6.510
|
$25.000
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(10")
|
SY
|
2,170.000
|
$27.000
|
$60.000
|
$92.220
|
$89.160
|
$75.000
|
|
|
PLANE ASPH CONC PAV(0" TO 2")
|
SY
|
3,835.000
|
$6.470
|
$10.000
|
$9.450
|
$35.400
|
$10.000
|
|
|
PAV JT UNDERSEAL (18")
|
LF
|
603.000
|
$50.000
|
$35.000
|
$22.400
|
$139.190
|
$55.000
|
|
|
CUT & RESTORING PAV
|
SY
|
239.000
|
$138.000
|
$300.000
|
$194.580
|
$108.500
|
$200.000
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
1,208.000
|
$5.030
|
$25.000
|
$4.330
|
$1.090
|
$1.000
|
|
|
CL C CONC (RAIL FOUNDATION)
|
CY
|
8.000
|
$795.130
|
$2,000.000
|
$2,639.630
|
$2,712.500
|
$5,000.000
|
|
|
RETAINING WALL (MSE)
|
SF
|
6,664.000
|
$64.700
|
$125.000
|
$179.540
|
$230.550
|
$225.000
|
|
|
RETAINING WALL (TEMP WALL)
|
SF
|
1,200.000
|
$42.000
|
$80.000
|
$157.820
|
$128.600
|
$150.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
28.000
|
$630.740
|
$1,000.000
|
$923.390
|
$705.250
|
$3,500.000
|
|
|
RIPRAP (STONE PROTECTION)(12 IN)
|
CY
|
24.000
|
$208.340
|
$400.000
|
$260.640
|
$434.000
|
$1,000.000
|
|
|
RAIL (TY C221)
|
LF
|
889.000
|
$213.080
|
$180.000
|
$61.600
|
$469.810
|
$400.000
|
|
|
RAIL (HANDRAIL)(TY A)
|
LF
|
138.000
|
$275.000
|
$150.000
|
$128.800
|
$130.200
|
$100.000
|
|
|
RETROFIT RAIL (TY C223)
|
LF
|
110.000
|
$184.000
|
$400.000
|
$88.480
|
$813.750
|
$800.000
|
|
|
RETROFIT RAIL (TY PR11)
|
LF
|
130.000
|
$125.000
|
$200.000
|
$193.760
|
$195.300
|
$150.000
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
721.000
|
$93.030
|
$150.000
|
$113.800
|
$222.430
|
$300.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
835.000
|
$147.230
|
$200.000
|
$119.580
|
$179.030
|
$300.000
|
|
|
MANH (COMPL)(PRM)(48IN)
|
EA
|
13.000
|
$8,033.310
|
$10,000.000
|
$7,860.230
|
$6,510.000
|
$15,000.000
|
|
|
JCTBOX(COMPL)(PJB)(4FTX4FT)
|
EA
|
6.000
|
$7,935.270
|
$10,000.000
|
$7,860.240
|
$6,510.000
|
$15,500.000
|
|
|
INLET (COMPL)(PCO)(6FT)(NONE)
|
EA
|
8.000
|
$10,740.000
|
$10,000.000
|
$7,860.240
|
$9,765.000
|
$18,000.000
|
|
|
INLET(COMPL)(PAZD)(FG)(4FTX4FT-4FTX4FT)
|
EA
|
4.000
|
$11,342.000
|
$10,000.000
|
$7,860.240
|
$11,935.000
|
$17,000.000
|
|
|
SET (TY II) (24 IN) (RCP) (3: 1) (C)
|
EA
|
1.000
|
$1,500.000
|
$7,500.000
|
$6,660.790
|
$1,953.000
|
$6,000.000
|
|
|
ADJUSTING MANHOLES
|
EA
|
2.000
|
$3,500.000
|
$4,000.000
|
$1,199.480
|
$5,425.000
|
$8,500.000
|
|
|
REMOV STR (INLET)
|
EA
|
3.000
|
$511.110
|
$2,500.000
|
$7.610
|
$1,085.000
|
$2,500.000
|
|
|
REMOV STR (PIPE)
|
LF
|
169.000
|
$10.740
|
$25.000
|
$7.950
|
$54.250
|
$125.000
|
|
|
REMOVE STR (RAIL)
|
LF
|
130.000
|
$14.270
|
$200.000
|
$7.950
|
$21.700
|
$100.000
|
|
|
REMOV STR (BUILDING)
|
EA
|
2.000
|
$4,268.000
|
$50,000.000
|
$53,088.670
|
$51,767.940
|
$25,000.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$211,467.080
|
$540,000.000
|
$523,870.840
|
$650,000.000
|
$1,000,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
16.000
|
$3,250.000
|
$2,480.000
|
$7,600.000
|
$9,500.000
|
$5,000.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
DAY
|
32.000
|
$120.330
|
$110.000
|
$84.000
|
$185.000
|
$150.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
11.000
|
$5,850.330
|
$4,820.000
|
$13,440.000
|
$1.000
|
$25,000.000
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
622.000
|
$30.000
|
$48.000
|
$16.800
|
$43.840
|
$40.000
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
622.000
|
$12.500
|
$16.000
|
$8.960
|
$20.590
|
$10.000
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (8")
|
LF
|
200.000
|
$7.500
|
$10.000
|
$7.840
|
$7.600
|
$7.750
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
690.000
|
$10.130
|
$15.000
|
$7.840
|
$7.600
|
$6.100
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
890.000
|
$3.080
|
$5.000
|
$3.470
|
$3.260
|
$1.450
|
|
|
PORT CTB (FUR & INST)(SGL SLOPE)(TY 1)
|
LF
|
960.000
|
$49.000
|
$80.000
|
$43.660
|
$186.810
|
$100.000
|
|
|
PORT CTB (FUR & INST)(LOW PROF)(TY 1)
|
LF
|
100.000
|
$57.000
|
$120.000
|
$43.660
|
$196.680
|
$125.000
|
|
|
PORT CTB (FUR & INST)(LOW PROF)(TY 2)
|
LF
|
80.000
|
$60.000
|
$120.000
|
$43.660
|
$177.390
|
$125.000
|
|
|
PORT CTB (MOVE)(SGL SLP)(TY 1)
|
LF
|
1,230.000
|
$7.000
|
$30.000
|
$43.660
|
$54.970
|
$20.000
|
|
|
PORT CTB (REMOVE)(SGL SLP)(TY 1)
|
LF
|
960.000
|
$14.250
|
$40.000
|
$43.660
|
$58.650
|
$25.000
|
|
|
PORT CTB (REMOVE)(LOW PROF)(TY 1)
|
LF
|
100.000
|
$14.000
|
$100.000
|
$43.660
|
$48.280
|
$50.000
|
|
|
PORT CTB (REMOVE)(LOW PROF)(TY 2)
|
LF
|
80.000
|
$17.000
|
$100.000
|
$43.660
|
$32.730
|
$50.000
|
|
|
CONCRETE C&G (VALLEY GUTTER)
|
LF
|
235.000
|
$75.000
|
$100.000
|
$107.510
|
$226.500
|
$275.000
|
|
|
CONC CURB & GUTTER (TY B) (MOUNTABLE)
|
LF
|
35.000
|
$154.980
|
$100.000
|
$163.500
|
$235.410
|
$600.000
|
|
|
CONC CURB & GUTTER (TY A) (BARRIER)
|
LF
|
2,762.000
|
$33.330
|
$42.000
|
$43.910
|
$75.960
|
$55.000
|
|
|
DRIVEWAYS (CONC)
|
SY
|
84.000
|
$100.000
|
$150.000
|
$948.800
|
$173.600
|
$725.000
|
|
|
DRIVEWAYS (ACP)
|
SY
|
295.000
|
$64.500
|
$230.000
|
$162.400
|
$218.800
|
$400.000
|
|
|
CONC SIDEWALKS (4")
|
SY
|
825.000
|
$85.000
|
$100.000
|
$85.660
|
$69.440
|
$200.000
|
|
|
CURB RAMPS (TY 1)
|
EA
|
2.000
|
$3,004.880
|
$3,555.000
|
$5,040.000
|
$3,797.500
|
$6,500.000
|
|
|
CURB RAMPS (TY 2)
|
EA
|
4.000
|
$3,183.000
|
$3,100.000
|
$5,040.000
|
$3,797.500
|
$4,000.000
|
|
|
CONC SIDEWALKS (SPECIAL)
|
SY
|
7.000
|
$250.000
|
$175.000
|
$224.000
|
$135.630
|
$1,500.000
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
2.000
|
$2,510.300
|
$3,170.000
|
$2,488.640
|
$3,130.230
|
$2,235.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
2.000
|
$3,341.030
|
$4,025.000
|
$4,368.000
|
$4,182.680
|
$3,040.000
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
6.000
|
$1,403.000
|
$6,400.000
|
$4,368.000
|
$4,626.370
|
$3,200.000
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
4.000
|
$895.000
|
$4,050.000
|
$4,032.000
|
$6,189.560
|
$1,325.000
|
|
|
CRASH CUSH ATTEN (INSTL)(L)(N)(TL3)
|
EA
|
2.000
|
$29,539.740
|
$38,400.000
|
$36,960.000
|
$49,535.680
|
$34,400.000
|
|
|
CCA (INSTL)(N)(TL3)(WORK ZONE)
|
EA
|
4.000
|
$10,329.460
|
$36,900.000
|
$36,960.000
|
$20,121.330
|
$34,480.000
|
|
|
ALUMINUM SIGNS (TY A)
|
SF
|
12.000
|
$35.490
|
$1.000
|
$224.000
|
$24.690
|
$22.750
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(P)
|
EA
|
5.000
|
$880.000
|
$870.000
|
$924.000
|
$764.930
|
$705.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(P-BM)
|
EA
|
4.000
|
$1,060.000
|
$970.000
|
$1,036.000
|
$835.450
|
$770.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(T)
|
EA
|
10.000
|
$980.000
|
$1,100.000
|
$1,176.000
|
$1,003.630
|
$925.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U)
|
EA
|
1.000
|
$1,230.000
|
$1,470.000
|
$1,568.000
|
$1,166.380
|
$1,075.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U-1EXT)
|
EA
|
1.000
|
$1,300.000
|
$1,680.000
|
$1,792.000
|
$1,388.800
|
$1,280.000
|
|
|
IN SM RD SN SUP&AM (RAIL MOUNT)
|
EA
|
3.000
|
$5,140.000
|
$8,140.000
|
$8,680.000
|
$4,464.780
|
$4,115.000
|
|
|
RELOCATE SM RD SN SUP&AM(SIGN ONLY)
|
EA
|
1.000
|
$340.000
|
$315.000
|
$1,344.000
|
$238.700
|
$220.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
12.000
|
$75.000
|
$95.000
|
$100.800
|
$629.710
|
$110.000
|
|
|
REMOVE LRSA
|
EA
|
1.000
|
$947.090
|
$1,260.000
|
$1,344.000
|
$1,437.630
|
$1,325.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)CTB (BI)
|
EA
|
12.000
|
$26.930
|
$30.000
|
$31.360
|
$26.590
|
$24.500
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF1 (BI)
|
EA
|
8.000
|
$22.800
|
$30.000
|
$31.360
|
$26.590
|
$24.500
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
|
EA
|
8.000
|
$40.570
|
$48.000
|
$50.400
|
$33.100
|
$30.500
|
|
|
WK ZN PAV MRK NON-REMOV (W)6"(SLD)
|
LF
|
2,400.000
|
$0.480
|
$0.700
|
$0.740
|
$1.310
|
$1.240
|
|
|
WK ZN PAV MRK NON-REMOV (W)8"(SLD)
|
LF
|
240.000
|
$0.620
|
$2.000
|
$2.240
|
$2.610
|
$2.480
|
|
|
WK ZN PAV MRK NON-REMOV (W)(ARROW)
|
EA
|
1.000
|
$146.000
|
$315.000
|
$336.000
|
$173.600
|
$165.540
|
|
|
WK ZN PAV MRK NON-REMOV (Y)6"(SLD)
|
LF
|
2,780.000
|
$0.480
|
$0.700
|
$0.740
|
$1.310
|
$1.240
|
|
|
WK ZN PAV MRK REMOV (W)6"(SLD)
|
LF
|
240.000
|
$0.690
|
$5.000
|
$5.600
|
$1.740
|
$1.660
|
|
|
WK ZN PAV MRK REMOV (Y)6"(SLD)
|
LF
|
240.000
|
$0.780
|
$5.000
|
$5.600
|
$2.830
|
$2.690
|
|
WK ZN PAV MRK SHT TERM (TAB)TY W
|
EA
|
40.000
|
$1.190
|
$2.500
|
$1.120
|
$3.650
|
$27.830
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
200.000
|
$1.120
|
$3.000
|
$1.120
|
$3.650
|
$9.860
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
420.000
|
$0.920
|
$9.000
|
$8.960
|
$4.130
|
$3.930
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
546.000
|
$5.570
|
$17.000
|
$17.920
|
$11.720
|
$11.170
|
|
REFL PAV MRK TY I (W)6"(BRK)(100MIL)
|
LF
|
320.000
|
$0.620
|
$16.000
|
$16.800
|
$2.610
|
$2.480
|
|
REFL PAV MRK TY I (W)6"(SLD)(100MIL)
|
LF
|
985.000
|
$0.480
|
$9.000
|
$8.960
|
$1.740
|
$1.660
|
|
REFL PAV MRK TY I (Y)6"(SLD)(100MIL)
|
LF
|
1,925.000
|
$0.550
|
$4.000
|
$4.480
|
$1.740
|
$1.660
|
|
PREFAB PM TY C (W)(ARROW)
|
EA
|
1.000
|
$170.000
|
$260.000
|
$280.000
|
$260.400
|
$248.310
|
|
PREFAB PM TY C (W)(DBL ARROW)
|
EA
|
2.000
|
$335.000
|
$370.000
|
$392.000
|
$455.700
|
$434.540
|
|
PREFAB PM TY C (W)(RR XING)
|
EA
|
5.000
|
$711.250
|
$526.000
|
$560.000
|
$672.700
|
$641.470
|
|
REFL PAV MRKR TY I-C
|
EA
|
62.000
|
$5.750
|
$8.000
|
$8.400
|
$6.300
|
$6.000
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
90.000
|
$10.170
|
$8.000
|
$7.840
|
$6.300
|
$6.000
|
|
|
ELIM EXT PM & MRKS (12")
|
LF
|
2,600.000
|
$0.850
|
$2.100
|
$2.240
|
$3.260
|
$3.100
|
|
|
ELIM EXT PM & MRKS (ARROW)
|
EA
|
1.000
|
$50.000
|
$157.000
|
$168.000
|
$130.200
|
$124.150
|
|
|
ELIM EXT PM & MRKS (RR XING)
|
EA
|
4.000
|
$250.000
|
$315.000
|
$336.000
|
$217.000
|
$206.930
|
|
|
TREE REMOVAL (30" - 36" DIA)
|
EA
|
3.000
|
$674.203
|
$1,500.000
|
$15,926.610
|
$12,884.190
|
$3,000.000
|
|
Totals: |
$3,802,174.647
|
$5,520,580.000
|
$5,742,691.970
|
$7,956,833.580
|