|
|
REMOVING CONC (FLUME)
|
SY
|
97.000
|
$11.000
|
$21.000
|
$19.950
|
$16.500
|
$22.000
|
$35.000
|
|
|
EMBANKMENT (FINAL)(ORD COMP)(TY D)
|
CY
|
60.000
|
$14.000
|
$42.000
|
$42.290
|
$41.000
|
$48.180
|
$100.000
|
|
|
BACKFILL (TY A OR B)
|
STA
|
722.000
|
$143.000
|
$120.000
|
$57.690
|
$100.000
|
$184.800
|
$180.000
|
|
|
ASPH(AC-15P, HFRS-2P OR CRS-2P)
|
GAL
|
180,607.000
|
$2.500
|
$3.000
|
$2.250
|
$2.200
|
$2.510
|
$3.400
|
|
|
AGGR(TY-PB GR-4S OR TY-PB GR-4)(SAC-B)
|
CY
|
4,213.000
|
$82.000
|
$93.000
|
$92.500
|
$90.000
|
$75.090
|
$64.000
|
|
|
D-GR HMA TY B SAC-B PG (64-22)
|
TON
|
29,992.000
|
$62.000
|
$56.000
|
$59.500
|
$66.000
|
$66.530
|
$77.000
|
|
|
SUPERPAVE MIXTURES SP-D SAC-B PG70-22
|
TON
|
36,460.000
|
$78.000
|
$72.000
|
$67.500
|
$75.000
|
$70.860
|
$91.000
|
|
|
PLANE ASPH CONC PAV(0" TO 2")
|
SY
|
5,061.000
|
$4.000
|
$4.000
|
$1.500
|
$1.500
|
$1.910
|
$2.500
|
|
|
PLANE ASPH CONC PAV (1")
|
SY
|
1,685.000
|
$1.250
|
$2.500
|
$6.910
|
$3.200
|
$1.910
|
$4.500
|
|
|
PLANE ASPH CONC PAV (2")
|
SY
|
303,634.000
|
$1.000
|
$0.400
|
$0.760
|
$1.100
|
$1.790
|
$1.950
|
|
|
PLANE ASPH CONC PAV (4")
|
SY
|
131,654.000
|
$2.500
|
$0.600
|
$1.440
|
$1.800
|
$1.790
|
$4.200
|
|
|
PLANE ASPH CONC PAV (2 1/2")
|
SY
|
7,470.000
|
$1.650
|
$2.500
|
$1.920
|
$1.800
|
$1.910
|
$2.500
|
|
|
RIPRAP (CONC)(FLUME)
|
CY
|
14.000
|
$430.000
|
$777.000
|
$359.330
|
$910.000
|
$480.000
|
$500.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
74.000
|
$470.000
|
$434.000
|
$216.480
|
$540.000
|
$475.000
|
$500.000
|
|
|
CLEANING EXISTING JOINTS
|
LF
|
152.000
|
$6.000
|
$34.000
|
$31.740
|
$22.000
|
$33.340
|
$35.000
|
|
|
RAIL (TY SSTR) (W/DRAIN SLOTS)
|
LF
|
60.000
|
$32.000
|
$250.000
|
$200.000
|
$130.000
|
$100.000
|
$430.000
|
|
|
RETROFIT RAIL (TY SSTR)
|
LF
|
60.000
|
$130.000
|
$700.000
|
$200.000
|
$480.000
|
$300.000
|
$1,320.000
|
|
|
SET (PIPE RUNNER ASSEMBLY)
|
EA
|
2.000
|
$3,000.000
|
$5,000.000
|
$1,888.380
|
$4,700.000
|
$4,000.000
|
$2,000.000
|
|
|
SET (REPLACE PIPE RUNNER ASSEMBLY)
|
EA
|
3.000
|
$4,540.000
|
$3,500.000
|
$1,888.380
|
$5,700.000
|
$4,000.000
|
$2,000.000
|
|
|
CLEAN EXIST CULVERTS
|
EA
|
2.000
|
$1,130.000
|
$3,000.000
|
$1,917.440
|
$2,800.000
|
$2,800.000
|
$3,000.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$472,500.000
|
$347,000.000
|
$436,972.930
|
$300,000.000
|
$549,661.050
|
$750,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
10.000
|
$3,500.000
|
$5,000.000
|
$10,158.880
|
$13,100.000
|
$3,489.120
|
$4,500.000
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (18")
|
LF
|
2,160.000
|
$5.000
|
$6.000
|
$5.050
|
$5.800
|
$4.950
|
$6.000
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
2,160.000
|
$1.000
|
$0.500
|
$1.100
|
$0.550
|
$1.000
|
$1.000
|
|
|
DRIVEWAYS (ACP)
|
SY
|
328.000
|
$30.000
|
$14.000
|
$41.000
|
$14.500
|
$9.990
|
$50.000
|
|
|
RUMBLE STRIPS (SHOULDER)
|
LF
|
112,414.000
|
$0.150
|
$0.200
|
$0.140
|
$0.170
|
$0.160
|
$0.300
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
925.000
|
$20.000
|
$20.000
|
$19.500
|
$23.000
|
$19.160
|
$20.000
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
8.000
|
$1,450.000
|
$1,300.000
|
$1,385.000
|
$1,500.000
|
$1,767.000
|
$1,300.000
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
2.000
|
$800.000
|
$850.000
|
$850.000
|
$990.000
|
$832.000
|
$850.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
950.000
|
$2.000
|
$1.000
|
$1.500
|
$1.200
|
$0.850
|
$1.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
6.000
|
$1,975.000
|
$2,200.000
|
$2,155.000
|
$2,500.000
|
$2,083.000
|
$2,500.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
8.000
|
$140.000
|
$36.000
|
$270.000
|
$59.000
|
$35.000
|
$40.000
|
|
|
MAILBOX INSTALL-S (TWW-POST) TY 4
|
EA
|
37.000
|
$220.000
|
$175.000
|
$175.000
|
$200.000
|
$175.000
|
$200.000
|
|
|
ALUMINUM SIGNS (TY O)
|
SF
|
28.000
|
$18.000
|
$28.000
|
$28.000
|
$30.000
|
$28.000
|
$40.000
|
|
|
REPLACE EXISTING ALUMINUM SIGNS(TY G)
|
SF
|
804.500
|
$23.000
|
$22.000
|
$22.000
|
$23.000
|
$22.000
|
$30.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(P)
|
EA
|
39.000
|
$500.000
|
$400.000
|
$395.000
|
$440.000
|
$395.000
|
$400.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(P-BM)
|
EA
|
28.000
|
$550.000
|
$525.000
|
$525.000
|
$590.000
|
$525.000
|
$600.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(T)
|
EA
|
70.000
|
$585.000
|
$410.000
|
$410.000
|
$460.000
|
$410.000
|
$450.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U)
|
EA
|
6.000
|
$720.000
|
$550.000
|
$550.000
|
$620.000
|
$550.000
|
$600.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U-EXAL)
|
EA
|
5.000
|
$1,250.000
|
$775.000
|
$775.000
|
$870.000
|
$775.000
|
$800.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
136.000
|
$65.000
|
$55.000
|
$55.000
|
$62.000
|
$55.000
|
$60.000
|
|
|
REMOVE LRSA
|
EA
|
1.000
|
$375.000
|
$1,000.000
|
$950.000
|
$1,000.000
|
$950.000
|
$500.000
|
|
|
REMOVE OVERHD SIGN SUP (SIGN ONLY)
|
EA
|
2.000
|
$340.000
|
$125.000
|
$125.000
|
$130.000
|
$125.000
|
$1,500.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(FLX)GND
|
EA
|
63.000
|
$55.000
|
$55.000
|
$55.000
|
$62.000
|
$55.000
|
$55.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)CTB
|
EA
|
34.000
|
$22.000
|
$14.000
|
$12.500
|
$14.000
|
$12.500
|
$13.000
|
|
|
INSTL DEL ASSM (D-SY)SZ (BRF)CTB
|
EA
|
34.000
|
$25.000
|
$14.000
|
$12.750
|
$14.250
|
$12.750
|
$14.000
|
|
|
INSTL DEL ASSM (D-SY)SZ (BRF)CTB (BI)
|
EA
|
32.000
|
$19.000
|
$15.000
|
$15.000
|
$16.750
|
$15.000
|
$20.000
|
|
|
INSTL DEL ASSM (D-DY)SZ 1(FLX)GND
|
EA
|
16.000
|
$67.000
|
$55.000
|
$55.000
|
$62.000
|
$55.000
|
$60.000
|
|
|
INSTL OM ASSM (OM-2Z)(FLX)GND
|
EA
|
90.000
|
$71.000
|
$55.000
|
$55.000
|
$62.000
|
$55.000
|
$60.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
|
EA
|
18.000
|
$25.000
|
$30.000
|
$30.000
|
$34.000
|
$30.000
|
$35.000
|
|
|
INSTL DEL ASSM (D-SY)SZ 1(BRF)GF2
|
EA
|
12.000
|
$25.000
|
$30.000
|
$30.000
|
$34.000
|
$30.000
|
$35.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(BRK)
|
LF
|
29,455.000
|
$0.340
|
$0.200
|
$0.200
|
$0.230
|
$0.200
|
$0.200
|
|
|
WK ZN PAV MRK NON-REMOV (W)8"(SLD)
|
LF
|
12,244.000
|
$1.160
|
$0.400
|
$0.440
|
$0.420
|
$0.400
|
$0.400
|
|
|
WK ZN PAV MRK NON-REMOV (W)24"(SLD)
|
LF
|
246.000
|
$12.500
|
$3.000
|
$2.770
|
$2.900
|
$2.770
|
$3.000
|
|
|
WK ZN PAV MRK NON-REMOV(W)36"(YLD TRI)
|
EA
|
37.000
|
$29.000
|
$22.000
|
$22.000
|
$23.000
|
$22.000
|
$22.000
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
|
LF
|
3,164.000
|
$0.300
|
$0.300
|
$0.300
|
$0.320
|
$0.300
|
$0.300
|
|
|
WK ZN PAV MRK REMOV (TRAF BTN) TY W
|
LF
|
3,100.000
|
$5.000
|
$0.550
|
$0.550
|
$0.600
|
$0.550
|
$0.550
|
|
|
WK ZN PAV MRK REMOV (TRAF BTN) TY Y
|
LF
|
1,550.000
|
$5.000
|
$0.550
|
$0.550
|
$0.600
|
$0.550
|
$0.550
|
|
WK ZN PAV MRK SHT TERM (TAB)TY W
|
EA
|
5,907.000
|
$0.850
|
$1.500
|
$0.950
|
$0.700
|
$1.600
|
$1.000
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
30.000
|
$0.760
|
$1.500
|
$9.750
|
$1.300
|
$1.600
|
$1.000
|
|
REFL PAV MRK TY I (W)8"(SLD)(090MIL)
|
LF
|
9,161.000
|
$0.540
|
$0.700
|
$0.670
|
$0.700
|
$0.670
|
$0.700
|
|
RE PM W/RET REQ TY I (W)4"(BRK)(090MIL)
|
LF
|
16,710.000
|
$0.230
|
$0.340
|
$0.340
|
$0.360
|
$0.340
|
$0.400
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(090MIL)
|
LF
|
75,808.000
|
$0.220
|
$0.300
|
$0.300
|
$0.320
|
$0.300
|
$0.300
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(090MIL)
|
LF
|
76,137.000
|
$0.230
|
$0.300
|
$0.300
|
$0.320
|
$0.300
|
$0.300
|
|
PREFAB PAV MRK TY C (W) (24") (SLD)
|
LF
|
396.000
|
$12.000
|
$11.000
|
$11.000
|
$11.750
|
$11.000
|
$11.000
|
|
PREFAB PAV MRK TY C (W) (ARROW)
|
EA
|
25.000
|
$196.000
|
$200.000
|
$200.000
|
$210.000
|
$200.000
|
$200.000
|
|
PREFAB PAV MRK TY C (W) (WORD)
|
EA
|
25.000
|
$235.000
|
$220.000
|
$220.000
|
$230.000
|
$220.000
|
$220.000
|
|
PREFAB PAV MRK TY C (W) (36")(YLD TRI)
|
EA
|
87.000
|
$30.000
|
$37.000
|
$37.000
|
$39.000
|
$37.000
|
$37.000
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
381.000
|
$3.000
|
$3.000
|
$3.000
|
$3.200
|
$3.000
|
$3.000
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
1,437.000
|
$3.000
|
$3.000
|
$3.000
|
$3.200
|
$3.000
|
$3.000
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
3,490.000
|
$2.500
|
$0.500
|
$0.470
|
$1.250
|
$0.470
|
$2.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
DAY
|
334.000
|
$70.000
|
$80.000
|
$52.560
|
$50.000
|
$64.950
|
$50.000
|
|
Totals: |
$7,233,639.050
|
$6,433,805.700
|
$6,466,666.660
|
$7,061,150.090
|
$7,296,389.760
|
$9,167,593.600
|