|
|
REMOVING CONC (HEADWALL)
|
CY
|
4.000
|
$150.000
|
$1,231.670
|
$780.000
|
$530.000
|
$1,815.000
|
$928.170
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
76.000
|
$10.000
|
$76.600
|
$43.000
|
$13.000
|
$145.000
|
$71.960
|
|
|
SUBGRADE WIDENING (DENS CONT)
|
STA
|
119.000
|
$500.000
|
$207.980
|
$353.000
|
$220.000
|
$425.000
|
$563.330
|
|
|
BACKFILL (TY B)
|
STA
|
119.000
|
$130.000
|
$96.700
|
$211.000
|
$220.000
|
$205.000
|
$268.300
|
|
|
FL BS (CMP IN PLC)(TYA GR1-2)(FNAL POS)
|
CY
|
3,709.000
|
$55.000
|
$71.480
|
$81.000
|
$81.000
|
$102.500
|
$86.160
|
|
|
PRIME COAT (MC-30)
|
GAL
|
2,945.000
|
$4.000
|
$3.840
|
$4.200
|
$4.800
|
$5.750
|
$5.610
|
|
|
ASPH (MULTI OPTION)
|
GAL
|
5,221.000
|
$3.000
|
$3.300
|
$2.150
|
$3.200
|
$3.500
|
$4.580
|
|
|
ASPH(AC-15P, HFRS-2P OR CRS-2P)
|
GAL
|
12,830.000
|
$3.000
|
$3.330
|
$2.800
|
$2.800
|
$3.500
|
$4.650
|
|
|
AGGR(TY-PB GR-4S OR TY-PB GR-4)(SAC-B)
|
CY
|
361.000
|
$100.000
|
$112.650
|
$120.000
|
$110.000
|
$150.000
|
$130.840
|
|
|
AGGR(TY-PB GR-3 OR TY-PB GR-3S)(SAC-B)
|
CY
|
158.000
|
$75.000
|
$168.330
|
$220.000
|
$250.000
|
$240.000
|
$210.480
|
|
|
DRILL SHAFT (RDWY ILL POLE) (30 IN)
|
LF
|
48.000
|
$200.000
|
$380.800
|
$337.000
|
$390.000
|
$320.000
|
$376.030
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
106.000
|
$500.000
|
$485.180
|
$526.000
|
$650.000
|
$655.000
|
$702.440
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
796.000
|
$65.000
|
$55.680
|
$70.000
|
$62.000
|
$81.000
|
$102.730
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
12.000
|
$75.000
|
$69.280
|
$208.000
|
$120.000
|
$125.000
|
$169.280
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (C)
|
EA
|
4.000
|
$1,100.000
|
$2,252.380
|
$1,540.000
|
$1,200.000
|
$1,700.000
|
$1,392.590
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
58.000
|
$1,000.000
|
$1,001.020
|
$1,300.000
|
$1,200.000
|
$1,700.000
|
$1,392.590
|
|
|
SET (TY II) (24 IN) (RCP) (4: 1) (C)
|
EA
|
6.000
|
$1,100.000
|
$2,281.700
|
$1,690.000
|
$1,600.000
|
$2,500.000
|
$1,795.090
|
|
|
CLEAN EXIST CULVERTS
|
EA
|
5.000
|
$2,000.000
|
$2,115.020
|
$1,160.000
|
$3,200.000
|
$1,500.000
|
$2,225.500
|
|
|
REMOV STR (PIPE)
|
LF
|
697.000
|
$16.000
|
$19.940
|
$12.000
|
$22.000
|
$15.000
|
$11.230
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$100,000.000
|
$136,599.610
|
$125,000.000
|
$61,200.000
|
$135,000.000
|
$146,545.650
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
4.000
|
$5,500.000
|
$370.060
|
$5,050.000
|
$13,000.000
|
$6,500.000
|
$6,027.400
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
120.000
|
$2.500
|
$9.520
|
$7.000
|
$9.700
|
$7.000
|
$7.410
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
120.000
|
$1.000
|
$6.050
|
$7.000
|
$5.200
|
$5.000
|
$7.410
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (18")
|
LF
|
300.000
|
$3.500
|
$6.720
|
$9.300
|
$6.800
|
$7.000
|
$9.130
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
300.000
|
$1.000
|
$2.800
|
$4.050
|
$2.900
|
$1.000
|
$4.180
|
|
|
INTERSECTIONS (SURF TREAT)
|
SY
|
428.000
|
$30.000
|
$25.130
|
$56.000
|
$60.000
|
$30.000
|
$52.000
|
|
|
DRIVEWAYS (SURF TREAT)
|
SY
|
1,688.000
|
$25.000
|
$34.370
|
$62.010
|
$55.000
|
$25.000
|
$30.260
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
1,325.000
|
$25.000
|
$28.000
|
$28.000
|
$24.000
|
$26.000
|
$26.470
|
|
|
MTL BM GD FEN (LONG SPAN SYSTEM)
|
EA
|
2.000
|
$900.000
|
$1,344.000
|
$1,110.000
|
$960.000
|
$1,800.000
|
$1,093.770
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
4.000
|
$3,000.000
|
$1,680.000
|
$3,320.000
|
$1,400.000
|
$3,000.000
|
$3,159.390
|
|
|
MAILBOX INSTALL-S (RR-POST) TY 4
|
EA
|
8.000
|
$250.000
|
$274.400
|
$215.000
|
$280.000
|
$250.000
|
$281.690
|
|
|
MAILBOX INSTALL-D (RR-POST) TY 4
|
EA
|
2.000
|
$250.000
|
$296.800
|
$256.000
|
$300.000
|
$325.000
|
$340.270
|
|
|
MAILBOX INSTALL-M (TWG-POST) TY 4
|
EA
|
1.000
|
$350.000
|
$420.000
|
$378.000
|
$430.000
|
$400.000
|
$510.050
|
|
|
IN RD IL (TY SA) 40T-8 (250W EQ) LED
|
EA
|
6.000
|
$3,500.000
|
$3,131.520
|
$3,250.000
|
$4,100.000
|
$3,100.000
|
$4,122.580
|
|
|
CONDT (PVC) (SCH 40) (2")
|
LF
|
1,045.000
|
$10.000
|
$7.840
|
$8.150
|
$16.500
|
$7.750
|
$16.040
|
|
|
CONDT (PVC) (SCH 80) (2") (BORE)
|
LF
|
50.000
|
$20.000
|
$56.000
|
$58.000
|
$83.000
|
$56.000
|
$82.250
|
|
|
CONDT (PVC) (SCH 80) (3")
|
LF
|
10.000
|
$15.000
|
$33.600
|
$35.000
|
$55.000
|
$40.000
|
$63.100
|
|
|
ELEC CONDR (NO.6) BARE
|
LF
|
1,135.000
|
$1.500
|
$1.230
|
$1.300
|
$2.600
|
$1.250
|
$2.620
|
|
|
ELEC CONDR (NO.6) INSULATED
|
LF
|
2,270.000
|
$1.500
|
$1.400
|
$1.450
|
$2.600
|
$1.500
|
$2.570
|
|
|
GROUND BOX TY A (122311)W/APRON
|
EA
|
2.000
|
$900.000
|
$1,243.200
|
$128.000
|
$1,400.000
|
$1,250.000
|
$1,423.770
|
|
|
ELC SRV TY A 240/480 060(NS)SS(E)GC(U)
|
EA
|
1.000
|
$5,500.000
|
$6,100.640
|
$6,450.000
|
$10,000.000
|
$6,500.000
|
$9,777.550
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(P)
|
EA
|
36.000
|
$450.000
|
$532.000
|
$553.000
|
$540.000
|
$550.000
|
$525.210
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(T)
|
EA
|
14.000
|
$525.000
|
$728.000
|
$669.000
|
$740.000
|
$650.000
|
$721.970
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U)
|
EA
|
1.000
|
$650.000
|
$868.000
|
$733.000
|
$880.000
|
$750.000
|
$950.050
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U-BM)
|
EA
|
1.000
|
$400.000
|
$1,176.000
|
$919.000
|
$1,200.000
|
$900.000
|
$1,252.550
|
|
|
RELOCATE SM RD SN SUP&AM TY S80
|
EA
|
3.000
|
$500.000
|
$392.000
|
$483.000
|
$400.000
|
$525.000
|
$417.520
|
|
|
RELOCATE SM RD SN SUP & AM TY TEMP
|
EA
|
34.000
|
$150.000
|
$123.200
|
$128.000
|
$130.000
|
$250.000
|
$123.870
|
|
|
ISRSA TYS80(1)SA(P) (EXCLUDING SIGN)
|
EA
|
2.000
|
$425.000
|
$414.400
|
$471.000
|
$420.000
|
$500.000
|
$455.770
|
|
|
INSTL OM ASSM (OM-2Z)(FLX)GND(BI)
|
EA
|
4.000
|
$50.000
|
$84.000
|
$61.000
|
$85.000
|
$70.000
|
$106.890
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
|
EA
|
15.000
|
$25.000
|
$24.640
|
$30.000
|
$25.000
|
$35.000
|
$30.700
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
1,086.000
|
$1.000
|
$0.730
|
$1.150
|
$2.500
|
$1.000
|
$17.320
|
|
REFL PAV MRK TY II (W) 4" (SLD)
|
LF
|
23,850.000
|
$0.150
|
$0.170
|
$0.200
|
$0.320
|
$0.320
|
$0.310
|
|
REFL PAV MRK TY II (Y) 4" (BRK)
|
LF
|
4,730.000
|
$0.150
|
$0.170
|
$0.200
|
$0.340
|
$0.320
|
$0.350
|
|
REFL PAV MRK TY II (Y) 4" (SLD)
|
LF
|
13,986.000
|
$0.150
|
$0.170
|
$0.200
|
$0.330
|
$0.320
|
$0.330
|
|
|
REF PROF PAV MRK TY I(W)4"(SLD)(060MIL)
|
LF
|
23,850.000
|
$0.500
|
$0.780
|
$0.750
|
$0.700
|
$0.670
|
$0.660
|
|
|
REF PROF PAV MRK TY I(Y)4"(SLD)(090MIL)
|
LF
|
13,986.000
|
$0.500
|
$0.780
|
$0.900
|
$0.750
|
$0.700
|
$0.720
|
|
|
REF PROF PAV MRK TY I(Y)4"(BRK)(090MIL)
|
LF
|
4,730.000
|
$0.500
|
$0.780
|
$0.900
|
$6.800
|
$6.750
|
$6.620
|
|
PREFAB PAV MRK TY C (W) (12") (SLD)
|
LF
|
88.000
|
$8.000
|
$12.320
|
$8.350
|
$15.750
|
$17.000
|
$16.510
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
239.000
|
$3.000
|
$4.480
|
$5.950
|
$5.700
|
$5.800
|
$5.910
|
|
|
ELIM EXT PAV MRK & MRKS (24")
|
LF
|
38.000
|
$1.500
|
$50.400
|
$17.000
|
$16.000
|
$5.800
|
$8.070
|
|
|
TREE TRIMMING / BRUSH REMOVAL
|
MI
|
1.500
|
$12,000.000
|
$21,873.600
|
$13,100.000
|
$22,200.000
|
$18,000.000
|
$5,877.630
|
|
|
GEOGRID BASE REINFORCEMENT (TY I)
|
SY
|
18,606.000
|
$1.500
|
$0.710
|
$1.750
|
$1.350
|
$1.500
|
$2.750
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
3.000
|
$8,000.000
|
$4,704.000
|
$5,670.000
|
$10,500.000
|
$15,000.000
|
$8,530.200
|
|
|
TMA (STATIONARY)
|
EA
|
1.000
|
$6,000.000
|
$16,800.000
|
$100.000
|
$16,200.000
|
$30,000.000
|
$13,297.550
|
|
|
TMA (MOBILE OPERATION)
|
HR
|
70.000
|
$50.000
|
$134.400
|
$10.000
|
$51.000
|
$35.000
|
$117.170
|
|
|
SOLAR POWERED LED WARNING SIGN
|
EA
|
1.000
|
$3,500.000
|
$2,626.400
|
$4,420.000
|
$3,200.000
|
$4,500.000
|
$3,177.550
|
|
|
SOLAR POWERED LED ROADSIDE SIGN
|
EA
|
1.000
|
$4,000.000
|
$2,626.400
|
$4,420.000
|
$3,600.000
|
$4,500.000
|
$3,507.550
|
|
Totals: |
$1,022,958.400
|
$1,150,495.070
|
$1,289,539.130
|
$1,337,642.180
|
$1,510,724.170
|
$1,516,459.695
|