PREPARING ROW
|
STA
|
75.000
|
$4,400.000
|
$2,787.000
|
$4,000.000
|
$3,500.000
|
$1,000.000
|
$7,000.000
|
|
|
REMOV CONC (PAV)
|
SY
|
686.000
|
$52.500
|
$20.000
|
$16.500
|
$17.000
|
$40.000
|
$20.000
|
|
|
REMOV CONC (RIPRAP)
|
SY
|
39.000
|
$37.000
|
$50.000
|
$18.000
|
$25.000
|
$40.000
|
$20.000
|
|
|
REMOV CONC (CURB)
|
LF
|
370.000
|
$10.500
|
$10.000
|
$18.000
|
$7.000
|
$10.000
|
$20.000
|
|
|
REMOV CONC (FLUME)
|
SY
|
1.550
|
$35.000
|
$250.000
|
$30.000
|
$310.000
|
$40.000
|
$20.000
|
|
|
RMV (16"-20") TRT/UNTRT BASE & ASPH PAV
|
SY
|
98.000
|
$25.000
|
$30.000
|
$25.000
|
$71.750
|
$40.000
|
$20.000
|
|
|
RMV (12") TRT/UNTRT BASE & ASPH PAV
|
SY
|
686.000
|
$12.000
|
$15.000
|
$20.000
|
$15.000
|
$50.000
|
$20.000
|
|
|
EXCAV (ROADWAY)
|
CY
|
34,115.000
|
$10.000
|
$15.000
|
$15.000
|
$14.500
|
$20.000
|
$20.000
|
|
|
EMBANK (FNL)(DC)(TY B)
|
CY
|
2,420.000
|
$17.750
|
$20.000
|
$15.000
|
$37.000
|
$40.000
|
$50.000
|
|
|
BACKFILL (TY A)
|
STA
|
75.000
|
$210.000
|
$300.000
|
$240.000
|
$275.000
|
$200.000
|
$450.000
|
|
|
VEGETATIVE WATERING
|
TGL
|
1,040.000
|
$30.000
|
$2.100
|
$21.000
|
$40.000
|
$25.000
|
$30.000
|
|
|
WILDFLOWER SEEDING
|
AC
|
6.130
|
$4,500.000
|
$2,100.000
|
$2,750.000
|
$2,500.000
|
$200.000
|
$3,500.000
|
|
|
FL BS (CMP IN PLC)(TY A GR 1-2) (6")
|
SY
|
24,362.000
|
$14.000
|
$15.000
|
$13.000
|
$14.000
|
$10.000
|
$18.000
|
|
|
LIME (COM OR QK)(SLURRY) OR QK(DRY)
|
TON
|
400.000
|
$366.000
|
$308.000
|
$340.000
|
$340.000
|
$400.000
|
$385.000
|
|
|
LIME TRT (SUBGRADE) (8")
|
SY
|
13,711.000
|
$7.000
|
$4.500
|
$4.000
|
$5.600
|
$10.000
|
$8.000
|
|
|
LIME TRT (SUBGRADE) (18")
|
SY
|
4,554.000
|
$12.500
|
$11.000
|
$13.000
|
$18.000
|
$20.000
|
$20.000
|
|
|
CEMENT
|
TON
|
147.000
|
$287.500
|
$400.000
|
$407.000
|
$470.000
|
$250.000
|
$350.000
|
|
|
CEMENT TRT (SUBGRADE) (8")
|
SY
|
10,611.000
|
$5.500
|
$2.250
|
$3.500
|
$5.000
|
$20.000
|
$8.000
|
|
|
PRIME COAT (MC-30)
|
GAL
|
10,452.000
|
$7.750
|
$5.500
|
$5.750
|
$6.500
|
$10.000
|
$6.000
|
|
|
D-GR HMA TY-B PG64-22
|
TON
|
702.000
|
$115.000
|
$133.000
|
$165.000
|
$151.000
|
$200.000
|
$130.000
|
|
|
TACK COAT
|
GAL
|
630.000
|
$3.150
|
$1.500
|
$0.010
|
$1.900
|
$10.000
|
$6.000
|
|
|
SP MIXES SP-C SAC-A PG70-28
|
TON
|
2,659.000
|
$260.000
|
$165.000
|
$184.800
|
$182.000
|
$190.000
|
$155.000
|
|
|
TACK COAT
|
GAL
|
4,879.000
|
$4.750
|
$1.500
|
$0.010
|
$1.900
|
$5.000
|
$6.000
|
|
|
PLANE & TEXT ASPH CONC PAV(0" TO 2")
|
SY
|
359.000
|
$8.000
|
$15.000
|
$10.000
|
$54.000
|
$22.000
|
$20.000
|
|
|
CONC PVMT (CRCP) (11")
|
SY
|
2,865.000
|
$140.000
|
$136.000
|
$125.000
|
$123.000
|
$120.000
|
$110.000
|
|
|
CUT & RESTORE ASPH PAVING
|
SY
|
35.000
|
$155.000
|
$175.000
|
$200.000
|
$472.000
|
$200.000
|
$200.000
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
242.000
|
$15.000
|
$10.000
|
$2.200
|
$20.000
|
$10.000
|
$10.000
|
|
|
RIPRAP (CONC)(4 IN)
|
CY
|
191.000
|
$790.000
|
$500.000
|
$670.000
|
$510.000
|
$800.000
|
$550.000
|
|
|
RIPRAP (CONC)(5 IN)
|
CY
|
105.000
|
$700.000
|
$500.000
|
$670.000
|
$650.000
|
$1,000.000
|
$600.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
89.000
|
$650.000
|
$650.000
|
$700.000
|
$1,020.000
|
$800.000
|
$550.000
|
|
|
RIPRAP (STONE COMMON)(DRY)(18 IN)
|
CY
|
848.000
|
$210.000
|
$250.000
|
$125.000
|
$224.000
|
$250.000
|
$160.000
|
|
|
CONC BOX CULV (5 FT X 2 FT)
|
LF
|
177.000
|
$505.000
|
$520.000
|
$455.000
|
$453.000
|
$500.000
|
$450.000
|
|
|
CONC BOX CULV (7 FT X 3 FT)
|
LF
|
108.000
|
$945.000
|
$730.000
|
$750.000
|
$640.000
|
$700.000
|
$850.000
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
144.000
|
$93.000
|
$100.000
|
$76.000
|
$104.000
|
$80.000
|
$85.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
189.000
|
$110.000
|
$150.000
|
$91.000
|
$175.000
|
$130.000
|
$105.000
|
|
|
INLET (COMPL)(PSL)(RC)(4FTX4FT)
|
EA
|
1.000
|
$6,868.000
|
$12,000.000
|
$7,650.000
|
$11,500.000
|
$6,000.000
|
$12,500.000
|
|
|
INLT (COMPL)(AD)(4'X 4'-3' X 3')(FTW)
|
EA
|
1.000
|
$10,000.000
|
$12,000.000
|
$9,000.000
|
$10,300.000
|
$6,000.000
|
$12,500.000
|
|
|
HEADWALL (CH - FW - 0) (DIA= 18 IN)
|
EA
|
2.000
|
$6,500.000
|
$7,500.000
|
$3,000.000
|
$5,000.000
|
$2,000.000
|
$1,650.000
|
|
|
HEADWALL (CH - PW - S) (DIA= 24 IN)
|
EA
|
2.000
|
$8,000.000
|
$10,000.000
|
$9,200.000
|
$8,160.000
|
$3,000.000
|
$2,200.000
|
|
|
WINGWALL (PW - 1) (HW=5 FT)
|
EA
|
4.000
|
$15,200.000
|
$18,000.000
|
$13,000.000
|
$17,750.000
|
$8,000.000
|
$6,500.000
|
|
|
REMOV STR (PIPE)
|
LF
|
200.000
|
$22.750
|
$100.000
|
$17.000
|
$31.000
|
$10.000
|
$50.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$463,752.420
|
$397,000.000
|
$440,000.000
|
$475,000.000
|
$300,000.000
|
$500,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
14.000
|
$10,000.000
|
$10,500.000
|
$5,000.000
|
$10,000.000
|
$10,000.000
|
$12,500.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
3.000
|
$13,000.000
|
$5,000.000
|
$13,200.000
|
$23,500.000
|
$1,000.000
|
$20,000.000
|
|
|
TMA (STATIONARY)
|
DAY
|
283.000
|
$125.000
|
$100.000
|
$205.000
|
$350.000
|
$300.000
|
$250.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
2.000
|
$300.000
|
$1,000.000
|
$205.000
|
$780.000
|
$300.000
|
$550.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
130.000
|
$50.000
|
$89.250
|
$44.000
|
$75.000
|
$40.000
|
$30.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 3)
|
LF
|
194.000
|
$80.000
|
$99.750
|
$77.000
|
$167.000
|
$40.000
|
$50.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
324.000
|
$15.000
|
$52.500
|
$14.300
|
$24.000
|
$10.000
|
$20.000
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
156.000
|
$30.000
|
$36.750
|
$44.000
|
$57.000
|
$30.000
|
$40.000
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
156.000
|
$11.000
|
$18.380
|
$16.500
|
$16.900
|
$10.000
|
$20.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
6,408.000
|
$4.000
|
$3.410
|
$4.400
|
$4.900
|
$5.000
|
$4.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
6,408.000
|
$1.000
|
$1.580
|
$1.100
|
$1.200
|
$1.000
|
$2.000
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
32.000
|
$7.000
|
$6.300
|
$11.000
|
$9.000
|
$6.000
|
$12.000
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
32.000
|
$1.750
|
$3.150
|
$5.500
|
$1.200
|
$1.000
|
$5.000
|
|
|
PORT CTB (FUR & INST)(F-SHAPE)(TY 1)
|
LF
|
2,550.000
|
$90.000
|
$10.000
|
$72.000
|
$31.000
|
$60.000
|
$100.000
|
|
|
PORT CTB (REMOVE)(F-SHAPE)(TY 1)
|
LF
|
2,550.000
|
$27.000
|
$8.000
|
$14.000
|
$6.000
|
$10.000
|
$20.000
|
|
|
CONC CURB (TY II)
|
LF
|
60.000
|
$48.500
|
$50.000
|
$45.000
|
$50.000
|
$40.000
|
$75.000
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
1,638.000
|
$28.000
|
$30.000
|
$30.600
|
$30.000
|
$40.000
|
$28.000
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
7.000
|
$1,500.000
|
$1,500.000
|
$1,750.000
|
$1,200.000
|
$1,500.000
|
$1,850.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
7.000
|
$3,500.000
|
$4,000.000
|
$3,450.000
|
$3,000.000
|
$3,500.000
|
$1,850.000
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
2.000
|
$1,050.000
|
$1,500.000
|
$2,100.000
|
$2,400.000
|
$1,000.000
|
$2,500.000
|
|
|
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
|
EA
|
2.000
|
$10,500.000
|
$9,000.000
|
$8,600.000
|
$8,300.000
|
$10,000.000
|
$21,000.000
|
|
|
ALUMINUM SIGNS (TY G)
|
SF
|
102.000
|
$17.000
|
$49.000
|
$49.500
|
$40.000
|
$40.000
|
$50.000
|
|
|
ALUMINUM SIGNS (TY O)
|
SF
|
329.000
|
$38.000
|
$45.000
|
$46.000
|
$42.000
|
$50.000
|
$50.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
8.000
|
$1,295.000
|
$750.000
|
$698.500
|
$780.000
|
$800.000
|
$1,150.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P-BM)
|
EA
|
1.000
|
$1,628.000
|
$850.000
|
$819.500
|
$1,000.000
|
$800.000
|
$1,150.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
19.000
|
$966.000
|
$800.000
|
$786.500
|
$966.000
|
$800.000
|
$1,150.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(P)
|
EA
|
1.000
|
$890.000
|
$1,000.000
|
$988.900
|
$1,470.000
|
$800.000
|
$1,150.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(P-BM)
|
EA
|
2.000
|
$740.000
|
$1,200.000
|
$1,182.500
|
$1,248.000
|
$1,000.000
|
$1,150.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(T)
|
EA
|
5.000
|
$1,168.000
|
$1,200.000
|
$1,149.500
|
$1,242.000
|
$800.000
|
$1,150.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U)
|
EA
|
1.000
|
$1,678.000
|
$1,450.000
|
$1,428.900
|
$1,338.000
|
$800.000
|
$1,150.000
|
|
|
IN SM RD SN SUP&AM (INST SIGN ONLY)
|
EA
|
4.000
|
$140.000
|
$420.000
|
$429.000
|
$420.000
|
$500.000
|
$1,150.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
11.000
|
$805.000
|
$100.000
|
$97.900
|
$180.000
|
$100.000
|
$500.000
|
|
|
REMOVE SM RD SN SUP&AM (SIGN ONLY)
|
EA
|
5.000
|
$70.000
|
$50.000
|
$49.500
|
$180.000
|
$100.000
|
$500.000
|
|
|
INSTALL LRSS (STRUCT STEEL)
|
LB
|
639.000
|
$17.000
|
$10.000
|
$8.690
|
$11.000
|
$10.000
|
$50.000
|
|
|
REMOVE OVERHD SIGN SUP (SIGN ONLY)
|
EA
|
2.000
|
$1,840.000
|
$950.000
|
$962.500
|
$1,200.000
|
$1,000.000
|
$10,000.000
|
|
|
REMOVE SIGN WALKWAY
|
EA
|
2.000
|
$2,700.000
|
$1,750.000
|
$1,725.900
|
$1,900.000
|
$2,000.000
|
$5,000.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
|
EA
|
30.000
|
$32.000
|
$27.000
|
$27.500
|
$42.000
|
$10.000
|
$100.000
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
1,193.000
|
$2.100
|
$1.000
|
$0.990
|
$1.200
|
$2.000
|
$6.000
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
74.000
|
$11.820
|
$7.000
|
$7.370
|
$8.800
|
$10.000
|
$20.000
|
|
REFL PAV MRK TY I(W)(DBL ARROW)(100MIL)
|
EA
|
4.000
|
$306.000
|
$300.000
|
$202.400
|
$232.000
|
$350.000
|
$500.000
|
|
REFL PAV MRK TY I (Y)8"(SLD)(100MIL)
|
LF
|
970.000
|
$2.000
|
$0.950
|
$1.050
|
$1.200
|
$2.000
|
$6.000
|
|
REFL PAV MRK TY I (Y)24"(SLD)(100MIL)
|
LF
|
221.000
|
$8.250
|
$7.000
|
$7.370
|
$8.500
|
$10.000
|
$20.000
|
|
RE PM TY II (W) 6" (BRK)
|
LF
|
2,400.000
|
$1.000
|
$0.170
|
$0.300
|
$0.350
|
$1.200
|
$1.000
|
|
RE PM TY II (W) 6" (SLD)
|
LF
|
11,329.000
|
$1.000
|
$0.140
|
$0.220
|
$0.250
|
$1.200
|
$1.000
|
|
RE PM TY II (Y) 6" (SLD)
|
LF
|
10,602.000
|
$1.000
|
$0.140
|
$0.220
|
$0.250
|
$1.200
|
$1.000
|
|
|
PAVEMENT SLER 6"
|
LF
|
24,331.000
|
$0.500
|
$0.080
|
$0.190
|
$0.220
|
$0.600
|
$1.000
|
|
|
PAVEMENT SLER 8"
|
LF
|
1,996.000
|
$0.500
|
$0.100
|
$0.290
|
$0.320
|
$0.900
|
$6.000
|
|
|
PAVEMENT SLER 24"
|
LF
|
74.000
|
$1.000
|
$1.000
|
$1.490
|
$1.700
|
$5.000
|
$20.000
|
|
|
PAVEMENT SLER (DBL ARROW)
|
EA
|
4.000
|
$47.250
|
$60.000
|
$40.700
|
$46.500
|
$250.000
|
$500.000
|
|
REFL PAV MRK TY I (W)6"(BRK)(100MIL)
|
LF
|
2,400.000
|
$1.080
|
$0.770
|
$0.660
|
$0.770
|
$1.200
|
$1.000
|
|
REFL PAV MRK TY I (W)6"(SLD)(100MIL)
|
LF
|
11,329.000
|
$5.600
|
$0.770
|
$0.660
|
$0.760
|
$1.200
|
$1.000
|
|
REFL PAV MRK TY I (Y)6"(SLD)(100MIL)
|
LF
|
10,602.000
|
$6.000
|
$0.770
|
$0.660
|
$0.770
|
$1.200
|
$1.000
|
|
REFL PAV MRKR TY I-R
|
EA
|
14.000
|
$8.250
|
$10.000
|
$4.950
|
$5.750
|
$10.000
|
$6.000
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
157.000
|
$5.500
|
$10.000
|
$4.950
|
$5.750
|
$10.000
|
$6.000
|
|
|
ELIM EXT PM & MRKS (4")
|
LF
|
13,686.000
|
$1.250
|
$0.400
|
$0.370
|
$0.430
|
$1.000
|
$1.000
|
|
|
ELIM EXT PM & MRKS (24")
|
LF
|
12.000
|
$3.650
|
$3.500
|
$2.920
|
$3.450
|
$3.000
|
$20.000
|
|
|
ELIM EXT PM & MRKS (DBL ARROW)
|
EA
|
3.000
|
$71.500
|
$166.000
|
$58.300
|
$67.000
|
$190.000
|
$500.000
|
|
|
ELIM EXT PM & MRKS (WORD)
|
EA
|
2.000
|
$71.500
|
$107.000
|
$48.400
|
$55.000
|
$190.000
|
$250.000
|
|
|
PAV SURF PREP FOR MRK (6")
|
LF
|
8,797.000
|
$0.250
|
$0.130
|
$0.020
|
$0.250
|
$1.250
|
$1.000
|
|
Totals: |
$5,101,276.600
|
$4,249,843.650
|
$4,406,664.940
|
$4,750,846.650
|
$4,859,286.650
|
$5,519,046.000
|