PREPARING ROW
|
STA
|
7.060
|
$14,279.000
|
$3,620.890
|
$4,000.000
|
$35,000.000
|
|
|
REMOV CONC (RIPRAP)
|
SY
|
211.000
|
$50.000
|
$101.899
|
$25.000
|
$42.000
|
|
|
RMV (12") TRT/UNTRT BASE & ASPH PAV
|
SY
|
1,724.000
|
$60.000
|
$8.224
|
$23.000
|
$7.500
|
|
|
EXCAV (ROADWAY)
|
CY
|
654.000
|
$37.000
|
$57.534
|
$42.000
|
$55.000
|
|
|
EMBANK (FNL)(DC)(TY C)
|
CY
|
618.000
|
$25.000
|
$31.304
|
$57.000
|
$55.000
|
|
|
BACKFILL (TY B)
|
STA
|
6.220
|
$335.000
|
$413.875
|
$4,000.000
|
$1,000.000
|
|
|
COMPOST MANUF TOPSOIL (4")
|
SY
|
1,942.000
|
$5.100
|
$19.103
|
$5.000
|
$11.250
|
|
|
BROADCAST SEED (PERM_URBAN_CLAY)
|
SY
|
3,089.000
|
$0.700
|
$1.881
|
$0.800
|
$6.000
|
|
|
DRILL SEED (TEMP_WARM)
|
SY
|
1,545.000
|
$0.300
|
$0.484
|
$1.200
|
$0.750
|
|
|
DRILL SEED (TEMP_COOL)
|
SY
|
1,545.000
|
$0.300
|
$0.570
|
$1.200
|
$0.750
|
|
|
VEGETATIVE WATERING
|
TGL
|
109.000
|
$116.000
|
$161.250
|
$50.000
|
$3.000
|
|
|
FL BS (CMP IN PLC)(TY A GR 1-2) (4")
|
SY
|
2,036.000
|
$20.000
|
$21.500
|
$27.000
|
$26.000
|
|
|
PRIME COAT (MC-30)
|
GAL
|
611.000
|
$11.000
|
$21.500
|
$22.000
|
$25.000
|
|
|
D-GR HMA TY-B PG64-22
|
TON
|
814.000
|
$237.000
|
$171.194
|
$144.000
|
$160.000
|
|
|
SP MIXES SP-C SAC-A PG70-28
|
TON
|
231.000
|
$206.000
|
$212.850
|
$222.000
|
$250.000
|
|
|
TACK COAT
|
GAL
|
401.000
|
$10.000
|
$2.688
|
$8.000
|
$9.000
|
|
|
CEM STABIL BKFL
|
CY
|
164.000
|
$248.000
|
$214.875
|
$350.000
|
$400.000
|
|
|
TEMPORARY SPL SHORING
|
SF
|
5,592.000
|
$51.000
|
$64.500
|
$63.000
|
$75.000
|
|
|
DRILL SHAFT (36 IN)
|
LF
|
592.000
|
$383.000
|
$249.400
|
$370.000
|
$350.000
|
|
|
CL C CONC (ABUT)(HPC)
|
CY
|
45.200
|
$1,787.000
|
$1,664.519
|
$1,700.000
|
$2,500.000
|
|
|
CL C CONC (CAP)(HPC)
|
CY
|
41.600
|
$2,024.000
|
$1,612.715
|
$1,500.000
|
$2,000.000
|
|
|
CL C CONC (COLUMN)(HPC)
|
CY
|
31.400
|
$2,013.000
|
$2,046.445
|
$1,600.000
|
$2,250.000
|
|
|
REINF CONC SLAB (HPC)
|
SF
|
5,500.000
|
$34.000
|
$34.400
|
$39.000
|
$40.000
|
|
|
APPROACH SLAB (HPC)
|
CY
|
91.900
|
$930.000
|
$967.500
|
$1,050.000
|
$1,250.000
|
|
|
RETAINING WALL (MSE)
|
SF
|
3,825.000
|
$93.000
|
$138.675
|
$106.000
|
$150.000
|
|
|
PRESTR CONC GIRDER (TX28)
|
LF
|
651.020
|
$242.000
|
$212.044
|
$333.000
|
$450.000
|
|
|
RIPRAP (CONC)(5 IN)
|
CY
|
75.000
|
$845.000
|
$752.500
|
$450.000
|
$850.000
|
|
|
RIPRAP (MOW STRIP)(5 IN)
|
CY
|
53.000
|
$584.000
|
$467.625
|
$750.000
|
$900.000
|
|
|
RAIL (TY T223)(HPC)
|
LF
|
737.000
|
$119.000
|
$162.626
|
$155.000
|
$150.000
|
|
|
SEALED EXPANSION JOINT (4 IN) (SEJ - B)
|
LF
|
98.500
|
$200.000
|
$168.775
|
$190.000
|
$150.000
|
|
|
GABION MATTRESSES (GALV)(18 IN)
|
SY
|
660.000
|
$306.000
|
$182.750
|
$235.000
|
$187.000
|
|
|
GABIONS (3' X 3')(GALV)
|
CY
|
273.000
|
$315.000
|
$413.875
|
$250.000
|
$425.000
|
|
|
GABION (1.5' X 3')(GALV)
|
CY
|
46.000
|
$210.000
|
$236.500
|
$455.000
|
$242.000
|
|
|
REMOV STR (BRIDGE 0 - 99 FT LENGTH)
|
EA
|
1.000
|
$45,000.000
|
$32,389.750
|
$230,000.000
|
$60,000.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$320,000.000
|
$263,847.300
|
$330,000.000
|
$376,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
10.000
|
$15,000.000
|
$8,062.500
|
$15,000.000
|
$15,750.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$11,482.000
|
$12,933.024
|
$15,000.000
|
$8,500.000
|
|
|
TMA (STATIONARY)
|
DAY
|
8.000
|
$240.000
|
$268.750
|
$350.000
|
$315.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
69.000
|
$35.000
|
$58.974
|
$37.000
|
$55.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
69.000
|
$15.000
|
$24.209
|
$25.000
|
$31.000
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 2)
|
SY
|
312.000
|
$36.000
|
$50.514
|
$45.000
|
$80.000
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
312.000
|
$16.000
|
$21.274
|
$10.000
|
$40.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
1,459.000
|
$4.000
|
$5.966
|
$3.500
|
$3.650
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
1,459.000
|
$1.400
|
$2.354
|
$1.000
|
$1.250
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (18")
|
LF
|
60.000
|
$8.000
|
$8.105
|
$7.000
|
$8.000
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
60.000
|
$3.000
|
$3.408
|
$2.000
|
$2.000
|
|
|
CONSTRUCTING DETOURS
|
SY
|
198.000
|
$95.000
|
$182.750
|
$165.000
|
$180.200
|
|
|
ONE-WAY TRAF CONT (PORT TRAF SIG)
|
MO
|
10.000
|
$6,624.000
|
$4,300.000
|
$5,000.000
|
$7,375.330
|
|
|
PORT CTB (FUR & INST)(SGL SLOPE)(TY 1)
|
LF
|
1,350.000
|
$72.000
|
$99.975
|
$86.000
|
$50.000
|
|
|
PORT CTB (MOVE)(SGL SLP)(TY 1)
|
LF
|
480.000
|
$18.000
|
$22.210
|
$16.000
|
$12.500
|
|
|
PORT CTB (REMOVE)(SGL SLP)(TY 1)
|
LF
|
1,350.000
|
$25.000
|
$21.500
|
$19.000
|
$25.000
|
|
|
PORT CTB (PINNING)
|
EA
|
32.000
|
$70.000
|
$50.000
|
$90.000
|
$75.000
|
|
|
MILL RUMBLE STRIPS (ASPHALT) (SHLDR)
|
LF
|
1,887.000
|
$0.600
|
$3.150
|
$4.000
|
$2.500
|
|
|
MILL RUMBLE STRIPS (ASPH) (CENTERLINE)
|
LF
|
1,109.000
|
$0.400
|
$1.129
|
$4.000
|
$3.750
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
200.000
|
$32.000
|
$26.875
|
$25.000
|
$25.000
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
4.000
|
$2,295.000
|
$2,096.250
|
$1,750.000
|
$3,017.570
|
|
|
MTL W-BEAM GD FEN ADJUSTMENT
|
LF
|
25.000
|
$21.000
|
$12.900
|
$25.000
|
$25.000
|
|
|
SHORT RADIUS (28")
|
LF
|
25.000
|
$454.000
|
$48.375
|
$35.000
|
$50.000
|
|
|
DRIVEWAY TERMINAL ANCHOR SECTION
|
EA
|
1.000
|
$522.000
|
$913.750
|
$875.000
|
$1,000.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
525.000
|
$5.000
|
$2.688
|
$2.250
|
$3.000
|
|
|
REMOVE DOWNSTREAM ANCHOR TERMINAL
|
EA
|
4.000
|
$284.000
|
$268.750
|
$150.000
|
$200.000
|
|
|
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
|
EA
|
4.000
|
$300.000
|
$268.750
|
$150.000
|
$350.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
3.000
|
$3,035.000
|
$3,225.000
|
$3,000.000
|
$3,000.000
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
2.000
|
$2,647.000
|
$1,612.500
|
$2,500.000
|
$2,000.000
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
4.000
|
$1,500.000
|
$967.500
|
$1,000.000
|
$1,000.000
|
|
|
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
|
EA
|
4.000
|
$12,462.000
|
$9,137.500
|
$8,700.000
|
$9,450.000
|
|
|
MAILBOX INSTALL-S (TWG-POST) TY 2
|
EA
|
2.000
|
$311.000
|
$344.000
|
$320.000
|
$295.000
|
|
|
MAILBOX INSTALL-D (TWG-POST) TY 2
|
EA
|
1.000
|
$530.000
|
$419.250
|
$390.000
|
$295.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
2.000
|
$814.000
|
$827.750
|
$770.000
|
$610.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
2.000
|
$200.000
|
$145.125
|
$135.000
|
$150.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)CTB (BI)
|
EA
|
11.000
|
$40.000
|
$10.750
|
$25.000
|
$18.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
|
EA
|
12.000
|
$57.000
|
$25.800
|
$29.000
|
$30.000
|
|
|
INSTL OM ASSM (OM-2Z)(WFLX)GND
|
EA
|
4.000
|
$100.000
|
$48.375
|
$60.000
|
$60.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)6"(SLD)
|
LF
|
505.000
|
$1.400
|
$0.376
|
$0.750
|
$2.000
|
|
|
WK ZN PAV MRK REMOV (W)6"(SLD)
|
LF
|
4,020.000
|
$1.600
|
$1.440
|
$1.000
|
$1.500
|
|
|
WK ZN PAV MRK REMOV (W)24"(SLD)
|
LF
|
48.000
|
$11.000
|
$14.642
|
$10.000
|
$15.750
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
144.000
|
$4.000
|
$1.075
|
$10.000
|
$7.500
|
|
RE PM TY II (W) 6" (SLD)
|
LF
|
2,963.000
|
$1.200
|
$1.000
|
$0.500
|
$1.500
|
|
RE PM TY II (Y) 6" (SLD)
|
LF
|
2,160.000
|
$1.400
|
$0.957
|
$0.500
|
$1.500
|
|
TY I HIGH PERF PM (W)6"(SLD)(100MIL)
|
LF
|
3,673.000
|
$1.600
|
$0.849
|
$1.000
|
$2.000
|
|
TY I HIGH PERF PM (Y)6"(SLD)(100MIL)
|
LF
|
2,870.000
|
$1.600
|
$0.849
|
$1.000
|
$2.000
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
37.000
|
$9.000
|
$11.682
|
$10.000
|
$15.000
|
|
|
ELIM EXT PM & MRKS (4")
|
LF
|
6,880.000
|
$2.200
|
$0.699
|
$0.750
|
$0.700
|
|
|
ELIM EXT PM & MRKS (RUMBLE STRIP)
|
LF
|
2,075.000
|
$1.700
|
$80.518
|
$0.750
|
$6.000
|
|
|
PAV SURF PREP FOR MRK (6")
|
LF
|
5,123.000
|
$0.500
|
$1.140
|
$0.600
|
$0.500
|
|
Totals: |
$3,591,277.580
|
$3,569,153.537
|
$3,741,530.910
|