EXCAVATION (ROADWAY AND CHANNEL)
|
CY
|
512.000
|
$20.000
|
$45.000
|
$30.000
|
$100.000
|
$125.000
|
|
|
SUBGRADE WIDENING (DENS CONT)
|
STA
|
626.000
|
$500.000
|
$1,800.000
|
$1,700.000
|
$1,200.000
|
$700.000
|
|
|
EMBANKMENT (FINAL)(ORD COMP)(TY A)
|
CY
|
400.000
|
$40.000
|
$45.000
|
$40.000
|
$100.000
|
$70.000
|
|
|
BACKFILL (TY B)
|
STA
|
626.000
|
$120.000
|
$375.000
|
$400.000
|
$700.000
|
$400.000
|
|
|
DRILL SEEDING (PERM) (RURAL) (CLAY)
|
AC
|
46.000
|
$750.000
|
$750.000
|
$1,200.000
|
$700.000
|
$1,000.000
|
|
|
DRILL SEEDING (TEMP)(WARM OR COOL)
|
AC
|
46.000
|
$415.000
|
$550.000
|
$1,200.000
|
$500.000
|
$550.000
|
|
|
VEGETATIVE WATERING
|
MG
|
313.000
|
$55.000
|
$100.000
|
$500.000
|
$60.000
|
$65.000
|
|
|
FL BS (CMP IN PLC)(TYA GR1-2)(FNAL POS)
|
CY
|
21,658.000
|
$70.000
|
$71.000
|
$60.000
|
$70.000
|
$125.000
|
|
|
PRIME COAT (MC-30)
|
GAL
|
14,195.000
|
$6.000
|
$7.000
|
$10.000
|
$7.500
|
$7.000
|
|
|
ASPH (MULTI OPTION)
|
GAL
|
32,732.000
|
$5.000
|
$6.000
|
$10.000
|
$7.000
|
$6.000
|
|
|
ASPH (AC-20-5TR)
|
GAL
|
90,644.000
|
$4.000
|
$6.000
|
$11.000
|
$7.000
|
$5.000
|
|
|
AGGR(TY-PB GR-3 SAC-B)
|
CY
|
678.000
|
$250.000
|
$175.000
|
$300.000
|
$250.000
|
$200.000
|
|
|
AGGR(TY-PB GR-4 SAC-B)
|
CY
|
1,813.000
|
$150.000
|
$175.000
|
$300.000
|
$250.000
|
$175.000
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(4")
|
SY
|
5,448.000
|
$50.000
|
$65.000
|
$45.000
|
$100.000
|
$60.000
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
512.000
|
$15.000
|
$25.000
|
$25.000
|
$25.000
|
$20.000
|
|
|
TEMPORARY SPL SHORING
|
SF
|
3,832.000
|
$50.000
|
$40.000
|
$33.000
|
$40.000
|
$80.000
|
|
|
RIPRAP (CONC)(CL B)
|
CY
|
846.000
|
$400.000
|
$815.000
|
$900.000
|
$635.000
|
$1,200.000
|
|
|
RAIL (TY T631)
|
LF
|
389.000
|
$115.000
|
$120.000
|
$110.000
|
$100.000
|
$125.000
|
|
|
CONC BOX CULV (8 FT X 8 FT)(EXTEND)
|
LF
|
20.000
|
$1,500.000
|
$1,440.000
|
$3,500.000
|
$1,600.000
|
$2,200.000
|
|
|
CONC BOX CULV (10 FT X 10 FT)(EXTEND)
|
LF
|
20.000
|
$2,000.000
|
$1,560.000
|
$3,500.000
|
$2,150.000
|
$3,200.000
|
|
|
RC PIPE (CL IV)(30 IN)
|
LF
|
166.000
|
$325.000
|
$300.000
|
$330.000
|
$250.000
|
$375.000
|
|
|
RC PIPE (CL IV)(36 IN)
|
LF
|
44.000
|
$350.000
|
$415.000
|
$400.000
|
$340.000
|
$425.000
|
|
|
RC PIPE (ARCH)(CL IV)(DES 3)
|
LF
|
1,262.000
|
$300.000
|
$415.000
|
$500.000
|
$380.000
|
$425.000
|
|
|
RC PIPE (ARCH)(CL IV)(DES 5)
|
LF
|
238.000
|
$500.000
|
$725.000
|
$410.000
|
$570.000
|
$725.000
|
|
|
WINGWALL (PW - 1) (HW=10 FT)
|
EA
|
2.000
|
$45,000.000
|
$40,000.000
|
$60,000.000
|
$75,000.000
|
$85,000.000
|
|
|
WINGWALL (PW - 1) (HW=12 FT)
|
EA
|
2.000
|
$75,000.000
|
$48,000.000
|
$90,000.000
|
$130,000.000
|
$150,000.000
|
|
|
SET (TY II) (30 IN) (RCP) (3: 1) (C)
|
EA
|
8.000
|
$5,000.000
|
$4,925.000
|
$3,500.000
|
$2,800.000
|
$5,000.000
|
|
|
SET (TY II) (36 IN) (RCP) (3: 1) (C)
|
EA
|
2.000
|
$6,000.000
|
$6,400.000
|
$4,000.000
|
$4,000.000
|
$6,000.000
|
|
|
SET (TY II) (DES 3) (RCP) (3: 1) (C)
|
EA
|
40.000
|
$2,000.000
|
$4,250.000
|
$5,000.000
|
$2,550.000
|
$4,000.000
|
|
|
SET (TY II) (DES 3) (RCP) (6: 1) (P)
|
EA
|
26.000
|
$3,500.000
|
$5,000.000
|
$5,500.000
|
$4,250.000
|
$4,500.000
|
|
|
SET (TY II) (DES 5) (RCP) (3: 1) (C)
|
EA
|
12.000
|
$6,000.000
|
$7,000.000
|
$7,500.000
|
$6,250.000
|
$6,000.000
|
|
|
REMOV STR (PIPE)
|
EA
|
44.000
|
$500.000
|
$1,000.000
|
$50.000
|
$500.000
|
$2,500.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$650,412.450
|
$700,000.000
|
$750,000.000
|
$1,100,000.000
|
$1,250,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
17.000
|
$20,000.000
|
$10,000.000
|
$10,000.000
|
$50,000.000
|
$35,000.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
450.000
|
$30.000
|
$70.000
|
$60.000
|
$65.000
|
$80.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
450.000
|
$10.000
|
$30.000
|
$40.000
|
$30.000
|
$35.000
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (18")
|
LF
|
1,800.000
|
$6.500
|
$10.000
|
$10.000
|
$7.000
|
$15.000
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
1,800.000
|
$2.000
|
$2.000
|
$6.000
|
$2.000
|
$2.000
|
|
|
ONE-WAY TRAF CONT (PORT TRAF SIG)
|
MO
|
3.000
|
$8,000.000
|
$6,500.000
|
$15,000.000
|
$5,000.000
|
$10,000.000
|
|
|
PORT CTB (DES SOURCE)(SGL SLP)(TY 1)
|
LF
|
1,350.000
|
$30.000
|
$32.000
|
$26.000
|
$90.000
|
$40.000
|
|
|
PORT CTB (MOVE)(SGL SLP)(TY 1)
|
LF
|
900.000
|
$20.000
|
$24.000
|
$22.000
|
$10.000
|
$35.000
|
|
|
PORT CTB (STKPL)(SGL SLP)(TY 1)
|
LF
|
1,350.000
|
$20.000
|
$28.200
|
$29.000
|
$20.000
|
$40.000
|
|
|
DRIVEWAYS (BASE)
|
SY
|
3,536.000
|
$20.000
|
$25.000
|
$16.000
|
$45.000
|
$30.000
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
900.000
|
$28.000
|
$31.250
|
$29.000
|
$26.000
|
$55.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
400.000
|
$3.000
|
$2.400
|
$3.000
|
$6.000
|
$5.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
8.000
|
$3,400.000
|
$3,960.000
|
$3,600.000
|
$3,100.000
|
$5,000.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
4.000
|
$350.000
|
$240.000
|
$220.000
|
$500.000
|
$500.000
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
4.000
|
$2,500.000
|
$3,000.000
|
$3,000.000
|
$1,500.000
|
$2,000.000
|
|
|
CRASH CUSH ATTEN (STKPL)
|
EA
|
6.000
|
$2,000.000
|
$1,800.000
|
$2,000.000
|
$1,500.000
|
$1,500.000
|
|
|
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
|
EA
|
6.000
|
$1,500.000
|
$9,000.000
|
$8,400.000
|
$8,000.000
|
$10,000.000
|
|
|
MAILBOX INSTALL-M (TWG-POST) TY 2
|
EA
|
17.000
|
$500.000
|
$660.000
|
$750.000
|
$450.000
|
$600.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
81.000
|
$600.000
|
$930.000
|
$770.000
|
$650.000
|
$800.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
81.000
|
$150.000
|
$100.000
|
$100.000
|
$75.000
|
$100.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
|
EA
|
16.000
|
$50.000
|
$30.000
|
$30.000
|
$52.950
|
$75.000
|
|
|
INSTL OM ASSM (OM-2Y)(WC)GND(BI)
|
EA
|
32.000
|
$65.000
|
$120.000
|
$60.000
|
$75.000
|
$125.000
|
|
|
WK ZN PAV MRK REMOV (REFL) TY II-A-A
|
LF
|
711.000
|
$5.000
|
$3.600
|
$1.000
|
$3.000
|
$10.000
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
2,717.000
|
$2.000
|
$3.500
|
$0.500
|
$1.500
|
$2.000
|
|
REFL PAV MRK TY II (W) 6" (SLD)
|
LF
|
2,808.000
|
$0.750
|
$0.360
|
$0.500
|
$0.300
|
$1.000
|
|
REFL PAV MRK TY II (W) 24" (SLD)
|
LF
|
48.000
|
$5.000
|
$12.000
|
$25.000
|
$10.000
|
$25.000
|
|
REFL PAV MRK TY II (Y) 6" (SLD)
|
LF
|
28,422.000
|
$1.000
|
$0.360
|
$1.500
|
$0.300
|
$1.000
|
|
|
REF PROF PAV MRK TY I(W)6"(SLD)(100MIL)
|
LF
|
118,499.000
|
$1.000
|
$0.830
|
$1.200
|
$0.690
|
$1.250
|
|
|
REF PROF PAV MRK TY I(Y)6"(BRK)(100MIL)
|
LF
|
14,980.000
|
$1.000
|
$0.830
|
$1.300
|
$0.690
|
$1.250
|
|
|
REF PROF PAV MRK TY I(Y)6"(SLD)(100MIL)
|
LF
|
31,962.000
|
$1.000
|
$0.830
|
$1.300
|
$0.690
|
$1.250
|
|
PREFAB PAV MRK TY C (W) (24") (SLD)
|
LF
|
48.000
|
$20.000
|
$30.000
|
$30.000
|
$25.000
|
$25.000
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
1,149.000
|
$6.000
|
$5.100
|
$6.000
|
$4.250
|
$7.000
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
9,223.000
|
$1.500
|
$0.540
|
$4.000
|
$0.450
|
$1.000
|
|
|
ELIM EXT PAV MRK & MRKS (6")
|
LF
|
22,008.000
|
$1.500
|
$0.540
|
$4.000
|
$0.450
|
$1.000
|
|
|
SP MIXES SP-D PG64-22 (LEVEL-UP)
|
TON
|
3,850.000
|
$140.000
|
$175.000
|
$140.000
|
$300.000
|
$200.000
|
|
|
TACK COAT
|
GAL
|
7,026.000
|
$6.000
|
$6.000
|
$10.000
|
$6.000
|
$8.000
|
|
|
PREFORMED CENTERLINE RUMBLE STRIP
|
LF
|
12,645.000
|
$6.000
|
$7.200
|
$1.000
|
$6.000
|
$15.000
|
|
|
TMA (STATIONARY)
|
DAY
|
216.000
|
$350.000
|
$500.000
|
$250.000
|
$510.000
|
$500.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
18.000
|
$500.000
|
$500.000
|
$500.000
|
$550.000
|
$700.000
|
|
Totals: |
$7,466,432.950
|
$9,538,047.570
|
$10,501,878.900
|
$11,316,281.690
|
$12,258,164.250
|