REMOVING CONC (CURB)
|
LF
|
20,682.000
|
$4.000
|
$3.250
|
$4.470
|
$2.260
|
$3.113
|
$2.240
|
$4.400
|
|
|
SUBGRADE WIDENING (ORD COMP)
|
STA
|
265.000
|
$275.000
|
$370.000
|
$513.750
|
$280.580
|
$471.302
|
$938.490
|
$2,000.000
|
|
|
BACKFILL (TY A OR B)
|
STA
|
265.000
|
$130.000
|
$105.000
|
$399.750
|
$122.570
|
$176.761
|
$220.400
|
$350.000
|
|
|
FL BS (CMP IN PLC)(TYA GR1-2)(FNAL POS)
|
CY
|
7,876.000
|
$55.000
|
$58.000
|
$60.950
|
$55.530
|
$77.234
|
$67.120
|
$85.000
|
|
|
LIME (HYDRATED LIME (SLURRY))
|
TON
|
608.000
|
$200.000
|
$216.000
|
$152.250
|
$199.710
|
$209.902
|
$192.800
|
$182.000
|
|
|
LIME TRT (SUBGRADE)(6")
|
SY
|
40,992.000
|
$4.000
|
$3.200
|
$2.510
|
$3.570
|
$3.459
|
$4.010
|
$3.250
|
|
|
CEMENT
|
TON
|
886.000
|
$150.000
|
$167.750
|
$152.250
|
$169.080
|
$163.416
|
$150.000
|
$155.000
|
|
|
CEMENT TREAT (MX EXST MTL & NW BS)(8")
|
SY
|
96,313.000
|
$2.500
|
$1.350
|
$2.510
|
$2.700
|
$2.986
|
$3.540
|
$2.900
|
|
|
ASPH (MULTI OPTION)
|
GAL
|
34,261.000
|
$3.000
|
$2.800
|
$3.440
|
$3.910
|
$2.882
|
$3.380
|
$4.250
|
|
|
ASPH (RC-250)
|
GAL
|
21,328.000
|
$4.000
|
$4.000
|
$4.060
|
$3.910
|
$3.993
|
$4.320
|
$4.250
|
|
|
AGGR(TY-PB GR-5 SAC-B)
|
CY
|
829.000
|
$100.000
|
$129.000
|
$118.370
|
$110.330
|
$112.464
|
$97.680
|
$136.000
|
|
|
ASPH(AC-15P, HFRS-2P OR CRS-2P)
|
GAL
|
28,115.000
|
$3.000
|
$3.300
|
$3.420
|
$3.910
|
$3.344
|
$3.270
|
$4.250
|
|
|
AGGR(TY-PB GR-4S OR TY-PB GR-4)(SAC-B)
|
CY
|
792.000
|
$115.000
|
$105.000
|
$102.490
|
$134.820
|
$103.499
|
$82.140
|
$135.000
|
|
|
AGGR(TY-PB GR-3 OR TY-PB GR-3S)(SAC-B)
|
CY
|
1,034.000
|
$75.000
|
$95.000
|
$102.450
|
$137.270
|
$104.863
|
$90.800
|
$133.000
|
|
|
CEM STABIL BKFL
|
CY
|
248.000
|
$65.000
|
$125.000
|
$152.250
|
$90.400
|
$156.000
|
$80.000
|
$150.000
|
|
|
CUT & RESTORE ASPH PAVING
|
SY
|
82.000
|
$58.000
|
$100.000
|
$120.000
|
$56.500
|
$208.000
|
$98.000
|
$80.000
|
|
|
TEMPORARY SPL SHORING (COFFERDAM)
|
SF
|
200.000
|
$20.000
|
$100.000
|
$60.000
|
$30.510
|
$104.000
|
$27.000
|
$60.000
|
|
|
CL C CONC (RAIL FOUNDATION)
|
CY
|
72.000
|
$450.000
|
$650.000
|
$480.000
|
$542.400
|
$1,248.000
|
$480.000
|
$651.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
49.000
|
$500.000
|
$550.000
|
$475.000
|
$565.000
|
$676.000
|
$425.000
|
$475.000
|
|
|
RAIL (TY SSTR)
|
LF
|
476.000
|
$50.000
|
$130.000
|
$94.000
|
$67.800
|
$99.840
|
$60.000
|
$84.000
|
|
|
CONC BOX CULV (4 FT X 2 FT)
|
LF
|
160.000
|
$190.000
|
$425.000
|
$393.000
|
$335.610
|
$517.920
|
$297.000
|
$333.200
|
|
|
CONC BOX CULV (4 FT X 3 FT)
|
LF
|
84.000
|
$210.000
|
$450.000
|
$430.000
|
$340.130
|
$566.800
|
$301.000
|
$345.800
|
|
|
CONC BOX CULV (5 FT X 3 FT)(EXTEND)
|
LF
|
16.000
|
$490.000
|
$800.000
|
$787.000
|
$740.150
|
$676.000
|
$655.000
|
$728.000
|
|
|
CONC BOX CULV (6 FT X 4 FT)(EXTEND)
|
LF
|
5.000
|
$500.000
|
$900.000
|
$892.000
|
$778.570
|
$754.000
|
$689.000
|
$728.000
|
|
|
CONC BOX CULV (6 FT X 5 FT)(EXTEND)
|
LF
|
33.000
|
$675.000
|
$850.000
|
$787.000
|
$949.200
|
$780.000
|
$840.000
|
$749.000
|
|
|
CONC BOX CULV (8 FT X 5 FT)(EXTEND)
|
LF
|
18.000
|
$590.000
|
$1,050.000
|
$944.000
|
$1,283.680
|
$884.000
|
$1,136.000
|
$896.000
|
|
|
CONC BOX CULV (10 FT X 5 FT)(EXTEND)
|
LF
|
13.500
|
$775.000
|
$1,250.000
|
$1,154.000
|
$1,644.150
|
$1,040.000
|
$1,455.000
|
$1,330.000
|
|
|
WINGWALL (PW - 2) (HW=5 FT)
|
EA
|
1.000
|
$7,700.000
|
$15,000.000
|
$8,084.000
|
$14,005.220
|
$9,360.000
|
$12,394.000
|
$7,168.000
|
|
|
WINGWALL (PW - 2) (HW=7 FT)
|
EA
|
2.000
|
$14,500.000
|
$18,350.000
|
$19,634.000
|
$22,102.800
|
$20,800.000
|
$19,560.000
|
$16,646.000
|
|
|
WINGWALL (PW - 2) (HW=8 FT)
|
EA
|
2.000
|
$14,000.000
|
$20,000.000
|
$24,600.000
|
$27,465.780
|
$26,000.000
|
$24,306.000
|
$19,054.000
|
|
|
WINGWALL (PW - 2) (HW=9 FT)
|
EA
|
1.000
|
$22,000.000
|
$26,000.000
|
$33,032.000
|
$32,554.170
|
$33,280.000
|
$28,809.000
|
$23,198.000
|
|
|
SET (TY I)(S= 4 FT)(HW= 3 FT)(3:1) (C)
|
EA
|
1.000
|
$5,000.000
|
$9,000.000
|
$5,669.000
|
$7,433.140
|
$5,200.000
|
$6,578.000
|
$4,914.000
|
|
|
SET (TY I)(S= 4 FT)(HW= 3 FT)(4:1) (C)
|
EA
|
3.000
|
$7,500.000
|
$9,500.000
|
$10,289.000
|
$7,830.900
|
$5,720.000
|
$6,930.000
|
$5,334.000
|
|
|
SET (TY I)(S= 4 FT)(HW= 4 FT)(4:1) (C)
|
EA
|
3.000
|
$7,000.000
|
$10,000.000
|
$11,549.000
|
$9,294.250
|
$6,240.000
|
$8,225.000
|
$5,474.000
|
|
|
SET (TY I)(S= 4 FT)(HW= 5 FT)(3:1) (C)
|
EA
|
1.000
|
$6,000.000
|
$12,000.000
|
$5,669.000
|
$9,349.620
|
$6,760.000
|
$8,274.000
|
$5,474.000
|
|
|
SET (TY I)(S= 5 FT)(HW= 4 FT)(3:1) (C)
|
EA
|
1.000
|
$6,000.000
|
$12,750.000
|
$5,039.000
|
$8,968.810
|
$7,280.000
|
$7,937.000
|
$5,474.000
|
|
|
SET (TY I)(S= 5 FT)(HW= 6 FT)(3:1) (C)
|
EA
|
1.000
|
$6,500.000
|
$13,500.000
|
$8,228.000
|
$10,366.620
|
$8,320.000
|
$9,174.000
|
$6,020.000
|
|
|
SET (TY I)(S= 6 FT)(HW= 6 FT)(3:1) (C)
|
EA
|
2.000
|
$7,500.000
|
$10,250.000
|
$22,049.000
|
$13,722.720
|
$8,840.000
|
$12,144.000
|
$8,960.000
|
|
|
SET (TY I)(S= 8 FT)(HW= 6 FT)(3:1) (C)
|
EA
|
1.000
|
$9,000.000
|
$11,000.000
|
$17,902.000
|
$16,375.960
|
$10,400.000
|
$14,492.000
|
$10,150.000
|
|
|
REMOV STR (WINGWALL)
|
EA
|
15.000
|
$1,400.000
|
$500.000
|
$997.000
|
$1,695.000
|
$2,080.000
|
$1,500.000
|
$700.000
|
|
|
REMOV STR (HEADWALL)
|
EA
|
8.000
|
$1,000.000
|
$600.000
|
$997.000
|
$1,695.000
|
$2,080.000
|
$1,500.000
|
$800.000
|
|
|
REMOV STR (PIPE)
|
LF
|
207.000
|
$15.000
|
$15.000
|
$19.000
|
$24.860
|
$36.400
|
$22.000
|
$15.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$200,000.000
|
$295,000.000
|
$349,011.610
|
$379,372.070
|
$371,548.759
|
$411,444.060
|
$450,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
6.000
|
$5,500.000
|
$5,500.000
|
$4,743.940
|
$32,605.700
|
$6,507.260
|
$23,305.200
|
$25,000.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 3)
|
CY
|
20.000
|
$50.000
|
$50.000
|
$70.000
|
$133.340
|
$72.800
|
$70.000
|
$80.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
CY
|
20.000
|
$15.000
|
$20.000
|
$50.000
|
$65.990
|
$52.000
|
$50.000
|
$40.000
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 2)
|
SY
|
234.000
|
$20.000
|
$25.000
|
$45.000
|
$59.040
|
$46.800
|
$45.000
|
$50.000
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
234.000
|
$5.000
|
$10.000
|
$20.000
|
$20.110
|
$20.800
|
$20.000
|
$10.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
454.000
|
$2.500
|
$5.000
|
$3.500
|
$10.850
|
$3.640
|
$3.500
|
$4.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
454.000
|
$1.000
|
$2.000
|
$2.500
|
$3.480
|
$2.600
|
$2.500
|
$1.000
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (18")
|
LF
|
978.000
|
$5.000
|
$6.000
|
$3.250
|
$9.360
|
$3.380
|
$3.250
|
$3.750
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
978.000
|
$1.000
|
$1.000
|
$1.000
|
$1.620
|
$1.040
|
$1.000
|
$0.500
|
|
|
DRIVEWAYS (SURF TREAT)
|
SY
|
2,290.000
|
$15.000
|
$20.000
|
$27.330
|
$25.710
|
$31.856
|
$38.400
|
$42.000
|
|
|
TURNOUTS (SURF TREAT)
|
SY
|
287.000
|
$25.000
|
$25.000
|
$27.330
|
$63.720
|
$35.805
|
$38.400
|
$42.000
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
575.000
|
$25.000
|
$25.000
|
$23.200
|
$26.220
|
$22.069
|
$23.200
|
$24.000
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
7.000
|
$1,400.000
|
$1,200.000
|
$1,090.000
|
$1,231.700
|
$1,003.600
|
$1,090.000
|
$1,090.000
|
|
|
MTL BM GD FEN (LONG SPAN SYSTEM)
|
EA
|
7.000
|
$900.000
|
$2,750.000
|
$795.000
|
$898.350
|
$1,109.680
|
$795.000
|
$795.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
390.000
|
$4.000
|
$5.000
|
$3.000
|
$3.390
|
$1.196
|
$3.000
|
$3.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
7.000
|
$2,750.000
|
$2,600.000
|
$2,895.000
|
$3,271.350
|
$2,401.360
|
$2,895.000
|
$2,895.000
|
|
|
CRASH CUSH ATTEN (INSTL)(L)(N)(TL3)
|
EA
|
4.000
|
$25,000.000
|
$33,000.000
|
$23,786.510
|
$20,509.500
|
$20,491.120
|
$18,150.000
|
$20,000.000
|
|
|
MAILBOX INSTALL-S (TWW-POST) TY 4
|
EA
|
13.000
|
$250.000
|
$300.000
|
$261.150
|
$367.250
|
$338.000
|
$261.150
|
$262.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(P)
|
EA
|
43.000
|
$460.000
|
$650.000
|
$527.610
|
$548.050
|
$504.400
|
$527.610
|
$528.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(T)
|
EA
|
20.000
|
$550.000
|
$700.000
|
$615.870
|
$734.500
|
$676.000
|
$615.870
|
$616.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U)
|
EA
|
1.000
|
$650.000
|
$725.000
|
$810.410
|
$932.250
|
$858.000
|
$810.410
|
$810.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
51.000
|
$50.000
|
$75.000
|
$100.000
|
$79.100
|
$72.800
|
$100.000
|
$100.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)CTB
|
EA
|
6.000
|
$15.000
|
$50.000
|
$15.860
|
$20.340
|
$18.720
|
$15.860
|
$16.000
|
|
|
INSTL OM ASSM (OM-2Z)(FLX)GND
|
EA
|
46.000
|
$75.000
|
$75.000
|
$48.690
|
$73.450
|
$67.600
|
$48.690
|
$49.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
|
EA
|
18.000
|
$25.000
|
$25.000
|
$19.810
|
$36.160
|
$33.280
|
$19.810
|
$20.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
|
LF
|
52,708.000
|
$0.250
|
$0.220
|
$0.200
|
$0.230
|
$0.208
|
$0.250
|
$0.200
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(BRK)
|
LF
|
3,597.000
|
$0.250
|
$0.240
|
$0.220
|
$0.250
|
$0.229
|
$0.300
|
$0.220
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
|
LF
|
30,494.000
|
$0.250
|
$0.220
|
$0.200
|
$0.230
|
$0.208
|
$0.250
|
$0.200
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
|
LF
|
52,708.000
|
$0.250
|
$0.440
|
$0.400
|
$0.450
|
$0.416
|
$0.350
|
$0.400
|
|
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
|
LF
|
3,597.000
|
$0.250
|
$0.450
|
$0.420
|
$0.470
|
$0.437
|
$0.350
|
$0.420
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
30,494.000
|
$0.300
|
$0.440
|
$0.400
|
$0.450
|
$0.416
|
$0.350
|
$0.400
|
|
PREFAB PAV MRK TY C (W) (24") (SLD)
|
LF
|
25.000
|
$14.000
|
$30.000
|
$25.000
|
$28.250
|
$26.000
|
$20.000
|
$25.000
|
|
PREFAB PAV MRK TY C (W) (36")(YLD TRI)
|
EA
|
2.000
|
$30.000
|
$40.000
|
$30.000
|
$33.900
|
$31.200
|
$75.000
|
$30.000
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
569.000
|
$3.000
|
$4.400
|
$4.000
|
$4.520
|
$4.160
|
$3.750
|
$4.000
|
|
|
TREE REMOVAL (60" - 72" DIA)
|
EA
|
1.000
|
$2,000.000
|
$8,000.000
|
$6,825.000
|
$5,085.000
|
$4,160.000
|
$4,000.000
|
$4,000.000
|
|
|
TREE TRIMMING AND BRUSH REMOVAL
|
LF
|
6,852.000
|
$30.000
|
$2.000
|
$4.200
|
$2.800
|
$3.796
|
$2.480
|
$2.480
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
6.000
|
$8,000.000
|
$4,500.000
|
$7,036.250
|
$11,300.000
|
$8,250.000
|
$6,000.000
|
$5,000.000
|
|
|
TMA (STATIONARY)
|
EA
|
6.000
|
$6,000.000
|
$11,500.000
|
$7,577.500
|
$7,345.000
|
$8,250.000
|
$7,000.000
|
$5,000.000
|
|
|
TMA (MOBILE OPERATION)
|
HR
|
180.000
|
$50.000
|
$60.000
|
$108.250
|
$113.000
|
$55.000
|
$60.000
|
$50.000
|
|
Totals: |
$3,052,810.200
|
$3,244,111.100
|
$3,478,308.070
|
$3,663,253.595
|
$3,729,164.426
|
$3,740,400.470
|
$4,334,899.440
|