PREPARING ROW
|
STA
|
98.200
|
$200.000
|
$618.000
|
$214.750
|
$1,329.094
|
$1,925.000
|
$317.130
|
$317.130
|
$1,037.000
|
$114.000
|
|
|
REMOVING CONC (SIDEWALKS)
|
SY
|
383.000
|
$12.000
|
$15.000
|
$5.850
|
$21.000
|
$10.000
|
$19.950
|
$19.950
|
$37.180
|
$12.210
|
|
|
REMOVING CONC (CURB AND GUTTER)
|
LF
|
10,205.000
|
$6.000
|
$7.500
|
$1.850
|
$8.579
|
$3.750
|
$6.030
|
$6.030
|
$7.780
|
$6.100
|
|
|
REMOVING CONC (MISC)
|
SY
|
53.000
|
$30.000
|
$40.000
|
$25.000
|
$40.950
|
$25.000
|
$43.680
|
$43.680
|
$37.180
|
$27.780
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
37,435.000
|
$14.000
|
$11.130
|
$9.100
|
$12.222
|
$11.600
|
$11.210
|
$11.210
|
$26.340
|
$25.080
|
|
|
EMBANKMENT (FINAL)(ORD COMP)(TY B)
|
CY
|
521.000
|
$18.000
|
$12.360
|
$28.300
|
$11.519
|
$8.500
|
$20.420
|
$20.420
|
$33.900
|
$33.490
|
|
|
COMPOST MANUF TOPSOIL (4")
|
SY
|
8,493.000
|
$2.000
|
$1.300
|
$1.450
|
$3.380
|
$2.000
|
$1.360
|
$6.460
|
$4.690
|
$3.310
|
|
|
BLOCK SODDING
|
SY
|
8,493.000
|
$5.000
|
$4.500
|
$4.300
|
$4.460
|
$4.400
|
$4.050
|
$4.750
|
$4.500
|
$4.670
|
|
|
VEGETATIVE WATERING
|
MG
|
154.800
|
$15.000
|
$29.970
|
$30.100
|
$24.990
|
$19.000
|
$28.400
|
$64.420
|
$28.560
|
$38.800
|
|
|
PROOF ROLLING
|
HR
|
20.000
|
$50.000
|
$42.180
|
$124.500
|
$61.005
|
$90.000
|
$58.570
|
$58.570
|
$56.500
|
$87.740
|
|
|
FL BS (CMP IN PLC)(TYA GR1-2)(FNAL POS)
|
CY
|
21,696.000
|
$50.000
|
$55.250
|
$60.650
|
$55.535
|
$55.000
|
$67.240
|
$62.110
|
$68.680
|
$64.200
|
|
|
PRIME COAT (SS-1)
|
GAL
|
26,037.000
|
$3.000
|
$2.800
|
$2.100
|
$1.609
|
$3.100
|
$1.760
|
$3.110
|
$0.200
|
$3.270
|
|
|
ASPH (MULTI OPTION)
|
GAL
|
25,388.000
|
$2.000
|
$2.570
|
$3.900
|
$2.192
|
$2.500
|
$2.550
|
$2.830
|
$2.610
|
$3.400
|
|
|
AGGR (MULTI OPTION)
|
CY
|
598.000
|
$50.000
|
$66.070
|
$153.700
|
$86.142
|
$100.000
|
$115.000
|
$152.020
|
$90.900
|
$210.720
|
|
|
D-GR HMA TY-B PG64-22
|
TON
|
19,950.000
|
$55.000
|
$63.970
|
$73.150
|
$60.201
|
$66.500
|
$66.000
|
$78.620
|
$72.670
|
$90.730
|
|
|
D-GR HMA TY-D SAC-B PG70-22
|
TON
|
6,955.000
|
$60.000
|
$69.680
|
$83.400
|
$67.485
|
$71.500
|
$71.000
|
$81.010
|
$78.690
|
$93.290
|
|
|
PLANE CONC PAV(0" TO 2")
|
SY
|
138.000
|
$4.000
|
$25.380
|
$32.150
|
$31.763
|
$4.000
|
$11.050
|
$52.110
|
$45.200
|
$85.400
|
|
|
CL A CONC (STEPS)
|
CY
|
2.000
|
$1,200.000
|
$428.420
|
$1,233.100
|
$672.000
|
$1,500.000
|
$1,426.920
|
$1,426.920
|
$2,000.000
|
$1,710.000
|
|
|
RIPRAP (CONC)(4 IN)
|
CY
|
3.000
|
$400.000
|
$455.200
|
$671.100
|
$567.000
|
$1,100.000
|
$694.420
|
$694.420
|
$2,000.000
|
$1,140.000
|
|
|
RETROFIT RAIL (TY T131RC)
|
LF
|
90.000
|
$120.000
|
$176.720
|
$154.900
|
$164.738
|
$130.000
|
$245.950
|
$245.950
|
$185.280
|
$188.100
|
|
|
CMP (GAL STL 30 IN)
|
LF
|
8.000
|
$100.000
|
$69.620
|
$265.750
|
$107.100
|
$160.000
|
$205.210
|
$205.210
|
$225.000
|
$652.220
|
|
|
SET (TY II) (30 IN) (CMP) (4: 1) (C)
|
EA
|
1.000
|
$1,800.000
|
$1,660.130
|
$2,319.950
|
$1,457.400
|
$2,400.000
|
$1,863.840
|
$1,863.840
|
$1,500.000
|
$1,710.000
|
|
|
REMOV STR (INLET)
|
EA
|
2.000
|
$300.000
|
$428.420
|
$622.800
|
$603.750
|
$540.000
|
$309.280
|
$309.280
|
$1,200.000
|
$2,603.350
|
|
|
REMOV STR (SET)
|
EA
|
1.000
|
$500.000
|
$267.760
|
$311.400
|
$577.500
|
$540.000
|
$340.530
|
$340.530
|
$1,200.000
|
$5,206.700
|
|
|
REMOV STR (PIPE)
|
LF
|
80.000
|
$25.000
|
$7.500
|
$15.550
|
$26.250
|
$23.000
|
$17.200
|
$17.200
|
$15.000
|
$65.080
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$250,000.000
|
$452,731.390
|
$300,000.000
|
$548,472.616
|
$555,000.000
|
$585,000.000
|
$360,700.000
|
$775,278.180
|
$802,796.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
13.000
|
$4,500.000
|
$4,100.000
|
$10,400.850
|
$6,037.520
|
$3,700.000
|
$13,781.000
|
$2,480.000
|
$18,312.000
|
$2,375.540
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 1)
|
LF
|
120.000
|
$25.000
|
$22.000
|
$31.550
|
$24.257
|
$21.000
|
$29.770
|
$26.680
|
$22.000
|
$62.700
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
120.000
|
$10.000
|
$7.000
|
$16.200
|
$8.704
|
$6.000
|
$15.300
|
$10.070
|
$7.000
|
$22.800
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
444.000
|
$20.000
|
$12.000
|
$26.750
|
$15.244
|
$30.000
|
$25.240
|
$16.490
|
$12.000
|
$28.500
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
444.000
|
$10.000
|
$3.000
|
$10.500
|
$5.974
|
$6.000
|
$9.910
|
$6.590
|
$3.000
|
$17.100
|
|
|
BACKHOE WORK (EROSION & SEDMT CONT)
|
HR
|
20.000
|
$115.000
|
$57.000
|
$185.500
|
$103.436
|
$115.000
|
$81.070
|
$81.070
|
$62.000
|
$51.300
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
3,217.000
|
$2.000
|
$1.850
|
$5.350
|
$2.575
|
$2.300
|
$5.050
|
$3.040
|
$1.850
|
$3.990
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
3,217.000
|
$0.250
|
$0.500
|
$0.600
|
$0.515
|
$0.500
|
$0.570
|
$0.840
|
$0.500
|
$0.570
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
132.000
|
$4.500
|
$5.500
|
$6.350
|
$6.077
|
$4.500
|
$6.010
|
$7.200
|
$5.500
|
$6.840
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
132.000
|
$1.000
|
$1.000
|
$1.800
|
$1.236
|
$2.500
|
$1.710
|
$2.030
|
$1.000
|
$1.140
|
|
|
ONE-WAY TRAF CONT (PORT TRAF SIG)
|
MO
|
4.000
|
$5,000.000
|
$5,640.000
|
$3,097.950
|
$4,480.500
|
$5,700.000
|
$4,250.000
|
$11,436.320
|
$4,000.000
|
$5,700.000
|
|
|
PORT CTB (FUR & INST)(LOW PROF)(TY 1)
|
LF
|
2,960.000
|
$35.000
|
$10.500
|
$27.550
|
$14.910
|
$20.000
|
$20.000
|
$62.010
|
$22.000
|
$68.760
|
|
|
PORT CTB (FUR & INST)(LOW PROF)(TY 2)
|
LF
|
480.000
|
$35.000
|
$15.000
|
$20.450
|
$27.878
|
$20.000
|
$20.000
|
$75.930
|
$22.000
|
$82.140
|
|
|
PORT CTB (MOVE)(LOW PROF)(TY 1)
|
LF
|
7,440.000
|
$9.000
|
$7.000
|
$4.250
|
$9.188
|
$7.500
|
$10.000
|
$7.110
|
$10.000
|
$20.820
|
|
|
PORT CTB (MOVE)(LOW PROF)(TY 2)
|
LF
|
1,040.000
|
$9.000
|
$13.000
|
$17.900
|
$12.338
|
$7.500
|
$10.000
|
$7.490
|
$10.000
|
$25.740
|
|
|
PORT CTB (REMOVE)(LOW PROF)(TY 1)
|
LF
|
2,960.000
|
$9.000
|
$8.500
|
$9.150
|
$12.863
|
$14.000
|
$12.000
|
$13.990
|
$15.000
|
$35.140
|
|
|
PORT CTB (REMOVE)(LOW PROF)(TY 2)
|
LF
|
480.000
|
$9.000
|
$8.500
|
$6.150
|
$12.863
|
$14.000
|
$12.000
|
$20.110
|
$15.000
|
$24.690
|
|
|
CONC CURB & GUTTER (TY II)
|
LF
|
12,621.000
|
$20.000
|
$19.280
|
$17.750
|
$27.143
|
$17.500
|
$17.340
|
$17.340
|
$23.010
|
$24.850
|
|
|
CONC CURB & GUTTER (ARMOR CURB)
|
LF
|
28.000
|
$125.000
|
$128.530
|
$245.850
|
$273.000
|
$165.000
|
$312.680
|
$312.680
|
$150.000
|
$142.500
|
|
|
DRIVEWAYS (CONC)
|
SY
|
1,024.000
|
$60.000
|
$67.480
|
$75.300
|
$63.000
|
$63.000
|
$69.280
|
$69.280
|
$64.150
|
$103.740
|
|
|
DRIVEWAYS (SURF TREAT)
|
SY
|
564.000
|
$25.000
|
$18.660
|
$16.850
|
$19.491
|
$23.000
|
$16.000
|
$38.900
|
$26.560
|
$17.100
|
|
|
DRIVEWAYS (BASE)
|
SY
|
333.000
|
$15.000
|
$9.900
|
$10.300
|
$15.971
|
$11.000
|
$32.030
|
$32.030
|
$22.560
|
$17.100
|
|
|
CONC SIDEWALKS (4")
|
SY
|
403.000
|
$45.000
|
$52.480
|
$76.750
|
$52.500
|
$53.000
|
$55.950
|
$55.950
|
$61.150
|
$88.920
|
|
|
CURB RAMPS (TY 1)
|
EA
|
2.000
|
$1,500.000
|
$1,392.370
|
$1,497.250
|
$1,197.000
|
$2,000.000
|
$1,885.430
|
$1,885.430
|
$1,200.000
|
$2,166.000
|
|
|
CURB RAMPS (TY 5)
|
EA
|
4.000
|
$1,500.000
|
$1,767.240
|
$3,387.500
|
$1,470.000
|
$2,250.000
|
$1,994.410
|
$1,994.410
|
$1,200.000
|
$1,938.000
|
|
|
CURB RAMPS (TY 7)
|
EA
|
4.000
|
$1,500.000
|
$1,553.030
|
$1,503.700
|
$1,617.000
|
$1,500.000
|
$2,019.410
|
$2,019.410
|
$1,200.000
|
$2,052.000
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
4.000
|
$1,500.000
|
$2,050.000
|
$2,114.600
|
$1,897.098
|
$1,800.000
|
$1,995.000
|
$2,498.290
|
$1,408.590
|
$2,741.700
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
4.000
|
$2,000.000
|
$2,225.000
|
$2,787.650
|
$2,482.300
|
$2,500.000
|
$2,630.000
|
$2,058.290
|
$2,410.000
|
$2,479.500
|
|
|
MAILBOX INSTALL-S (TWG-POST) TY 1
|
EA
|
10.000
|
$275.000
|
$115.000
|
$265.000
|
$118.450
|
$115.000
|
$250.000
|
$135.820
|
$115.000
|
$148.200
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(P)
|
EA
|
118.000
|
$490.000
|
$455.000
|
$498.200
|
$468.650
|
$460.000
|
$470.000
|
$510.760
|
$455.000
|
$530.100
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(T)
|
EA
|
6.000
|
$550.000
|
$575.000
|
$736.650
|
$592.250
|
$575.000
|
$695.000
|
$640.260
|
$575.000
|
$706.800
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U)
|
EA
|
3.000
|
$675.000
|
$660.000
|
$620.050
|
$679.800
|
$675.000
|
$585.000
|
$735.320
|
$660.000
|
$803.700
|
|
|
RELOCATE SM RD SN SUP&AM TY S80
|
EA
|
1.000
|
$360.000
|
$375.000
|
$529.950
|
$386.250
|
$400.000
|
$500.000
|
$421.820
|
$375.000
|
$609.900
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
16.000
|
$65.000
|
$60.000
|
$238.500
|
$61.800
|
$60.000
|
$225.000
|
$71.820
|
$60.000
|
$74.100
|
|
|
WK ZN PAV MRK NON-REMOV (W)24"(SLD)
|
LF
|
96.000
|
$2.350
|
$3.000
|
$6.350
|
$3.090
|
$3.100
|
$6.000
|
$7.570
|
$3.000
|
$3.420
|
|
|
WK ZN PAV MRK REMOV (REFL) TY I-C
|
EA
|
1,914.000
|
$3.500
|
$2.000
|
$2.550
|
$2.060
|
$2.100
|
$2.400
|
$2.690
|
$2.000
|
$2.280
|
|
|
WK ZN PAV MRK REMOV (REFL) TY II-A-A
|
EA
|
1,914.000
|
$3.500
|
$2.000
|
$2.550
|
$2.060
|
$2.100
|
$2.400
|
$2.690
|
$2.000
|
$2.280
|
|
|
WK ZN PAV MRK REMOV (TRAF BTN) TY W
|
EA
|
7,940.000
|
$2.000
|
$1.500
|
$2.250
|
$1.545
|
$1.550
|
$2.100
|
$2.320
|
$1.500
|
$1.710
|
|
|
WK ZN PAV MRK REMOV (TRAF BTN) TY Y
|
EA
|
7,940.000
|
$2.000
|
$1.500
|
$2.250
|
$1.545
|
$1.550
|
$2.100
|
$2.320
|
$1.500
|
$1.710
|
|
WK ZN PAV MRK SHT TERM (TAB)TY W
|
EA
|
1,044.000
|
$1.000
|
$1.550
|
$0.600
|
$1.449
|
$0.800
|
$2.000
|
$1.230
|
$1.380
|
$0.970
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y
|
EA
|
2,941.000
|
$1.000
|
$1.550
|
$0.600
|
$1.449
|
$0.800
|
$2.000
|
$1.270
|
$1.380
|
$0.970
|
|
REFL PAV MRK TY I (W)8"(DOT)(100MIL)
|
LF
|
207.000
|
$1.200
|
$0.640
|
$1.050
|
$0.659
|
$0.700
|
$1.000
|
$1.550
|
$0.640
|
$0.730
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
1,973.000
|
$0.750
|
$0.640
|
$0.700
|
$0.659
|
$0.700
|
$0.670
|
$0.780
|
$0.640
|
$0.730
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
|
LF
|
15,664.000
|
$0.250
|
$0.320
|
$0.350
|
$0.330
|
$0.350
|
$0.340
|
$0.390
|
$0.320
|
$0.360
|
|
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
|
LF
|
1,732.000
|
$0.250
|
$0.320
|
$0.350
|
$0.330
|
$0.350
|
$0.340
|
$0.430
|
$0.320
|
$0.360
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
19,408.000
|
$0.300
|
$0.320
|
$0.350
|
$0.330
|
$0.350
|
$0.340
|
$0.390
|
$0.320
|
$0.360
|
|
PREFAB PAV MRK TY C (W) (12") (SLD)
|
LF
|
823.000
|
$6.500
|
$6.000
|
$6.700
|
$6.180
|
$6.100
|
$6.330
|
$7.080
|
$6.000
|
$6.840
|
|
PREFAB PAV MRK TY C (W) (24") (SLD)
|
LF
|
1,294.000
|
$12.000
|
$12.000
|
$11.050
|
$12.360
|
$12.000
|
$10.430
|
$11.540
|
$12.000
|
$13.680
|
|
PREFAB PAV MRK TY C (W) (ARROW)
|
EA
|
28.000
|
$195.000
|
$200.000
|
$212.000
|
$206.000
|
$200.000
|
$200.000
|
$223.330
|
$200.000
|
$228.000
|
|
PREFAB PAV MRK TY C (W) (WORD)
|
EA
|
4.000
|
$250.000
|
$300.000
|
$233.200
|
$309.000
|
$300.000
|
$220.000
|
$265.290
|
$300.000
|
$342.000
|
|
REFL PAV MRKR TY I-C
|
EA
|
18.000
|
$3.000
|
$3.000
|
$4.250
|
$3.090
|
$3.000
|
$4.000
|
$4.920
|
$3.000
|
$3.420
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
446.000
|
$3.000
|
$3.000
|
$3.650
|
$3.090
|
$3.000
|
$3.440
|
$3.800
|
$3.000
|
$3.420
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
9,463.000
|
$0.500
|
$0.900
|
$1.050
|
$1.029
|
$0.750
|
$1.500
|
$1.140
|
$0.800
|
$2.280
|
|
|
DITCH CLEANING AND RESHAPING (FOOT)
|
LF
|
50.000
|
$1.500
|
$25.080
|
$13.300
|
$23.552
|
$18.000
|
$18.600
|
$18.600
|
$50.000
|
$136.670
|
|
|
DRAIN INLET CLEANING
|
EA
|
9.000
|
$1,500.000
|
$750.000
|
$323.300
|
$262.500
|
$1,000.000
|
$1,749.720
|
$1,749.720
|
$1,000.000
|
$1,710.000
|
|
|
STORM SEWER CLEANING (PIPE)(25"-30"DIA)
|
LF
|
290.000
|
$28.000
|
$20.000
|
$20.100
|
$29.400
|
$26.000
|
$50.840
|
$50.840
|
$22.000
|
$34.200
|
|
|
GEOGRID BASE REINFORCEMENT (TY II)
|
SY
|
65,082.000
|
$1.600
|
$1.340
|
$1.500
|
$1.404
|
$1.500
|
$1.830
|
$1.830
|
$1.970
|
$1.100
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
8.000
|
$9,000.000
|
$7,677.250
|
$229.500
|
$10,500.000
|
$10,000.000
|
$9,500.000
|
$19,830.000
|
$12,000.000
|
$13,680.000
|
|
|
SOLAR POWERED LED WARNING SIGN
|
EA
|
4.000
|
$2,250.000
|
$2,850.000
|
$3,020.850
|
$2,935.500
|
$3,000.000
|
$2,850.000
|
$3,158.290
|
$2,850.000
|
$8,550.000
|
|
|
SOLAR POWERED LED STOP SIGN
|
EA
|
4.000
|
$2,250.000
|
$2,850.000
|
$3,020.850
|
$2,935.500
|
$3,000.000
|
$2,850.000
|
$3,158.290
|
$2,850.000
|
$8,550.000
|
|
Totals: |
$4,807,490.600
|
$5,186,387.046
|
$5,451,747.330
|
$5,520,600.947
|
$5,546,964.300
|
$5,887,845.116
|
$6,108,187.052
|
$7,047,799.938
|
$7,742,442.380
|