|
|
REMOVING CONC (MEDIANS)
|
SY
|
94.000
|
$10.000
|
$12.270
|
$12.200
|
$22.000
|
$52.130
|
$55.500
|
$24.270
|
|
|
REMOVING CONC (DRIVEWAYS)
|
SY
|
60.000
|
$15.000
|
$12.270
|
$19.150
|
$29.500
|
$37.670
|
$26.640
|
$38.020
|
|
|
REMOVING STAB BASE AND ASPH PAV (2")
|
SY
|
512.000
|
$2.000
|
$2.560
|
$6.450
|
$3.300
|
$5.000
|
$7.770
|
$11.360
|
|
|
REMOVING STAB BASE AND ASPH PAV (3")
|
SY
|
1,472.000
|
$5.000
|
$2.560
|
$4.000
|
$3.300
|
$5.000
|
$9.990
|
$7.440
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
1,259.000
|
$10.000
|
$29.970
|
$15.600
|
$29.900
|
$18.000
|
$11.230
|
$18.930
|
|
|
EMBANKMENT (FINAL)(ORD COMP)(TY C)
|
CY
|
397.000
|
$15.000
|
$23.310
|
$3.250
|
$15.000
|
$8.000
|
$15.540
|
$16.260
|
|
|
BACKFILL (TY A OR B)
|
STA
|
77.000
|
$85.000
|
$111.750
|
$144.350
|
$270.000
|
$300.000
|
$435.810
|
$145.060
|
|
|
CELL FBR MLCH SEED(PERM)(RURAL)(CLAY)
|
SY
|
28,330.000
|
$0.300
|
$0.250
|
$0.300
|
$0.300
|
$0.250
|
$0.280
|
$0.380
|
|
|
FERTILIZER
|
TON
|
1.100
|
$1,000.000
|
$1,200.000
|
$398.150
|
$1,350.000
|
$1,200.000
|
$1,332.000
|
$1,848.860
|
|
|
VEGETATIVE WATERING
|
MG
|
457.000
|
$38.000
|
$23.310
|
$29.950
|
$40.000
|
$15.000
|
$25.530
|
$61.540
|
|
|
PROOF ROLLING
|
HR
|
32.000
|
$86.000
|
$68.400
|
$102.450
|
$64.000
|
$100.000
|
$68.820
|
$67.360
|
|
|
FL BS (CMP IN PLC)(TYA GR1-2)(FNAL POS)
|
CY
|
820.000
|
$60.000
|
$61.050
|
$70.300
|
$72.600
|
$60.000
|
$90.130
|
$95.450
|
|
|
LIME (HYD, COM, OR QK(SLURRY))
|
TON
|
42.000
|
$160.000
|
$210.000
|
$172.300
|
$145.000
|
$150.000
|
$183.150
|
$177.290
|
|
|
LIME TRT (SUBGRADE)(8")
|
SY
|
3,123.000
|
$3.000
|
$2.850
|
$2.250
|
$6.000
|
$7.000
|
$8.290
|
$5.870
|
|
|
PRIME COAT (MC-30)
|
GAL
|
541.000
|
$5.500
|
$4.380
|
$7.150
|
$5.000
|
$4.500
|
$5.630
|
$6.970
|
|
|
ASPH (MULTI OPTION)
|
GAL
|
7,448.000
|
$2.350
|
$3.120
|
$3.950
|
$3.000
|
$3.600
|
$2.940
|
$3.850
|
|
|
AGGR(TY-PB GR-4S OR TY-PB GR-4)(SAC-B)
|
CY
|
174.000
|
$73.000
|
$111.210
|
$147.000
|
$130.000
|
$140.000
|
$145.430
|
$166.820
|
|
|
D-GR HMA TY B SAC-B PG (64-22)
|
TON
|
4,191.000
|
$65.000
|
$63.210
|
$64.550
|
$75.000
|
$82.000
|
$88.070
|
$84.990
|
|
|
STONE-MTRX-ASPH SMA-D SAC-A PG76-22
|
TON
|
3,492.000
|
$95.000
|
$101.100
|
$101.500
|
$109.000
|
$133.000
|
$137.630
|
$128.370
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(6")
|
SY
|
2,271.000
|
$50.000
|
$30.260
|
$37.800
|
$53.000
|
$47.000
|
$42.180
|
$62.920
|
|
|
FLEXIBLE PAV STRUCTURE REPAIR (1.5")
|
SY
|
1,813.000
|
$25.000
|
$9.330
|
$13.200
|
$12.000
|
$10.000
|
$19.980
|
$20.480
|
|
|
PLANE ASPH CONC PAV (3")
|
SY
|
17,554.000
|
$2.000
|
$1.590
|
$1.800
|
$2.000
|
$2.000
|
$2.590
|
$3.820
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
152.000
|
$50.000
|
$67.840
|
$116.800
|
$86.500
|
$95.000
|
$86.580
|
$76.390
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
104.000
|
$75.000
|
$79.310
|
$147.250
|
$105.000
|
$110.000
|
$108.780
|
$109.050
|
|
|
RC PIPE (CL III)(36 IN)
|
LF
|
4.000
|
$110.000
|
$86.000
|
$765.400
|
$470.000
|
$286.210
|
$355.200
|
$486.280
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
8.000
|
$700.000
|
$1,399.140
|
$1,236.350
|
$1,170.000
|
$1,586.840
|
$999.000
|
$880.150
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
4.000
|
$1,000.000
|
$1,399.140
|
$1,624.750
|
$1,500.000
|
$2,170.820
|
$1,665.000
|
$1,752.600
|
|
|
SET (TY II) (36 IN) (RCP) (6: 1) (P)
|
EA
|
1.000
|
$2,700.000
|
$2,934.780
|
$3,128.950
|
$4,300.000
|
$4,067.390
|
$3,552.000
|
$6,002.250
|
|
|
RING & COVER
|
EA
|
1.000
|
$1,500.000
|
$1,260.010
|
$925.350
|
$1,140.000
|
$1,345.290
|
$2,775.000
|
$2,043.120
|
|
|
CLEAN EXIST CULVERTS
|
EA
|
17.000
|
$2,500.000
|
$2,520.030
|
$1,274.000
|
$1,060.000
|
$1,500.000
|
$222.000
|
$3,244.720
|
|
|
REMOV STR (SET)
|
EA
|
8.000
|
$495.000
|
$945.010
|
$270.350
|
$295.000
|
$380.420
|
$166.500
|
$464.220
|
|
|
REMOV STR (HEADWALL)
|
EA
|
1.000
|
$700.000
|
$1,260.010
|
$1,122.100
|
$845.000
|
$1,717.480
|
$888.000
|
$1,525.930
|
|
|
REMOV STR (PIPE)
|
LF
|
255.000
|
$20.000
|
$12.600
|
$30.450
|
$21.000
|
$12.060
|
$8.880
|
$14.560
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$180,000.000
|
$156,874.090
|
$160,000.000
|
$95,000.000
|
$160,000.000
|
$190,501.720
|
$254,654.340
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
6.000
|
$4,500.000
|
$2,049.030
|
$3,995.450
|
$9,000.000
|
$1,000.000
|
$999.000
|
$4,790.690
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
111.000
|
$30.500
|
$27.700
|
$44.450
|
$31.000
|
$27.500
|
$30.750
|
$13.360
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
111.000
|
$10.000
|
$8.500
|
$11.850
|
$9.500
|
$8.500
|
$9.440
|
$5.520
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (18")
|
LF
|
415.000
|
$5.000
|
$4.500
|
$5.200
|
$5.000
|
$4.500
|
$5.000
|
$11.210
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
415.000
|
$1.000
|
$1.500
|
$1.150
|
$1.700
|
$1.500
|
$1.110
|
$1.340
|
|
|
PORT CTB (FUR & INST)(LOW PROF)(TY 1)
|
LF
|
580.000
|
$35.000
|
$16.800
|
$29.350
|
$29.300
|
$14.000
|
$25.890
|
$92.100
|
|
|
PORT CTB (FUR & INST)(LOW PROF)(TY 2)
|
LF
|
200.000
|
$60.000
|
$16.800
|
$31.450
|
$30.600
|
$14.000
|
$25.900
|
$93.510
|
|
|
PORT CTB (REMOVE)(LOW PROF)(TY 1)
|
LF
|
580.000
|
$10.000
|
$16.800
|
$20.100
|
$17.400
|
$14.000
|
$25.890
|
$14.390
|
|
|
PORT CTB (REMOVE)(LOW PROF)(TY 2)
|
LF
|
200.000
|
$15.000
|
$16.800
|
$22.950
|
$18.750
|
$14.000
|
$25.900
|
$17.880
|
|
|
DRIVEWAYS (CONC)
|
SY
|
67.000
|
$85.000
|
$68.250
|
$98.500
|
$86.350
|
$142.990
|
$55.500
|
$146.310
|
|
|
TURNOUTS (ACP)
|
SY
|
175.000
|
$30.000
|
$31.710
|
$76.850
|
$70.600
|
$27.900
|
$38.850
|
$65.370
|
|
|
DRIVEWAYS (ACP)(TYPE 1)
|
SY
|
1,337.000
|
$30.000
|
$26.280
|
$24.950
|
$34.000
|
$20.410
|
$27.750
|
$43.080
|
|
|
DRIVEWAYS (ACP) (TYPE 2)
|
SY
|
127.000
|
$40.000
|
$40.560
|
$44.800
|
$32.000
|
$39.660
|
$31.080
|
$83.250
|
|
|
INTERSECTIONS (ACP) (TYPE 1)
|
SY
|
815.000
|
$15.000
|
$26.280
|
$26.550
|
$27.500
|
$26.740
|
$31.080
|
$39.900
|
|
|
INTERSECTIONS (ACP) (TYPE 2)
|
SY
|
1,161.000
|
$30.000
|
$38.190
|
$39.600
|
$50.000
|
$37.440
|
$46.620
|
$34.120
|
|
|
DRIVEWAYS (ACP)(TYPE 3)
|
SY
|
1,109.000
|
$65.000
|
$31.710
|
$62.150
|
$41.000
|
$61.360
|
$49.950
|
$34.780
|
|
|
MAILBOX INSTALL-S (TWG-POST) TY 2
|
EA
|
4.000
|
$225.000
|
$182.570
|
$180.500
|
$190.000
|
$170.000
|
$249.750
|
$257.560
|
|
|
MAILBOX INSTALL-D (TWG-POST) TY 2
|
EA
|
1.000
|
$260.000
|
$198.680
|
$196.400
|
$210.000
|
$185.000
|
$283.050
|
$290.560
|
|
|
MAILBOX INSTALL-M (TWG-POST) TY 4
|
EA
|
3.000
|
$400.000
|
$300.700
|
$297.250
|
$315.000
|
$280.000
|
$496.170
|
$501.760
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(P)
|
EA
|
47.000
|
$450.000
|
$381.250
|
$467.150
|
$400.000
|
$440.000
|
$493.950
|
$499.560
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(T)
|
EA
|
2.000
|
$530.000
|
$563.820
|
$557.400
|
$590.000
|
$525.000
|
$692.640
|
$696.460
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U)
|
EA
|
3.000
|
$580.000
|
$671.210
|
$663.550
|
$700.000
|
$625.000
|
$852.480
|
$854.860
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U-1EXT)
|
EA
|
1.000
|
$800.000
|
$687.320
|
$679.500
|
$715.000
|
$640.000
|
$849.150
|
$850.860
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
53.000
|
$50.000
|
$42.960
|
$42.450
|
$45.000
|
$40.000
|
$79.920
|
$90.590
|
|
|
ISRSA TYS80(1)SA(P) (EXCLUDING SIGN)
|
EA
|
7.000
|
$310.000
|
$424.210
|
$419.350
|
$440.000
|
$395.000
|
$419.580
|
$425.860
|
|
|
INSTL OM ASSM (OM-2Z)(FLX)GND
|
EA
|
4.000
|
$60.000
|
$55.850
|
$55.200
|
$58.000
|
$52.000
|
$79.920
|
$89.260
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
|
LF
|
6,700.000
|
$0.150
|
$0.160
|
$0.150
|
$0.200
|
$0.160
|
$0.180
|
$0.190
|
|
|
WK ZN PAV MRK NON-REMOV (W)8"(SLD)
|
LF
|
210.000
|
$0.300
|
$0.500
|
$0.550
|
$0.550
|
$0.500
|
$0.560
|
$1.030
|
|
|
WK ZN PAV MRK NON-REMOV (W)(ARROW)
|
EA
|
4.000
|
$60.000
|
$63.000
|
$66.900
|
$70.400
|
$63.000
|
$69.930
|
$79.360
|
|
|
WK ZN PAV MRK NON-REMOV(W)(WORD)
|
EA
|
4.000
|
$85.000
|
$63.000
|
$66.900
|
$70.400
|
$63.000
|
$69.930
|
$79.360
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
|
LF
|
22,879.000
|
$0.150
|
$0.160
|
$0.150
|
$0.200
|
$0.160
|
$0.180
|
$0.190
|
|
|
WK ZN PAV MRK REMOV (TRAF BTN) TY W
|
LF
|
6,910.000
|
$1.500
|
$0.430
|
$0.450
|
$0.500
|
$0.430
|
$0.480
|
$0.500
|
|
|
WK ZN PAV MRK REMOV (TRAF BTN) TY Y
|
LF
|
10,550.000
|
$1.500
|
$0.430
|
$0.450
|
$0.500
|
$0.430
|
$0.480
|
$0.490
|
|
WK ZN PAV MRK SHT TERM (TAB)TY W
|
EA
|
188.000
|
$1.500
|
$1.760
|
$2.200
|
$0.600
|
$1.000
|
$0.370
|
$2.200
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y
|
EA
|
1,276.000
|
$1.500
|
$1.760
|
$1.750
|
$0.600
|
$1.000
|
$0.370
|
$1.200
|
|
REFL PAV MRK TY I (W)8"(SLD)(090MIL)
|
LF
|
770.000
|
$0.600
|
$0.700
|
$0.750
|
$0.800
|
$0.700
|
$0.780
|
$1.030
|
|
REFL PAV MRK TY I (W)24"(SLD)(090MIL)
|
LF
|
300.000
|
$5.000
|
$5.000
|
$5.300
|
$5.600
|
$5.000
|
$5.550
|
$5.840
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(090MIL)
|
LF
|
5,209.000
|
$0.250
|
$0.340
|
$0.350
|
$0.400
|
$0.340
|
$0.380
|
$0.390
|
|
RE PM W/RET REQ TY I (W)6"(SLD)(090MIL)
|
LF
|
11,186.000
|
$0.500
|
$0.480
|
$0.500
|
$0.550
|
$0.480
|
$0.530
|
$0.550
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(090MIL)
|
LF
|
7,844.000
|
$0.250
|
$0.340
|
$0.350
|
$0.400
|
$0.340
|
$0.380
|
$0.390
|
|
RE PM W/RET REQ TY I (Y)6"(SLD)(090MIL)
|
LF
|
10,442.000
|
$0.500
|
$0.480
|
$0.500
|
$0.550
|
$0.480
|
$0.530
|
$0.550
|
|
PREFAB PAV MRK TY C (W) (24") (SLD)
|
LF
|
192.000
|
$12.000
|
$10.430
|
$11.050
|
$11.650
|
$10.430
|
$11.580
|
$12.520
|
|
PREFAB PAV MRK TY C (W) (ARROW)
|
EA
|
2.000
|
$200.000
|
$188.000
|
$199.600
|
$210.000
|
$188.000
|
$208.680
|
$231.950
|
|
PREFAB PAV MRK TY C (W) (LNDP ARROW)
|
EA
|
2.000
|
$500.000
|
$533.000
|
$565.900
|
$600.000
|
$533.000
|
$591.630
|
$611.450
|
|
PREFAB PAV MRK TY C (W) (WORD)
|
EA
|
2.000
|
$300.000
|
$203.000
|
$215.500
|
$230.000
|
$203.000
|
$225.330
|
$248.450
|
|
PREFAB PAV MRK TY C (W) (18")(YLD TRI)
|
EA
|
21.000
|
$25.000
|
$33.000
|
$35.050
|
$37.000
|
$33.000
|
$36.630
|
$45.880
|
|
REFL PAV MRKR TY I-C
|
EA
|
54.000
|
$2.600
|
$8.000
|
$8.500
|
$9.000
|
$8.000
|
$8.880
|
$10.660
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
596.000
|
$2.600
|
$2.800
|
$2.950
|
$3.000
|
$2.800
|
$3.110
|
$3.420
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
10,550.000
|
$1.200
|
$0.500
|
$0.450
|
$0.700
|
$2.000
|
$0.110
|
$1.390
|
|
|
ELIM EXT PAV MRK & MRKS (8")
|
LF
|
210.000
|
$0.800
|
$0.500
|
$6.450
|
$3.000
|
$43.000
|
$0.110
|
$2.130
|
|
|
ELIM EXT PAV MRK & MRKS (ARROW)
|
EA
|
4.000
|
$40.000
|
$43.000
|
$45.650
|
$48.000
|
$43.000
|
$47.730
|
$72.450
|
|
|
ELIM EXT PAV MRK & MRKS (WORD)
|
EA
|
4.000
|
$40.000
|
$43.000
|
$45.650
|
$48.000
|
$39.000
|
$47.730
|
$72.450
|
|
|
REMOV RDSD FLSH BCN AM (SOLAR PWRD)
|
EA
|
4.000
|
$250.000
|
$475.000
|
$286.650
|
$300.000
|
$270.000
|
$299.700
|
$322.150
|
|
|
TREE TRIMMING / BRUSH REMOVAL
|
MI
|
1.100
|
$20,000.000
|
$17,850.000
|
$21,950.300
|
$17,600.000
|
$44,005.140
|
$22,949.250
|
$8,256.360
|
|
|
TREE REMOVAL (12" - 18" DIA)
|
EA
|
1.000
|
$800.000
|
$1,050.000
|
$1,210.300
|
$1,120.000
|
$1,000.000
|
$1,265.400
|
$1,846.970
|
|
|
TREE REMOVAL (18" - 24" DIA)
|
EA
|
1.000
|
$400.000
|
$1,575.000
|
$1,210.300
|
$1,120.000
|
$2,000.000
|
$1,265.400
|
$2,119.430
|
|
|
DITCH CLEANING AND RESHAPING (FOOT)
|
LF
|
10,687.000
|
$15.000
|
$2.280
|
$1.300
|
$1.700
|
$4.130
|
$1.980
|
$3.890
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
DAY
|
312.000
|
$65.000
|
$55.660
|
$35.850
|
$50.000
|
$50.300
|
$46.620
|
$91.180
|
|
|
TMA (STATIONARY)
|
DAY
|
176.000
|
$230.000
|
$135.310
|
$160.850
|
$335.000
|
$99.560
|
$35.520
|
$109.510
|
|
|
TMA (MOBILE OPERATION)
|
HR
|
128.000
|
$25.000
|
$54.130
|
$41.400
|
$50.000
|
$40.870
|
$43.290
|
$108.640
|
|
|
SOLAR POWERED LED ROADSIDE SIGN
|
EA
|
7.000
|
$4,700.000
|
$3,850.000
|
$3,609.700
|
$3,800.000
|
$3,400.000
|
$3,774.000
|
$3,840.590
|
|
Totals: |
$1,856,605.900
|
$1,573,309.640
|
$1,675,152.495
|
$1,799,766.450
|
$1,903,279.624
|
$1,956,700.815
|
$2,252,995.652
|