PREPARING ROW
|
STA
|
586.390
|
$1,000.000
|
$151.090
|
$525.770
|
$253.080
|
$162.000
|
$99.700
|
$386.526
|
$129.500
|
$500.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
3,021.000
|
$5.000
|
$10.870
|
$21.770
|
$11.040
|
$11.730
|
$13.350
|
$13.131
|
$10.000
|
$13.000
|
|
|
SUBGRADE WIDENING (DENS CONT)
|
STA
|
557.890
|
$350.000
|
$347.810
|
$331.960
|
$496.170
|
$275.060
|
$408.560
|
$362.442
|
$280.000
|
$88.000
|
|
|
EMBANKMENT (FINAL)(ORD COMP)(TY B)
|
CY
|
6,748.000
|
$7.000
|
$10.720
|
$5.940
|
$10.950
|
$20.610
|
$11.250
|
$19.177
|
$6.000
|
$15.000
|
|
|
BACKFILL (TY A OR B)
|
STA
|
586.390
|
$115.000
|
$365.690
|
$175.850
|
$506.160
|
$247.400
|
$115.900
|
$152.716
|
$1,100.000
|
$800.000
|
|
|
BLADING
|
HR
|
66.000
|
$160.000
|
$96.080
|
$100.000
|
$85.500
|
$70.200
|
$128.270
|
$116.942
|
$110.000
|
$85.000
|
|
|
CELL FBR MLCH SEED(PERM)(RURAL)(SANDY)
|
SY
|
312,740.000
|
$0.250
|
$0.350
|
$0.300
|
$0.300
|
$0.480
|
$0.370
|
$0.312
|
$0.350
|
$0.300
|
|
|
DRILL SEED (TEMP)(WARM OR COOL)
|
SY
|
78,186.000
|
$0.100
|
$0.100
|
$0.180
|
$0.180
|
$0.410
|
$0.160
|
$0.187
|
$0.200
|
$0.200
|
|
|
VEGETATIVE WATERING
|
MG
|
3,231.000
|
$20.000
|
$4.350
|
$8.000
|
$19.980
|
$21.600
|
$11.780
|
$17.004
|
$30.000
|
$15.000
|
|
|
SOIL RETENTION BLANKETS (CL 1) (TY D)
|
SY
|
5,000.000
|
$1.500
|
$0.750
|
$1.300
|
$1.300
|
$1.810
|
$1.610
|
$1.352
|
$1.500
|
$1.000
|
|
|
SOIL RETENTION BLANKETS (CL 2) (TY F)
|
SY
|
5,000.000
|
$1.500
|
$0.800
|
$1.840
|
$1.840
|
$1.890
|
$1.770
|
$1.914
|
$2.000
|
$1.000
|
|
|
PROOF ROLLING
|
HR
|
28.000
|
$85.000
|
$96.080
|
$65.000
|
$68.400
|
$48.600
|
$61.820
|
$64.068
|
$72.000
|
$100.000
|
|
|
FL BS (CMP IN PLC)(TYA GR1-2)(FNAL POS)
|
CY
|
43,369.000
|
$60.000
|
$53.040
|
$59.750
|
$53.350
|
$63.160
|
$63.580
|
$68.529
|
$75.000
|
$75.000
|
|
|
FL BS (CMP IN PLC)(TYE GR1-2)(FNAL POS)
|
CY
|
5,000.000
|
$85.000
|
$17.890
|
$18.860
|
$57.460
|
$13.150
|
$23.190
|
$25.870
|
$28.000
|
$95.000
|
|
|
FL BS (RDWY DEL)(TY A GR 1-2)(FNAL POS)
|
CY
|
10,528.000
|
$40.000
|
$50.870
|
$59.650
|
$54.050
|
$54.610
|
$59.860
|
$67.899
|
$65.000
|
$95.000
|
|
|
CEMENT
|
TON
|
2,277.000
|
$150.000
|
$142.500
|
$132.040
|
$147.000
|
$149.030
|
$147.790
|
$150.913
|
$160.000
|
$175.000
|
|
|
CEM TRT (MX EXST MTL & NW BS)(DC)(6")
|
SY
|
210,739.000
|
$2.000
|
$1.200
|
$1.260
|
$1.820
|
$1.400
|
$1.070
|
$2.614
|
$1.750
|
$4.500
|
|
|
ASPH (MULTI OPTION)
|
GAL
|
144,645.000
|
$3.000
|
$3.080
|
$3.200
|
$2.990
|
$2.890
|
$3.680
|
$3.268
|
$3.000
|
$4.500
|
|
|
ASPH (RC-250)
|
GAL
|
39,093.000
|
$4.000
|
$3.970
|
$3.610
|
$4.420
|
$3.530
|
$4.360
|
$4.083
|
$3.500
|
$5.000
|
|
|
AGGR(TY-B GR-5 SAC-B)
|
CY
|
1,449.000
|
$70.000
|
$94.780
|
$79.660
|
$54.190
|
$137.520
|
$126.880
|
$83.336
|
$140.000
|
$95.000
|
|
|
AGGR(TY-PB GR-4S OR TY-PB GR-4)(SAC-B)
|
CY
|
1,778.000
|
$85.000
|
$82.890
|
$91.300
|
$68.490
|
$120.870
|
$118.420
|
$88.639
|
$120.000
|
$110.000
|
|
|
AGGR(TY-PB GR-3 OR TY-PB GR-3S)(SAC-B)
|
CY
|
2,300.000
|
$125.000
|
$75.690
|
$97.300
|
$68.510
|
$93.580
|
$112.450
|
$88.018
|
$110.000
|
$110.000
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(6")
|
SY
|
9,776.000
|
$50.000
|
$31.820
|
$27.600
|
$27.480
|
$33.050
|
$57.270
|
$48.560
|
$55.000
|
$48.000
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
40.000
|
$5.000
|
$12.000
|
$12.000
|
$20.000
|
$27.000
|
$36.220
|
$12.480
|
$30.000
|
$25.000
|
|
|
TEMPORARY SPL SHORING
|
SF
|
3,000.000
|
$10.000
|
$15.000
|
$15.000
|
$24.000
|
$30.240
|
$21.390
|
$15.600
|
$35.000
|
$25.000
|
|
|
RIPRAP (CONC)(5 IN)
|
CY
|
71.750
|
$350.000
|
$450.000
|
$450.000
|
$425.000
|
$405.000
|
$458.670
|
$581.916
|
$550.000
|
$800.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
108.000
|
$450.000
|
$450.000
|
$450.000
|
$475.000
|
$459.000
|
$546.110
|
$512.230
|
$570.000
|
$600.000
|
|
|
CMP (GAL STL 18 IN)
|
LF
|
701.000
|
$65.000
|
$45.000
|
$45.000
|
$55.000
|
$62.640
|
$38.920
|
$46.800
|
$55.000
|
$70.000
|
|
|
CONC BOX CULV (3 FT X 2 FT)(EXTEND)
|
LF
|
48.000
|
$600.000
|
$330.000
|
$330.000
|
$455.000
|
$496.800
|
$354.370
|
$343.200
|
$400.000
|
$700.000
|
|
|
CONC BOX CULV (3 FT X 3 FT)(EXTEND)
|
LF
|
42.000
|
$600.000
|
$395.000
|
$395.000
|
$455.000
|
$496.800
|
$409.460
|
$410.800
|
$480.000
|
$675.000
|
|
|
CONC BOX CULV (4 FT X 3 FT)(EXTEND)
|
LF
|
48.000
|
$600.000
|
$440.000
|
$440.000
|
$500.000
|
$550.800
|
$416.870
|
$457.600
|
$530.000
|
$850.000
|
|
|
CONC BOX CULV (4 FT X 4 FT)(EXTEND)
|
LF
|
42.000
|
$600.000
|
$485.000
|
$485.000
|
$480.000
|
$523.800
|
$400.280
|
$504.400
|
$590.000
|
$875.000
|
|
|
CONC BOX CULV (5 FT X 5 FT)(EXTEND)
|
LF
|
42.000
|
$800.000
|
$650.000
|
$650.000
|
$550.000
|
$534.600
|
$596.960
|
$676.000
|
$775.000
|
$1,100.000
|
|
|
CONC BOX CULV (6 FT X 5 FT)(EXTEND)
|
LF
|
36.000
|
$600.000
|
$725.000
|
$725.000
|
$700.000
|
$675.000
|
$659.990
|
$754.000
|
$880.000
|
$1,300.000
|
|
|
CONC BOX CULV (7 FT X 5 FT)(EXTEND)
|
LF
|
14.000
|
$750.000
|
$780.000
|
$780.000
|
$1,100.000
|
$1,242.000
|
$1,146.680
|
$811.200
|
$950.000
|
$1,600.000
|
|
|
CONC BOX CULV (5 FT X 6 FT) (EXTEND)
|
LF
|
6.000
|
$750.000
|
$750.000
|
$750.000
|
$1,100.000
|
$945.000
|
$1,925.590
|
$780.000
|
$900.000
|
$2,000.000
|
|
|
CONC BOX CULV (3 FT X 2.5 FT) (EXTEND)
|
LF
|
7.000
|
$450.000
|
$400.000
|
$400.000
|
$740.000
|
$945.000
|
$1,519.260
|
$416.000
|
$475.000
|
$900.000
|
|
|
CONC BOX CULVERT (2 FT X 2 FT) (EXTEND)
|
LF
|
42.000
|
$400.000
|
$350.000
|
$350.000
|
$525.000
|
$567.000
|
$409.460
|
$364.000
|
$400.000
|
$800.000
|
|
|
CONC BOX CULV (5 FT X 2.5 FT) (EXTEND)
|
LF
|
14.000
|
$475.000
|
$500.000
|
$500.000
|
$665.000
|
$756.000
|
$853.380
|
$520.000
|
$600.000
|
$1,100.000
|
|
|
CONC BOX CULV (6 FT X 3.5 FT)(EXTEND)
|
LF
|
14.000
|
$500.000
|
$700.000
|
$700.000
|
$800.000
|
$793.800
|
$947.130
|
$728.000
|
$850.000
|
$1,450.000
|
|
|
WINGWALL (PW - 2) (HW=5 FT)
|
EA
|
1.000
|
$10,000.000
|
$5,200.000
|
$5,200.000
|
$6,200.000
|
$5,508.000
|
$12,984.150
|
$5,408.000
|
$6,000.000
|
$8,100.000
|
|
|
WINGWALL (PW - 2) (HW=7 FT)
|
EA
|
2.000
|
$15,000.000
|
$12,000.000
|
$12,000.000
|
$12,000.000
|
$10,152.000
|
$17,884.020
|
$12,480.000
|
$14,500.000
|
$19,000.000
|
|
|
WINGWALL (PW - 2) (HW=8 FT)
|
EA
|
2.000
|
$15,000.000
|
$15,000.000
|
$15,000.000
|
$15,000.000
|
$14,580.000
|
$18,976.890
|
$15,600.000
|
$18,000.000
|
$24,000.000
|
|
|
SET (TY I)(S=2 FT)(HW=3FT)(3:1)(C)
|
EA
|
6.000
|
$4,000.000
|
$2,800.000
|
$2,800.000
|
$3,500.000
|
$3,942.000
|
$6,380.320
|
$2,912.000
|
$3,000.000
|
$4,000.000
|
|
|
SET (TY I)(S=3 FT)(HW=3FT)(3:1)(C)
|
EA
|
8.000
|
$5,500.000
|
$3,500.000
|
$3,500.000
|
$3,500.000
|
$3,780.000
|
$6,755.320
|
$3,640.000
|
$4,000.000
|
$4,900.000
|
|
|
SET (TY I)(S=3 FT)(HW= 4 FT)(3:1)(C)
|
EA
|
7.000
|
$4,000.000
|
$4,000.000
|
$4,000.000
|
$3,700.000
|
$3,996.000
|
$6,755.320
|
$4,160.000
|
$4,500.000
|
$5,600.000
|
|
|
SET (TY I)(S= 4 FT)(HW= 4 FT)(3:1) (C)
|
EA
|
7.000
|
$6,000.000
|
$4,500.000
|
$4,500.000
|
$4,000.000
|
$4,320.000
|
$7,005.320
|
$4,680.000
|
$5,500.000
|
$6,500.000
|
|
|
SET (TY I)(S= 4 FT)(HW= 5 FT)(3:1) (C)
|
EA
|
6.000
|
$7,000.000
|
$5,500.000
|
$5,500.000
|
$4,300.000
|
$4,428.000
|
$7,630.320
|
$5,720.000
|
$6,700.000
|
$7,700.000
|
|
|
SET (TY I)(S= 5 FT)(HW= 4 FT)(3:1) (C)
|
EA
|
2.000
|
$6,000.000
|
$6,000.000
|
$6,000.000
|
$4,100.000
|
$4,212.000
|
$7,630.320
|
$6,240.000
|
$7,300.000
|
$8,400.000
|
|
|
SET (TY I)(S= 5 FT)(HW= 6 FT)(3:1) (C)
|
EA
|
6.000
|
$6,000.000
|
$6,500.000
|
$6,500.000
|
$5,600.000
|
$5,184.000
|
$8,005.320
|
$6,760.000
|
$7,900.000
|
$9,100.000
|
|
|
SET (TY I)(S= 6 FT)(HW= 5 FT)(3:1) (C)
|
EA
|
2.000
|
$6,000.000
|
$6,800.000
|
$6,800.000
|
$5,700.000
|
$5,400.000
|
$8,880.320
|
$7,072.000
|
$8,300.000
|
$9,500.000
|
|
|
SET (TY I)(S= 6 FT)(HW= 6 FT)(3:1) (C)
|
EA
|
12.000
|
$7,000.000
|
$7,500.000
|
$7,500.000
|
$5,700.000
|
$5,940.000
|
$9,505.320
|
$7,800.000
|
$9,100.000
|
$10,500.000
|
|
|
SET (TY II) (18 IN) (CMP) (6: 1) (P)
|
EA
|
40.000
|
$900.000
|
$1,000.000
|
$1,000.000
|
$1,180.000
|
$1,182.600
|
$935.020
|
$1,040.000
|
$1,200.000
|
$9,300.000
|
|
|
CLEAN EXIST CULVERTS
|
EA
|
20.000
|
$1,500.000
|
$1,500.000
|
$1,500.000
|
$1,600.000
|
$1,620.000
|
$3,484.420
|
$1,560.000
|
$1,800.000
|
$2,500.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$750,000.000
|
$807,568.580
|
$629,050.000
|
$670,755.800
|
$900,000.000
|
$697,123.240
|
$991,833.041
|
$175,000.000
|
$1,098,173.980
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
15.000
|
$3,000.000
|
$3,948.270
|
$6,078.000
|
$3,705.560
|
$2,700.000
|
$5,328.800
|
$4,842.925
|
$14,800.000
|
$15,500.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
80.000
|
$30.000
|
$45.000
|
$30.650
|
$30.650
|
$70.200
|
$37.890
|
$36.400
|
$37.000
|
$31.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
80.000
|
$10.000
|
$7.000
|
$7.500
|
$7.500
|
$3.240
|
$10.530
|
$9.360
|
$9.000
|
$10.000
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
222.000
|
$22.000
|
$14.000
|
$24.770
|
$24.770
|
$27.000
|
$15.510
|
$14.976
|
$30.000
|
$28.250
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
222.000
|
$6.000
|
$2.000
|
$7.500
|
$7.500
|
$5.400
|
$6.480
|
$6.032
|
$9.000
|
$9.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
800.000
|
$2.500
|
$3.950
|
$3.000
|
$3.000
|
$3.240
|
$2.730
|
$2.600
|
$3.500
|
$3.500
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
800.000
|
$0.750
|
$1.500
|
$0.500
|
$0.500
|
$0.490
|
$0.630
|
$0.520
|
$0.500
|
$1.500
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (18")
|
LF
|
800.000
|
$5.000
|
$5.000
|
$4.680
|
$4.680
|
$5.400
|
$7.980
|
$7.800
|
$5.500
|
$5.500
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
800.000
|
$1.100
|
$1.500
|
$1.000
|
$1.000
|
$0.490
|
$1.160
|
$1.040
|
$1.000
|
$1.500
|
|
|
INTERSECTIONS (SURF TREAT)
|
SY
|
1,029.000
|
$30.000
|
$30.760
|
$37.330
|
$38.550
|
$114.730
|
$26.350
|
$33.652
|
$72.000
|
$5.000
|
|
|
DRIVEWAYS (ACP)
|
SY
|
1,109.000
|
$50.000
|
$39.090
|
$62.790
|
$44.850
|
$32.030
|
$45.890
|
$45.614
|
$77.000
|
$27.000
|
|
|
DRIVEWAYS (SURF TREAT)
|
SY
|
5,880.000
|
$30.000
|
$24.990
|
$29.710
|
$37.410
|
$39.190
|
$29.590
|
$29.297
|
$55.000
|
$6.000
|
|
|
TURNOUTS (SURF TREAT)
|
SY
|
399.000
|
$30.000
|
$30.620
|
$43.240
|
$65.700
|
$39.200
|
$33.000
|
$33.652
|
$95.000
|
$5.500
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
1,100.000
|
$22.000
|
$21.450
|
$20.450
|
$20.450
|
$20.520
|
$23.280
|
$22.308
|
$25.000
|
$27.000
|
|
|
MTL BM GD FEN (LONG SPAN SYSTEM)
|
EA
|
4.000
|
$1,200.000
|
$785.000
|
$785.000
|
$785.000
|
$1,134.000
|
$944.460
|
$816.400
|
$950.000
|
$1,050.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
8.000
|
$2,500.000
|
$2,635.000
|
$2,745.000
|
$2,745.000
|
$2,484.000
|
$3,026.360
|
$2,740.400
|
$3,300.000
|
$2,300.000
|
|
|
MAILBOX INSTALL-S (TWG-POST) TY 2
|
EA
|
17.000
|
$200.000
|
$185.000
|
$185.000
|
$185.000
|
$189.000
|
$204.370
|
$192.400
|
$150.000
|
$190.000
|
|
|
MAILBOX INSTALL-D (TWG-POST) TY 2
|
EA
|
1.000
|
$215.000
|
$230.000
|
$230.000
|
$230.000
|
$226.800
|
$250.110
|
$239.200
|
$230.000
|
$260.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(P)
|
EA
|
38.000
|
$470.000
|
$485.000
|
$485.000
|
$485.000
|
$550.800
|
$518.310
|
$504.400
|
$640.000
|
$350.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(T)
|
EA
|
35.000
|
$550.000
|
$605.000
|
$605.000
|
$605.000
|
$729.000
|
$645.090
|
$629.200
|
$700.000
|
$425.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(T-2EXT)
|
EA
|
2.000
|
$650.000
|
$650.000
|
$650.000
|
$650.000
|
$810.000
|
$691.110
|
$676.000
|
$750.000
|
$500.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U)
|
EA
|
2.000
|
$660.000
|
$720.000
|
$720.000
|
$720.000
|
$810.000
|
$764.610
|
$748.800
|
$840.000
|
$525.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U-1EXT)
|
EA
|
1.000
|
$800.000
|
$820.000
|
$820.000
|
$820.000
|
$1,134.000
|
$869.610
|
$852.800
|
$950.000
|
$550.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
78.000
|
$60.000
|
$40.000
|
$40.000
|
$40.000
|
$70.200
|
$50.830
|
$41.600
|
$85.000
|
$70.000
|
|
|
INSTL OM ASSM (OM-2Z)(FLX)GND(BI)
|
EA
|
42.000
|
$60.000
|
$52.000
|
$52.000
|
$52.000
|
$75.600
|
$64.840
|
$54.080
|
$61.000
|
$40.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
|
EA
|
24.000
|
$26.000
|
$28.000
|
$28.000
|
$28.000
|
$48.600
|
$40.160
|
$29.120
|
$34.000
|
$40.000
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(BRK)
|
LF
|
12,785.000
|
$0.250
|
$0.240
|
$0.320
|
$0.320
|
$0.260
|
$0.260
|
$0.250
|
$0.250
|
$0.250
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
|
LF
|
49,940.000
|
$0.250
|
$0.240
|
$0.320
|
$0.320
|
$0.260
|
$0.260
|
$0.250
|
$0.250
|
$0.250
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
10,624.000
|
$0.500
|
$0.930
|
$1.500
|
$1.250
|
$0.700
|
$1.160
|
$1.294
|
$0.500
|
$1.000
|
|
|
REF PROF PAV MRK TY I(W)4"(SLD)(100MIL)
|
LF
|
123,370.000
|
$0.500
|
$0.580
|
$0.620
|
$0.620
|
$0.630
|
$0.620
|
$0.603
|
$0.750
|
$0.600
|
|
|
REF PROF PAV MRK TY I(Y)4"(BRK)(100MIL)
|
LF
|
12,785.000
|
$0.500
|
$0.630
|
$0.650
|
$0.650
|
$0.680
|
$0.670
|
$0.655
|
$0.750
|
$0.650
|
|
|
REF PROF PAV MRK TY I(Y)4"(SLD)(100MIL)
|
LF
|
49,940.000
|
$0.500
|
$0.600
|
$0.650
|
$0.650
|
$0.650
|
$0.640
|
$0.624
|
$0.750
|
$0.600
|
|
PREFAB PAV MRK TY C (W) (24") (SLD)
|
LF
|
108.000
|
$12.000
|
$12.000
|
$12.200
|
$12.200
|
$12.960
|
$13.400
|
$12.480
|
$14.500
|
$12.000
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
1,264.000
|
$2.500
|
$3.000
|
$2.800
|
$2.800
|
$3.240
|
$3.220
|
$3.120
|
$3.500
|
$3.000
|
|
|
TREE TRIMMING / BRUSH REMOVAL
|
MI
|
11.000
|
$14,000.000
|
$5,670.450
|
$5,670.460
|
$4,725.000
|
$7,128.000
|
$9,176.180
|
$8,170.006
|
$6,900.000
|
$1,000.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$8,000.000
|
$6,000.000
|
$18,403.000
|
$7,036.250
|
$12,960.000
|
$24,270.430
|
$16,770.000
|
$21,700.000
|
$3,000.000
|
|
|
PREFORMED CENTERLINE RUMBLE STRIP
|
LF
|
2,890.000
|
$4.000
|
$7.430
|
$4.400
|
$4.200
|
$8.020
|
$7.830
|
$7.727
|
$9.000
|
$7.500
|
|
|
TMA (STATIONARY)
|
DAY
|
452.000
|
$60.000
|
$100.000
|
$111.000
|
$189.440
|
$189.000
|
$35.040
|
$214.000
|
$240.000
|
$125.000
|
|
|
TMA (MOBILE OPERATION)
|
HR
|
380.000
|
$35.000
|
$40.000
|
$25.000
|
$81.190
|
$70.200
|
$79.290
|
$47.529
|
$56.000
|
$75.000
|
|
Totals: |
$9,269,755.200
|
$7,894,058.015
|
$8,339,101.316
|
$8,460,837.295
|
$9,051,351.139
|
$9,195,079.725
|
$9,845,066.932
|
$10,249,743.655
|
$12,407,500.000
|