PREPARING ROW
|
STA
|
269.000
|
$1,500.000
|
$250.000
|
$510.600
|
$730.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
15,911.000
|
$11.000
|
$16.000
|
$23.600
|
$26.000
|
|
|
EMBANKMENT (FINAL)(ORD COMP)(TY D)
|
CY
|
5,431.000
|
$14.000
|
$10.000
|
$23.600
|
$24.000
|
|
|
DRILL SEEDING (PERM) (RURAL) (CLAY)
|
SY
|
52,999.000
|
$0.350
|
$0.330
|
$0.480
|
$0.480
|
|
|
DRILL SEED (TEMP)(WARM OR COOL)
|
SY
|
52,999.000
|
$0.200
|
$0.290
|
$0.400
|
$0.400
|
|
|
VEGETATIVE WATERING
|
MG
|
3,182.000
|
$30.000
|
$15.000
|
$17.500
|
$24.000
|
|
|
FL BS (CMP IN PLC)(TY A GR 5)(FNAL POS)
|
CY
|
34.000
|
$115.000
|
$400.000
|
$346.990
|
$228.000
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(8")
|
SY
|
3,166.000
|
$65.000
|
$80.000
|
$58.680
|
$83.000
|
|
|
PLANE ASPH CONC PAV(0" TO 2")
|
SY
|
948.000
|
$10.000
|
$8.000
|
$9.900
|
$6.000
|
|
|
FLOWABLE BACKFILL
|
CY
|
42.000
|
$400.000
|
$300.000
|
$480.000
|
$210.000
|
|
|
TEMPORARY SPL SHORING
|
SF
|
5,836.000
|
$45.000
|
$20.000
|
$65.000
|
$60.000
|
|
|
RIPRAP (CONC)(4 IN)
|
CY
|
97.000
|
$600.000
|
$500.000
|
$610.200
|
$565.000
|
|
|
RIPRAP (CONC)(5 IN)
|
CY
|
38.000
|
$550.000
|
$525.000
|
$756.000
|
$700.000
|
|
|
CMP (GAL STL 24 IN)
|
LF
|
20.000
|
$160.000
|
$85.000
|
$113.400
|
$105.000
|
|
|
CMP (GAL STL 42 IN)
|
LF
|
12.000
|
$175.000
|
$150.000
|
$172.800
|
$160.000
|
|
|
CMP (GAL STL 48 IN)
|
LF
|
35.000
|
$200.000
|
$375.000
|
$297.000
|
$275.000
|
|
|
CMP AR (GAL STL DES 4)
|
LF
|
22.000
|
$240.000
|
$150.000
|
$156.600
|
$145.000
|
|
|
CMP AR (GAL STL DES 5)
|
LF
|
18.000
|
$330.000
|
$180.000
|
$266.760
|
$247.000
|
|
|
CMP (GAL STL 72 IN)
|
LF
|
100.000
|
$350.000
|
$700.000
|
$410.400
|
$380.000
|
|
|
CONC BOX CULV (5 FT X 5 FT)(EXTEND)
|
LF
|
64.000
|
$1,200.000
|
$725.000
|
$961.200
|
$890.000
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
9.000
|
$135.000
|
$100.000
|
$102.600
|
$95.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
758.000
|
$150.000
|
$120.000
|
$105.840
|
$98.000
|
|
|
HEADWALL (CH - FW - 0) (DIA= 48 IN)
|
EA
|
4.000
|
$12,000.000
|
$10,000.000
|
$18,899.950
|
$17,500.000
|
|
|
HEADWALL (CH - PW - 0) (DIA= 72 IN)
|
EA
|
8.000
|
$20,000.000
|
$15,000.000
|
$23,219.930
|
$21,500.000
|
|
|
WINGWALL (PW - 2) (HW=6 FT)
|
EA
|
1.000
|
$25,000.000
|
$14,000.000
|
$17,852.350
|
$16,530.000
|
|
|
SET (TY I)(S= 5 FT)(HW= 5 FT)(3:1) (C)
|
EA
|
11.000
|
$10,000.000
|
$9,000.000
|
$7,451.980
|
$6,900.000
|
|
|
SET (TY II) (15 IN) (CMP) (6: 1) (P)
|
EA
|
2.000
|
$2,750.000
|
$1,000.000
|
$1,296.000
|
$1,200.000
|
|
|
SET (TY II) (18 IN) (CMP) (6: 1) (P)
|
EA
|
22.000
|
$1,800.000
|
$1,000.000
|
$1,566.000
|
$1,450.000
|
|
|
SET (TY II) (18 IN) (RCP) (4: 1) (C)
|
EA
|
1.000
|
$2,100.000
|
$1,500.000
|
$1,566.000
|
$1,450.000
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
12.000
|
$1,500.000
|
$1,500.000
|
$2,008.790
|
$1,860.000
|
|
|
SET (TY II) (24 IN) (CMP) (4: 1) (C)
|
EA
|
6.000
|
$2,400.000
|
$1,400.000
|
$1,997.990
|
$1,850.000
|
|
|
SET (TY II) (24 IN) (CMP) (6: 1) (P)
|
EA
|
46.000
|
$1,700.000
|
$1,600.000
|
$2,051.990
|
$1,500.000
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
46.000
|
$2,300.000
|
$2,200.000
|
$2,051.990
|
$1,900.000
|
|
|
SET (TY II) (42 IN) (CMP) (4: 1) (C)
|
EA
|
2.000
|
$2,400.000
|
$6,000.000
|
$5,281.180
|
$4,900.000
|
|
|
SET (TY II) (DES 4) (CMP) (4: 1) (C)
|
EA
|
4.000
|
$3,000.000
|
$3,500.000
|
$2,915.990
|
$2,700.000
|
|
|
SET (TY II) (DES 5) (CMP) (3: 1) (C)
|
EA
|
1.000
|
$4,500.000
|
$4,000.000
|
$3,860.990
|
$3,600.000
|
|
|
SET (TY II) (DES 5) (CMP) (4: 1) (C)
|
EA
|
1.000
|
$4,000.000
|
$6,000.000
|
$4,211.990
|
$3,900.000
|
|
|
CLEAN EXIST CULVERTS
|
EA
|
14.000
|
$1,000.000
|
$1,200.000
|
$1,393.200
|
$1,300.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$646,882.810
|
$425,000.000
|
$632,796.100
|
$642,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
8.000
|
$10,000.000
|
$10,000.000
|
$4,749.600
|
$16,300.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 3)
|
LF
|
420.000
|
$95.000
|
$75.000
|
$119.250
|
$120.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
2,440.000
|
$15.000
|
$30.000
|
$15.400
|
$15.400
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
13,879.000
|
$5.300
|
$4.250
|
$3.500
|
$3.500
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
13,879.000
|
$2.000
|
$1.250
|
$0.500
|
$0.500
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2) (6:1)
|
LF
|
2,020.000
|
$60.000
|
$135.000
|
$53.500
|
$54.000
|
|
|
CONCRETE CURB (SPECIAL)
|
LF
|
371.000
|
$100.000
|
$35.000
|
$48.600
|
$45.000
|
|
|
INTERSECTIONS (ACP)
|
SY
|
250.000
|
$62.000
|
$150.000
|
$43.800
|
$146.000
|
|
|
DRIVEWAYS (ACP)
|
SY
|
1,108.000
|
$100.000
|
$75.000
|
$43.800
|
$72.000
|
|
|
DRIVEWAYS (SURF TREAT)
|
SY
|
2,033.000
|
$125.000
|
$50.000
|
$36.800
|
$72.000
|
|
|
TURNOUTS (ACP)
|
SY
|
269.000
|
$100.000
|
$75.000
|
$48.400
|
$200.000
|
|
|
RUMBLE STRIPS (SHOULDER)
|
LF
|
53,784.000
|
$0.500
|
$0.200
|
$0.180
|
$0.200
|
|
|
RUMBLE STRIPS (CENTERLINE)
|
LF
|
26,744.000
|
$2.000
|
$0.200
|
$0.230
|
$0.270
|
|
|
MAILBOX INSTALL-S (TWW-POST) TY 4
|
EA
|
22.000
|
$325.000
|
$350.000
|
$280.000
|
$280.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(P)
|
EA
|
90.000
|
$863.000
|
$800.000
|
$700.000
|
$700.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(T)
|
EA
|
1.000
|
$1,500.000
|
$1,000.000
|
$900.000
|
$900.000
|
|
|
INSTL OM ASSM (OM-2Y)(WC)GND(BI)
|
EA
|
25.000
|
$75.000
|
$175.000
|
$65.000
|
$65.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)6"(SLD)
|
LF
|
56,254.000
|
$0.780
|
$0.400
|
$0.450
|
$0.400
|
|
|
WK ZN PAV MRK NON-REMOV (Y)6"(BRK)
|
LF
|
2,063.000
|
$0.550
|
$2.000
|
$0.450
|
$2.000
|
|
|
WK ZN PAV MRK NON-REMOV (Y)6"(SLD)
|
LF
|
100,184.000
|
$0.700
|
$0.400
|
$0.450
|
$0.400
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
2,348.000
|
$2.350
|
$1.600
|
$1.630
|
$1.800
|
|
RE PM W/RET REQ TY I (W)6"(SLD)(090MIL)
|
LF
|
53,730.000
|
$0.560
|
$0.750
|
$0.600
|
$0.720
|
|
RE PM W/RET REQ TY I (Y)6"(BRK)(090MIL)
|
LF
|
2,063.000
|
$0.500
|
$2.000
|
$0.600
|
$2.000
|
|
RE PM W/RET REQ TY I (Y)6"(SLD)(090MIL)
|
LF
|
43,972.000
|
$0.560
|
$0.750
|
$0.600
|
$0.720
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
1,154.000
|
$5.000
|
$5.000
|
$4.500
|
$5.000
|
|
|
D-GR HMA TY-B PG64-22
|
TON
|
20,839.000
|
$100.000
|
$92.000
|
$90.900
|
$112.000
|
|
|
D-GR HMA TY-B PG64-22 (LEVEL-UP)
|
TON
|
96.000
|
$125.000
|
$240.000
|
$170.500
|
$296.000
|
|
|
D-GR HMA TY-D SAC-B PG70-22
|
TON
|
10,810.000
|
$105.000
|
$110.000
|
$103.200
|
$129.000
|
|
|
TACK COAT
|
GAL
|
16,137.000
|
$5.000
|
$5.000
|
$4.090
|
$3.800
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$17,500.000
|
$15,000.000
|
$10,000.000
|
$15,000.000
|
|
|
TMA (STATIONARY)
|
DAY
|
243.000
|
$169.000
|
$200.000
|
$300.000
|
$275.000
|
|
|
TMA (MOBILE OPERATION)
|
HR
|
288.000
|
$150.000
|
$25.000
|
$90.000
|
$85.000
|
|
|
LEAD LED CHEVRON
|
EA
|
2.000
|
$4,400.000
|
$100.000
|
$3,850.000
|
$3,900.000
|
|
|
LED CHEVRON
|
EA
|
15.000
|
$3,000.000
|
$4,500.000
|
$3,200.000
|
$3,200.000
|
|
Totals: |
$7,558,774.950
|
$6,545,352.980
|
$6,900,744.490
|
$7,971,940.440
|