PREPARING ROW
|
STA
|
113.000
|
$300.000
|
$100.000
|
$369.630
|
$611.421
|
$480.000
|
$255.380
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
711.120
|
$11.500
|
$20.000
|
$18.930
|
$15.360
|
$15.750
|
$19.440
|
|
|
SUBGRADE WIDENING (ORD COMP)
|
STA
|
105.000
|
$350.000
|
$200.000
|
$875.790
|
$505.506
|
$933.870
|
$696.350
|
|
|
EMBANKMENT (FINAL)(ORD COMP)(TY B)
|
CY
|
1,086.000
|
$11.000
|
$15.000
|
$16.650
|
$15.614
|
$13.500
|
$12.230
|
|
|
BACKFILL (TY A OR B)
|
STA
|
113.000
|
$350.000
|
$110.000
|
$379.620
|
$370.853
|
$146.250
|
$274.200
|
|
|
BLADING
|
HR
|
10.000
|
$100.000
|
$140.000
|
$91.200
|
$109.128
|
$90.000
|
$146.280
|
|
|
CELL FBR MLCH SEED(PERM)(RURAL)(CLAY)
|
SY
|
60,267.000
|
$0.300
|
$0.300
|
$0.350
|
$0.270
|
$0.320
|
$0.400
|
|
|
CELL FBR MLCH SEED(TEMP)(WARM)
|
SY
|
15,067.000
|
$0.250
|
$0.250
|
$0.300
|
$0.218
|
$0.290
|
$0.360
|
|
|
CELL FBR MLCH SEED(TEMP)(COOL)
|
SY
|
15,067.000
|
$0.250
|
$0.250
|
$0.300
|
$0.218
|
$0.290
|
$0.360
|
|
|
VEGETATIVE WATERING
|
MG
|
623.000
|
$15.000
|
$18.000
|
$23.310
|
$21.888
|
$12.000
|
$64.400
|
|
|
PROOF ROLLING
|
HR
|
10.000
|
$96.000
|
$80.000
|
$79.800
|
$65.800
|
$78.750
|
$72.920
|
|
|
FL BS (CMP IN PLC)(TYA GR1-2)(FNAL POS)
|
CY
|
1,357.000
|
$60.000
|
$67.500
|
$58.830
|
$63.553
|
$59.450
|
$69.580
|
|
|
FL BS (CMP IN PLC)(TYE GR1-2)(FNAL POS)
|
CY
|
5,605.000
|
$20.000
|
$25.750
|
$30.180
|
$32.454
|
$23.700
|
$33.590
|
|
|
FL BS (RDWY DEL)(TY A GR 1-2)(FNAL POS)
|
CY
|
3,500.000
|
$55.000
|
$55.000
|
$58.840
|
$62.918
|
$61.700
|
$64.050
|
|
|
CEMENT
|
TON
|
444.000
|
$150.000
|
$160.000
|
$155.840
|
$147.290
|
$150.000
|
$174.820
|
|
|
CEM TRT (MX EXST MTL & NW BS)(DC)(6")
|
SY
|
37,334.000
|
$1.600
|
$1.250
|
$1.940
|
$2.173
|
$1.620
|
$2.400
|
|
|
ASPH (MULTI OPTION)
|
GAL
|
27,875.000
|
$3.200
|
$3.000
|
$3.800
|
$3.462
|
$3.560
|
$4.270
|
|
|
ASPH (RC-250)
|
GAL
|
7,535.000
|
$4.000
|
$3.750
|
$5.110
|
$4.222
|
$5.940
|
$4.450
|
|
|
AGGR(TY-B GR-5 SAC-B)
|
CY
|
280.000
|
$94.000
|
$115.000
|
$109.590
|
$87.232
|
$83.900
|
$140.160
|
|
|
AGGR(TY-PB GR-4S OR TY-PB GR-4)(SAC-B)
|
CY
|
378.000
|
$86.000
|
$94.000
|
$99.420
|
$90.334
|
$84.860
|
$123.050
|
|
|
AGGR(TY-PB GR-3 OR TY-PB GR-3S)(SAC-B)
|
CY
|
444.000
|
$100.000
|
$88.500
|
$99.530
|
$93.326
|
$83.130
|
$148.130
|
|
|
CEM STABIL BKFL
|
CY
|
152.000
|
$80.000
|
$90.000
|
$180.000
|
$156.000
|
$150.000
|
$121.070
|
|
|
CUT & RESTORING PAV
|
SY
|
155.000
|
$65.000
|
$20.000
|
$80.000
|
$182.000
|
$175.000
|
$98.920
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
80.000
|
$12.000
|
$40.000
|
$10.000
|
$20.800
|
$20.000
|
$34.020
|
|
|
TEMPORARY SPL SHORING
|
SF
|
304.000
|
$15.000
|
$30.000
|
$5.000
|
$104.000
|
$100.000
|
$60.250
|
|
|
RIPRAP (CONC)(5 IN)
|
CY
|
9.100
|
$450.000
|
$600.000
|
$400.000
|
$624.000
|
$600.000
|
$654.020
|
|
|
CONC BOX CULV (5 FT X 3 FT)
|
LF
|
80.000
|
$235.000
|
$425.000
|
$340.000
|
$520.000
|
$500.000
|
$587.920
|
|
|
CONC BOX CULV (5 FT X 5 FT)
|
LF
|
120.000
|
$250.000
|
$475.000
|
$370.000
|
$676.000
|
$650.000
|
$646.410
|
|
|
CONC BOX CULV (6 FT X 3 FT)
|
LF
|
40.000
|
$285.000
|
$625.000
|
$440.000
|
$624.000
|
$600.000
|
$880.220
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
475.000
|
$60.000
|
$84.000
|
$48.000
|
$58.240
|
$56.000
|
$73.990
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
240.000
|
$70.000
|
$93.000
|
$84.000
|
$114.400
|
$110.000
|
$170.430
|
|
|
SET (TY I)(S= 5 FT)(HW= 4 FT)(3:1) (C)
|
EA
|
4.000
|
$6,250.000
|
$8,500.000
|
$3,800.000
|
$6,240.000
|
$6,000.000
|
$6,507.530
|
|
|
SET (TY I)(S= 5 FT)(HW= 6 FT)(3:1) (C)
|
EA
|
6.000
|
$6,500.000
|
$9,000.000
|
$5,800.000
|
$7,800.000
|
$7,500.000
|
$7,757.530
|
|
|
SET (TY I)(S= 6 FT)(HW= 4 FT)(3:1) (C)
|
EA
|
2.000
|
$6,500.000
|
$12,000.000
|
$4,800.000
|
$8,320.000
|
$8,000.000
|
$8,382.530
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
18.000
|
$700.000
|
$1,850.000
|
$1,500.000
|
$1,040.000
|
$1,000.000
|
$945.440
|
|
|
SET (TY II) (24 IN) (RCP) (4: 1) (C)
|
EA
|
12.000
|
$1,400.000
|
$2,000.000
|
$1,550.000
|
$1,560.000
|
$1,500.000
|
$1,146.690
|
|
|
REMOV STR (PIPE)
|
LF
|
332.000
|
$15.000
|
$10.000
|
$12.000
|
$31.200
|
$30.000
|
$16.390
|
|
|
REMOVE STR (CONC)
|
EA
|
1.000
|
$4,500.000
|
$10,000.000
|
$7,500.000
|
$5,200.000
|
$5,000.000
|
$4,893.440
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$141,720.130
|
$112,750.000
|
$166,841.280
|
$226,560.806
|
$229,972.340
|
$208,196.040
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
7.000
|
$5,000.000
|
$2,500.000
|
$3,188.600
|
$6,861.738
|
$18,437.500
|
$4,639.510
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
200.000
|
$31.000
|
$30.000
|
$33.800
|
$35.152
|
$24.000
|
$37.690
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
200.000
|
$8.000
|
$15.000
|
$7.240
|
$7.530
|
$7.000
|
$8.470
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
222.000
|
$20.000
|
$25.000
|
$13.500
|
$14.040
|
$13.000
|
$15.310
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
222.000
|
$7.000
|
$10.000
|
$5.860
|
$6.094
|
$2.000
|
$6.900
|
|
|
BACKHOE WORK (EROSION & SEDMT CONT)
|
HR
|
42.000
|
$80.000
|
$85.000
|
$85.500
|
$102.472
|
$60.000
|
$83.720
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
2,500.000
|
$3.100
|
$4.000
|
$2.500
|
$2.600
|
$3.000
|
$3.080
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
2,500.000
|
$0.550
|
$2.000
|
$0.500
|
$0.520
|
$1.000
|
$0.710
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (18")
|
LF
|
440.000
|
$5.000
|
$6.000
|
$6.000
|
$6.240
|
$5.250
|
$6.830
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
440.000
|
$1.100
|
$2.000
|
$1.000
|
$1.040
|
$1.500
|
$1.330
|
|
|
CONSTRUCTING DETOURS
|
SY
|
981.000
|
$45.000
|
$27.000
|
$39.420
|
$29.646
|
$52.500
|
$59.710
|
|
|
CONC CURB (MOD) (TYPE I)
|
LF
|
258.000
|
$20.000
|
$40.000
|
$25.000
|
$41.600
|
$40.000
|
$28.820
|
|
|
DRIVEWAYS (SURF TREAT)
|
SY
|
1,032.000
|
$25.000
|
$18.750
|
$28.560
|
$24.872
|
$25.960
|
$36.180
|
|
|
TURNOUTS (SURF TREAT)
|
SY
|
275.000
|
$20.000
|
$25.000
|
$28.560
|
$24.624
|
$25.960
|
$52.620
|
|
|
WIRE FENCE (TY A)
|
LF
|
150.000
|
$15.000
|
$16.000
|
$10.000
|
$27.000
|
$18.000
|
$17.180
|
|
|
MAILBOX INSTALL-S (TWG-POST) TY 4
|
EA
|
7.000
|
$220.000
|
$500.000
|
$190.000
|
$197.600
|
$190.000
|
$257.670
|
|
|
MAILBOX INSTALL-D (TWG-POST) TY 4
|
EA
|
2.000
|
$300.000
|
$550.000
|
$225.000
|
$234.000
|
$225.000
|
$367.670
|
|
|
MAILBOX INSTALL-M (TWG-POST) TY 4
|
EA
|
2.000
|
$350.000
|
$650.000
|
$410.000
|
$426.400
|
$410.000
|
$421.960
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(P)
|
EA
|
42.000
|
$485.000
|
$525.000
|
$475.000
|
$494.000
|
$475.000
|
$576.190
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(T)
|
EA
|
12.000
|
$605.000
|
$650.000
|
$590.000
|
$613.600
|
$590.000
|
$774.670
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U-BM)
|
EA
|
1.000
|
$850.000
|
$850.000
|
$755.000
|
$785.200
|
$755.000
|
$1,055.170
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
29.000
|
$50.000
|
$55.000
|
$50.000
|
$52.000
|
$180.000
|
$120.520
|
|
|
INSTL OM ASSM (OM-2Z)(FLX)GND
|
EA
|
18.000
|
$100.000
|
$75.000
|
$65.000
|
$67.600
|
$65.000
|
$88.150
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
|
LF
|
22,600.000
|
$0.260
|
$0.520
|
$0.300
|
$0.312
|
$0.300
|
$0.680
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
568.000
|
$0.750
|
$1.000
|
$1.760
|
$1.970
|
$1.400
|
$1.510
|
|
|
REF PROF PAV MRK TY I(W)4"(SLD)(100MIL)
|
LF
|
22,600.000
|
$0.580
|
$0.750
|
$0.700
|
$0.728
|
$0.700
|
$0.900
|
|
|
REF PROF PAV MRK TY I(Y)4"(SLD)(100MIL)
|
LF
|
22,600.000
|
$0.600
|
$0.750
|
$0.700
|
$0.728
|
$0.700
|
$0.900
|
|
PREFAB PAV MRK TY C (W) (24") (SLD)
|
LF
|
12.000
|
$11.500
|
$30.000
|
$20.000
|
$20.800
|
$20.000
|
$35.980
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
284.000
|
$2.600
|
$4.400
|
$4.000
|
$4.160
|
$4.000
|
$5.310
|
|
|
TREE TRIMMING / BRUSH REMOVAL
|
MI
|
2.140
|
$12,000.000
|
$7,500.000
|
$23,625.000
|
$17,327.794
|
$7,675.000
|
$8,737.580
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$9,000.000
|
$4,000.000
|
$7,643.930
|
$9,720.000
|
$16,000.000
|
$11,428.730
|
|
|
PREFORMED IN-LANE(TRANS) RUMBLE STRIP
|
LF
|
160.000
|
$15.000
|
$30.000
|
$12.000
|
$12.480
|
$12.000
|
$17.140
|
|
|
TMA (STATIONARY)
|
EA
|
2.000
|
$7,500.000
|
$10,000.000
|
$7,643.930
|
$6,480.000
|
$18,000.000
|
$13,911.980
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
30.000
|
$150.000
|
$400.000
|
$356.720
|
$540.000
|
$40.000
|
$541.710
|
|
Totals: |
$1,577,929.410
|
$1,657,477.600
|
$1,869,877.482
|
$2,072,188.367
|
$2,090,649.230
|
$2,224,592.686
|