AGGR(TY-PL GR-3LW SAC-B)
|
CY
|
28,982.000
|
$147.100
|
$148.170
|
$195.000
|
|
|
AGGR (TY-PB GR-4 OR TY-PL GR-4 ( SAC-B)
|
CY
|
10,235.000
|
$133.630
|
$137.220
|
$180.000
|
|
|
ASPH (AC-15P,AC-20-5TR, OR AC-20XP)
|
TON
|
7,352.710
|
$871.680
|
$909.000
|
$1,250.000
|
|
|
PLANE ASPH CONC PAV (2")
|
SY
|
72,003.000
|
$2.710
|
$3.100
|
$5.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$1,750,000.000
|
$3,523,462.000
|
$2,500,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
10.000
|
$15,500.000
|
$17,500.000
|
$25,000.000
|
|
|
RUMBLE STRIPS (SHOULDER) ASPHALT
|
LF
|
3,020.000
|
$0.750
|
$1.750
|
$2.500
|
|
|
RUMBLE STRIPS (CENTERLINE) ASPHALT
|
LF
|
3,622.000
|
$0.750
|
$1.750
|
$2.500
|
|
|
MAILBOX INSTALL-S (TWW-POST) TY 4
|
EA
|
171.000
|
$367.400
|
$595.000
|
$325.000
|
|
|
MAILBOX INSTALL-D (TWW-POST) TY 4
|
EA
|
7.000
|
$400.000
|
$685.000
|
$350.000
|
|
|
MAILBOX INSTALL-M (TWW-POST) TY 4
|
EA
|
13.000
|
$872.000
|
$955.000
|
$900.000
|
|
WK ZN PAV MRK SHT TERM (TAB)TY W
|
EA
|
9,143.000
|
$1.330
|
$0.010
|
$0.100
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
131,182.000
|
$1.730
|
$0.010
|
$0.100
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
40,978.000
|
$1.250
|
$0.900
|
$1.000
|
|
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
|
LF
|
984.000
|
$3.650
|
$5.500
|
$4.000
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
7,994.000
|
$6.750
|
$6.900
|
$7.250
|
|
REFL PAV MRK TY I (Y)12"(SLD)(100MIL)
|
LF
|
10,867.000
|
$5.150
|
$5.500
|
$4.000
|
|
REFL PAV MRK TY II (W) 4" (BRK)
|
LF
|
30,260.000
|
$0.280
|
$0.130
|
$0.250
|
|
REFL PAV MRK TY II (W) 6" (SLD)
|
LF
|
2,531,466.000
|
$0.350
|
$0.160
|
$0.250
|
|
REFL PAV MRK TY II (W) 8" (SLD)
|
LF
|
33,822.000
|
$0.680
|
$0.200
|
$0.500
|
|
REFL PAV MRK TY II (W) 12" (LNDP)
|
LF
|
131.000
|
$4.750
|
$4.000
|
$2.200
|
|
REFL PAV MRK TY II (W) 12" (SLD)
|
LF
|
2,636.000
|
$2.680
|
$3.250
|
$2.200
|
|
REFL PAV MRK TY II (W) 24" (SLD)
|
LF
|
8,581.000
|
$3.680
|
$4.050
|
$3.750
|
|
REFL PAV MRK TY II (Y) 4" (BRK)
|
LF
|
189,260.000
|
$0.230
|
$0.130
|
$0.100
|
|
REFL PAV MRK TY II (Y) 4" (SLD)
|
LF
|
1,692,418.000
|
$0.160
|
$0.120
|
$0.200
|
|
REFL PAV MRK TY II (Y) 12" (SLD)
|
LF
|
7,274.000
|
$0.780
|
$3.250
|
$2.000
|
|
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
|
LF
|
23,520.000
|
$0.570
|
$0.360
|
$0.350
|
|
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
|
LF
|
2,234,408.000
|
$0.750
|
$0.560
|
$0.550
|
|
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
|
LF
|
149,610.000
|
$0.620
|
$0.360
|
$0.400
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
1,498,930.000
|
$0.520
|
$0.350
|
$0.400
|
|
RE PROF PM (W)4"(SLD) RAISD PROF ONLY
|
LF
|
2,023,378.000
|
$0.270
|
$0.290
|
$0.350
|
|
RE PROF PM (Y)4"(SLD) RAISD PROF ONLY
|
LF
|
1,064,989.000
|
$0.280
|
$0.270
|
$0.350
|
|
RE PROF PM (Y)4"(BRK) RAISD PROF ONLY
|
LF
|
108,440.000
|
$0.320
|
$0.280
|
$0.350
|
|
PREFAB PAV MRK TY C (W) (ARROW)
|
EA
|
134.000
|
$180.000
|
$165.000
|
$250.000
|
|
PREFAB PAV MRK TY C (W) (WORD)
|
EA
|
117.000
|
$220.000
|
$200.000
|
$300.000
|
|
PREFAB PAV MRK TY C (W) (RR XING)
|
EA
|
12.000
|
$605.000
|
$700.000
|
$850.000
|
|
PREFAB PAV MRK TY C (W) (36")(YLD TRI)
|
EA
|
155.000
|
$43.150
|
$35.000
|
$35.000
|
|
REFL PAV MRKR TY I-C
|
EA
|
1,207.000
|
$5.380
|
$3.800
|
$5.000
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
30,995.000
|
$5.380
|
$3.800
|
$5.000
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
2,057.000
|
$5.380
|
$3.800
|
$5.000
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
66,493.000
|
$0.550
|
$0.680
|
$0.750
|
|
|
ELIM EXT PAV MRK & MRKS (8")
|
LF
|
2,590.000
|
$1.100
|
$0.750
|
$1.750
|
|
|
ELIM EXT PAV MRK & MRKS (24")
|
LF
|
615.000
|
$4.710
|
$4.000
|
$5.500
|
|
|
ELIM EXT PAV MRK & MRKS (ARROW)
|
EA
|
27.000
|
$46.680
|
$60.000
|
$200.000
|
|
|
ELIM EXT PAV MRK & MRKS (WORD)
|
EA
|
25.000
|
$53.660
|
$60.000
|
$200.000
|
|
|
ELIM EXT PAV MRK & MRKS (36")(YLD TRI)
|
EA
|
18.000
|
$29.000
|
$20.000
|
$100.000
|
|
|
PAV SURF PREP FOR MRK (4")
|
LF
|
66,493.000
|
$0.170
|
$0.040
|
$0.150
|
|
|
PAV SURF PREP FOR MRK (8")
|
LF
|
2,590.000
|
$0.240
|
$0.040
|
$0.150
|
|
|
PAV SURF PREP FOR MRK (24")
|
LF
|
615.000
|
$1.270
|
$0.500
|
$1.250
|
|
|
PAV SURF PREP FOR MRK (ARROW)
|
EA
|
27.000
|
$21.100
|
$10.000
|
$20.000
|
|
|
PAV SURF PREP FOR MRK (WORD)
|
EA
|
25.000
|
$21.750
|
$10.000
|
$20.000
|
|
|
PAV SURF PREP FOR MRK (36")(YLD TRI)
|
EA
|
18.000
|
$16.970
|
$5.000
|
$20.000
|
|
|
SP MIXES SP-C PG64-22
|
TON
|
8,801.600
|
$244.180
|
$168.900
|
$275.000
|
|
|
TACK COAT
|
GAL
|
4,863.000
|
$4.960
|
$1.000
|
$6.500
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
125.000
|
$135.000
|
$1.000
|
$100.000
|
|
Totals: |
$21,841,302.151
|
$21,784,893.280
|
$26,927,000.050
|