|
|
REMOVING CONC (FLUME)
|
SY
|
4.000
|
$14.860
|
$1,000.000
|
$210.000
|
$210.000
|
$100.000
|
|
|
EMBANKMENT (FINAL)(ORD COMP)(TY C)
|
CY
|
63.000
|
$18.000
|
$100.000
|
$100.000
|
$100.000
|
$50.000
|
|
|
BACKFILL (TY A OR B)
|
STA
|
83.000
|
$210.000
|
$200.000
|
$335.000
|
$375.000
|
$250.000
|
|
|
COMPOST MANUF TOPSOIL (4")
|
SY
|
8,098.000
|
$0.800
|
$0.500
|
$1.000
|
$1.000
|
$8.000
|
|
|
BLOCK SODDING
|
SY
|
8,098.000
|
$4.320
|
$2.000
|
$4.550
|
$4.500
|
$8.000
|
|
|
DRILL SEED (TEMP)(WARM OR COOL)
|
SY
|
6,075.000
|
$0.120
|
$0.010
|
$0.260
|
$0.250
|
$1.000
|
|
|
VEGETATIVE WATERING
|
MG
|
2,111.000
|
$8.340
|
$0.010
|
$0.010
|
$25.000
|
$20.000
|
|
|
FLEX PAVEMENT STRUCTURE REPAIR (4"-6")
|
SY
|
16,860.000
|
$66.000
|
$46.000
|
$54.000
|
$47.200
|
$50.000
|
|
|
PLAN & TEXT ASPH CONC PAV(0" TO 2")
|
SY
|
176,990.000
|
$2.000
|
$0.750
|
$2.380
|
$2.550
|
$4.000
|
|
|
CEM STABIL BKFL
|
CY
|
25.000
|
$141.780
|
$190.000
|
$400.000
|
$405.000
|
$350.000
|
|
|
CONC STR REPAIR (VERTICAL & OVERHEAD)
|
SF
|
99.000
|
$237.050
|
$250.000
|
$235.000
|
$225.000
|
$500.000
|
|
|
RIPRAP (CONC)(5 IN)
|
CY
|
38.100
|
$800.000
|
$530.000
|
$665.000
|
$660.000
|
$650.000
|
|
|
RIPRAP (STONE PROTECTION)(18 IN)
|
CY
|
305.000
|
$240.000
|
$200.000
|
$215.000
|
$204.000
|
$185.000
|
|
|
RIPRAP (CONC)(FLUME)
|
CY
|
0.300
|
$700.000
|
$5,000.000
|
$11,000.000
|
$10,900.000
|
$1,000.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
200.000
|
$800.000
|
$510.000
|
$710.000
|
$664.000
|
$550.000
|
|
|
CLEAN EXIST CULVERTS
|
EA
|
5.000
|
$2,200.000
|
$2,000.000
|
$2,100.000
|
$2,150.000
|
$1,500.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$351,245.950
|
$300,000.000
|
$332,106.000
|
$450,000.000
|
$500,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
5.000
|
$23,000.000
|
$19,700.000
|
$19,000.000
|
$7,500.000
|
$8,500.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 3)
|
LF
|
472.000
|
$54.000
|
$20.000
|
$62.000
|
$64.000
|
$30.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
472.000
|
$10.000
|
$5.000
|
$15.350
|
$16.000
|
$15.000
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
492.000
|
$5.000
|
$10.000
|
$28.750
|
$29.000
|
$40.000
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
492.000
|
$1.000
|
$5.000
|
$9.350
|
$9.500
|
$20.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
6,061.000
|
$3.250
|
$2.000
|
$2.850
|
$2.950
|
$4.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
6,061.000
|
$0.150
|
$1.000
|
$0.800
|
$0.800
|
$2.000
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
1,403.000
|
$4.800
|
$5.000
|
$4.400
|
$4.500
|
$18.000
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
1,403.000
|
$0.800
|
$1.000
|
$0.900
|
$0.900
|
$9.000
|
|
|
RUMBLE STRIPS (SHOULDER)
|
LF
|
24,330.000
|
$0.180
|
$0.300
|
$0.220
|
$0.360
|
$0.500
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
1,168.000
|
$21.000
|
$20.000
|
$22.000
|
$21.500
|
$30.000
|
|
|
MTL BEAM GD FEN TRANS (T6)
|
EA
|
14.000
|
$1,100.000
|
$550.000
|
$614.000
|
$575.000
|
$1,850.000
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
11.000
|
$1,100.000
|
$1,000.000
|
$1,135.000
|
$1,080.000
|
$1,850.000
|
|
|
MTL W - BEAM GD FEN (LOW FILL CULVERT)
|
LF
|
107.000
|
$103.000
|
$75.000
|
$86.000
|
$79.000
|
$50.000
|
|
|
MTL BM GD FEN TRANS (31"-28")
|
EA
|
14.000
|
$700.000
|
$535.000
|
$614.000
|
$575.000
|
$50.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
475.000
|
$2.200
|
$2.500
|
$2.800
|
$2.650
|
$3.000
|
|
|
REMOVE DOWNSTREAM ANCHOR TERMINAL
|
EA
|
7.000
|
$230.000
|
$150.000
|
$170.000
|
$160.000
|
$500.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
11.000
|
$2,900.000
|
$3,000.000
|
$3,100.000
|
$2,950.000
|
$3,250.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
7.000
|
$240.000
|
$250.000
|
$285.000
|
$265.000
|
$1,500.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
|
EA
|
39.000
|
$30.000
|
$25.000
|
$28.000
|
$26.500
|
$100.000
|
|
WK ZN PAV MRK SHT TERM (TAB)TY W
|
EA
|
6,250.000
|
$1.090
|
$1.000
|
$1.100
|
$2.000
|
$6.000
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
1,130.000
|
$2.500
|
$1.000
|
$1.100
|
$2.000
|
$6.000
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
1,935.000
|
$1.420
|
$0.750
|
$0.820
|
$1.150
|
$2.000
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
2,598.000
|
$8.000
|
$6.000
|
$6.050
|
$6.600
|
$12.000
|
|
REFL PAV MRK TY I (W)(ARROW)(100MIL)
|
EA
|
30.000
|
$192.000
|
$110.000
|
$115.000
|
$172.000
|
$250.000
|
|
REFL PAV MRK TY I (W)(WORD)(100MIL)
|
EA
|
16.000
|
$179.000
|
$110.000
|
$115.000
|
$210.000
|
$250.000
|
|
REFL PAV MRK TY II (W) 6" (BRK)
|
LF
|
24,511.000
|
$0.300
|
$0.200
|
$0.210
|
$0.380
|
$0.500
|
|
REFL PAV MRK TY II (W) 6" (SLD)
|
LF
|
98,034.000
|
$0.250
|
$0.200
|
$0.200
|
$0.370
|
$0.500
|
|
REFL PAV MRK TY II (W) 8" (SLD)
|
LF
|
2,590.000
|
$0.420
|
$0.240
|
$0.260
|
$0.780
|
$0.650
|
|
REFL PAV MRK TY II (W) 24" (SLD)
|
LF
|
296.000
|
$3.620
|
$1.000
|
$1.150
|
$4.650
|
$5.000
|
|
REFL PAV MRK TY II (Y) 6" (BRK)
|
LF
|
7,645.000
|
$0.210
|
$0.200
|
$0.210
|
$0.390
|
$0.500
|
|
REFL PAV MRK TY II (Y) 6" (SLD)
|
LF
|
78,427.000
|
$0.220
|
$0.200
|
$0.210
|
$0.370
|
$0.500
|
|
RE PM W/RET REQ TY I (W)6"(BRK)(100MIL)
|
LF
|
9,460.000
|
$0.660
|
$0.600
|
$0.620
|
$0.780
|
$1.000
|
|
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
|
LF
|
42,589.000
|
$0.690
|
$0.600
|
$0.620
|
$0.700
|
$1.000
|
|
RE PM W/RET REQ TY I (Y)6"(BRK)(100MIL)
|
LF
|
7,645.000
|
$0.620
|
$0.600
|
$0.620
|
$0.770
|
$1.000
|
|
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
|
LF
|
39,443.000
|
$0.540
|
$0.600
|
$0.620
|
$0.700
|
$1.000
|
|
REFL PAV MRKR TY I-C
|
EA
|
105.000
|
$5.000
|
$4.000
|
$3.750
|
$7.000
|
$6.000
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
585.000
|
$5.000
|
$4.000
|
$3.750
|
$6.000
|
$6.000
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
478.000
|
$5.000
|
$4.000
|
$3.750
|
$6.000
|
$6.000
|
|
|
FULL - WIDTH MOWING
|
CYC
|
2.000
|
$3,000.000
|
$2,000.000
|
$2,600.000
|
$3,500.000
|
$3,500.000
|
|
|
DITCH CLEANING AND RESHAPING (FOOT)
|
LF
|
1,180.000
|
$5.670
|
$15.000
|
$16.000
|
$16.200
|
$15.000
|
|
|
CNC CRACK REPAIR (DISCRETE)(INJECT)
|
LF
|
37.000
|
$140.000
|
$195.000
|
$575.000
|
$545.000
|
$500.000
|
|
|
SP MIXES SP-C SAC-B PG70-22
|
TON
|
19,474.000
|
$125.000
|
$136.000
|
$127.000
|
$126.300
|
$124.000
|
|
|
TACK COAT
|
GAL
|
19,474.000
|
$4.000
|
$3.000
|
$4.450
|
$1.300
|
$8.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$13,000.000
|
$5,000.000
|
$7,500.000
|
$12,500.000
|
$12,500.000
|
|
|
TMA (STATIONARY)
|
DAY
|
73.000
|
$150.000
|
$100.000
|
$325.000
|
$150.000
|
$250.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
31.000
|
$300.000
|
$1.000
|
$0.010
|
$250.000
|
$350.000
|
|
Totals: |
$5,228,015.380
|
$4,616,246.310
|
$5,099,033.940
|
$5,109,627.450
|
$5,804,761.000
|