|
|
PREPARING ROW
|
STA
|
36.600
|
$3,350.170
|
$900.000
|
$4,000.000
|
$900.000
|
$2,628.000
|
$1,500.000
|
$776.940
|
|
|
REMOVING CONC (RIPRAP)
|
SY
|
99.000
|
$8.250
|
$20.000
|
$31.500
|
$40.000
|
$19.000
|
$25.000
|
$11.160
|
|
|
REMOVING CONC (DRIVEWAYS)
|
SY
|
43.000
|
$10.000
|
$20.000
|
$31.500
|
$40.000
|
$25.000
|
$25.000
|
$17.170
|
|
|
REMOVING STAB BASE & ASPH PAV (12")
|
SY
|
562.000
|
$4.160
|
$20.000
|
$7.000
|
$20.000
|
$14.000
|
$20.000
|
$18.650
|
|
|
REMOVING STAB BASE & ASPH PAV (0-6")
|
SY
|
487.000
|
$2.770
|
$15.000
|
$7.000
|
$20.000
|
$14.000
|
$10.000
|
$18.650
|
|
|
RMV STAB BASE & ASPH PV (17")
|
SY
|
190.000
|
$3.780
|
$30.000
|
$10.000
|
$40.000
|
$14.000
|
$35.000
|
$18.650
|
|
|
SUBGRADE WIDENING (ORD COMP)
|
STA
|
36.600
|
$1,575.000
|
$500.000
|
$945.000
|
$700.000
|
$375.000
|
$350.000
|
$1,094.990
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY C)
|
CY
|
3,417.000
|
$11.400
|
$27.000
|
$15.750
|
$33.000
|
$23.000
|
$17.000
|
$11.990
|
|
|
BACKFILL (TY A OR B)
|
STA
|
36.600
|
$199.510
|
$200.000
|
$157.500
|
$400.000
|
$355.000
|
$350.000
|
$204.010
|
|
|
ROAD GRADER WORK (ORD COMP)
|
STA
|
36.600
|
$251.880
|
$150.000
|
$315.000
|
$250.000
|
$275.000
|
$500.000
|
$215.900
|
|
|
COMPOST MANUF TOPSOIL (4")
|
SY
|
15,476.000
|
$0.800
|
$2.200
|
$1.000
|
$1.100
|
$1.000
|
$5.000
|
$1.290
|
|
|
DRILL SEEDING (PERM) (RURAL) (CLAY)
|
SY
|
15,476.000
|
$0.320
|
$0.220
|
$0.150
|
$0.250
|
$0.350
|
$0.320
|
$0.620
|
|
|
DRILL SEED (TEMP)(WARM OR COOL)
|
SY
|
6,192.000
|
$0.100
|
$0.330
|
$0.120
|
$0.240
|
$0.400
|
$0.400
|
$1.240
|
|
|
VEGETATIVE WATERING
|
MG
|
3,225.000
|
$2.040
|
$5.000
|
$1.000
|
$1.000
|
$0.010
|
$10.000
|
$1.550
|
|
|
FL BS (CMP IN PLACE) (TY D GR 1-2)(15")
|
SY
|
1,357.000
|
$28.000
|
$35.000
|
$30.000
|
$50.000
|
$40.000
|
$50.000
|
$35.960
|
|
|
FL BS (CMP IN PLC)(TY D GR1-2)(12")
|
SY
|
4,178.000
|
$15.000
|
$27.000
|
$24.000
|
$32.000
|
$35.000
|
$45.000
|
$31.150
|
|
|
EMULS ASPH (PRIME)(MS-2 OR SS-1)
|
GAL
|
1,109.000
|
$4.630
|
$5.000
|
$10.500
|
$7.000
|
$4.000
|
$10.000
|
$13.210
|
|
|
ASPH (CRS-2P)
|
GAL
|
2,768.000
|
$3.810
|
$4.500
|
$4.500
|
$7.000
|
$4.000
|
$5.000
|
$4.580
|
|
|
ASPH (AC-15P, AC-20-5TR OR AC-20XP)
|
GAL
|
2,327.000
|
$3.340
|
$4.500
|
$4.500
|
$7.000
|
$4.250
|
$5.000
|
$4.740
|
|
|
AGGR (TY-B GR-3 OR TY-L GR-3)(SAC-B)
|
CY
|
53.000
|
$175.160
|
$190.000
|
$600.000
|
$400.000
|
$195.000
|
$500.000
|
$893.480
|
|
|
FLEX PAVEMT STRUCTURES REPAIR 12"(HMAC)
|
SY
|
239.000
|
$120.000
|
$100.000
|
$160.000
|
$210.000
|
$155.000
|
$350.000
|
$256.390
|
|
|
PLAN & TEXT ASPH CONC PAV(0" TO 2")
|
SY
|
12,708.000
|
$0.640
|
$3.250
|
$2.100
|
$5.000
|
$1.820
|
$5.000
|
$2.920
|
|
|
RIPRAP (CONC)(5 IN)
|
CY
|
233.000
|
$459.130
|
$450.000
|
$450.000
|
$575.000
|
$600.000
|
$500.000
|
$517.330
|
|
|
RIPRAP (STONE COMMON)(GROUT)(12 IN)
|
CY
|
16.500
|
$189.870
|
$185.000
|
$400.000
|
$200.000
|
$225.000
|
$180.000
|
$494.150
|
|
|
CONC BOX CULV (4 FT X 2 FT)(EXTEND)
|
LF
|
24.000
|
$525.000
|
$450.000
|
$420.000
|
$450.000
|
$440.000
|
$400.000
|
$1,165.460
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
256.000
|
$58.440
|
$50.000
|
$52.500
|
$58.000
|
$65.000
|
$45.000
|
$67.130
|
|
|
RC PIPE (CL III)(36 IN)
|
LF
|
84.000
|
$120.000
|
$125.000
|
$105.000
|
$135.000
|
$145.000
|
$112.000
|
$198.900
|
|
|
WINGWALL (PW - 1) (HW=4 FT)
|
EA
|
1.000
|
$10,000.000
|
$5,000.000
|
$7,350.000
|
$6,000.000
|
$6,000.000
|
$8,500.000
|
$13,321.360
|
|
|
WINGWALL (PW - 1) (HW=8 FT)
|
EA
|
1.000
|
$29,607.140
|
$16,000.000
|
$21,000.000
|
$24,000.000
|
$21,000.000
|
$16,000.000
|
$35,004.510
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
16.000
|
$796.050
|
$650.000
|
$630.000
|
$1,000.000
|
$1,050.000
|
$650.000
|
$1,013.950
|
|
|
SET (TY II) (36 IN) (RCP) (6: 1) (P)
|
EA
|
2.000
|
$975.000
|
$1,500.000
|
$4,200.000
|
$4,000.000
|
$4,500.000
|
$4,748.000
|
$5,885.550
|
|
|
CLEAN EXIST CULVERTS
|
EA
|
2.000
|
$2,057.290
|
$1,000.000
|
$2,100.000
|
$3,700.000
|
$2,100.000
|
$5,000.000
|
$2,953.350
|
|
|
REMOV STR (SET)
|
EA
|
12.000
|
$400.000
|
$500.000
|
$210.000
|
$220.000
|
$210.000
|
$500.000
|
$815.740
|
|
|
REMOV STR (WINGWALL)
|
EA
|
2.000
|
$1,122.790
|
$1,000.000
|
$1,575.000
|
$750.000
|
$800.000
|
$1,000.000
|
$1,897.930
|
|
|
REMOV STR (PIPE)
|
EA
|
9.000
|
$330.000
|
$500.000
|
$210.000
|
$180.000
|
$195.000
|
$300.000
|
$615.560
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$112,594.270
|
$120,000.000
|
$140,000.000
|
$160,000.000
|
$168,991.000
|
$125,000.000
|
$170,933.480
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
10.000
|
$11,000.000
|
$10,000.000
|
$15,750.000
|
$16,000.000
|
$21,000.000
|
$5,000.000
|
$15,539.410
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
237.000
|
$26.610
|
$35.000
|
$40.000
|
$27.000
|
$90.000
|
$32.000
|
$41.590
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
237.000
|
$6.330
|
$1.000
|
$20.000
|
$10.000
|
$29.000
|
$10.000
|
$12.390
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
179.000
|
$24.550
|
$30.000
|
$22.000
|
$15.000
|
$30.000
|
$25.000
|
$30.670
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
179.000
|
$6.000
|
$1.000
|
$11.000
|
$5.000
|
$9.750
|
$10.000
|
$10.460
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
777.000
|
$1.410
|
$4.000
|
$2.000
|
$2.400
|
$6.250
|
$3.000
|
$3.390
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
777.000
|
$0.230
|
$1.000
|
$0.250
|
$0.650
|
$1.050
|
$1.000
|
$1.060
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
672.000
|
$2.520
|
$6.000
|
$3.500
|
$4.500
|
$7.000
|
$6.000
|
$5.680
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
672.000
|
$0.430
|
$1.000
|
$1.000
|
$0.800
|
$1.150
|
$2.000
|
$1.650
|
|
|
DRIVEWAYS (ACP)
|
SY
|
393.000
|
$45.250
|
$60.000
|
$60.000
|
$82.000
|
$75.000
|
$55.000
|
$65.650
|
|
|
DRIVEWAYS (BASE)
|
SY
|
39.000
|
$25.660
|
$40.000
|
$52.500
|
$80.000
|
$75.000
|
$35.000
|
$28.410
|
|
|
DRIVEWAYS (CONC) (HES)
|
SY
|
33.000
|
$92.970
|
$125.000
|
$168.000
|
$116.000
|
$130.000
|
$100.000
|
$125.720
|
|
|
RUMBLE STRIPS (SHOULDER) ASPHALT
|
LF
|
6,736.000
|
$0.150
|
$0.250
|
$0.800
|
$1.700
|
$0.820
|
$1.000
|
$1.170
|
|
|
RUMBLE STRIPS (CENTERLINE) ASPHALT
|
LF
|
1,675.000
|
$0.170
|
$0.250
|
$0.800
|
$2.900
|
$0.820
|
$1.000
|
$1.170
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
2,075.000
|
$16.340
|
$21.000
|
$18.290
|
$20.000
|
$21.000
|
$18.000
|
$23.880
|
|
|
SHORT RADIUS
|
LF
|
48.000
|
$20.000
|
$40.000
|
$21.940
|
$22.000
|
$24.000
|
$39.000
|
$42.190
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
2.000
|
$1,020.000
|
$1,200.000
|
$1,139.500
|
$1,200.000
|
$1,300.000
|
$1,010.000
|
$1,677.490
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
350.000
|
$3.450
|
$4.000
|
$2.920
|
$3.000
|
$3.000
|
$4.000
|
$3.790
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
8.000
|
$2,338.220
|
$2,600.000
|
$2,602.300
|
$2,600.000
|
$2,800.000
|
$2,400.000
|
$3,588.990
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
4.000
|
$209.000
|
$250.000
|
$238.500
|
$250.000
|
$275.000
|
$300.000
|
$403.660
|
|
|
MAILBOX INSTALL-S (TWW-POST) TY 4
|
EA
|
4.000
|
$268.500
|
$300.000
|
$196.100
|
$210.000
|
$310.000
|
$259.000
|
$380.720
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
21.000
|
$502.370
|
$565.000
|
$408.100
|
$480.000
|
$430.000
|
$600.000
|
$744.340
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
2.000
|
$644.780
|
$600.000
|
$625.400
|
$570.000
|
$660.000
|
$750.000
|
$832.910
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
|
EA
|
1.000
|
$812.350
|
$900.000
|
$779.100
|
$770.000
|
$820.000
|
$766.000
|
$1,194.980
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U)
|
EA
|
3.000
|
$833.150
|
$900.000
|
$1,054.700
|
$870.000
|
$1,150.000
|
$850.000
|
$1,350.370
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U-BM)
|
EA
|
2.000
|
$975.300
|
$1,400.000
|
$948.700
|
$1,100.000
|
$1,000.000
|
$1,000.000
|
$1,536.850
|
|
|
INSTL OM ASSM (OM-2Z)(FLX)GND(BI)
|
EA
|
6.000
|
$53.000
|
$100.000
|
$53.000
|
$50.000
|
$55.000
|
$81.000
|
$132.080
|
|
|
REMOVE DELIN & OBJECT MARKER ASSMS
|
EA
|
6.000
|
$10.110
|
$50.000
|
$10.600
|
$25.000
|
$12.000
|
$21.000
|
$38.850
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
|
EA
|
28.000
|
$21.110
|
$50.000
|
$35.510
|
$60.000
|
$38.000
|
$75.000
|
$40.870
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
449.000
|
$0.350
|
$3.000
|
$2.040
|
$0.700
|
$1.150
|
$1.000
|
$1.810
|
|
REFL PAV MRK TY I (W)8"(DOT)(100MIL)
|
LF
|
650.000
|
$1.500
|
$1.100
|
$2.390
|
$2.100
|
$2.250
|
$1.000
|
$3.500
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
900.000
|
$0.870
|
$1.100
|
$2.120
|
$1.100
|
$1.150
|
$1.000
|
$3.110
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
30.000
|
$5.760
|
$8.000
|
$10.600
|
$12.000
|
$12.595
|
$7.000
|
$15.540
|
|
REFL PAV MRK TY I (W)(ARROW)(100MIL)
|
EA
|
6.000
|
$112.760
|
$200.000
|
$153.700
|
$150.000
|
$165.000
|
$150.000
|
$225.320
|
|
REFL PAV MRK TY I (W)(WORD)(100MIL)
|
EA
|
6.000
|
$156.710
|
$200.000
|
$196.100
|
$175.000
|
$185.000
|
$180.000
|
$287.480
|
|
REFL PAV MRK TY II (W) 4" (SLD)
|
LF
|
6,736.000
|
$0.100
|
$1.100
|
$0.690
|
$0.300
|
$0.330
|
$1.000
|
$1.010
|
|
REFL PAV MRK TY II (Y) 4" (SLD)
|
LF
|
1,675.000
|
$0.100
|
$1.100
|
$0.690
|
$0.300
|
$0.330
|
$1.000
|
$1.010
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
|
LF
|
5,984.000
|
$0.320
|
$1.100
|
$0.800
|
$0.600
|
$0.610
|
$1.000
|
$1.170
|
|
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
|
LF
|
1,476.000
|
$0.450
|
$1.100
|
$1.330
|
$0.750
|
$0.800
|
$1.000
|
$1.940
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
6,763.000
|
$0.320
|
$1.100
|
$0.800
|
$0.600
|
$0.620
|
$1.000
|
$1.170
|
|
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
|
LF
|
1,476.000
|
$0.640
|
$1.100
|
$1.330
|
$0.750
|
$0.800
|
$1.000
|
$1.940
|
|
REFL PAV MRKR TY I-C
|
EA
|
98.000
|
$2.730
|
$5.000
|
$7.420
|
$8.500
|
$9.250
|
$4.000
|
$10.880
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
329.000
|
$2.710
|
$5.000
|
$7.420
|
$9.000
|
$10.000
|
$4.000
|
$10.880
|
|
|
FULL - WIDTH MOWING
|
CYC
|
2.000
|
$3,011.110
|
$3,000.000
|
$1,000.000
|
$2,000.000
|
$1,700.000
|
$500.000
|
$8,546.670
|
|
|
SP MIXES SP-C SAC-B PG64-22
|
TON
|
2,269.000
|
$75.000
|
$100.000
|
$94.500
|
$115.000
|
$100.000
|
$180.000
|
$148.400
|
|
|
TACK COAT
|
GAL
|
1,734.000
|
$3.980
|
$3.000
|
$4.750
|
$4.000
|
$3.200
|
$10.000
|
$4.350
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$9,141.840
|
$15,000.000
|
$5,000.000
|
$8,000.000
|
$15,000.000
|
$10,000.000
|
$13,626.740
|
|
|
TMA (STATIONARY)
|
DAY
|
166.000
|
$156.830
|
$200.000
|
$105.000
|
$100.000
|
$285.000
|
$250.000
|
$233.090
|
|
|
TMA (MOBILE OPERATION)
|
HR
|
96.000
|
$69.000
|
$20.000
|
$52.500
|
$40.000
|
$45.000
|
$50.000
|
$79.040
|
|
Totals: |
$1,236,815.931
|
$1,399,629.030
|
$1,491,457.040
|
$1,687,110.630
|
$1,697,841.960
|
$1,825,154.120
|
$1,836,743.189
|