PREPARING ROW
|
STA
|
117.000
|
$4,239.100
|
$4,500.000
|
$1,000.000
|
$2,100.000
|
$1,000.000
|
$5,500.000
|
|
|
REMOVING STAB BASE & ASP PAV (18"-24")
|
SY
|
15,100.000
|
$21.000
|
$17.000
|
$10.000
|
$12.000
|
$38.000
|
$30.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
14,865.000
|
$20.000
|
$15.000
|
$5.250
|
$23.000
|
$40.000
|
$20.000
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY C)
|
CY
|
6,452.000
|
$32.000
|
$10.000
|
$10.500
|
$28.000
|
$52.000
|
$50.000
|
|
|
BACKFILL (TY A OR B)
|
STA
|
117.000
|
$456.500
|
$460.000
|
$525.000
|
$255.000
|
$440.000
|
$450.000
|
|
|
ROAD GRADER WORK (ORD COMP)
|
STA
|
117.000
|
$379.000
|
$300.000
|
$525.000
|
$246.000
|
$100.000
|
$250.000
|
|
|
COMPOST MANUF TOPSOIL (4")
|
SY
|
34,570.000
|
$2.000
|
$1.050
|
$1.500
|
$1.350
|
$2.600
|
$8.000
|
|
|
DRILL SEEDING (PERM) (RURAL) (CLAY)
|
SY
|
34,570.000
|
$1.000
|
$0.350
|
$0.360
|
$0.280
|
$0.180
|
$1.000
|
|
|
DRILL SEED (TEMP)(WARM OR COOL)
|
SY
|
34,570.000
|
$0.300
|
$0.340
|
$0.340
|
$0.220
|
$0.160
|
$1.000
|
|
|
VEGETATIVE WATERING
|
MG
|
5,292.000
|
$20.000
|
$29.000
|
$2.100
|
$0.010
|
$1.000
|
$30.000
|
|
|
FL BS (CMP IN PLACE) (TY D GR 1-2)(10")
|
SY
|
32,400.000
|
$27.000
|
$18.000
|
$35.000
|
$33.000
|
$42.000
|
$28.000
|
|
|
LIME (HYDRATED LIME (SLURRY))
|
TON
|
570.000
|
$320.000
|
$325.000
|
$375.000
|
$370.000
|
$380.000
|
$450.000
|
|
|
LIME TRT (EXST MATL) (6")
|
SY
|
32,400.000
|
$4.000
|
$7.000
|
$5.250
|
$9.500
|
$7.000
|
$8.000
|
|
|
PRIME COAT (MC-30 OR EC-30)
|
GAL
|
6,489.000
|
$7.000
|
$5.850
|
$6.600
|
$5.000
|
$8.000
|
$10.000
|
|
|
PLAN & TEXT ASPH CONC PAV(0" TO 2")
|
SY
|
2,318.000
|
$15.000
|
$5.000
|
$7.350
|
$5.350
|
$8.000
|
$20.000
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
6.000
|
$2,150.000
|
$4,000.000
|
$3,150.000
|
$4,000.000
|
$2,100.000
|
$2,500.000
|
|
|
REMOV STR (BOX CULVERT)
|
EA
|
1.000
|
$8,000.000
|
$6,000.000
|
$5,250.000
|
$6,000.000
|
$6,500.000
|
$5,000.000
|
|
|
REMOV STR (HEADWALL)
|
EA
|
2.000
|
$2,500.000
|
$4,000.000
|
$4,200.000
|
$1,800.000
|
$3,300.000
|
$5,000.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$545,572.000
|
$550,000.000
|
$538,000.000
|
$650,499.000
|
$400,000.000
|
$700,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
15.000
|
$15,000.000
|
$4,000.000
|
$26,250.000
|
$22,000.000
|
$7,000.000
|
$8,500.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
440.000
|
$40.000
|
$40.000
|
$53.030
|
$56.000
|
$45.000
|
$30.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
440.000
|
$11.000
|
$12.000
|
$23.100
|
$21.000
|
$16.000
|
$15.000
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
560.000
|
$32.000
|
$45.000
|
$16.000
|
$46.000
|
$10.000
|
$40.000
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
560.000
|
$12.000
|
$12.000
|
$8.000
|
$15.000
|
$5.000
|
$20.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
1,634.000
|
$6.000
|
$5.000
|
$3.260
|
$5.500
|
$4.500
|
$4.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
1,634.000
|
$2.000
|
$1.000
|
$1.050
|
$1.400
|
$0.600
|
$2.000
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (18")
|
LF
|
200.000
|
$11.000
|
$8.000
|
$6.830
|
$11.000
|
$6.500
|
$18.000
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
200.000
|
$5.000
|
$1.250
|
$1.310
|
$4.000
|
$1.000
|
$9.000
|
|
|
CONSTRUCTING DETOURS
|
SY
|
1,563.000
|
$100.000
|
$200.000
|
$157.500
|
$145.000
|
$140.000
|
$75.000
|
|
|
RUMBLE STRIPS (SHOULDER) CONCRETE
|
LF
|
386.000
|
$0.750
|
$9.000
|
$10.000
|
$6.000
|
$13.000
|
$10.000
|
|
|
CONC DIRECTIONAL ISLAND
|
SY
|
295.000
|
$450.000
|
$45.000
|
$126.000
|
$160.000
|
$175.000
|
$150.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
36.000
|
$750.000
|
$671.720
|
$787.500
|
$700.000
|
$700.000
|
$1,500.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
4.000
|
$895.000
|
$762.630
|
$840.000
|
$800.000
|
$850.000
|
$1,500.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
|
EA
|
1.000
|
$1,000.000
|
$959.600
|
$892.500
|
$1,000.000
|
$1,100.000
|
$1,500.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SB(P)
|
EA
|
6.000
|
$830.800
|
$722.220
|
$945.000
|
$635.000
|
$700.000
|
$1,500.000
|
|
|
REMOVE SM RD SN (FOUNDATION ONLY)
|
EA
|
32.000
|
$110.000
|
$116.160
|
$262.500
|
$135.000
|
$130.000
|
$200.000
|
|
|
WK ZN PAV MRK REMOV (W)6"(BRK)
|
LF
|
4,813.000
|
$2.000
|
$0.880
|
$2.100
|
$0.900
|
$0.900
|
$3.000
|
|
|
WK ZN PAV MRK REMOV (W)6"(SLD)
|
LF
|
20,846.000
|
$1.500
|
$0.830
|
$1.840
|
$0.850
|
$0.850
|
$2.000
|
|
|
WK ZN PAV MRK REMOV (W)24"(SLD)
|
LF
|
12.000
|
$10.400
|
$7.290
|
$21.000
|
$7.350
|
$7.500
|
$20.000
|
|
|
WK ZN PAV MRK REMOV (Y)6"(SLD)
|
LF
|
22,119.000
|
$2.000
|
$0.830
|
$1.840
|
$0.860
|
$0.850
|
$2.000
|
|
REFL PAV MRK TY I(W)(UTURN ARW)(090MIL)
|
EA
|
10.000
|
$205.500
|
$260.260
|
$288.750
|
$275.000
|
$270.000
|
$300.000
|
|
REF PAV MRK TY I(W)36"(YLD TRI)(090MIL)
|
EA
|
3.000
|
$70.000
|
$72.870
|
$210.000
|
$75.000
|
$75.000
|
$250.000
|
|
|
PAVEMENT SEALER 6"
|
LF
|
57,516.000
|
$0.800
|
$0.210
|
$0.320
|
$0.210
|
$0.200
|
$0.500
|
|
|
PAVEMENT SEALER 8"
|
LF
|
9,867.000
|
$0.740
|
$0.310
|
$0.530
|
$0.320
|
$0.300
|
$0.650
|
|
|
PAVEMENT SEALER 24"
|
LF
|
16,582.000
|
$2.350
|
$1.770
|
$2.890
|
$1.800
|
$1.700
|
$3.000
|
|
|
PAVEMENT SEALER (ARROW)
|
EA
|
15.000
|
$45.000
|
$33.310
|
$78.750
|
$34.000
|
$32.000
|
$300.000
|
|
|
PAVEMENT SEALER (WORD)
|
EA
|
10.000
|
$50.000
|
$40.600
|
$131.250
|
$41.000
|
$39.000
|
$250.000
|
|
|
PAVEMENT SEALER (UTURN ARROW)
|
EA
|
10.000
|
$35.000
|
$49.970
|
$157.500
|
$51.000
|
$48.000
|
$250.000
|
|
|
PAVEMENT SEALER (YLD TRI)
|
EA
|
3.000
|
$20.000
|
$14.310
|
$105.000
|
$15.000
|
$14.000
|
$250.000
|
|
RE PM TY I(W)6"(BRK)(090MIL)(CALLOUT)
|
LF
|
5,538.000
|
$0.650
|
$0.770
|
$0.790
|
$0.780
|
$0.800
|
$1.000
|
|
RE PM TY I(W)6"(SLD)(090MIL)(CALLOUT)
|
LF
|
24,462.000
|
$0.650
|
$0.730
|
$0.740
|
$0.740
|
$0.750
|
$1.000
|
|
RE PM TY I(W)8"(SLD)(090MIL)(CALLOUT)
|
LF
|
9,867.000
|
$0.850
|
$1.070
|
$1.260
|
$1.100
|
$1.100
|
$1.500
|
|
RE PM TY I(W)24"(SLD)(090MIL)(CALLOUT)
|
LF
|
48.000
|
$7.500
|
$10.410
|
$7.880
|
$10.700
|
$10.000
|
$8.000
|
|
RE PM TY I(W)(ARROW)(090MIL)(CALLOUT)
|
EA
|
15.000
|
$97.500
|
$193.630
|
$157.500
|
$193.000
|
$186.000
|
$250.000
|
|
RE PM TY I(W)(WORD)(090MIL)(CALLOUT)
|
EA
|
10.000
|
$125.000
|
$237.360
|
$199.500
|
$240.000
|
$230.000
|
$250.000
|
|
RE PM TY I(Y)24"(SLD)(090MIL)(CALLOUT)
|
LF
|
16,534.000
|
$6.750
|
$7.550
|
$4.520
|
$7.650
|
$7.500
|
$5.000
|
|
|
REF PROF PAV MRK TY I(Y)6"(SLD)(090MIL)
|
LF
|
27,516.000
|
$1.200
|
$1.410
|
$1.580
|
$1.420
|
$1.400
|
$2.000
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
25.000
|
$7.000
|
$5.210
|
$6.300
|
$5.450
|
$5.000
|
$6.000
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
220.000
|
$5.250
|
$5.210
|
$6.300
|
$5.450
|
$5.000
|
$6.000
|
|
|
ELIM EXT PAV MRK & MRKS (6")
|
LF
|
98,317.000
|
$1.000
|
$0.830
|
$0.710
|
$0.900
|
$0.800
|
$1.000
|
|
|
FULL - WIDTH MOWING
|
CYC
|
3.000
|
$6,400.000
|
$10,000.000
|
$10,000.000
|
$2,900.000
|
$2,800.000
|
$5,000.000
|
|
|
SP MIXES SP-B PG64-22
|
TON
|
6,338.000
|
$150.000
|
$145.000
|
$144.000
|
$145.000
|
$172.000
|
$140.000
|
|
|
SP MIXES SP-C SAC-B PG70-22
|
TON
|
3,462.000
|
$155.000
|
$150.000
|
$142.000
|
$165.000
|
$186.000
|
$200.000
|
|
|
TACK COAT
|
GAL
|
2,004.000
|
$5.000
|
$2.000
|
$2.350
|
$4.500
|
$7.000
|
$10.000
|
|
|
THERMOPLASTIC PIPE (PP) (24")
|
LF
|
608.000
|
$40.000
|
$78.730
|
$63.000
|
$150.000
|
$80.000
|
$250.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
15.000
|
$500.000
|
$908.590
|
$1,155.000
|
$435.000
|
$200.000
|
$250.000
|
|
Totals: |
$6,095,724.530
|
$5,405,602.010
|
$5,447,991.640
|
$6,105,756.250
|
$6,732,618.450
|
$7,264,209.050
|