PREPARING ROW
|
STA
|
12.200
|
$4,000.000
|
$3,800.000
|
$800.000
|
$1,000.000
|
$4,200.000
|
$3,000.000
|
$2,000.000
|
$5,194.770
|
$27,000.000
|
$3,500.000
|
$6,000.000
|
$15,000.000
|
|
|
REMOVING CONC (RIPRAP)
|
SY
|
145.000
|
$20.000
|
$6.950
|
$15.000
|
$15.000
|
$16.000
|
$22.000
|
$20.000
|
$14.950
|
$12.000
|
$15.000
|
$40.000
|
$10.000
|
|
|
REMOVING STAB BASE & ASPH PAV (12")
|
SY
|
2,770.000
|
$10.000
|
$4.950
|
$9.000
|
$8.000
|
$8.400
|
$7.000
|
$6.000
|
$8.210
|
$7.000
|
$8.000
|
$10.000
|
$5.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
1,760.000
|
$15.000
|
$6.500
|
$12.000
|
$10.000
|
$21.000
|
$12.000
|
$8.000
|
$19.880
|
$30.000
|
$8.000
|
$9.000
|
$10.000
|
|
|
EMBANKMENT (FINAL) (DENS CONT) (TY C1)
|
CY
|
5,864.000
|
$16.000
|
$4.000
|
$11.000
|
$12.000
|
$21.000
|
$16.000
|
$14.000
|
$15.860
|
$20.000
|
$13.000
|
$16.000
|
$10.000
|
|
|
EMBANKMENT (FINAL) (DENS CONT) (TY C2)
|
CY
|
523.000
|
$22.000
|
$20.000
|
$15.000
|
$14.000
|
$31.500
|
$22.000
|
$14.000
|
$33.010
|
$25.000
|
$35.000
|
$45.000
|
$15.000
|
|
|
COMPOST MANUF TOPSOIL (4")
|
SY
|
12,666.000
|
$1.800
|
$0.950
|
$1.020
|
$2.000
|
$0.100
|
$2.750
|
$1.500
|
$3.370
|
$0.860
|
$2.000
|
$1.500
|
$1.000
|
|
|
DRILL SEEDING (PERM) (RURAL) (CLAY)
|
SY
|
12,666.000
|
$0.310
|
$0.200
|
$0.200
|
$0.180
|
$3.500
|
$0.200
|
$0.200
|
$0.380
|
$0.180
|
$0.150
|
$0.250
|
$0.200
|
|
|
DRILL SEED (TEMP)(WARM OR COOL)
|
SY
|
12,666.000
|
$0.200
|
$0.190
|
$0.200
|
$0.120
|
$0.030
|
$0.150
|
$0.200
|
$0.370
|
$0.130
|
$0.150
|
$0.350
|
$0.200
|
|
|
VEGETATIVE WATERING
|
MG
|
1,138.000
|
$15.000
|
$20.100
|
$0.100
|
$5.000
|
$1.000
|
$0.610
|
$1.000
|
$33.640
|
$10.000
|
$12.000
|
$20.000
|
$20.000
|
|
|
FL BS (CMP IN PLC)(TY D GR1-2)(8")
|
SY
|
4,334.000
|
$11.000
|
$10.450
|
$24.750
|
$25.000
|
$15.750
|
$14.000
|
$26.000
|
$18.990
|
$13.000
|
$16.000
|
$14.000
|
$18.000
|
|
|
LIME (HYDRATED LIME (SLURRY))
|
TON
|
99.000
|
$165.000
|
$150.000
|
$185.000
|
$250.000
|
$168.000
|
$200.000
|
$250.000
|
$185.600
|
$160.000
|
$250.000
|
$220.000
|
$175.000
|
|
|
LIME TRT (EXST MATL) (12")
|
SY
|
4,334.000
|
$10.000
|
$3.100
|
$4.750
|
$8.000
|
$6.300
|
$4.250
|
$6.000
|
$7.420
|
$4.500
|
$6.000
|
$10.000
|
$3.500
|
|
|
PRIME COAT (MS-2 OR SS-1)
|
GAL
|
867.000
|
$6.000
|
$4.500
|
$7.900
|
$13.500
|
$7.600
|
$8.300
|
$14.000
|
$8.820
|
$7.600
|
$8.000
|
$6.500
|
$3.750
|
|
|
ASPH (CRS-2P)
|
GAL
|
1,085.000
|
$4.000
|
$3.300
|
$4.850
|
$7.000
|
$4.500
|
$4.900
|
$8.000
|
$5.160
|
$4.450
|
$6.000
|
$6.250
|
$2.750
|
|
|
ASPH (AC-15P, AC-20-5TR OR AC-20XP)
|
GAL
|
912.000
|
$5.000
|
$3.500
|
$5.450
|
$10.000
|
$5.000
|
$5.450
|
$12.000
|
$5.740
|
$4.950
|
$6.000
|
$7.750
|
$3.000
|
|
|
AGGR (TY-B GR-3 OR TY-L GR-3)(SAC-B)
|
CY
|
42.000
|
$200.000
|
$127.000
|
$425.000
|
$600.000
|
$400.000
|
$423.000
|
$700.000
|
$452.400
|
$390.000
|
$200.000
|
$600.000
|
$200.000
|
|
|
SUPERPAVE MIXTURES SP-D SAC-B PG64-22
|
TON
|
932.000
|
$74.000
|
$118.000
|
$110.000
|
$110.000
|
$110.000
|
$110.000
|
$110.000
|
$118.320
|
$102.000
|
$110.000
|
$97.000
|
$125.000
|
|
|
CEM STABIL BKFL
|
CY
|
69.000
|
$180.000
|
$50.000
|
$155.000
|
$120.000
|
$125.000
|
$140.000
|
$200.000
|
$159.520
|
$160.000
|
$200.000
|
$230.000
|
$100.000
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
69.000
|
$22.000
|
$2.150
|
$50.000
|
$5.000
|
$25.000
|
$20.000
|
$10.000
|
$8.410
|
$1.000
|
$20.000
|
$3.000
|
$5.000
|
|
|
TEMPORARY SPL SHORING
|
SF
|
2,780.700
|
$22.500
|
$15.600
|
$29.000
|
$45.000
|
$22.000
|
$35.000
|
$30.000
|
$16.650
|
$15.000
|
$40.000
|
$30.000
|
$25.000
|
|
|
TEMPORARY SPL SHORING (COFFERDAM)
|
SF
|
600.000
|
$100.000
|
$280.000
|
$35.000
|
$35.000
|
$10.000
|
$30.000
|
$40.000
|
$10.440
|
$110.000
|
$50.000
|
$60.000
|
$100.000
|
|
|
DRILL SHAFT (36 IN)
|
LF
|
925.000
|
$155.000
|
$125.000
|
$150.000
|
$130.000
|
$205.000
|
$156.000
|
$120.000
|
$267.290
|
$152.000
|
$180.000
|
$160.000
|
$145.000
|
|
|
CL C CONC (ABUT)(HPC)
|
CY
|
51.300
|
$1,000.000
|
$903.000
|
$850.000
|
$1,200.000
|
$1,365.000
|
$1,100.000
|
$1,000.000
|
$1,425.630
|
$1,200.000
|
$900.000
|
$1,100.000
|
$1,000.000
|
|
|
CL C CONC (CAP)(HPC)
|
CY
|
69.900
|
$1,000.000
|
$965.000
|
$850.000
|
$1,100.000
|
$1,365.000
|
$1,300.000
|
$1,000.000
|
$1,271.840
|
$1,500.000
|
$900.000
|
$1,400.000
|
$1,100.000
|
|
|
CL C CONC (COLUMN)(HPC)
|
CY
|
22.100
|
$1,000.000
|
$1,000.000
|
$1,200.000
|
$924.000
|
$2,100.000
|
$1,200.000
|
$1,000.000
|
$1,710.430
|
$1,400.000
|
$900.000
|
$2,800.000
|
$1,100.000
|
|
|
REINF CONC SLAB (HPC)
|
SF
|
9,634.000
|
$20.000
|
$20.000
|
$16.250
|
$21.000
|
$23.000
|
$17.000
|
$20.000
|
$22.600
|
$23.000
|
$25.000
|
$20.000
|
$18.000
|
|
|
APPROACH SLAB (HPC)
|
CY
|
267.000
|
$500.000
|
$551.000
|
$575.000
|
$500.000
|
$125.000
|
$495.000
|
$600.000
|
$486.960
|
$425.000
|
$520.000
|
$550.000
|
$500.000
|
|
|
PRESTR CONC BOX BEAM (5XB20)
|
LF
|
1,193.010
|
$190.000
|
$200.000
|
$235.000
|
$265.000
|
$300.000
|
$278.000
|
$240.000
|
$369.160
|
$275.000
|
$275.000
|
$245.000
|
$325.000
|
|
|
RIPRAP (STONE PROTECTION)(12 IN)
|
CY
|
658.000
|
$125.000
|
$115.000
|
$115.000
|
$120.000
|
$120.000
|
$125.000
|
$100.000
|
$157.280
|
$110.000
|
$120.000
|
$250.000
|
$200.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
85.000
|
$450.000
|
$440.000
|
$425.000
|
$400.000
|
$549.000
|
$475.000
|
$400.000
|
$583.790
|
$470.000
|
$450.000
|
$500.000
|
$500.000
|
|
|
RAIL (TY T223)(HPC)
|
LF
|
441.400
|
$110.000
|
$113.000
|
$115.000
|
$100.000
|
$126.000
|
$110.000
|
$110.000
|
$106.770
|
$90.000
|
$100.000
|
$140.000
|
$250.000
|
|
|
SEALED EXPANSION JOINT (4 IN) (SEJ - A)
|
LF
|
95.000
|
$85.000
|
$90.000
|
$95.000
|
$100.000
|
$45.000
|
$95.000
|
$80.000
|
$78.000
|
$75.000
|
$75.000
|
$80.000
|
$60.000
|
|
|
CONC BOX CULV (6 FT X 6 FT)
|
LF
|
344.000
|
$375.000
|
$392.000
|
$365.000
|
$280.000
|
$375.000
|
$450.000
|
$700.000
|
$373.940
|
$350.000
|
$460.000
|
$375.000
|
$400.000
|
|
|
CONC BOX CULV (6 FT X 6 FT)(EXTEND)
|
LF
|
75.000
|
$600.000
|
$440.000
|
$465.000
|
$300.000
|
$606.000
|
$450.000
|
$800.000
|
$834.760
|
$500.000
|
$650.000
|
$950.000
|
$500.000
|
|
|
WINGWALL (PW - 2) (HW=8 FT)
|
EA
|
4.000
|
$20,000.000
|
$15,950.000
|
$24,450.000
|
$20,000.000
|
$21,000.000
|
$26,000.000
|
$20,000.000
|
$24,834.990
|
$26,500.000
|
$17,000.000
|
$23,500.000
|
$32,000.000
|
|
|
CLEAN EXIST CULVERTS
|
EA
|
1.000
|
$2,000.000
|
$1,165.000
|
$3,000.000
|
$2,000.000
|
$3,750.000
|
$1,000.010
|
$4,000.000
|
$10,986.650
|
$1,500.000
|
$3,000.000
|
$6,500.000
|
$2,000.000
|
|
|
REMOV STR (WINGWALL)
|
EA
|
4.000
|
$1,300.000
|
$1,100.000
|
$1,000.000
|
$500.000
|
$1,680.000
|
$550.000
|
$3,000.000
|
$1,618.280
|
$1,500.000
|
$1,000.000
|
$5,500.000
|
$3,500.000
|
|
|
REMOV STR (BOX CULVERT)
|
LF
|
236.000
|
$80.000
|
$40.650
|
$22.000
|
$50.000
|
$63.000
|
$25.000
|
$45.000
|
$38.900
|
$30.000
|
$65.000
|
$95.000
|
$150.000
|
|
|
REMOV STR (BRIDGE 100 - 499 FT LENGTH)
|
EA
|
2.000
|
$50,000.000
|
$34,700.000
|
$28,000.000
|
$30,000.000
|
$31,500.000
|
$28,000.000
|
$50,000.000
|
$31,966.530
|
$40,000.000
|
$40,000.000
|
$23,000.000
|
$55,000.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$286,545.000
|
$129,463.230
|
$250,000.000
|
$150,000.000
|
$305,434.550
|
$310,000.000
|
$345,000.000
|
$261,803.280
|
$330,000.000
|
$320,000.000
|
$350,000.000
|
$450,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
18.000
|
$2,800.000
|
$6,500.000
|
$1,300.000
|
$2,500.000
|
$11,550.000
|
$2,500.000
|
$4,000.000
|
$3,330.270
|
$12,800.000
|
$6,000.000
|
$9,000.000
|
$3,000.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
240.000
|
$24.000
|
$84.000
|
$32.000
|
$31.000
|
$25.030
|
$24.500
|
$20.000
|
$31.320
|
$22.500
|
$35.000
|
$35.000
|
$30.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
240.000
|
$10.000
|
$20.000
|
$10.000
|
$10.000
|
$10.650
|
$8.000
|
$5.000
|
$9.280
|
$8.000
|
$8.000
|
$10.000
|
$10.000
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
528.000
|
$21.000
|
$21.000
|
$23.000
|
$23.500
|
$21.300
|
$21.700
|
$15.000
|
$30.470
|
$20.000
|
$25.000
|
$20.000
|
$24.000
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
528.000
|
$8.000
|
$9.250
|
$9.000
|
$7.000
|
$10.650
|
$8.000
|
$5.000
|
$9.280
|
$8.000
|
$10.000
|
$5.000
|
$10.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
3,745.000
|
$2.500
|
$3.000
|
$2.000
|
$2.390
|
$1.540
|
$2.000
|
$5.000
|
$2.320
|
$1.800
|
$3.000
|
$2.000
|
$2.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
3,745.000
|
$0.600
|
$0.630
|
$0.750
|
$1.000
|
$0.160
|
$0.450
|
$2.000
|
$0.510
|
$0.400
|
$0.500
|
$0.750
|
$0.630
|
|
|
CONSTRUCTING DETOURS
|
SY
|
4,150.000
|
$100.000
|
$50.000
|
$73.850
|
$69.000
|
$52.500
|
$93.000
|
$60.000
|
$58.750
|
$45.000
|
$75.000
|
$90.000
|
$100.000
|
|
|
PORT CTB (FUR & INST)(F-SHAPE)(TY 1)
|
LF
|
2,430.000
|
$40.000
|
$30.000
|
$70.000
|
$100.000
|
$17.500
|
$40.000
|
$75.000
|
$41.340
|
$23.000
|
$100.000
|
$35.000
|
$115.000
|
|
|
PORT CTB (MOVE)(F-SHAPE)(TY 1)
|
LF
|
3,600.000
|
$10.000
|
$4.700
|
$9.000
|
$16.000
|
$4.250
|
$10.000
|
$10.000
|
$7.120
|
$6.000
|
$15.000
|
$5.000
|
$15.000
|
|
|
PORT CTB (REMOVE)(F-SHAPE)(TY 1)
|
LF
|
2,430.000
|
$10.000
|
$7.500
|
$22.000
|
$16.000
|
$5.250
|
$14.000
|
$15.000
|
$12.450
|
$9.000
|
$10.000
|
$12.000
|
$38.000
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
1,950.000
|
$19.000
|
$24.000
|
$22.000
|
$19.000
|
$18.640
|
$18.930
|
$20.000
|
$20.300
|
$17.500
|
$23.000
|
$20.000
|
$22.000
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
8.000
|
$1,600.000
|
$1,812.000
|
$1,450.000
|
$1,550.000
|
$1,632.780
|
$1,410.000
|
$2,000.000
|
$1,885.000
|
$1,625.000
|
$1,600.000
|
$1,500.000
|
$1,600.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
1,876.000
|
$2.500
|
$3.100
|
$2.000
|
$3.000
|
$2.080
|
$2.140
|
$4.000
|
$3.480
|
$3.000
|
$3.000
|
$2.500
|
$3.500
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
4.000
|
$260.000
|
$360.000
|
$500.000
|
$350.000
|
$213.000
|
$232.000
|
$400.000
|
$290.000
|
$250.000
|
$300.000
|
$250.000
|
$250.000
|
|
|
GDRAIL END TRT(INST)(WOOD POST)(TY I)
|
EA
|
4.000
|
$2,300.000
|
$2,680.000
|
$2,600.000
|
$2,550.000
|
$2,625.230
|
$2,678.000
|
$3,000.000
|
$2,436.000
|
$2,100.000
|
$2,600.000
|
$2,700.000
|
$3,000.000
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
6.000
|
$1,500.000
|
$3,360.000
|
$2,600.000
|
$1,200.000
|
$945.000
|
$1,495.000
|
$4,000.000
|
$922.200
|
$2,500.000
|
$3,000.000
|
$1,350.000
|
$1,800.000
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
4.000
|
$1,000.000
|
$1,350.000
|
$1,100.000
|
$695.000
|
$735.000
|
$772.000
|
$2,000.000
|
$580.000
|
$1,000.000
|
$1,200.000
|
$4,100.000
|
$900.000
|
|
|
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
|
EA
|
4.000
|
$8,500.000
|
$7,300.000
|
$9,300.000
|
$7,650.000
|
$9,450.000
|
$8,521.000
|
$10,000.000
|
$5,147.500
|
$6,475.000
|
$10,000.000
|
$10,000.000
|
$10,000.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
2.000
|
$525.000
|
$465.000
|
$1,100.000
|
$1,074.000
|
$525.000
|
$700.000
|
$2,000.000
|
$1,245.840
|
$1,074.630
|
$1,200.000
|
$600.000
|
$1,500.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
2.000
|
$625.000
|
$560.000
|
$1,100.000
|
$1,100.000
|
$630.000
|
$700.000
|
$2,000.000
|
$1,273.680
|
$1,098.630
|
$1,200.000
|
$600.000
|
$1,500.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
|
EA
|
8.000
|
$23.000
|
$30.000
|
$17.000
|
$66.000
|
$25.000
|
$27.000
|
$30.000
|
$76.710
|
$30.000
|
$30.000
|
$20.000
|
$23.000
|
|
|
INSTL OM ASSM (OM-2Z)(FLX)GND
|
EA
|
8.000
|
$58.000
|
$78.500
|
$42.000
|
$24.000
|
$210.000
|
$75.000
|
$100.000
|
$106.070
|
$50.000
|
$65.000
|
$60.000
|
$70.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
|
EA
|
27.000
|
$31.000
|
$31.000
|
$27.000
|
$29.000
|
$38.000
|
$35.000
|
$85.000
|
$91.990
|
$25.000
|
$40.000
|
$40.000
|
$42.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
|
LF
|
2,488.000
|
$0.700
|
$0.170
|
$1.100
|
$1.000
|
$1.070
|
$1.110
|
$2.000
|
$1.160
|
$1.000
|
$1.100
|
$1.100
|
$1.250
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
|
LF
|
2,312.000
|
$1.000
|
$0.180
|
$1.100
|
$1.000
|
$1.070
|
$1.110
|
$2.000
|
$1.160
|
$1.000
|
$1.100
|
$1.100
|
$1.250
|
|
|
WK ZN PAV MRK REMOV (REFL) TY II-A-A
|
EA
|
382.000
|
$4.000
|
$3.300
|
$3.600
|
$3.400
|
$3.620
|
$3.840
|
$4.000
|
$3.940
|
$3.400
|
$4.000
|
$4.000
|
$4.260
|
|
|
WK ZN PAV MRK REMOV (W)4"(SLD)
|
LF
|
7,181.000
|
$0.900
|
$0.590
|
$1.100
|
$1.000
|
$1.070
|
$1.090
|
$1.500
|
$1.160
|
$1.000
|
$1.100
|
$1.100
|
$1.250
|
|
|
WK ZN PAV MRK REMOV (Y)4"(SLD)
|
LF
|
5,312.000
|
$1.000
|
$0.760
|
$1.100
|
$1.000
|
$1.070
|
$1.090
|
$1.500
|
$1.160
|
$1.000
|
$1.100
|
$1.100
|
$1.250
|
|
|
PAVEMENT SEALER 4"
|
LF
|
800.000
|
$0.700
|
$0.130
|
$1.100
|
$1.000
|
$1.070
|
$1.160
|
$2.000
|
$1.160
|
$1.000
|
$1.100
|
$1.100
|
$1.250
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
|
LF
|
2,424.000
|
$0.650
|
$0.280
|
$2.200
|
$2.000
|
$2.130
|
$2.190
|
$2.500
|
$2.320
|
$2.000
|
$2.200
|
$2.200
|
$2.510
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
2,424.000
|
$1.250
|
$0.320
|
$2.200
|
$2.000
|
$2.130
|
$2.190
|
$2.500
|
$2.320
|
$2.000
|
$2.200
|
$2.200
|
$2.510
|
|
RE PM W/RET REQ TY II (W) 4" (SLD)
|
LF
|
400.000
|
$0.700
|
$0.230
|
$1.100
|
$1.000
|
$1.070
|
$1.240
|
$2.000
|
$1.160
|
$1.000
|
$1.100
|
$1.100
|
$1.250
|
|
RE PM W/RET REQ TY II (Y) 4" (SLD)
|
LF
|
400.000
|
$0.800
|
$0.200
|
$1.100
|
$1.000
|
$1.070
|
$1.240
|
$2.000
|
$1.160
|
$1.000
|
$1.100
|
$1.100
|
$1.250
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
30.000
|
$7.000
|
$3.000
|
$5.500
|
$5.000
|
$5.330
|
$7.480
|
$5.000
|
$5.800
|
$5.000
|
$6.000
|
$5.500
|
$6.260
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
2,924.000
|
$1.000
|
$0.390
|
$1.100
|
$1.000
|
$1.070
|
$1.100
|
$1.500
|
$1.160
|
$1.000
|
$1.000
|
$1.100
|
$1.250
|
|
|
PAV SURF PREP FOR MRK (4")
|
LF
|
4,848.000
|
$0.350
|
$0.100
|
$0.300
|
$0.250
|
$0.270
|
$0.280
|
$1.000
|
$0.290
|
$0.250
|
$0.300
|
$0.300
|
$0.300
|
|
|
FULL - WIDTH MOWING
|
CYC
|
3.000
|
$2,600.000
|
$2,875.000
|
$1,500.000
|
$5,000.000
|
$735.000
|
$1,100.000
|
$1,500.000
|
$1,073.000
|
$650.000
|
$500.000
|
$3,000.000
|
$2,500.000
|
|
|
LITTER REMOVAL
|
CYC
|
3.000
|
$2,000.000
|
$2,104.000
|
$1,000.000
|
$2,000.000
|
$750.000
|
$750.000
|
$100.000
|
$754.000
|
$2,200.000
|
$100.000
|
$2,000.000
|
$1,900.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$10,000.000
|
$10,370.000
|
$8,000.000
|
$10,000.000
|
$7,500.000
|
$7,400.000
|
$6,000.000
|
$8,700.000
|
$6,500.000
|
$20,000.000
|
$10,000.000
|
$17,000.000
|
|
|
TMA (STATIONARY)
|
EA
|
2.000
|
$12,500.000
|
$13,950.000
|
$20,000.000
|
$20,000.000
|
$2,500.000
|
$14,000.000
|
$15,000.000
|
$15,225.000
|
$7,500.000
|
$40,000.000
|
$20,000.000
|
$25,000.000
|
|
|
TMA (MOBILE OPERATION)
|
HR
|
162.000
|
$95.000
|
$53.000
|
$15.000
|
$20.000
|
$73.500
|
$25.000
|
$25.000
|
$11.600
|
$80.000
|
$10.000
|
$60.000
|
$300.000
|
|
Totals: |
$3,151,751.510
|
$2,718,727.830
|
$3,014,725.770
|
$3,108,609.200
|
$3,195,000.000
|
$3,217,717.170
|
$3,406,864.300
|
$3,460,401.937
|
$3,489,761.640
|
$3,581,556.350
|
$3,659,844.250
|
$4,148,176.750
|