PREPARING ROW
|
STA
|
7.030
|
$3,500.000
|
$2,300.000
|
$1,500.000
|
$3,000.000
|
$9,000.000
|
$4,000.000
|
$4,500.000
|
$19,950.000
|
$5,000.000
|
|
|
REMOVING CONC (RIPRAP)
|
SY
|
92.000
|
$19.000
|
$32.000
|
$25.000
|
$70.000
|
$23.000
|
$40.000
|
$60.000
|
$15.750
|
$15.000
|
|
|
REMOVING STAB BASE & ASPH PAV (8"-10")
|
SY
|
1,826.000
|
$8.500
|
$5.750
|
$12.000
|
$8.500
|
$8.000
|
$9.000
|
$12.500
|
$9.450
|
$15.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
347.000
|
$16.000
|
$19.000
|
$30.000
|
$22.000
|
$10.000
|
$20.000
|
$16.500
|
$13.650
|
$15.000
|
|
|
EMBANKMENT (FINAL) (DENS CONT) (TY C1)
|
CY
|
1,512.000
|
$22.000
|
$20.060
|
$20.000
|
$25.000
|
$28.000
|
$20.000
|
$18.500
|
$15.750
|
$15.000
|
|
|
EMBANKMENT (FINAL) (DENS CONT) (TY C2)
|
CY
|
81.000
|
$40.000
|
$30.000
|
$20.000
|
$30.000
|
$29.000
|
$30.000
|
$26.000
|
$42.000
|
$50.000
|
|
|
COMPOST MANUF TOPSOIL (4")
|
SY
|
12,365.000
|
$2.500
|
$1.400
|
$2.000
|
$4.000
|
$1.000
|
$2.500
|
$2.250
|
$1.050
|
$3.000
|
|
|
DRILL SEEDING (PERM) (RURAL) (CLAY)
|
SY
|
12,365.000
|
$0.700
|
$0.200
|
$0.140
|
$0.240
|
$0.250
|
$0.300
|
$0.190
|
$0.200
|
$0.350
|
|
|
DRILL SEEDING (TEMP) (WARM)
|
SY
|
9,274.000
|
$0.700
|
$0.120
|
$0.120
|
$0.180
|
$0.300
|
$0.300
|
$0.160
|
$0.100
|
$0.350
|
|
|
DRILL SEEDING (TEMP) (COOL)
|
SY
|
3,091.000
|
$0.700
|
$0.120
|
$0.120
|
$0.410
|
$0.300
|
$0.500
|
$0.160
|
$0.100
|
$0.700
|
|
|
VEGETATIVE WATERING
|
MG
|
1,882.000
|
$26.000
|
$2.500
|
$10.000
|
$10.000
|
$32.000
|
$1.000
|
$12.000
|
$1.000
|
$12.000
|
|
|
FL BS (CMP IN PLC)(TY D GR1-2)(12")
|
SY
|
2,355.000
|
$23.000
|
$40.000
|
$25.000
|
$34.000
|
$19.000
|
$30.000
|
$36.000
|
$20.000
|
$37.000
|
|
|
LIME (HYDRATED LIME (SLURRY))
|
TON
|
59.000
|
$180.000
|
$180.000
|
$180.000
|
$235.000
|
$205.000
|
$220.000
|
$225.000
|
$200.000
|
$200.000
|
|
|
LIME TRT (EXST MATL) (12")
|
SY
|
2,355.000
|
$7.000
|
$7.000
|
$4.000
|
$11.500
|
$5.000
|
$10.000
|
$3.250
|
$7.350
|
$8.000
|
|
|
PRIME COAT (MS-2 OR SS-1)
|
GAL
|
471.000
|
$8.000
|
$12.000
|
$20.000
|
$12.300
|
$12.000
|
$10.000
|
$5.500
|
$11.870
|
$11.000
|
|
|
ASPH (CRS-2P)
|
GAL
|
589.000
|
$7.000
|
$6.500
|
$20.000
|
$6.550
|
$7.000
|
$10.000
|
$5.500
|
$6.270
|
$8.000
|
|
|
ASPH (AC-15P, AC-20-5TR OR AC-20XP)
|
GAL
|
495.000
|
$16.000
|
$6.500
|
$20.000
|
$6.900
|
$7.000
|
$20.000
|
$7.000
|
$6.590
|
$8.000
|
|
|
AGGR (TY-B GR-3 OR TY-L GR-3)(SAC-B)
|
CY
|
22.000
|
$147.000
|
$700.000
|
$500.000
|
$714.000
|
$700.000
|
$900.000
|
$230.000
|
$691.660
|
$300.000
|
|
|
SUPERPAVE MIXTURES SP-D SAC-B PG64-22
|
TON
|
379.000
|
$140.000
|
$140.000
|
$150.000
|
$144.000
|
$141.000
|
$140.000
|
$118.000
|
$140.690
|
$120.000
|
|
|
CEM STABIL BKFL
|
CY
|
19.100
|
$200.000
|
$225.000
|
$210.000
|
$250.000
|
$300.000
|
$30.000
|
$225.000
|
$150.000
|
$200.000
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
58.000
|
$25.000
|
$50.000
|
$10.000
|
$27.000
|
$55.000
|
$20.000
|
$27.500
|
$10.000
|
$10.000
|
|
|
TEMPORARY SPL SHORING
|
SF
|
1,313.000
|
$35.000
|
$18.500
|
$35.000
|
$40.000
|
$30.000
|
$30.000
|
$45.000
|
$25.000
|
$45.000
|
|
|
DRILL SHAFT (36 IN)
|
LF
|
480.000
|
$195.000
|
$125.000
|
$150.000
|
$143.000
|
$250.000
|
$150.000
|
$190.000
|
$175.000
|
$220.000
|
|
|
CL C CONC (ABUT)(HPC)
|
CY
|
47.500
|
$1,000.000
|
$975.000
|
$850.000
|
$1,100.000
|
$1,000.000
|
$1,200.000
|
$950.000
|
$1,575.000
|
$1,200.000
|
|
|
REINF CONC SLAB (HPC)
|
SF
|
2,520.000
|
$21.500
|
$22.250
|
$17.000
|
$24.500
|
$18.000
|
$24.000
|
$24.000
|
$52.500
|
$32.000
|
|
|
APPROACH SLAB (HPC)
|
CY
|
99.400
|
$520.000
|
$600.000
|
$500.000
|
$490.000
|
$500.000
|
$800.000
|
$525.000
|
$525.000
|
$550.000
|
|
|
PRESTR CONC BOX BEAM (5XB20)
|
LF
|
297.110
|
$220.000
|
$230.000
|
$230.000
|
$255.000
|
$250.000
|
$220.000
|
$280.000
|
$525.000
|
$275.000
|
|
|
RIPRAP (STONE PROTECTION)(12 IN)
|
CY
|
495.000
|
$130.000
|
$105.000
|
$180.000
|
$123.000
|
$75.000
|
$150.000
|
$156.000
|
$157.500
|
$150.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
24.000
|
$475.000
|
$425.000
|
$400.000
|
$550.000
|
$400.000
|
$500.000
|
$500.000
|
$630.000
|
$500.000
|
|
|
RAIL (TY T223)(HPC)
|
LF
|
156.000
|
$115.000
|
$115.000
|
$110.000
|
$135.000
|
$100.000
|
$130.000
|
$115.000
|
$157.500
|
$100.000
|
|
|
SEALED EXPANSION JOINT (4 IN) (SEJ - A)
|
LF
|
94.000
|
$90.000
|
$85.000
|
$100.000
|
$95.000
|
$100.000
|
$120.000
|
$72.000
|
$75.000
|
$75.000
|
|
|
RC PIPE (CL III)(36 IN)
|
LF
|
106.000
|
$160.000
|
$85.000
|
$100.000
|
$85.000
|
$150.000
|
$100.000
|
$104.000
|
$100.000
|
$75.000
|
|
|
SET (TY II) (36 IN) (RCP) (6: 1) (P)
|
EA
|
1.000
|
$2,500.000
|
$3,550.000
|
$3,500.000
|
$3,100.000
|
$5,000.000
|
$3,400.000
|
$3,900.000
|
$4,000.000
|
$5,000.000
|
|
|
REMOV STR (PIPE)
|
LF
|
24.000
|
$20.000
|
$10.000
|
$25.000
|
$20.000
|
$50.000
|
$20.000
|
$35.000
|
$21.000
|
$15.000
|
|
|
REMOV STR (BRIDGE 0 - 99 FT LENGTH)
|
EA
|
1.000
|
$20,000.000
|
$19,000.000
|
$20,000.000
|
$18,000.000
|
$26,000.000
|
$30,000.000
|
$32,600.000
|
$25,000.000
|
$20,000.000
|
|
|
REMOV STR (SMALL FENCE)
|
LF
|
620.000
|
$4.000
|
$2.000
|
$5.000
|
$3.500
|
$5.000
|
$5.000
|
$11.000
|
$4.000
|
$5.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$118,874.730
|
$125,000.000
|
$100,000.000
|
$140,000.000
|
$149,000.000
|
$140,000.000
|
$140,000.000
|
$155,000.000
|
$160,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
12.000
|
$3,000.000
|
$2,000.000
|
$1,500.000
|
$2,500.000
|
$5,000.000
|
$3,000.000
|
$1,400.000
|
$7,350.000
|
$10,000.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 3)
|
LF
|
74.000
|
$35.000
|
$36.000
|
$35.000
|
$40.000
|
$115.000
|
$40.000
|
$37.000
|
$29.930
|
$55.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
74.000
|
$12.000
|
$11.000
|
$19.000
|
$12.000
|
$22.000
|
$20.000
|
$12.000
|
$9.450
|
$15.000
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
334.000
|
$25.000
|
$19.000
|
$17.000
|
$40.000
|
$42.000
|
$60.000
|
$19.000
|
$23.100
|
$15.000
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
334.000
|
$11.000
|
$8.000
|
$6.000
|
$12.000
|
$10.000
|
$20.000
|
$6.500
|
$8.400
|
$5.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
1,735.000
|
$2.500
|
$1.750
|
$2.500
|
$2.080
|
$10.000
|
$4.000
|
$2.000
|
$1.420
|
$3.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
1,735.000
|
$0.750
|
$0.600
|
$0.710
|
$0.630
|
$1.000
|
$1.000
|
$0.700
|
$0.110
|
$1.000
|
|
|
CONSTRUCTING DETOURS
|
SY
|
1,073.000
|
$75.000
|
$165.000
|
$160.000
|
$152.000
|
$100.000
|
$200.000
|
$200.000
|
$133.000
|
$125.000
|
|
|
ONE-WAY TRAF CONT (PORT TRAF SIG)
|
MO
|
8.000
|
$4,800.000
|
$6,200.000
|
$5,000.000
|
$3,050.000
|
$10,000.000
|
$6,000.000
|
$7,500.000
|
$4,000.000
|
$8,000.000
|
|
|
PORT CTB (FUR & INST)(F-SHAPE)(TY 1)
|
LF
|
1,140.000
|
$40.000
|
$65.000
|
$65.000
|
$60.000
|
$28.000
|
$60.000
|
$77.000
|
$30.000
|
$75.000
|
|
|
PORT CTB (MOVE)(F-SHAPE)(TY 1)
|
LF
|
420.000
|
$15.000
|
$20.000
|
$20.000
|
$8.000
|
$6.000
|
$20.000
|
$6.000
|
$10.000
|
$5.000
|
|
|
PORT CTB (REMOVE)(F-SHAPE)(TY 1)
|
LF
|
1,140.000
|
$12.000
|
$12.000
|
$25.000
|
$11.000
|
$10.000
|
$30.000
|
$11.000
|
$5.000
|
$15.000
|
|
|
DRIVEWAYS (ACP)
|
SY
|
402.000
|
$45.000
|
$17.000
|
$25.000
|
$40.000
|
$18.000
|
$40.000
|
$50.000
|
$33.000
|
$100.000
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
262.500
|
$20.000
|
$17.500
|
$17.000
|
$19.250
|
$19.000
|
$24.000
|
$27.500
|
$18.510
|
$22.000
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
4.000
|
$1,200.000
|
$1,400.000
|
$1,285.000
|
$1,400.000
|
$1,365.000
|
$1,800.000
|
$1,750.000
|
$1,708.720
|
$1,800.000
|
|
|
SHORT RADIUS
|
LF
|
62.000
|
$25.000
|
$42.000
|
$37.000
|
$22.500
|
$22.000
|
$30.000
|
$47.000
|
$21.300
|
$38.000
|
|
|
DRIVEWAY TERMINAL ANCHOR SECTION
|
EA
|
2.000
|
$640.000
|
$800.000
|
$695.000
|
$725.000
|
$700.000
|
$800.000
|
$1,050.000
|
$682.500
|
$800.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
466.000
|
$2.500
|
$6.000
|
$5.000
|
$3.650
|
$5.000
|
$5.000
|
$8.500
|
$3.410
|
$3.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
2.000
|
$2,200.000
|
$2,350.000
|
$2,175.000
|
$2,250.000
|
$2,205.000
|
$2,500.000
|
$2,500.000
|
$2,205.000
|
$2,500.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
2.000
|
$270.000
|
$350.000
|
$3,000.000
|
$400.000
|
$321.000
|
$400.000
|
$300.000
|
$367.500
|
$220.000
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
2.000
|
$1,650.000
|
$1,600.000
|
$2,750.000
|
$1,525.000
|
$1,200.000
|
$1,800.000
|
$2,000.000
|
$1,500.000
|
$3,000.000
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
6.000
|
$980.000
|
$900.000
|
$1,025.000
|
$820.000
|
$1,500.000
|
$1,000.000
|
$950.000
|
$250.000
|
$1,500.000
|
|
|
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
|
EA
|
4.000
|
$8,800.000
|
$9,000.000
|
$9,000.000
|
$8,200.000
|
$7,500.000
|
$8,000.000
|
$10,000.000
|
$10,000.000
|
$11,000.000
|
|
|
MAILBOX INSTALL-S (TWG-POST) TY 2
|
EA
|
1.000
|
$225.000
|
$500.000
|
$350.000
|
$495.000
|
$550.000
|
$600.000
|
$275.000
|
$367.500
|
$600.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P-BM)
|
EA
|
1.000
|
$700.000
|
$500.000
|
$250.000
|
$495.000
|
$1,165.000
|
$1,200.000
|
$625.000
|
$892.500
|
$1,400.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
4.000
|
$575.000
|
$500.000
|
$300.000
|
$495.000
|
$861.000
|
$1,000.000
|
$650.000
|
$624.750
|
$900.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
|
EA
|
6.000
|
$23.000
|
$25.000
|
$50.000
|
$35.000
|
$32.000
|
$40.000
|
$29.000
|
$30.450
|
$25.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)GF1 (BI)
|
EA
|
14.000
|
$18.000
|
$30.000
|
$50.000
|
$35.000
|
$32.000
|
$40.000
|
$29.000
|
$30.450
|
$25.000
|
|
|
WK ZN PAV MRK REMOV (REFL) TY II-A-A
|
EA
|
150.000
|
$4.000
|
$5.600
|
$3.200
|
$5.500
|
$6.000
|
$6.000
|
$5.500
|
$5.250
|
$6.000
|
|
|
WK ZN PAV MRK REMOV (W)4"(SLD)
|
LF
|
3,892.000
|
$0.850
|
$0.850
|
$0.750
|
$0.800
|
$1.000
|
$1.000
|
$1.000
|
$0.790
|
$1.000
|
|
|
WK ZN PAV MRK REMOV (W)24"(SLD)
|
LF
|
36.000
|
$8.000
|
$9.000
|
$6.000
|
$10.000
|
$9.000
|
$10.000
|
$10.000
|
$8.400
|
$9.000
|
|
|
WK ZN PAV MRK REMOV (Y)4"(SLD)
|
LF
|
6,000.000
|
$0.900
|
$0.850
|
$0.750
|
$0.800
|
$1.000
|
$1.000
|
$1.000
|
$0.790
|
$1.000
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
10.000
|
$7.000
|
$7.000
|
$10.000
|
$11.000
|
$7.000
|
$8.000
|
$8.000
|
$6.300
|
$7.000
|
|
|
PAVEMENT SEALER 4"
|
LF
|
366.000
|
$0.200
|
$0.300
|
$0.250
|
$0.420
|
$1.000
|
$0.300
|
$0.330
|
$0.260
|
$0.300
|
|
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
|
LF
|
180.000
|
$1.200
|
$1.100
|
$3.000
|
$1.380
|
$2.000
|
$1.000
|
$1.250
|
$1.050
|
$1.200
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
|
LF
|
1,406.000
|
$0.750
|
$1.350
|
$1.000
|
$1.390
|
$2.000
|
$1.500
|
$1.550
|
$1.310
|
$1.400
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
703.000
|
$0.750
|
$1.350
|
$3.000
|
$1.430
|
$2.000
|
$1.500
|
$1.550
|
$1.310
|
$1.400
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
18.000
|
$7.000
|
$6.500
|
$4.000
|
$9.490
|
$7.000
|
$8.000
|
$8.000
|
$6.300
|
$7.000
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
3,966.000
|
$0.700
|
$1.200
|
$0.750
|
$1.090
|
$3.000
|
$1.000
|
$1.250
|
$1.050
|
$1.200
|
|
|
PAV SURF PREP FOR MRK (4")
|
LF
|
2,109.000
|
$0.500
|
$0.250
|
$0.050
|
$0.300
|
$1.000
|
$0.300
|
$0.330
|
$0.260
|
$0.300
|
|
|
FULL - WIDTH MOWING
|
CYC
|
2.000
|
$3,000.000
|
$1,000.000
|
$2,500.000
|
$1,100.000
|
$1,500.000
|
$1,000.000
|
$1,200.000
|
$1,000.000
|
$500.000
|
|
|
LITTER REMOVAL
|
CYC
|
2.000
|
$3,000.000
|
$500.000
|
$2,500.000
|
$900.000
|
$1,750.000
|
$2,000.000
|
$1,250.000
|
$1,000.000
|
$500.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$14,000.000
|
$16,000.000
|
$10,000.000
|
$8,500.000
|
$15,000.000
|
$12,000.000
|
$25,000.000
|
$13,650.000
|
$20,000.000
|
|
Totals: |
$1,343,622.030
|
$1,359,589.420
|
$1,378,420.500
|
$1,459,692.215
|
$1,496,827.750
|
$1,598,325.900
|
$1,610,783.000
|
$1,679,097.035
|
$1,730,065.900
|