|
|
PREPARING ROW
|
STA
|
109.300
|
$3,200.000
|
$345.000
|
$700.000
|
$425.000
|
$474.410
|
$290.410
|
$1,000.000
|
|
|
REMOVING CONC (DRIVEWAYS)
|
SY
|
356.050
|
$11.500
|
$21.000
|
$25.000
|
$30.300
|
$14.000
|
$12.000
|
$20.000
|
|
|
REMOVING STAB BASE AND ASPH PAV (2"-6")
|
SY
|
2,776.540
|
$1.500
|
$6.300
|
$9.000
|
$12.350
|
$5.100
|
$3.000
|
$15.000
|
|
|
REMOVE TRT BASE & ASPH PAV (12"-20")
|
SY
|
934.000
|
$13.750
|
$7.350
|
$12.000
|
$20.300
|
$6.940
|
$7.500
|
$25.000
|
|
|
SUBGRADE WIDENING (DENS CONT)
|
STA
|
109.300
|
$400.000
|
$400.000
|
$210.000
|
$230.000
|
$223.680
|
$224.000
|
$450.000
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY C)
|
CY
|
3,636.000
|
$17.000
|
$15.750
|
$9.000
|
$6.950
|
$14.460
|
$14.000
|
$30.000
|
|
|
BACKFILL (TY A OR B)
|
STA
|
109.300
|
$210.000
|
$115.000
|
$170.000
|
$124.250
|
$223.680
|
$268.000
|
$250.000
|
|
|
ROAD GRADER WORK (ORD COMP)
|
STA
|
109.300
|
$235.000
|
$189.000
|
$170.000
|
$60.000
|
$223.680
|
$304.000
|
$200.000
|
|
|
COMPOST MANUF TOPSOIL (4")
|
SY
|
64,103.000
|
$1.250
|
$1.050
|
$1.000
|
$0.730
|
$1.490
|
$1.000
|
$2.000
|
|
|
DRILL SEEDING (PERM) (RURAL) (CLAY)
|
SY
|
64,103.000
|
$0.300
|
$0.530
|
$0.110
|
$0.110
|
$0.100
|
$0.200
|
$0.120
|
|
|
DRILL SEED (TEMP)(WARM OR COOL)
|
SY
|
10,576.000
|
$0.160
|
$0.160
|
$0.110
|
$0.110
|
$0.100
|
$0.400
|
$0.120
|
|
|
VEGETATIVE WATERING
|
MG
|
11,102.400
|
$4.750
|
$1.000
|
$0.010
|
$0.010
|
$2.310
|
$0.010
|
$1.000
|
|
|
FL BS (CMP IN PLC)(TY D GR 1-2) (6")
|
SY
|
1,338.000
|
$9.000
|
$12.000
|
$12.000
|
$14.600
|
$12.120
|
$10.810
|
$23.000
|
|
|
FL BS (RDWY DEL) (TY D GR 1-2)
|
TON
|
6,825.000
|
$25.000
|
$23.000
|
$34.000
|
$30.150
|
$29.410
|
$32.000
|
$45.000
|
|
|
FL BS (CMP IN PLC)(TY D GR1-2)(12")
|
SY
|
34,002.000
|
$21.000
|
$17.500
|
$22.500
|
$21.500
|
$21.760
|
$24.760
|
$32.000
|
|
|
REWORK BS MATL(TY C)(13")(ORD COMP)
|
SY
|
31,074.000
|
$1.750
|
$1.000
|
$2.000
|
$1.550
|
$2.190
|
$4.300
|
$10.000
|
|
|
CEMENT
|
TON
|
208.700
|
$160.000
|
$200.000
|
$185.000
|
$172.250
|
$160.000
|
$190.000
|
$165.000
|
|
|
CEMENT TREAT (NEW BASE) (6")
|
SY
|
1,338.000
|
$2.000
|
$2.000
|
$3.000
|
$1.500
|
$5.950
|
$2.000
|
$2.000
|
|
|
CEMENT TREAT (MX EXST MTL & NW BS) (6")
|
SY
|
35,675.000
|
$1.750
|
$2.000
|
$1.700
|
$1.500
|
$1.860
|
$2.000
|
$2.250
|
|
|
EMULS ASPH (PRIME)(MS-2 OR SS-1)
|
GAL
|
6,800.740
|
$5.000
|
$4.000
|
$3.400
|
$4.250
|
$4.350
|
$3.680
|
$4.500
|
|
|
ASPH (CRS-2P)
|
GAL
|
5,874.500
|
$4.750
|
$4.000
|
$3.000
|
$3.750
|
$4.600
|
$3.780
|
$4.500
|
|
|
ASPH (AC-15P, AC-20-5TR OR AC-20XP)
|
GAL
|
4,934.700
|
$4.000
|
$4.000
|
$3.900
|
$2.800
|
$4.700
|
$4.000
|
$4.250
|
|
|
AGGR (TY-B GR-3 OR TY-L GR-3)(SAC-B)
|
CY
|
329.700
|
$225.000
|
$160.000
|
$150.000
|
$115.500
|
$144.140
|
$125.000
|
$125.000
|
|
|
PLANE ASPH CONC PAV (5")
|
SY
|
23,845.000
|
$2.750
|
$1.100
|
$4.200
|
$2.550
|
$1.400
|
$2.900
|
$5.000
|
|
|
TEMPORARY SPL SHORING
|
SF
|
144.000
|
$30.000
|
$50.000
|
$37.000
|
$38.050
|
$100.000
|
$50.000
|
$45.000
|
|
|
RIPRAP (CONC)(4 IN)
|
CY
|
5.000
|
$410.000
|
$735.000
|
$472.000
|
$490.000
|
$525.000
|
$445.000
|
$600.000
|
|
|
RIPRAP (CONC)(5 IN)
|
CY
|
10.400
|
$462.000
|
$735.000
|
$530.000
|
$543.500
|
$525.000
|
$475.000
|
$600.000
|
|
|
RIPRAP (STONE COMMON)(DRY)(24 IN)
|
CY
|
49.500
|
$175.000
|
$217.360
|
$195.000
|
$201.000
|
$300.000
|
$220.000
|
$250.000
|
|
|
RIPRAP (STONE COMMON)(GROUT)(6 IN)
|
CY
|
4.050
|
$265.000
|
$520.520
|
$79.000
|
$81.550
|
$300.000
|
$400.000
|
$500.000
|
|
|
RAIL (TY T631)
|
LF
|
120.000
|
$85.000
|
$70.000
|
$69.000
|
$93.750
|
$72.000
|
$65.000
|
$88.000
|
|
|
CONC BOX CULV (3 FT X 3 FT)(EXTEND)
|
LF
|
28.000
|
$510.000
|
$396.000
|
$430.000
|
$435.000
|
$550.000
|
$380.000
|
$500.000
|
|
|
CONC BOX CULV (5 FT X 3 FT)(EXTEND)
|
LF
|
32.000
|
$585.000
|
$504.000
|
$635.000
|
$653.000
|
$600.000
|
$550.000
|
$600.000
|
|
|
CONC BOX CULV (6 FT X 3 FT)(EXTEND)
|
LF
|
36.000
|
$705.000
|
$526.000
|
$740.000
|
$761.000
|
$700.000
|
$625.000
|
$800.000
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
852.000
|
$65.000
|
$52.500
|
$47.000
|
$48.950
|
$45.000
|
$42.000
|
$45.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
316.000
|
$78.000
|
$73.500
|
$90.000
|
$93.500
|
$65.000
|
$46.000
|
$55.000
|
|
|
WINGWALL (FW - 0) (HW=4 FT)
|
EA
|
4.000
|
$6,635.000
|
$9,535.000
|
$5,300.000
|
$5,435.000
|
$8,500.000
|
$7,900.000
|
$5,000.000
|
|
|
WINGWALL (PW - 1) (HW=5 FT)
|
EA
|
2.000
|
$12,950.000
|
$18,830.000
|
$14,000.000
|
$14,675.000
|
$12,500.000
|
$9,000.000
|
$14,000.000
|
|
|
SET (TY I)(S=3 FT)(HW= 4 FT)(3:1)(C)
|
EA
|
1.000
|
$6,450.000
|
$6,245.000
|
$5,300.000
|
$5,435.000
|
$7,500.000
|
$8,000.000
|
$10,000.000
|
|
|
SET (TY I)(S=3 FT)(HW= 4 FT)(4:1)(C)
|
EA
|
1.000
|
$8,000.000
|
$6,315.000
|
$5,800.000
|
$5,980.000
|
$8,500.000
|
$8,500.000
|
$10,000.000
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
40.000
|
$785.000
|
$700.000
|
$850.000
|
$870.000
|
$650.000
|
$650.000
|
$700.000
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
16.000
|
$1,365.000
|
$1,025.000
|
$950.000
|
$980.000
|
$1,000.000
|
$900.000
|
$950.000
|
|
|
CLEAN EXIST CULVERTS
|
EA
|
4.000
|
$1,850.000
|
$4,000.000
|
$1,300.000
|
$1,360.000
|
$1,500.000
|
$1,200.000
|
$1,500.000
|
|
|
REMOV STR (SET)
|
EA
|
2.000
|
$260.000
|
$297.000
|
$550.000
|
$544.000
|
$300.000
|
$245.000
|
$500.000
|
|
|
REMOV STR (WINGWALL)
|
EA
|
8.000
|
$1,190.000
|
$3,150.000
|
$550.000
|
$544.000
|
$800.000
|
$1,000.000
|
$1,000.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$250,000.000
|
$223,000.000
|
$180,000.000
|
$291,000.000
|
$296,760.000
|
$191,400.000
|
$370,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
7.000
|
$9,500.000
|
$21,000.000
|
$9,500.000
|
$19,645.000
|
$7,470.000
|
$7,156.330
|
$10,000.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
150.000
|
$30.000
|
$27.300
|
$30.000
|
$40.550
|
$32.000
|
$28.500
|
$35.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
150.000
|
$7.500
|
$13.130
|
$5.000
|
$12.700
|
$10.000
|
$7.190
|
$10.000
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
235.000
|
$25.000
|
$22.050
|
$5.000
|
$34.000
|
$15.000
|
$27.900
|
$30.000
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
235.000
|
$7.500
|
$10.500
|
$1.000
|
$8.000
|
$5.000
|
$9.750
|
$10.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
5,129.000
|
$1.750
|
$1.580
|
$2.600
|
$5.500
|
$2.200
|
$2.750
|
$3.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
5,129.000
|
$0.500
|
$0.110
|
$1.000
|
$0.550
|
$1.000
|
$0.410
|
$1.000
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
898.000
|
$3.500
|
$3.680
|
$5.500
|
$4.900
|
$5.000
|
$4.900
|
$6.000
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
898.000
|
$0.850
|
$1.050
|
$1.000
|
$0.550
|
$1.000
|
$0.810
|
$1.000
|
|
|
DRIVEWAYS (ACP)
|
SY
|
1,340.000
|
$50.000
|
$49.550
|
$43.000
|
$73.750
|
$51.200
|
$49.200
|
$30.000
|
|
|
DRIVEWAYS (BASE)
|
SY
|
1,018.000
|
$25.000
|
$23.500
|
$19.000
|
$33.150
|
$27.970
|
$25.000
|
$25.000
|
|
|
DRIVEWAYS (CONC) (HES)
|
SY
|
332.580
|
$106.000
|
$105.000
|
$125.000
|
$162.650
|
$95.000
|
$130.000
|
$100.000
|
|
|
RUMBLE STRIPS (SHOULDER)
|
LF
|
21,815.000
|
$0.200
|
$0.140
|
$0.250
|
$0.140
|
$0.130
|
$0.200
|
$0.250
|
|
|
RUMBLE STRIPS (CENTERLINE)
|
LF
|
10,730.000
|
$0.200
|
$0.140
|
$0.290
|
$0.140
|
$0.130
|
$0.200
|
$0.500
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
475.000
|
$25.000
|
$21.000
|
$22.000
|
$29.350
|
$21.000
|
$20.000
|
$26.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
4.000
|
$2,500.000
|
$2,625.000
|
$2,600.000
|
$2,962.000
|
$2,625.000
|
$2,500.000
|
$3,000.000
|
|
|
MAILBOX INSTALL-S (TWW-POST) TY 4
|
EA
|
25.000
|
$215.000
|
$189.530
|
$260.000
|
$284.250
|
$215.000
|
$340.000
|
$250.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
20.000
|
$525.000
|
$502.430
|
$530.000
|
$520.000
|
$510.000
|
$570.000
|
$600.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
3.000
|
$710.000
|
$670.640
|
$750.000
|
$695.000
|
$670.000
|
$795.000
|
$800.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
|
EA
|
2.000
|
$785.000
|
$801.890
|
$820.000
|
$830.000
|
$765.000
|
$910.000
|
$800.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U)
|
EA
|
2.000
|
$860.000
|
$894.180
|
$890.000
|
$926.000
|
$895.000
|
$715.000
|
$1,000.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U-BM)
|
EA
|
3.000
|
$965.000
|
$989.420
|
$1,000.000
|
$1,025.000
|
$1,045.000
|
$1,400.000
|
$1,100.000
|
|
|
RELOCATE SM RD SN SUP&AM TY 10BWG
|
EA
|
1.000
|
$285.000
|
$439.430
|
$470.000
|
$455.000
|
$450.000
|
$300.000
|
$500.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
|
EA
|
6.000
|
$25.000
|
$21.000
|
$22.000
|
$49.000
|
$29.000
|
$20.000
|
$50.000
|
|
|
INSTL OM ASSM (OM-2Z)(WFLX)GND
|
EA
|
4.000
|
$55.000
|
$42.000
|
$80.000
|
$67.400
|
$40.000
|
$45.000
|
$50.000
|
|
|
INSTL OM ASSM (OM-2Z)(WFLX)GND(BI)
|
EA
|
8.000
|
$55.000
|
$42.000
|
$80.000
|
$71.000
|
$42.000
|
$45.000
|
$50.000
|
|
|
WK ZN PAV MRK REMOV (REFL) TY II-A-A
|
EA
|
817.000
|
$3.500
|
$4.200
|
$2.000
|
$4.850
|
$4.450
|
$4.000
|
$12.000
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
81.000
|
$6.500
|
$5.250
|
$5.200
|
$8.700
|
$8.000
|
$5.000
|
$8.000
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
|
LF
|
17,609.000
|
$0.420
|
$0.360
|
$0.360
|
$0.400
|
$0.370
|
$0.340
|
$0.550
|
|
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
|
LF
|
536.000
|
$0.550
|
$0.460
|
$0.460
|
$0.820
|
$0.750
|
$0.440
|
$0.550
|
|
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
|
LF
|
4,294.000
|
$0.450
|
$0.650
|
$0.650
|
$0.490
|
$0.450
|
$0.620
|
$0.550
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
3,330.000
|
$0.400
|
$0.360
|
$0.360
|
$0.400
|
$0.370
|
$0.340
|
$0.550
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
215.000
|
$3.200
|
$3.680
|
$3.700
|
$4.650
|
$4.300
|
$3.500
|
$5.000
|
|
|
FULL - WIDTH MOWING
|
CYC
|
2.000
|
$4,100.000
|
$1,500.000
|
$2,500.000
|
$3,900.000
|
$1,500.000
|
$2,500.000
|
$5,000.000
|
|
|
SP MIXES SP-C SAC-B PG64-22
|
TON
|
3,796.870
|
$75.000
|
$97.000
|
$94.140
|
$97.250
|
$91.500
|
$91.500
|
$100.000
|
|
|
TACK COAT
|
GAL
|
2,077.500
|
$3.100
|
$1.500
|
$2.000
|
$2.880
|
$1.500
|
$1.500
|
$3.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
4.000
|
$11,800.000
|
$5,000.000
|
$5,000.000
|
$545.000
|
$15,000.000
|
$14,000.000
|
$20,000.000
|
|
|
TMA (STATIONARY)
|
DAY
|
111.000
|
$240.000
|
$105.000
|
$210.000
|
$1.000
|
$150.000
|
$175.000
|
$300.000
|
|
|
TMA (MOBILE OPERATION)
|
HR
|
60.000
|
$76.000
|
$73.500
|
$40.000
|
$70.450
|
$150.000
|
$175.000
|
$30.000
|
|
Totals: |
$3,176,315.430
|
$2,707,441.128
|
$2,832,649.712
|
$2,919,684.970
|
$2,936,051.075
|
$2,949,676.405
|
$4,096,968.985
|