|
|
PREPARING ROW
|
STA
|
59.500
|
$525.000
|
$105.000
|
$830.000
|
$1,200.000
|
$1,900.000
|
$950.000
|
$2,590.000
|
|
|
PREPARING ROW(TREE)(24" TO 36" DIA.)
|
EA
|
1.000
|
$1,500.000
|
$2,100.000
|
$2,500.000
|
$1,000.000
|
$5,000.000
|
$1,900.000
|
$2,200.000
|
|
|
REMOVING CONC (RIPRAP)
|
SY
|
10.000
|
$13.000
|
$52.500
|
$60.000
|
$50.000
|
$25.000
|
$30.000
|
$80.000
|
|
|
REMOVING CONC (DRIVEWAYS)
|
SY
|
495.000
|
$20.000
|
$15.750
|
$15.000
|
$20.000
|
$25.000
|
$15.000
|
$26.000
|
|
|
REMOVING STAB BASE AND ASPH PAV (2"-6")
|
SY
|
708.000
|
$6.000
|
$15.750
|
$14.000
|
$20.000
|
$11.000
|
$15.000
|
$20.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
217.000
|
$15.000
|
$42.000
|
$18.500
|
$12.000
|
$28.000
|
$29.000
|
$35.000
|
|
|
SUBGRADE WIDENING (ORD COMP)
|
STA
|
34.500
|
$250.000
|
$353.000
|
$225.000
|
$500.000
|
$373.000
|
$450.000
|
$1,600.000
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY C)
|
CY
|
1,050.000
|
$17.000
|
$31.500
|
$14.000
|
$25.000
|
$22.000
|
$28.000
|
$26.000
|
|
|
BACKFILL (TY A OR B)
|
STA
|
25.000
|
$250.000
|
$73.500
|
$225.000
|
$400.000
|
$300.000
|
$390.000
|
$550.000
|
|
|
ROAD GRADER WORK (ORD COMP)
|
STA
|
57.600
|
$300.000
|
$26.250
|
$175.000
|
$300.000
|
$110.000
|
$790.000
|
$300.000
|
|
|
DRILL SEEDING (PERM) (RURAL) (CLAY)
|
SY
|
33,858.000
|
$0.100
|
$0.210
|
$0.190
|
$0.130
|
$0.160
|
$0.150
|
$0.150
|
|
|
DRILL SEED (TEMP)(WARM OR COOL)
|
SY
|
11,286.000
|
$0.100
|
$0.030
|
$0.190
|
$0.110
|
$0.140
|
$0.150
|
$0.150
|
|
|
VEGETATIVE WATERING
|
MG
|
4,617.000
|
$1.500
|
$0.010
|
$1.000
|
$7.000
|
$0.010
|
$15.000
|
$1.000
|
|
|
SOIL RETENTION BLANKETS (CL 1) (TY A)
|
SY
|
1,072.000
|
$0.900
|
$1.680
|
$1.200
|
$3.000
|
$1.400
|
$2.080
|
$2.200
|
|
|
FL BS (CMP IN PLC)(TY-D GR-1-2)(14")
|
SY
|
2,593.000
|
$20.000
|
$17.500
|
$20.000
|
$30.000
|
$20.000
|
$55.000
|
$20.000
|
|
|
PRIME COAT(MC-30 OR AE-P)
|
GAL
|
521.000
|
$4.500
|
$9.450
|
$7.500
|
$8.000
|
$4.000
|
$8.000
|
$11.000
|
|
|
ASPH (CRS-2P)
|
GAL
|
5,284.000
|
$4.000
|
$3.850
|
$4.600
|
$4.500
|
$3.900
|
$7.000
|
$3.000
|
|
|
ASPH (AC-15P, AC-20-5TR OR AC-20XP)
|
GAL
|
4,438.000
|
$4.200
|
$4.200
|
$4.750
|
$4.500
|
$5.000
|
$7.200
|
$4.500
|
|
|
AGGR (TY-B GR-3 OR TY-L GR-3)(SAC-B)
|
CY
|
205.000
|
$130.000
|
$126.000
|
$150.000
|
$125.000
|
$175.000
|
$280.000
|
$150.000
|
|
|
SUPERPAVE MIXTURES SP-C SAC-B PG64-22
|
TON
|
2,327.000
|
$85.000
|
$88.880
|
$100.000
|
$105.000
|
$85.000
|
$115.000
|
$99.440
|
|
|
SUPERPAVE MIXTURES SP-C PG64-22
|
TON
|
448.000
|
$85.000
|
$136.500
|
$115.000
|
$105.000
|
$105.000
|
$130.000
|
$136.240
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(19")
|
SY
|
3,625.000
|
$85.000
|
$71.330
|
$106.000
|
$70.000
|
$85.000
|
$69.000
|
$124.000
|
|
|
PLANE ASPH CONC PAV(0" TO 3")
|
SY
|
18,827.000
|
$2.500
|
$2.530
|
$2.750
|
$4.000
|
$2.350
|
$3.000
|
$3.500
|
|
|
CEM STABIL BKFL
|
CY
|
86.000
|
$340.000
|
$157.500
|
$245.000
|
$400.000
|
$290.000
|
$175.000
|
$210.000
|
|
|
CUT & RESTORE ASPH PAVING
|
SY
|
98.000
|
$150.000
|
$157.500
|
$115.000
|
$125.000
|
$148.000
|
$170.000
|
$85.000
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
100.000
|
$13.500
|
$10.500
|
$25.000
|
$20.000
|
$26.000
|
$2.000
|
$12.000
|
|
|
TEMPORARY SPL SHORING
|
SF
|
724.000
|
$65.000
|
$10.500
|
$42.000
|
$45.000
|
$58.000
|
$70.000
|
$59.000
|
|
|
RIPRAP (CONC)(4 IN)
|
CY
|
1.400
|
$500.000
|
$735.000
|
$1,100.000
|
$800.000
|
$1,000.000
|
$1,500.000
|
$1,600.000
|
|
|
RIPRAP (CONC)(5 IN)
|
CY
|
3.500
|
$550.000
|
$735.000
|
$900.000
|
$500.000
|
$1,000.000
|
$950.000
|
$1,300.000
|
|
|
RIPRAP (STONE COMMON)(DRY)(12 IN)
|
CY
|
31.500
|
$130.000
|
$210.000
|
$195.000
|
$180.000
|
$140.000
|
$200.000
|
$185.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
10.500
|
$525.000
|
$735.000
|
$550.000
|
$500.000
|
$1,000.000
|
$900.000
|
$930.000
|
|
|
CONC BOX CULV (5 FT X 3 FT)
|
LF
|
78.000
|
$260.000
|
$525.000
|
$350.000
|
$550.000
|
$465.000
|
$310.000
|
$350.000
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
448.000
|
$50.000
|
$63.000
|
$44.000
|
$40.000
|
$45.000
|
$70.000
|
$70.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
56.000
|
$75.000
|
$94.500
|
$70.000
|
$55.000
|
$58.000
|
$95.000
|
$180.000
|
|
|
RC PIPE (CL III)(36 IN)
|
LF
|
44.000
|
$115.000
|
$367.500
|
$115.000
|
$110.000
|
$93.000
|
$290.000
|
$260.000
|
|
|
RC PIPE (CL III)(42 IN)
|
LF
|
16.000
|
$130.000
|
$525.000
|
$155.000
|
$175.000
|
$128.000
|
$290.000
|
$280.000
|
|
|
HEADWALL (CH - PW - 0) (DIA= 42 IN)
|
EA
|
1.000
|
$7,000.000
|
$9,450.000
|
$8,000.000
|
$7,000.000
|
$6,000.000
|
$12,000.000
|
$17,000.000
|
|
|
WINGWALL (PW - 1) (HW=5 FT)
|
EA
|
1.000
|
$12,000.000
|
$17,850.000
|
$7,500.000
|
$7,000.000
|
$13,000.000
|
$10,000.000
|
$17,000.000
|
|
|
SET (TY I) (36 IN) (3: 1) (C)
|
EA
|
4.000
|
$4,200.000
|
$7,350.000
|
$6,000.000
|
$3,000.000
|
$3,900.000
|
$4,500.000
|
$3,000.000
|
|
|
SET (TY I)(S= 5 FT)(HW= 4 FT)(3:1) (C)
|
EA
|
1.000
|
$8,000.000
|
$11,550.000
|
$9,000.000
|
$7,000.000
|
$6,750.000
|
$13,500.000
|
$14,000.000
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
20.000
|
$720.000
|
$945.000
|
$620.000
|
$575.000
|
$800.000
|
$900.000
|
$1,300.000
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
4.000
|
$880.000
|
$1,470.000
|
$950.000
|
$900.000
|
$1,050.000
|
$1,400.000
|
$1,700.000
|
|
|
CLEAN EXIST CULVERTS
|
EA
|
2.000
|
$1,600.000
|
$2,100.000
|
$4,000.000
|
$1,500.000
|
$2,650.000
|
$1,500.000
|
$2,000.000
|
|
|
REMOV STR (SET)
|
EA
|
8.000
|
$250.000
|
$525.000
|
$160.000
|
$500.000
|
$215.000
|
$250.000
|
$750.000
|
|
|
REMOV STR (HEADWALL)
|
EA
|
5.000
|
$950.000
|
$1,050.000
|
$1,200.000
|
$1,000.000
|
$430.000
|
$900.000
|
$1,400.000
|
|
|
REMOV STR (PIPE)
|
LF
|
525.000
|
$13.000
|
$21.000
|
$14.000
|
$15.000
|
$5.450
|
$9.000
|
$25.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$132,119.080
|
$138,967.000
|
$130,000.000
|
$150,000.000
|
$172,472.000
|
$195,000.000
|
$190,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
6.000
|
$15,000.000
|
$12,600.000
|
$3,200.000
|
$7,000.000
|
$14,491.330
|
$19,000.000
|
$12,000.000
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
164.000
|
$17.500
|
$18.700
|
$22.000
|
$28.000
|
$25.000
|
$45.000
|
$15.000
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
164.000
|
$7.000
|
$8.800
|
$8.800
|
$13.000
|
$10.000
|
$10.000
|
$1.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
1,857.000
|
$3.000
|
$2.100
|
$1.900
|
$3.000
|
$2.200
|
$5.000
|
$4.500
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
1,857.000
|
$0.800
|
$0.500
|
$0.550
|
$1.000
|
$1.000
|
$1.000
|
$1.250
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
415.000
|
$5.500
|
$3.850
|
$4.350
|
$6.000
|
$3.800
|
$7.000
|
$7.500
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
415.000
|
$1.000
|
$0.500
|
$0.850
|
$1.000
|
$1.000
|
$1.000
|
$1.250
|
|
|
PORT CTB (FUR & INST)(F-SHAPE)(TY 1)
|
LF
|
180.000
|
$50.000
|
$10.000
|
$90.000
|
$90.000
|
$100.000
|
$15.000
|
$45.000
|
|
|
PORT CTB (REMOVE)(F-SHAPE)(TY 1)
|
LF
|
180.000
|
$10.000
|
$10.000
|
$20.000
|
$20.000
|
$45.000
|
$12.000
|
$15.000
|
|
|
DRIVEWAYS (ACP)
|
SY
|
232.000
|
$45.000
|
$36.330
|
$54.000
|
$60.000
|
$60.000
|
$49.000
|
$55.000
|
|
|
DRIVEWAYS (BASE)
|
SY
|
430.000
|
$27.000
|
$15.750
|
$30.000
|
$20.000
|
$30.000
|
$19.000
|
$21.000
|
|
|
DRIVEWAYS (CONC) (HES)
|
SY
|
753.000
|
$100.000
|
$115.500
|
$86.000
|
$100.000
|
$145.000
|
$69.000
|
$105.000
|
|
|
RUMBLE STRIPS (SHOULDER)
|
LF
|
10,158.000
|
$0.150
|
$0.300
|
$1.150
|
$0.750
|
$0.600
|
$0.300
|
$0.450
|
|
|
RUMBLE STRIPS (CENTERLINE)
|
LF
|
3,740.000
|
$0.170
|
$0.300
|
$0.400
|
$0.750
|
$0.600
|
$0.300
|
$0.600
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
87.500
|
$20.000
|
$20.200
|
$27.500
|
$27.000
|
$25.000
|
$22.000
|
$20.000
|
|
|
MTL BM GD FEN (LONG SPAN SYSTEM)
|
EA
|
1.000
|
$625.000
|
$1,039.970
|
$1,200.000
|
$1,300.000
|
$1,100.000
|
$1,200.000
|
$1,100.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
2.000
|
$2,550.000
|
$2,681.170
|
$3,000.000
|
$3,000.000
|
$2,900.000
|
$2,500.000
|
$2,700.000
|
|
|
CRASH CUSH ATTEN (INSTL)
|
EA
|
2.000
|
$8,000.000
|
$3,150.000
|
$10,250.000
|
$10,000.000
|
$9,000.000
|
$14,000.000
|
$10,000.000
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
2.000
|
$800.000
|
$315.000
|
$1,100.000
|
$2,000.000
|
$850.000
|
$850.000
|
$1,000.000
|
|
|
MAILBOX INSTALL-S (TWW-POST) TY 4
|
EA
|
1.000
|
$215.000
|
$243.740
|
$415.000
|
$500.000
|
$255.000
|
$250.000
|
$240.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
11.000
|
$460.000
|
$498.320
|
$620.000
|
$600.000
|
$500.000
|
$400.000
|
$500.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
7.000
|
$570.000
|
$628.310
|
$740.000
|
$800.000
|
$625.000
|
$500.000
|
$620.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
|
EA
|
1.000
|
$760.000
|
$785.390
|
$880.000
|
$900.000
|
$800.000
|
$550.000
|
$770.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(P-BM)
|
EA
|
1.000
|
$900.000
|
$785.390
|
$880.000
|
$900.000
|
$800.000
|
$550.000
|
$770.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(T)
|
EA
|
1.000
|
$815.000
|
$937.050
|
$1,050.000
|
$1,100.000
|
$965.000
|
$600.000
|
$920.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U)
|
EA
|
4.000
|
$880.000
|
$893.720
|
$990.000
|
$1,000.000
|
$920.000
|
$650.000
|
$880.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U-BM)
|
EA
|
1.000
|
$1,000.000
|
$1,191.630
|
$1,265.000
|
$1,300.000
|
$1,200.000
|
$700.000
|
$1,200.000
|
|
|
INSTL OM ASSM (OM-2Z)(FLX)GND
|
EA
|
6.000
|
$65.000
|
$61.750
|
$50.000
|
$60.000
|
$70.000
|
$80.000
|
$65.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
|
EA
|
4.000
|
$30.000
|
$24.920
|
$27.500
|
$40.000
|
$32.000
|
$11.000
|
$35.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)8"(SLD)
|
LF
|
624.000
|
$0.700
|
$1.030
|
$1.350
|
$1.350
|
$1.000
|
$1.000
|
$1.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)24"(SLD)
|
LF
|
66.000
|
$6.000
|
$4.330
|
$8.250
|
$8.250
|
$4.250
|
$4.500
|
$4.500
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
|
LF
|
12,957.000
|
$0.300
|
$0.430
|
$1.100
|
$1.100
|
$0.430
|
$0.450
|
$0.400
|
|
WK ZN PAV MRK SHT TERM (TAB)TY W
|
EA
|
64.000
|
$1.500
|
$2.250
|
$1.450
|
$2.000
|
$1.050
|
$2.000
|
$1.000
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
650.000
|
$2.300
|
$2.350
|
$1.450
|
$2.000
|
$1.050
|
$2.000
|
$1.000
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
624.000
|
$1.500
|
$1.350
|
$1.100
|
$1.100
|
$1.350
|
$1.500
|
$1.300
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
66.000
|
$7.250
|
$8.670
|
$6.600
|
$6.600
|
$8.550
|
$9.000
|
$8.500
|
|
REFL PAV MRK TY I (W)(ARROW)(100MIL)
|
EA
|
6.000
|
$145.000
|
$146.250
|
$160.000
|
$160.000
|
$150.000
|
$150.000
|
$143.000
|
|
REFL PAV MRK TY I (W)(WORD)(100MIL)
|
EA
|
6.000
|
$180.000
|
$167.910
|
$200.000
|
$200.000
|
$175.000
|
$170.000
|
$165.000
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
|
LF
|
11,829.000
|
$0.500
|
$0.490
|
$0.720
|
$0.720
|
$0.480
|
$0.500
|
$0.470
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
12,957.000
|
$0.500
|
$0.490
|
$0.720
|
$0.720
|
$0.480
|
$0.500
|
$0.470
|
|
REFL PAV MRKR TY I-C
|
EA
|
30.000
|
$5.500
|
$5.420
|
$5.500
|
$5.500
|
$5.500
|
$6.000
|
$5.500
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
341.000
|
$5.500
|
$5.420
|
$5.500
|
$5.500
|
$5.500
|
$6.000
|
$5.500
|
|
|
FULL - WIDTH MOWING
|
CYC
|
3.000
|
$2,500.000
|
$525.000
|
$8,500.000
|
$3,000.000
|
$3,300.000
|
$1,900.000
|
$1,500.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
DAY
|
7.000
|
$100.000
|
$157.500
|
$100.000
|
$300.000
|
$125.000
|
$75.000
|
$250.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
3.000
|
$15,000.000
|
$3,150.000
|
$7,500.000
|
$15,000.000
|
$6,300.000
|
$11,000.000
|
$10,000.000
|
|
|
TMA (STATIONARY)
|
EA
|
1.000
|
$12,000.000
|
$3,150.000
|
$7,500.000
|
$30,000.000
|
$18,000.000
|
$7,500.000
|
$25,000.000
|
|
|
TMA (MOBILE OPERATION)
|
HR
|
64.000
|
$70.000
|
$63.000
|
$22.000
|
$50.000
|
$25.000
|
$85.000
|
$50.000
|
|
Totals: |
$1,543,309.880
|
$1,469,989.630
|
$1,641,031.030
|
$1,739,541.020
|
$1,740,196.960
|
$1,983,343.010
|
$2,084,892.420
|