|
|
PREPARING ROW
|
STA
|
331.420
|
$795.000
|
$89.500
|
$335.000
|
$250.000
|
$200.000
|
$853.600
|
$285.000
|
$396.290
|
$100.000
|
|
|
PREP ROW (TREE) (18"-36" DIA.)
|
EA
|
4.000
|
$850.000
|
$530.000
|
$500.000
|
$1,700.000
|
$600.000
|
$750.000
|
$900.000
|
$576.180
|
$1,500.000
|
|
|
REMOVING CONC (MEDIANS)
|
SY
|
65.000
|
$30.000
|
$30.550
|
$12.000
|
$30.000
|
$12.500
|
$25.000
|
$12.000
|
$27.300
|
$25.000
|
|
|
REMOVING CONC (DRIVEWAYS)
|
SY
|
625.000
|
$20.000
|
$16.650
|
$12.000
|
$30.000
|
$12.500
|
$15.000
|
$12.000
|
$17.130
|
$25.000
|
|
|
REMOVING STAB BASE & ASPH PAV (0-6")
|
SY
|
12,110.000
|
$5.000
|
$0.650
|
$13.000
|
$8.000
|
$7.000
|
$0.100
|
$6.500
|
$3.130
|
$3.000
|
|
|
REMOVING STAB BASE AND ASPH PAV(9"-14")
|
SY
|
4,283.000
|
$9.000
|
$6.750
|
$16.140
|
$10.000
|
$15.000
|
$0.900
|
$7.330
|
$6.840
|
$6.000
|
|
|
REMOVING STAB BASE & ASPH PAV (10"-12")
|
SY
|
890.000
|
$9.000
|
$8.200
|
$19.000
|
$14.000
|
$15.000
|
$1.000
|
$11.440
|
$11.250
|
$15.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
1,951.000
|
$11.000
|
$18.200
|
$11.430
|
$12.000
|
$8.000
|
$2.500
|
$7.500
|
$11.520
|
$25.000
|
|
|
SUBGRADE WIDENING (ORD COMP)
|
STA
|
311.370
|
$400.000
|
$113.750
|
$191.320
|
$250.000
|
$150.000
|
$375.000
|
$315.000
|
$674.010
|
$350.000
|
|
|
EMBANKMENT (FINAL)(ORD COMP)(TY C)
|
CY
|
12,229.000
|
$12.000
|
$13.950
|
$9.120
|
$18.000
|
$17.000
|
$8.500
|
$7.500
|
$14.930
|
$15.000
|
|
|
BACKFILL (TY A OR B)
|
STA
|
331.420
|
$190.000
|
$195.000
|
$186.340
|
$160.650
|
$150.000
|
$125.000
|
$225.000
|
$200.640
|
$500.000
|
|
|
ROAD GRADER WORK (ORD COMP)
|
STA
|
331.420
|
$170.000
|
$93.000
|
$186.340
|
$200.000
|
$200.000
|
$250.000
|
$272.000
|
$150.690
|
$350.000
|
|
|
COMPOST MANUF TOPSOIL (4")
|
SY
|
257,815.000
|
$1.000
|
$0.750
|
$0.700
|
$0.500
|
$0.690
|
$0.630
|
$0.700
|
$0.770
|
$0.700
|
|
|
DRILL SEEDING (PERM) (RURAL) (CLAY)
|
SY
|
257,815.000
|
$0.250
|
$0.150
|
$0.140
|
$0.120
|
$0.210
|
$0.100
|
$0.140
|
$0.230
|
$0.140
|
|
|
DRILL SEED (TEMP)(WARM OR COOL)
|
SY
|
128,908.000
|
$0.250
|
$0.080
|
$0.080
|
$0.080
|
$0.100
|
$0.060
|
$0.080
|
$0.090
|
$0.080
|
|
|
VEGETATIVE WATERING
|
MG
|
57,536.000
|
$1.000
|
$0.010
|
$0.860
|
$0.100
|
$1.000
|
$0.100
|
$0.010
|
$1.150
|
$1.000
|
|
|
FL BS (CMP IN PLC)(TY D GR 1-2) (6")
|
SY
|
6,863.000
|
$10.000
|
$10.100
|
$10.730
|
$12.000
|
$11.000
|
$14.000
|
$14.600
|
$16.460
|
$19.000
|
|
|
FL BS (RDWY DEL) (TY D GR 1-2)
|
TON
|
6,100.000
|
$22.000
|
$29.300
|
$35.460
|
$28.000
|
$33.000
|
$25.000
|
$42.000
|
$49.580
|
$30.000
|
|
|
FL BS (CMP IN PLC)(TY D GR1-2)(12")
|
SY
|
106,124.000
|
$16.000
|
$18.350
|
$21.210
|
$22.500
|
$21.000
|
$22.500
|
$27.130
|
$23.250
|
$30.620
|
|
|
REWRKING BS MATL (TY C)(10")(ORD COMP)
|
SY
|
74,859.000
|
$1.400
|
$1.150
|
$1.870
|
$1.600
|
$2.000
|
$1.250
|
$3.650
|
$2.400
|
$2.880
|
|
|
CEMENT
|
TON
|
668.000
|
$180.000
|
$174.500
|
$159.000
|
$185.000
|
$162.750
|
$174.490
|
$175.000
|
$151.670
|
$200.000
|
|
|
CEMENT TREAT (NEW BASE) (6")
|
SY
|
6,863.000
|
$1.750
|
$0.750
|
$2.120
|
$2.000
|
$2.500
|
$2.100
|
$3.100
|
$1.530
|
$3.500
|
|
|
CEMENT TREAT (MX EXST MTL & NW BS) (6")
|
SY
|
106,624.000
|
$1.600
|
$0.750
|
$1.870
|
$1.500
|
$2.500
|
$1.550
|
$3.450
|
$1.550
|
$2.880
|
|
|
EMULS ASPH (PRIME)(MS-2 OR SS-1)
|
GAL
|
20,627.000
|
$5.000
|
$3.100
|
$4.170
|
$4.000
|
$4.330
|
$5.250
|
$4.000
|
$4.860
|
$4.220
|
|
|
ASPH (CRS-2P)
|
GAL
|
19,951.000
|
$3.750
|
$3.700
|
$4.200
|
$3.000
|
$4.000
|
$3.780
|
$4.150
|
$4.490
|
$4.000
|
|
|
ASPH (RC-250)
|
GAL
|
9,630.000
|
$3.750
|
$5.250
|
$4.940
|
$4.000
|
$4.510
|
$4.360
|
$5.000
|
$5.070
|
$4.400
|
|
|
AGGR (TY-B GR-5 OR TY-L GR-5)
|
CY
|
278.000
|
$75.000
|
$176.650
|
$140.600
|
$120.000
|
$151.000
|
$136.500
|
$115.000
|
$169.400
|
$147.000
|
|
|
ASPH (AC-15P, AC-20-5TR OR AC-20XP)
|
GAL
|
21,218.000
|
$3.500
|
$3.400
|
$4.190
|
$3.500
|
$4.900
|
$4.460
|
$4.500
|
$5.470
|
$4.750
|
|
|
AGGR (TY-PB GR-4 OR TY-PL GR-4 ( SAC-B)
|
CY
|
159.000
|
$80.000
|
$212.400
|
$158.400
|
$165.000
|
$190.000
|
$194.250
|
$155.000
|
$213.190
|
$185.000
|
|
|
AGGR (TY-B GR-4 OR TY-L GR-4 SAC-B)
|
CY
|
159.000
|
$125.000
|
$194.000
|
$143.410
|
$140.000
|
$190.000
|
$173.250
|
$110.000
|
$213.190
|
$185.000
|
|
|
AGGR (TY-B GR-3 OR TY-L GR-3)(SAC-B)
|
CY
|
656.000
|
$125.000
|
$142.300
|
$137.530
|
$140.000
|
$139.000
|
$132.300
|
$110.000
|
$155.570
|
$180.000
|
|
|
CUT & RESTORING PAV
|
SY
|
22.000
|
$130.000
|
$63.150
|
$100.000
|
$110.000
|
$102.500
|
$125.000
|
$100.000
|
$118.580
|
$250.000
|
|
|
TEMPORARY SPL SHORING
|
SF
|
3,196.000
|
$24.000
|
$50.000
|
$30.000
|
$50.000
|
$42.500
|
$20.000
|
$53.000
|
$54.700
|
$55.000
|
|
|
RIPRAP (CONC)(5 IN)
|
CY
|
23.540
|
$525.000
|
$552.650
|
$500.000
|
$550.000
|
$512.500
|
$630.000
|
$500.000
|
$417.300
|
$650.000
|
|
|
RIPRAP (STONE COMMON)(DRY)(6 IN)
|
CY
|
64.930
|
$260.000
|
$247.400
|
$250.000
|
$110.000
|
$200.000
|
$210.000
|
$159.000
|
$152.940
|
$250.000
|
|
|
CONC BOX CULV (3 FT X 2 FT)
|
LF
|
56.000
|
$225.000
|
$526.350
|
$325.000
|
$340.000
|
$333.000
|
$300.000
|
$325.000
|
$290.390
|
$450.000
|
|
|
CONC BOX CULV (4 FT X 3 FT)(EXTEND)
|
LF
|
42.000
|
$500.000
|
$705.000
|
$575.000
|
$610.000
|
$589.500
|
$450.000
|
$575.000
|
$392.260
|
$600.000
|
|
|
CONC BOX CULV (5 FT X 2 FT)(EXTEND)
|
LF
|
10.000
|
$575.000
|
$780.000
|
$575.000
|
$610.000
|
$589.500
|
$500.000
|
$575.000
|
$895.910
|
$700.000
|
|
|
CONC BOX CULV (5 FT X 3 FT)(EXTEND)
|
LF
|
32.000
|
$600.000
|
$842.000
|
$600.000
|
$640.000
|
$615.000
|
$550.000
|
$600.000
|
$511.100
|
$750.000
|
|
|
CONC BOX CULV (6 FT X 5 FT)(EXTEND)
|
LF
|
18.000
|
$725.000
|
$1,232.000
|
$775.000
|
$620.000
|
$795.000
|
$675.000
|
$775.000
|
$899.550
|
$800.000
|
|
|
CONC BOX CULV (9 FT X 9 FT)(EXTEND)
|
LF
|
32.000
|
$1,500.000
|
$1,631.000
|
$1,200.000
|
$1,300.000
|
$1,230.000
|
$1,000.000
|
$1,200.000
|
$1,183.580
|
$1,100.000
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
3,552.000
|
$50.000
|
$52.650
|
$42.000
|
$45.000
|
$43.000
|
$55.000
|
$42.000
|
$41.970
|
$45.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
748.000
|
$70.000
|
$71.600
|
$62.000
|
$66.000
|
$63.550
|
$66.000
|
$62.000
|
$60.200
|
$66.000
|
|
|
RC PIPE (CL III)(30 IN)
|
LF
|
56.000
|
$85.000
|
$100.000
|
$82.000
|
$87.000
|
$84.000
|
$99.000
|
$82.000
|
$151.580
|
$150.000
|
|
|
RC PIPE (CL IV)(24 IN)
|
LF
|
40.000
|
$80.000
|
$86.300
|
$120.000
|
$127.000
|
$123.000
|
$250.000
|
$120.000
|
$156.120
|
$120.000
|
|
|
RC PIPE (CL IV)(30 IN)
|
LF
|
32.000
|
$110.000
|
$110.550
|
$160.000
|
$170.000
|
$164.000
|
$305.000
|
$160.000
|
$208.570
|
$180.000
|
|
|
RC PIPE (CL IV)(42 IN)
|
LF
|
16.000
|
$210.000
|
$237.000
|
$260.000
|
$275.000
|
$266.500
|
$400.000
|
$260.000
|
$390.770
|
$350.000
|
|
|
RC PIPE (CL IV)(48 IN)
|
LF
|
16.000
|
$240.000
|
$358.000
|
$350.000
|
$370.000
|
$358.750
|
$565.000
|
$350.000
|
$542.080
|
$450.000
|
|
|
HEADWALL (CH - PW - S) (DIA= 42 IN)
|
EA
|
1.000
|
$8,500.000
|
$11,580.000
|
$10,000.000
|
$11,000.000
|
$10,250.000
|
$11,700.000
|
$10,000.000
|
$7,425.510
|
$9,200.000
|
|
|
HEADWALL (CH - PW - S) (DIA= 48 IN)
|
EA
|
2.000
|
$10,000.000
|
$15,053.000
|
$11,000.000
|
$12,000.000
|
$11,275.000
|
$15,000.000
|
$11,000.000
|
$7,834.190
|
$10,500.000
|
|
|
WINGWALL (PW - 1) (HW=10 FT)
|
EA
|
2.000
|
$41,000.000
|
$45,266.000
|
$40,000.000
|
$42,000.000
|
$41,000.000
|
$41,000.000
|
$40,000.000
|
$19,896.580
|
$40,800.000
|
|
|
WINGWALL (PW - 1) (HW=4 FT)
|
EA
|
2.000
|
$9,000.000
|
$10,527.000
|
$10,000.000
|
$11,000.000
|
$10,250.000
|
$10,200.000
|
$10,000.000
|
$12,292.770
|
$7,000.000
|
|
|
WINGWALL (PW - 1) (HW=6 FT)
|
EA
|
2.000
|
$15,000.000
|
$18,950.000
|
$17,000.000
|
$18,000.000
|
$17,425.000
|
$15,700.000
|
$17,000.000
|
$13,842.130
|
$12,000.000
|
|
|
SET (TY I)(S=3 FT)(HW=3FT)(3:1)(C)
|
EA
|
2.000
|
$4,000.000
|
$4,737.000
|
$7,000.000
|
$7,400.000
|
$7,175.000
|
$9,600.000
|
$7,000.000
|
$6,820.500
|
$6,500.000
|
|
|
SET (TY I)(S= 4 FT)(HW= 4 FT)(3:1) (C)
|
EA
|
2.000
|
$8,000.000
|
$7,474.000
|
$8,000.000
|
$8,500.000
|
$8,200.000
|
$13,800.000
|
$8,000.000
|
$8,263.750
|
$8,000.000
|
|
|
SET (TY I)(S= 5 FT)(HW= 3 FT)(3:1) (C)
|
EA
|
2.000
|
$6,500.000
|
$6,210.000
|
$8,200.000
|
$8,700.000
|
$8,405.000
|
$11,400.000
|
$8,200.000
|
$7,670.470
|
$8,100.000
|
|
|
SET (TY I)(S= 5 FT)(HW= 4 FT)(3:1) (C)
|
EA
|
4.000
|
$7,500.000
|
$8,422.000
|
$8,500.000
|
$9,000.000
|
$8,712.500
|
$15,300.000
|
$8,500.000
|
$6,195.380
|
$12,000.000
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
251.000
|
$720.000
|
$1,000.000
|
$650.000
|
$700.000
|
$667.000
|
$750.000
|
$650.000
|
$1,125.770
|
$700.000
|
|
|
SET (TY II) (24 IN) (RCP) (3: 1) (C)
|
EA
|
6.000
|
$800.000
|
$1,475.000
|
$650.000
|
$700.000
|
$667.000
|
$750.000
|
$650.000
|
$1,498.060
|
$700.000
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
52.000
|
$900.000
|
$1,158.000
|
$950.000
|
$1,000.000
|
$974.000
|
$900.000
|
$950.000
|
$1,388.140
|
$1,100.000
|
|
|
SET (TY II) (30 IN) (RCP) (3: 1) (C)
|
EA
|
4.000
|
$1,600.000
|
$2,632.000
|
$1,500.000
|
$1,600.000
|
$1,537.500
|
$1,500.000
|
$1,500.000
|
$2,183.710
|
$1,800.000
|
|
|
SET (TY II) (30 IN) (RCP) (6: 1) (P)
|
EA
|
4.000
|
$2,300.000
|
$4,950.000
|
$4,500.000
|
$4,800.000
|
$4,612.500
|
$4,000.000
|
$4,500.000
|
$4,304.040
|
$4,175.000
|
|
|
CLEAN EXIST CULVERTS
|
EA
|
12.000
|
$1,000.000
|
$1,370.000
|
$1,200.000
|
$1,300.000
|
$1,230.000
|
$2,500.000
|
$1,200.000
|
$2,061.280
|
$3,000.000
|
|
|
REMOV STR (SET)
|
EA
|
30.000
|
$250.000
|
$210.000
|
$150.000
|
$160.000
|
$153.750
|
$300.000
|
$150.000
|
$472.460
|
$500.000
|
|
|
REMOV STR (WINGWALL)
|
EA
|
14.000
|
$1,500.000
|
$950.000
|
$800.000
|
$850.000
|
$820.000
|
$1,100.000
|
$800.000
|
$1,257.710
|
$1,000.000
|
|
|
REMOV STR (HEADWALL)
|
EA
|
11.000
|
$2,500.000
|
$947.000
|
$800.000
|
$850.000
|
$820.000
|
$500.000
|
$800.000
|
$1,096.830
|
$500.000
|
|
|
REMOV STR (BOX CULVERT)
|
LF
|
50.000
|
$100.000
|
$210.000
|
$75.000
|
$80.000
|
$77.000
|
$90.000
|
$75.000
|
$69.140
|
$100.000
|
|
|
REMOV STR (PIPE)
|
EA
|
135.000
|
$250.000
|
$15.800
|
$250.000
|
$270.000
|
$256.250
|
$175.000
|
$250.000
|
$489.710
|
$20.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$685,901.000
|
$463,524.000
|
$552,313.000
|
$550,000.000
|
$738,000.000
|
$844,000.000
|
$645,750.000
|
$893,073.270
|
$750,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
15.000
|
$15,000.000
|
$16,300.000
|
$6,500.000
|
$12,000.000
|
$7,500.000
|
$17,000.000
|
$7,411.000
|
$9,218.820
|
$5,000.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
1,435.000
|
$30.000
|
$33.700
|
$32.000
|
$32.000
|
$28.700
|
$27.500
|
$32.000
|
$29.030
|
$28.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
1,435.000
|
$15.750
|
$8.400
|
$8.000
|
$10.000
|
$7.180
|
$14.000
|
$8.000
|
$8.650
|
$7.000
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
1,139.000
|
$13.100
|
$15.000
|
$14.000
|
$5.000
|
$20.500
|
$20.000
|
$15.000
|
$21.410
|
$25.000
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
1,139.000
|
$3.300
|
$5.000
|
$5.000
|
$1.000
|
$7.180
|
$10.000
|
$5.000
|
$7.300
|
$5.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
2,139.000
|
$5.000
|
$6.500
|
$3.000
|
$5.300
|
$2.310
|
$2.500
|
$3.000
|
$1.900
|
$2.250
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
2,139.000
|
$1.000
|
$1.050
|
$1.000
|
$0.850
|
$0.510
|
$0.150
|
$1.000
|
$0.740
|
$1.000
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
4,750.000
|
$5.000
|
$5.250
|
$5.000
|
$4.900
|
$4.200
|
$5.000
|
$5.000
|
$3.190
|
$4.100
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
4,750.000
|
$1.000
|
$1.050
|
$1.000
|
$0.850
|
$1.030
|
$1.000
|
$1.000
|
$1.150
|
$1.000
|
|
|
DRIVEWAYS (ACP)
|
SY
|
9,722.000
|
$40.000
|
$59.000
|
$38.750
|
$40.000
|
$42.000
|
$37.500
|
$42.650
|
$38.730
|
$45.000
|
|
|
DRIVEWAYS (CONC) (HES)
|
SY
|
694.000
|
$110.000
|
$117.000
|
$95.000
|
$100.000
|
$97.500
|
$125.000
|
$105.000
|
$55.470
|
$125.000
|
|
|
RUMBLE STRIPS (SHOULDER) ASPHALT
|
LF
|
54,184.000
|
$0.190
|
$0.300
|
$0.180
|
$0.150
|
$0.150
|
$0.200
|
$0.170
|
$0.140
|
$0.120
|
|
|
RUMBLE STRIPS (CENTERLINE) ASPHALT
|
LF
|
27,092.000
|
$0.190
|
$0.300
|
$0.180
|
$0.220
|
$0.150
|
$0.210
|
$0.170
|
$0.140
|
$0.120
|
|
|
MAILBOX INSTALL-S (TWW-POST) TY 4
|
EA
|
65.000
|
$225.750
|
$237.000
|
$225.000
|
$240.000
|
$66.630
|
$275.000
|
$250.000
|
$265.260
|
$350.000
|
|
|
MAILBOX INSTALL-D (TWW-POST) TY 4
|
EA
|
2.000
|
$275.000
|
$275.000
|
$260.000
|
$280.000
|
$266.500
|
$350.000
|
$300.000
|
$284.400
|
$400.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
106.000
|
$500.000
|
$610.600
|
$580.000
|
$615.000
|
$594.500
|
$750.000
|
$815.000
|
$520.550
|
$750.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
7.000
|
$600.000
|
$695.000
|
$660.000
|
$700.000
|
$676.500
|
$800.000
|
$977.000
|
$537.590
|
$800.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T-2EXT)
|
EA
|
1.000
|
$690.000
|
$832.000
|
$790.000
|
$840.000
|
$810.000
|
$1,000.000
|
$1,200.000
|
$598.400
|
$850.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U)
|
EA
|
6.000
|
$900.000
|
$937.000
|
$890.000
|
$950.000
|
$912.250
|
$1,050.000
|
$1,593.000
|
$853.980
|
$800.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U-1EXT)
|
EA
|
1.000
|
$950.000
|
$1,032.000
|
$980.000
|
$1,100.000
|
$1,005.000
|
$1,100.000
|
$1,812.000
|
$861.150
|
$1,000.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U-BM)
|
EA
|
6.000
|
$900.000
|
$1,053.000
|
$1,000.000
|
$1,100.000
|
$1,025.000
|
$1,075.000
|
$1,860.000
|
$889.170
|
$700.000
|
|
|
INSTL OM ASSM (OM-2Z)(WFLX)GND(BI)
|
EA
|
35.000
|
$45.000
|
$66.000
|
$62.000
|
$66.000
|
$63.550
|
$75.000
|
$42.000
|
$71.450
|
$35.000
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
3,315.000
|
$1.100
|
$1.000
|
$2.250
|
$0.750
|
$1.000
|
$2.000
|
$1.000
|
$1.260
|
$1.000
|
|
REFL PAV MRK TY I (W)6"(DOT)(100MIL)
|
LF
|
99.000
|
$2.000
|
$1.630
|
$1.550
|
$1.600
|
$1.050
|
$1.550
|
$1.550
|
$1.150
|
$3.000
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
240.000
|
$6.300
|
$6.320
|
$6.000
|
$6.400
|
$6.200
|
$6.150
|
$6.000
|
$6.910
|
$7.000
|
|
REFL PAV MRK TY II (W) 4" (SLD)
|
LF
|
54,184.000
|
$0.140
|
$0.150
|
$0.140
|
$0.160
|
$0.150
|
$0.160
|
$0.140
|
$0.140
|
$0.220
|
|
REFL PAV MRK TY II (Y) 4" (SLD)
|
LF
|
60,234.000
|
$0.140
|
$0.150
|
$0.140
|
$0.160
|
$0.150
|
$0.160
|
$0.140
|
$0.140
|
$0.220
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
|
LF
|
52,816.000
|
$0.360
|
$0.420
|
$0.400
|
$0.350
|
$0.530
|
$0.340
|
$0.400
|
$0.580
|
$0.410
|
|
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
|
LF
|
12,451.000
|
$0.500
|
$0.630
|
$0.600
|
$0.550
|
$0.670
|
$0.520
|
$0.600
|
$0.750
|
$0.580
|
|
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
|
LF
|
5,510.000
|
$0.390
|
$0.420
|
$0.400
|
$0.350
|
$0.520
|
$0.350
|
$0.400
|
$0.580
|
$0.470
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
26,453.000
|
$0.360
|
$0.420
|
$0.400
|
$0.350
|
$0.520
|
$0.340
|
$0.400
|
$0.580
|
$0.420
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
669.000
|
$3.930
|
$5.260
|
$5.000
|
$4.800
|
$3.700
|
$4.750
|
$5.000
|
$4.150
|
$4.000
|
|
|
FULL - WIDTH MOWING
|
CYC
|
6.000
|
$2,000.000
|
$2,700.000
|
$3,000.000
|
$2,200.000
|
$2,000.000
|
$2,500.000
|
$2,500.000
|
$3,480.100
|
$2,500.000
|
|
|
SP MIXES SP-C SAC-B PG64-22
|
TON
|
9,275.000
|
$84.000
|
$92.350
|
$90.500
|
$93.000
|
$93.000
|
$100.000
|
$95.000
|
$100.250
|
$95.000
|
|
|
TACK COAT
|
GAL
|
5,057.000
|
$1.000
|
$3.200
|
$1.000
|
$3.400
|
$1.050
|
$2.500
|
$2.500
|
$1.150
|
$1.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
4.000
|
$3,600.000
|
$2,700.000
|
$7,500.000
|
$5,000.000
|
$6,500.000
|
$10,000.000
|
$17,000.000
|
$4,609.410
|
$10,000.000
|
|
|
TMA (STATIONARY)
|
DAY
|
246.000
|
$150.000
|
$550.000
|
$75.000
|
$120.000
|
$50.000
|
$150.000
|
$100.000
|
$138.280
|
$100.000
|
|
|
TMA (MOBILE OPERATION)
|
HR
|
168.000
|
$60.000
|
$86.250
|
$75.000
|
$25.000
|
$40.000
|
$75.000
|
$100.000
|
$46.090
|
$50.000
|
|
Totals: |
$7,524,106.620
|
$7,647,970.670
|
$7,784,423.424
|
$7,930,817.783
|
$8,117,720.220
|
$8,448,663.102
|
$8,984,229.360
|
$9,016,429.290
|
$9,622,238.030
|