|
|
PREPARING ROW
|
STA
|
290.200
|
$3,350.170
|
$795.000
|
$750.000
|
$100.000
|
$395.000
|
$779.000
|
$500.000
|
$160.800
|
$2,100.000
|
$1,896.440
|
$115.150
|
$2,500.000
|
|
|
REMOVING CONC (MEDIANS)
|
SY
|
21.000
|
$11.680
|
$52.500
|
$38.000
|
$25.000
|
$18.000
|
$16.500
|
$25.000
|
$18.950
|
$20.000
|
$14.550
|
$61.690
|
$20.000
|
|
|
REMOVING CONC (DRIVEWAYS)
|
SY
|
990.000
|
$10.000
|
$15.000
|
$25.000
|
$25.000
|
$18.000
|
$12.000
|
$22.000
|
$11.250
|
$15.000
|
$13.970
|
$26.170
|
$20.000
|
|
|
REMOVING STAB BASE AND ASPH PAV (21")
|
SY
|
2,974.000
|
$4.500
|
$7.000
|
$7.000
|
$11.770
|
$10.000
|
$7.250
|
$13.000
|
$8.950
|
$21.000
|
$14.220
|
$7.250
|
$15.000
|
|
|
REMOVING STAB BASE & ASPH PAV (0-6")
|
SY
|
7,852.000
|
$2.650
|
$3.000
|
$6.000
|
$5.000
|
$11.000
|
$3.450
|
$2.000
|
$4.200
|
$15.000
|
$2.840
|
$2.750
|
$6.000
|
|
|
REMOVE TRT BASE & ASPH PAV (9"-22")
|
SY
|
6,400.000
|
$4.500
|
$5.500
|
$7.000
|
$7.840
|
$9.000
|
$5.300
|
$9.000
|
$6.550
|
$22.000
|
$11.380
|
$6.740
|
$10.000
|
|
|
SUBGRADE WIDENING (ORD COMP)
|
STA
|
290.200
|
$750.000
|
$300.000
|
$250.000
|
$278.000
|
$193.060
|
$248.000
|
$400.000
|
$374.100
|
$400.000
|
$1,048.150
|
$289.360
|
$250.000
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY C)
|
CY
|
10,993.000
|
$11.400
|
$6.000
|
$8.000
|
$12.000
|
$9.460
|
$13.500
|
$17.000
|
$12.100
|
$28.000
|
$9.760
|
$13.590
|
$20.000
|
|
|
BACKFILL (TY A OR B)
|
STA
|
290.200
|
$125.000
|
$150.000
|
$170.000
|
$150.000
|
$230.690
|
$245.000
|
$175.000
|
$280.850
|
$250.000
|
$165.990
|
$244.030
|
$250.000
|
|
|
ROAD GRADER WORK (ORD COMP)
|
STA
|
290.200
|
$185.000
|
$150.000
|
$170.000
|
$150.000
|
$193.060
|
$185.000
|
$100.000
|
$176.250
|
$200.000
|
$175.660
|
$89.580
|
$250.000
|
|
|
COMPOST MANUF TOPSOIL (4")
|
SY
|
234,201.000
|
$1.120
|
$0.700
|
$1.000
|
$0.870
|
$0.500
|
$0.800
|
$0.750
|
$0.900
|
$2.000
|
$0.970
|
$1.130
|
$1.000
|
|
|
DRILL SEEDING (PERM) (RURAL) (CLAY)
|
SY
|
234,201.000
|
$0.140
|
$0.150
|
$0.120
|
$0.090
|
$0.110
|
$0.093
|
$0.110
|
$0.100
|
$0.110
|
$0.110
|
$0.100
|
$0.200
|
|
|
DRILL SEED (TEMP)(WARM OR COOL)
|
SY
|
93,684.000
|
$0.130
|
$0.150
|
$0.120
|
$0.080
|
$0.070
|
$0.085
|
$0.080
|
$0.100
|
$0.100
|
$0.100
|
$0.090
|
$0.200
|
|
|
VEGETATIVE WATERING
|
MG
|
48,785.000
|
$2.020
|
$1.000
|
$0.010
|
$1.000
|
$0.530
|
$0.010
|
$0.010
|
$1.950
|
$0.010
|
$0.630
|
$12.270
|
$10.000
|
|
|
FL BS (CMP IN PLC)(TY D GR 1-2) (6")
|
SY
|
12,115.000
|
$7.750
|
$9.000
|
$9.500
|
$7.260
|
$8.740
|
$10.500
|
$9.500
|
$8.850
|
$8.000
|
$11.730
|
$9.960
|
$13.000
|
|
|
FL BS (RDWY DEL) (TY D GR 1-2)
|
TON
|
6,609.000
|
$19.500
|
$22.000
|
$31.000
|
$28.000
|
$24.690
|
$18.300
|
$29.000
|
$31.300
|
$39.000
|
$20.230
|
$28.830
|
$40.000
|
|
|
FL BS (CMP IN PLACE)(TY D GR 1-2)(11")
|
SY
|
93,438.000
|
$14.500
|
$14.000
|
$17.000
|
$21.000
|
$16.270
|
$16.500
|
$17.750
|
$14.950
|
$18.000
|
$16.200
|
$18.210
|
$15.500
|
|
|
REWORK BS MTL (TY C) (11") (ORD COMP)
|
SY
|
67,951.000
|
$1.750
|
$1.500
|
$2.100
|
$2.910
|
$1.950
|
$1.720
|
$1.500
|
$2.550
|
$4.000
|
$2.530
|
$0.720
|
$5.000
|
|
|
CEMENT
|
TON
|
595.000
|
$138.000
|
$165.000
|
$165.000
|
$150.000
|
$135.000
|
$140.000
|
$150.000
|
$143.400
|
$150.000
|
$177.000
|
$150.210
|
$200.000
|
|
|
CEMENT TREAT (NEW BASE) (6")
|
SY
|
12,115.000
|
$1.500
|
$1.250
|
$2.300
|
$3.000
|
$2.190
|
$1.650
|
$1.650
|
$3.100
|
$2.000
|
$1.780
|
$1.160
|
$12.000
|
|
|
CEMENT TREAT (MX EXST MTL & NW BS) (6")
|
SY
|
87,770.000
|
$1.500
|
$1.300
|
$2.300
|
$2.810
|
$1.960
|
$1.520
|
$1.650
|
$2.550
|
$2.000
|
$1.810
|
$0.900
|
$8.000
|
|
|
EMULS ASPH (PRIME)(MS-2 OR SS-1)
|
GAL
|
18,696.000
|
$2.750
|
$5.000
|
$3.000
|
$5.000
|
$4.200
|
$3.000
|
$2.850
|
$3.900
|
$5.000
|
$4.870
|
$3.290
|
$4.000
|
|
|
ASPH (CRS-2P)
|
GAL
|
13,236.000
|
$3.810
|
$3.750
|
$3.000
|
$3.850
|
$4.720
|
$3.350
|
$3.250
|
$4.500
|
$4.250
|
$4.740
|
$3.070
|
$4.000
|
|
|
ASPH (RC-250)
|
GAL
|
6,025.000
|
$3.900
|
$3.750
|
$3.000
|
$3.750
|
$4.740
|
$3.680
|
$3.500
|
$5.050
|
$5.000
|
$4.740
|
$3.790
|
$4.000
|
|
|
AGGR (TY-B GR-5 OR TY-L GR-5)
|
CY
|
731.000
|
$100.000
|
$75.000
|
$100.000
|
$85.000
|
$139.020
|
$124.000
|
$115.000
|
$154.400
|
$90.000
|
$94.820
|
$129.410
|
$80.000
|
|
|
ASPH (AC-15P, AC-20-5TR OR AC-20XP)
|
GAL
|
12,636.000
|
$3.340
|
$3.500
|
$3.800
|
$4.500
|
$4.450
|
$3.380
|
$3.000
|
$4.100
|
$4.000
|
$4.430
|
$3.090
|
$4.000
|
|
|
AGGR (TY-B GR-4 OR TY-L GR-4 SAC-B)
|
CY
|
758.000
|
$113.120
|
$80.000
|
$100.000
|
$110.000
|
$136.240
|
$129.500
|
$125.000
|
$159.500
|
$90.000
|
$101.140
|
$68.990
|
$90.000
|
|
|
AGGR (TY-B GR-3 OR TY-L GR-3)(SAC-B)
|
CY
|
864.000
|
$124.500
|
$80.000
|
$100.000
|
$110.000
|
$136.440
|
$132.000
|
$115.000
|
$150.050
|
$90.000
|
$101.140
|
$87.000
|
$90.000
|
|
|
FLOWABLE BACKFILL
|
CY
|
183.000
|
$195.000
|
$250.000
|
$140.000
|
$180.000
|
$225.000
|
$208.000
|
$205.000
|
$236.800
|
$250.000
|
$227.570
|
$239.220
|
$350.000
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
155.000
|
$2.020
|
$10.000
|
$11.000
|
$10.000
|
$18.000
|
$12.500
|
$12.500
|
$18.950
|
$15.000
|
$3.870
|
$10.800
|
$10.000
|
|
|
TEMPORARY SPL SHORING
|
SF
|
1,158.000
|
$11.500
|
$10.000
|
$30.000
|
$55.000
|
$76.000
|
$41.000
|
$41.000
|
$26.300
|
$45.000
|
$20.200
|
$32.400
|
$85.000
|
|
|
RIPRAP (CONC)(5 IN)
|
CY
|
11.500
|
$431.000
|
$630.000
|
$850.000
|
$500.000
|
$500.000
|
$550.000
|
$520.000
|
$526.250
|
$600.000
|
$636.570
|
$804.950
|
$650.000
|
|
|
RIPRAP (STONE COMMON)(GROUT)(12 IN)
|
CY
|
144.500
|
$178.000
|
$260.000
|
$120.000
|
$250.000
|
$211.000
|
$105.000
|
$105.000
|
$264.300
|
$200.000
|
$264.200
|
$268.370
|
$185.000
|
|
|
CONC BOX CULV (5 FT X 2 FT)(EXTEND)
|
LF
|
24.000
|
$273.690
|
$500.000
|
$500.000
|
$700.000
|
$550.000
|
$460.000
|
$470.000
|
$578.900
|
$450.000
|
$581.580
|
$616.520
|
$480.000
|
|
|
CONC BOX CULV (6 FT X 4 FT)(EXTEND)
|
LF
|
24.000
|
$620.000
|
$600.000
|
$600.000
|
$750.000
|
$625.000
|
$520.000
|
$520.000
|
$657.850
|
$500.000
|
$682.720
|
$658.440
|
$560.000
|
|
|
CONC BOX CULV (9 FT X 9 FT)(EXTEND)
|
LF
|
44.000
|
$960.000
|
$750.000
|
$800.000
|
$1,100.000
|
$1,100.000
|
$720.000
|
$725.000
|
$1,157.800
|
$900.000
|
$1,074.650
|
$970.290
|
$800.000
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
2,464.000
|
$43.250
|
$50.000
|
$50.000
|
$45.000
|
$45.000
|
$49.000
|
$50.000
|
$47.350
|
$45.000
|
$56.890
|
$66.070
|
$75.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
604.000
|
$68.500
|
$70.000
|
$70.000
|
$5.000
|
$65.000
|
$93.000
|
$94.000
|
$68.400
|
$55.000
|
$80.910
|
$83.150
|
$95.000
|
|
|
RC PIPE (CL III)(48 IN)
|
LF
|
76.000
|
$175.000
|
$300.000
|
$220.000
|
$250.000
|
$200.000
|
$235.000
|
$235.000
|
$210.500
|
$350.000
|
$246.540
|
$241.290
|
$250.000
|
|
|
RC PIPE (CL III)(60 IN)
|
LF
|
24.000
|
$265.000
|
$500.000
|
$350.000
|
$350.000
|
$325.000
|
$316.000
|
$315.000
|
$342.050
|
$800.000
|
$442.500
|
$381.310
|
$450.000
|
|
|
RC PIPE (CL III)(72 IN)
|
LF
|
16.000
|
$450.000
|
$700.000
|
$550.000
|
$550.000
|
$500.000
|
$418.000
|
$415.000
|
$526.250
|
$1,000.000
|
$632.150
|
$457.600
|
$1,000.000
|
|
|
HEADWALL (CH - PW - 0) (DIA= 48 IN)
|
EA
|
4.000
|
$10,250.000
|
$10,500.000
|
$12,000.000
|
$9,500.000
|
$11,000.000
|
$7,200.000
|
$7,300.000
|
$11,578.050
|
$8,000.000
|
$12,642.960
|
$15,467.200
|
$12,000.000
|
|
|
HEADWALL (CH - PW - 0) (DIA= 72 IN)
|
EA
|
2.000
|
$9,505.000
|
$17,500.000
|
$21,000.000
|
$12,216.000
|
$17,000.000
|
$15,400.000
|
$15,500.000
|
$17,893.350
|
$20,000.000
|
$25,285.930
|
$23,871.620
|
$22,500.000
|
|
|
HEADWALL (CH - PW - S) (DIA= 60 IN)
|
EA
|
2.000
|
$11,500.000
|
$18,000.000
|
$24,000.000
|
$12,000.000
|
$15,000.000
|
$14,400.000
|
$14,500.000
|
$15,788.250
|
$16,500.000
|
$20,860.890
|
$38,668.010
|
$25,000.000
|
|
|
WINGWALL (FW - 0) (HW=4 FT)
|
EA
|
4.000
|
$7,000.000
|
$5,500.000
|
$6,500.000
|
$8,000.000
|
$7,000.000
|
$5,200.000
|
$5,300.000
|
$7,367.850
|
$3,500.000
|
$42,353.920
|
$10,258.750
|
$8,000.000
|
|
|
WINGWALL (PW - 1) (HW=11 FT)
|
EA
|
2.000
|
$42,000.000
|
$42,500.000
|
$55,000.000
|
$34,000.000
|
$52,000.000
|
$41,500.000
|
$42,000.000
|
$54,732.650
|
$40,000.000
|
$53,100.440
|
$74,820.410
|
$60,000.000
|
|
|
WINGWALL (PW - 1) (HW=13 FT)
|
EA
|
2.000
|
$67,500.000
|
$60,000.000
|
$80,000.000
|
$12,000.000
|
$62,000.000
|
$62,000.000
|
$62,000.000
|
$65,258.150
|
$55,000.000
|
$79,650.660
|
$98,347.070
|
$80,000.000
|
|
|
WINGWALL (PW - 1) (HW=6 FT)
|
EA
|
2.000
|
$14,500.000
|
$16,000.000
|
$16,000.000
|
$14,500.000
|
$19,000.000
|
$14,250.000
|
$14,500.000
|
$19,998.450
|
$12,000.000
|
$18,964.440
|
$27,323.960
|
$20,000.000
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
150.000
|
$634.000
|
$630.000
|
$750.000
|
$550.000
|
$650.000
|
$825.000
|
$825.000
|
$684.150
|
$575.000
|
$1,011.440
|
$1,367.610
|
$850.000
|
|
|
SET (TY II) (24 IN) (RCP) (3: 1) (C)
|
EA
|
9.000
|
$800.000
|
$650.000
|
$1,000.000
|
$660.000
|
$700.000
|
$875.000
|
$825.000
|
$736.800
|
$600.000
|
$1,137.870
|
$1,482.490
|
$1,500.000
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
30.000
|
$950.000
|
$900.000
|
$1,000.000
|
$986.000
|
$1,000.000
|
$925.000
|
$935.000
|
$1,052.550
|
$900.000
|
$1,264.300
|
$1,976.530
|
$1,500.000
|
|
|
SET (TY II) (48 IN) (RCP) (6: 1) (P)
|
EA
|
2.000
|
$927.000
|
$6,000.000
|
$5,600.000
|
$6,872.000
|
$9,000.000
|
$7,200.000
|
$7,300.000
|
$9,472.950
|
$9,000.000
|
$10,367.230
|
$9,736.220
|
$8,000.000
|
|
|
CLEAN EXIST CULVERTS
|
EA
|
14.000
|
$1,375.000
|
$1,000.000
|
$2,000.000
|
$1,500.000
|
$1,200.000
|
$1,540.000
|
$1,550.000
|
$1,263.050
|
$1,000.000
|
$1,264.300
|
$814.860
|
$1,500.000
|
|
|
REMOV STR (SET)
|
EA
|
12.000
|
$192.500
|
$250.000
|
$220.000
|
$500.000
|
$225.000
|
$515.000
|
$520.000
|
$236.800
|
$500.000
|
$252.860
|
$431.830
|
$1,500.000
|
|
|
REMOV STR (WINGWALL)
|
EA
|
10.000
|
$1,165.630
|
$3,000.000
|
$1,100.000
|
$1,000.000
|
$1,000.000
|
$875.000
|
$875.000
|
$1,052.550
|
$500.000
|
$948.220
|
$1,295.500
|
$2,500.000
|
|
|
REMOV STR (HEADWALL)
|
EA
|
17.000
|
$800.000
|
$1,000.000
|
$800.000
|
$500.000
|
$1,000.000
|
$875.000
|
$875.000
|
$1,052.550
|
$500.000
|
$948.220
|
$1,295.500
|
$2,500.000
|
|
|
REMOV STR (PIPE)
|
EA
|
91.000
|
$295.000
|
$250.000
|
$260.000
|
$300.000
|
$275.000
|
$775.000
|
$760.000
|
$289.450
|
$500.000
|
$189.640
|
$569.450
|
$500.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$750,058.100
|
$690,000.000
|
$475,000.000
|
$600,000.000
|
$770,159.730
|
$700,000.000
|
$815,000.000
|
$728,934.600
|
$450,000.000
|
$979,829.600
|
$1,773,056.320
|
$900,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
15.000
|
$10,000.000
|
$21,000.000
|
$12,000.000
|
$1,000.000
|
$7,185.000
|
$18,000.000
|
$12,500.000
|
$10,201.500
|
$8,000.000
|
$12,642.960
|
$2,304.000
|
$8,500.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
660.000
|
$25.640
|
$29.400
|
$34.000
|
$30.000
|
$28.000
|
$30.000
|
$26.000
|
$30.500
|
$32.000
|
$33.840
|
$31.320
|
$30.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 3)
|
LF
|
370.000
|
$56.000
|
$39.900
|
$39.000
|
$40.000
|
$45.000
|
$39.000
|
$57.000
|
$40.000
|
$45.000
|
$64.590
|
$41.040
|
$30.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
1,030.000
|
$5.820
|
$15.750
|
$11.000
|
$6.000
|
$6.000
|
$6.100
|
$9.000
|
$6.300
|
$5.000
|
$10.080
|
$6.480
|
$15.000
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
3,020.000
|
$22.000
|
$13.060
|
$5.000
|
$20.000
|
$20.000
|
$20.500
|
$5.000
|
$21.050
|
$20.000
|
$24.950
|
$19.440
|
$40.000
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
3,020.000
|
$7.000
|
$3.270
|
$1.000
|
$5.000
|
$5.000
|
$7.150
|
$1.000
|
$7.350
|
$1.000
|
$8.510
|
$5.400
|
$20.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
4,164.000
|
$2.100
|
$1.520
|
$2.500
|
$2.250
|
$2.250
|
$2.650
|
$3.750
|
$2.650
|
$3.000
|
$2.760
|
$2.700
|
$4.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
4,164.000
|
$0.600
|
$0.160
|
$0.780
|
$0.500
|
$0.500
|
$0.520
|
$0.600
|
$0.550
|
$0.500
|
$0.860
|
$0.540
|
$2.000
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
4,515.000
|
$4.000
|
$3.100
|
$4.300
|
$4.500
|
$4.500
|
$4.250
|
$5.750
|
$4.200
|
$4.000
|
$4.620
|
$4.320
|
$18.000
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
4,515.000
|
$1.510
|
$1.050
|
$0.800
|
$0.500
|
$0.500
|
$1.050
|
$0.750
|
$1.050
|
$1.000
|
$1.340
|
$1.080
|
$9.000
|
|
|
DRIVEWAYS (ACP)
|
SY
|
7,152.000
|
$40.000
|
$40.000
|
$37.000
|
$40.000
|
$45.000
|
$42.000
|
$47.000
|
$43.150
|
$50.000
|
$61.920
|
$47.300
|
$38.000
|
|
|
DRIVEWAYS (BASE)
|
SY
|
912.000
|
$18.500
|
$20.000
|
$19.000
|
$25.000
|
$27.570
|
$24.250
|
$22.000
|
$8.850
|
$10.000
|
$23.120
|
$12.200
|
$25.000
|
|
|
DRIVEWAYS (CONC) (HES)
|
SY
|
1,001.000
|
$87.200
|
$95.000
|
$130.000
|
$100.000
|
$95.000
|
$110.000
|
$110.000
|
$100.000
|
$95.000
|
$126.430
|
$108.650
|
$105.000
|
|
|
RUMBLE STRIPS (SHOULDER) ASPHALT
|
LF
|
57,892.000
|
$0.150
|
$0.120
|
$0.200
|
$0.120
|
$0.100
|
$0.150
|
$0.320
|
$0.150
|
$0.400
|
$0.150
|
$0.160
|
$0.200
|
|
|
RUMBLE STRIPS (CENTERLINE) ASPHALT
|
LF
|
28,996.000
|
$0.170
|
$0.120
|
$0.200
|
$0.120
|
$0.100
|
$0.150
|
$0.320
|
$0.300
|
$0.400
|
$0.150
|
$0.220
|
$0.200
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
650.000
|
$16.340
|
$18.110
|
$19.000
|
$21.000
|
$18.500
|
$18.750
|
$18.000
|
$19.500
|
$22.000
|
$20.460
|
$19.980
|
$22.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
4.000
|
$2,338.220
|
$2,551.500
|
$2,600.000
|
$2,550.000
|
$2,500.000
|
$2,645.000
|
$2,550.000
|
$2,157.750
|
$2,600.000
|
$2,576.490
|
$2,683.800
|
$2,850.000
|
|
|
MAILBOX INSTALL-S (TWW-POST) TY 4
|
EA
|
53.000
|
$226.000
|
$225.750
|
$230.000
|
$250.000
|
$215.000
|
$275.000
|
$225.000
|
$121.050
|
$300.000
|
$297.110
|
$124.200
|
$650.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
45.000
|
$495.000
|
$498.750
|
$500.000
|
$450.000
|
$475.000
|
$400.000
|
$500.000
|
$473.650
|
$600.000
|
$682.720
|
$486.000
|
$850.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U)
|
EA
|
3.000
|
$833.150
|
$908.250
|
$900.000
|
$817.000
|
$865.000
|
$1,025.000
|
$920.000
|
$789.400
|
$900.000
|
$1,099.940
|
$810.000
|
$850.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U-BM)
|
EA
|
2.000
|
$900.000
|
$952.350
|
$960.000
|
$1,000.000
|
$907.000
|
$910.000
|
$950.000
|
$810.450
|
$1,000.000
|
$1,232.690
|
$831.600
|
$850.000
|
|
|
INSTL OM ASSM (OM-2Z)(FLX)GND(BI)
|
EA
|
34.000
|
$48.000
|
$42.790
|
$55.000
|
$75.000
|
$40.000
|
$42.000
|
$42.000
|
$26.300
|
$110.000
|
$82.180
|
$27.000
|
$100.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
|
EA
|
12.000
|
$26.000
|
$29.930
|
$30.000
|
$21.000
|
$25.000
|
$29.000
|
$30.000
|
$17.900
|
$50.000
|
$31.290
|
$21.600
|
$100.000
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
5,799.000
|
$1.340
|
$2.000
|
$0.650
|
$1.000
|
$2.250
|
$1.030
|
$1.250
|
$1.050
|
$2.000
|
$1.390
|
$0.540
|
$5.000
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
117.000
|
$5.840
|
$6.300
|
$5.900
|
$6.000
|
$6.000
|
$5.850
|
$7.450
|
$5.900
|
$6.000
|
$7.590
|
$7.560
|
$8.000
|
|
REFL PAV MRK TY II (W) 4" (SLD)
|
LF
|
57,892.000
|
$0.100
|
$0.260
|
$0.130
|
$0.120
|
$0.250
|
$0.125
|
$0.230
|
$0.150
|
$0.130
|
$0.320
|
$0.240
|
$0.200
|
|
REFL PAV MRK TY II (Y) 4" (SLD)
|
LF
|
28,996.000
|
$0.100
|
$0.260
|
$0.130
|
$0.120
|
$0.250
|
$0.125
|
$0.230
|
$0.150
|
$0.130
|
$0.320
|
$0.240
|
$0.200
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
|
LF
|
49,865.000
|
$0.320
|
$0.360
|
$0.450
|
$0.440
|
$0.340
|
$0.450
|
$0.360
|
$0.450
|
$0.460
|
$0.430
|
$0.370
|
$0.500
|
|
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
|
LF
|
8,077.000
|
$0.450
|
$0.500
|
$0.780
|
$0.750
|
$0.480
|
$0.780
|
$0.400
|
$0.800
|
$0.800
|
$0.610
|
$0.410
|
$1.000
|
|
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
|
LF
|
5,424.000
|
$0.360
|
$0.390
|
$0.530
|
$0.500
|
$0.370
|
$0.520
|
$0.340
|
$0.550
|
$0.550
|
$0.470
|
$0.350
|
$1.000
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
33,485.000
|
$0.320
|
$0.360
|
$0.450
|
$0.440
|
$0.340
|
$0.460
|
$0.340
|
$0.450
|
$0.500
|
$0.430
|
$0.350
|
$1.000
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
637.000
|
$2.710
|
$3.930
|
$3.700
|
$3.500
|
$3.740
|
$3.600
|
$5.000
|
$3.650
|
$4.000
|
$4.730
|
$5.240
|
$5.000
|
|
|
FULL - WIDTH MOWING
|
CYC
|
3.000
|
$2,900.000
|
$3,300.000
|
$4,000.000
|
$2,700.000
|
$2,500.000
|
$2,650.000
|
$2,800.000
|
$4,000.000
|
$5,000.000
|
$4,425.040
|
$1,213.770
|
$3,500.000
|
|
|
SP MIXES SP-C SAC-B PG64-22
|
TON
|
20,204.000
|
$75.000
|
$88.000
|
$79.500
|
$82.000
|
$82.000
|
$82.000
|
$86.000
|
$86.300
|
$95.000
|
$106.200
|
$89.890
|
$88.000
|
|
|
TACK COAT
|
GAL
|
5,514.000
|
$1.800
|
$2.250
|
$3.000
|
$3.000
|
$3.050
|
$3.050
|
$5.000
|
$3.200
|
$3.000
|
$2.840
|
$3.290
|
$3.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$9,250.000
|
$7,350.000
|
$15,000.000
|
$10,000.000
|
$15,000.000
|
$13,197.000
|
$10,000.000
|
$15,250.000
|
$15,000.000
|
$10,114.370
|
$10,397.790
|
$16,500.000
|
|
|
TMA (STATIONARY)
|
DAY
|
253.000
|
$275.000
|
$52.500
|
$150.000
|
$100.000
|
$150.000
|
$275.000
|
$100.000
|
$300.000
|
$300.000
|
$189.640
|
$270.000
|
$300.000
|
|
|
TMA (MOBILE OPERATION)
|
HR
|
150.000
|
$61.000
|
$42.000
|
$35.000
|
$20.000
|
$100.000
|
$31.000
|
$65.000
|
$100.000
|
$30.000
|
$94.820
|
$32.400
|
$85.000
|
|
Totals: |
$8,344,338.014
|
$7,598,568.100
|
$7,747,626.240
|
$7,890,056.990
|
$7,941,811.712
|
$7,996,508.423
|
$8,210,758.240
|
$8,230,311.675
|
$9,419,994.200
|
$9,933,383.523
|
$9,973,828.004
|
$11,080,532.200
|