PREPARING ROW
|
STA
|
315.350
|
$1,620.000
|
$341.930
|
$750.000
|
$641.000
|
$174.730
|
$742.500
|
$509.450
|
$1,179.900
|
|
|
REMOV CONC (PAV)
|
SY
|
321.000
|
$12.170
|
$31.960
|
$35.000
|
$21.000
|
$15.950
|
$22.000
|
$60.000
|
$27.050
|
|
|
REMOV CONC (RIPRAP)
|
SY
|
808.000
|
$14.740
|
$22.790
|
$30.000
|
$15.800
|
$12.670
|
$19.800
|
$35.000
|
$16.300
|
|
|
REMOV CONC (FLUME)
|
SY
|
138.000
|
$36.000
|
$21.280
|
$40.000
|
$22.900
|
$18.550
|
$19.800
|
$45.000
|
$16.300
|
|
|
RMV (2"-6") TRT/UNTRT BASE & ASPH PAV
|
SY
|
4,255.000
|
$7.390
|
$2.480
|
$4.000
|
$15.400
|
$4.150
|
$4.650
|
$4.250
|
$10.400
|
|
|
RMV (5"-9") TRT/UNTRT BASE & ASPH PAV
|
SY
|
22,456.000
|
$5.910
|
$2.420
|
$5.000
|
$4.900
|
$4.150
|
$5.880
|
$9.550
|
$10.650
|
|
|
EXCAV (ROADWAY)
|
CY
|
14,005.000
|
$14.220
|
$18.910
|
$15.000
|
$15.500
|
$12.310
|
$49.500
|
$19.570
|
$53.150
|
|
|
EMBANK (FNL)(DC)(TY C1)
|
CY
|
1,376.000
|
$25.540
|
$63.850
|
$55.000
|
$12.500
|
$27.710
|
$34.770
|
$53.960
|
$47.150
|
|
|
BLADING
|
STA
|
315.350
|
$167.490
|
$56.440
|
$150.000
|
$37.300
|
$117.610
|
$319.000
|
$63.500
|
$132.550
|
|
|
COMPOST MANUF TOPSOIL (4")
|
SY
|
54,882.000
|
$1.250
|
$2.470
|
$2.000
|
$2.380
|
$8.550
|
$2.090
|
$1.990
|
$3.100
|
|
|
DRILL SEED (PERM_RURAL_CLAY)
|
SY
|
54,882.000
|
$0.260
|
$0.250
|
$0.500
|
$0.330
|
$0.220
|
$0.210
|
$0.200
|
$0.250
|
|
|
BONDED FBR MTRX SEED (TEMP)(WARM)
|
SY
|
27,444.000
|
$0.550
|
$0.930
|
$1.500
|
$1.300
|
$0.830
|
$0.790
|
$0.750
|
$0.850
|
|
|
BONDED FBR MTRX SEED (TEMP)(COOL)
|
SY
|
27,444.000
|
$0.550
|
$0.930
|
$1.500
|
$1.300
|
$0.830
|
$0.790
|
$0.750
|
$0.850
|
|
|
VEGETATIVE WATERING
|
TGL
|
1,707.820
|
$24.210
|
$54.320
|
$35.000
|
$54.900
|
$36.630
|
$26.400
|
$52.750
|
$70.800
|
|
|
SOIL RET BLKT(SL_MOD_CLAY_LONG_ROLL)
|
SY
|
46,860.000
|
$3.030
|
$2.480
|
$1.500
|
$1.250
|
$2.220
|
$2.100
|
$2.000
|
$2.300
|
|
|
SOIL RET BLKT(SL_STEEP_CLAY_LONG_ROLL)
|
SY
|
8,022.000
|
$3.030
|
$3.110
|
$1.750
|
$1.600
|
$2.780
|
$2.620
|
$2.500
|
$2.850
|
|
|
PROOF ROLLING
|
HR
|
87.000
|
$172.000
|
$140.240
|
$575.000
|
$92.400
|
$47.400
|
$121.000
|
$65.000
|
$132.650
|
|
|
FL BS (CMP IN PLC)(TYD GR1-2)(FNAL POS)
|
CY
|
7,552.000
|
$71.380
|
$70.560
|
$75.000
|
$87.750
|
$74.310
|
$81.090
|
$123.820
|
$92.800
|
|
|
ASPH (RC-250)
|
GAL
|
10,159.000
|
$6.080
|
$7.390
|
$6.000
|
$6.300
|
$5.090
|
$7.150
|
$14.850
|
$9.600
|
|
|
ASPH (AC-15P, AC-20-5TR OR AC-20XP)
|
GAL
|
30,602.000
|
$3.820
|
$7.390
|
$5.000
|
$5.100
|
$4.740
|
$5.500
|
$4.450
|
$4.850
|
|
|
AGGR (TY-B, GR-5)(SAC-A)
|
CY
|
278.000
|
$125.000
|
$242.400
|
$245.000
|
$339.000
|
$455.960
|
$230.880
|
$471.300
|
$547.150
|
|
|
AGGR (TY-PD, GR-4)(SAC-B)
|
CY
|
851.000
|
$98.970
|
$189.180
|
$190.000
|
$132.000
|
$131.520
|
$154.400
|
$160.250
|
$161.500
|
|
|
CUT & RESTORING PAV
|
SY
|
146.000
|
$211.680
|
$376.120
|
$180.000
|
$423.000
|
$183.150
|
$304.350
|
$262.630
|
$1,349.000
|
|
|
FLOWABLE BACKFILL
|
CY
|
8.000
|
$318.000
|
$208.830
|
$500.000
|
$248.000
|
$508.480
|
$463.400
|
$450.000
|
$497.450
|
|
|
TEMPORARY SPL SHORING
|
SF
|
1,623.000
|
$18.250
|
$21.120
|
$60.000
|
$26.400
|
$44.400
|
$49.960
|
$35.000
|
$19.050
|
|
|
RIPRAP (CONC)(4 IN)
|
CY
|
216.000
|
$590.000
|
$630.580
|
$550.000
|
$529.000
|
$943.500
|
$758.480
|
$850.000
|
$712.650
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
67.000
|
$610.220
|
$659.130
|
$800.000
|
$793.000
|
$943.500
|
$818.440
|
$805.000
|
$723.500
|
|
|
GABION MATTRESSES (GALV)(12 IN)
|
SY
|
121.000
|
$69.880
|
$167.700
|
$295.000
|
$97.900
|
$142.080
|
$141.740
|
$135.000
|
$234.700
|
|
|
GABION MATTRESSES (GALV) (24 IN)
|
SY
|
12.000
|
$150.000
|
$223.600
|
$375.000
|
$232.000
|
$205.350
|
$188.990
|
$180.000
|
$522.900
|
|
|
CMP AR (GAL STL DES 3)
|
LF
|
16.000
|
$120.000
|
$93.840
|
$345.000
|
$233.000
|
$339.470
|
$242.250
|
$300.000
|
$540.400
|
|
|
CMP AR (GAL STL DES 5)
|
LF
|
11.000
|
$300.000
|
$157.790
|
$525.000
|
$248.000
|
$499.500
|
$374.970
|
$450.000
|
$807.750
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
14.000
|
$83.440
|
$83.480
|
$335.000
|
$122.000
|
$72.150
|
$195.960
|
$65.000
|
$593.450
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
80.000
|
$122.180
|
$106.090
|
$355.000
|
$153.000
|
$166.500
|
$207.440
|
$150.000
|
$635.750
|
|
|
RC PIPE (CL III)(36 IN)
|
LF
|
28.000
|
$197.200
|
$197.260
|
$415.000
|
$301.000
|
$333.000
|
$339.920
|
$300.000
|
$667.500
|
|
|
SET (TY II) (18 IN) (RCP) (3: 1) (C)
|
EA
|
1.000
|
$1,200.000
|
$1,961.330
|
$2,750.000
|
$3,220.000
|
$943.500
|
$2,722.550
|
$850.000
|
$2,366.300
|
|
|
SET (TY II) (18 IN) (RCP) (4: 1) (C)
|
EA
|
1.000
|
$1,358.040
|
$2,049.110
|
$2,500.000
|
$3,220.000
|
$999.000
|
$2,847.730
|
$900.000
|
$2,366.300
|
|
|
SET (TY II) (24 IN) (RCP) (3: 1) (C)
|
EA
|
2.000
|
$1,491.620
|
$2,205.860
|
$3,250.000
|
$2,110.000
|
$2,220.000
|
$2,895.790
|
$2,000.000
|
$2,224.150
|
|
|
SET (TY II) (24 IN) (RCP) (4: 1) (C)
|
EA
|
7.000
|
$2,459.000
|
$2,687.770
|
$3,500.000
|
$3,170.000
|
$2,497.500
|
$3,285.120
|
$2,250.000
|
$2,634.500
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (C)
|
EA
|
3.000
|
$1,778.240
|
$2,918.340
|
$4,250.000
|
$3,600.000
|
$2,775.000
|
$3,684.850
|
$2,500.000
|
$2,755.950
|
|
|
SET (TY II) (36 IN) (RCP) (4: 1) (C)
|
EA
|
4.000
|
$3,172.730
|
$5,385.880
|
$7,500.000
|
$8,640.000
|
$4,440.000
|
$5,244.810
|
$4,000.000
|
$6,788.650
|
|
|
SET (TY II) (DES 3) (CMP) (4: 1) (C)
|
EA
|
1.000
|
$3,500.000
|
$2,443.290
|
$8,000.000
|
$2,640.000
|
$2,824.880
|
$3,440.170
|
$2,500.000
|
$2,376.750
|
|
|
SET (TY II) (DES 3) (CMP) (6: 1) (C)
|
EA
|
1.000
|
$6,000.000
|
$2,689.040
|
$9,500.000
|
$2,780.000
|
$3,885.000
|
$4,094.420
|
$3,500.000
|
$2,394.750
|
|
|
SET (TY II) (DES 5) (CMP) (4: 1) (C)
|
EA
|
2.000
|
$6,500.000
|
$4,872.430
|
$10,250.000
|
$3,280.000
|
$4,995.000
|
$5,720.900
|
$4,500.000
|
$5,862.800
|
|
|
CLEAN EXIST CULVERTS
|
EA
|
5.000
|
$2,807.400
|
$3,450.370
|
$1,500.000
|
$3,170.000
|
$2,220.000
|
$3,095.330
|
$2,000.000
|
$2,920.750
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$358,000.000
|
$315,624.450
|
$275,000.000
|
$385,000.000
|
$444,451.020
|
$321,577.860
|
$361,700.000
|
$550,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
13.000
|
$10,000.000
|
$1,595.800
|
$7,750.000
|
$8,000.000
|
$7,215.000
|
$3,458.870
|
$4,580.000
|
$3,866.800
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
DAY
|
400.000
|
$70.900
|
$23.370
|
$50.000
|
$66.300
|
$22.200
|
$68.190
|
$100.000
|
$95.650
|
|
|
TMA (STATIONARY)
|
DAY
|
20.000
|
$283.900
|
$153.560
|
$225.000
|
$137.000
|
$564.980
|
$170.490
|
$350.000
|
$429.950
|
|
|
TMA (MOBILE OPERATION)
|
HR
|
144.000
|
$89.100
|
$44.670
|
$115.000
|
$114.000
|
$50.850
|
$85.240
|
$57.480
|
$82.200
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
1,871.000
|
$40.270
|
$55.900
|
$45.000
|
$42.300
|
$47.730
|
$45.150
|
$43.000
|
$48.800
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 3)
|
LF
|
990.000
|
$70.900
|
$99.380
|
$105.000
|
$1.000
|
$87.690
|
$82.950
|
$79.000
|
$89.650
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
2,861.000
|
$12.810
|
$12.420
|
$30.000
|
$37.000
|
$12.210
|
$11.550
|
$11.000
|
$12.500
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
224.000
|
$22.330
|
$37.270
|
$40.000
|
$30.100
|
$44.400
|
$42.000
|
$40.000
|
$45.400
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
224.000
|
$8.910
|
$9.940
|
$15.000
|
$19.000
|
$15.540
|
$14.700
|
$14.000
|
$15.900
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
41,840.000
|
$3.500
|
$4.220
|
$4.750
|
$4.450
|
$4.440
|
$4.200
|
$4.000
|
$4.550
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
41,840.000
|
$0.920
|
$1.060
|
$1.000
|
$1.200
|
$1.110
|
$1.050
|
$1.000
|
$1.100
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (18")
|
LF
|
1,140.000
|
$8.240
|
$8.070
|
$8.000
|
$6.900
|
$7.770
|
$7.350
|
$7.000
|
$7.950
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
1,140.000
|
$1.760
|
$0.930
|
$2.000
|
$1.250
|
$1.110
|
$1.570
|
$1.500
|
$1.700
|
|
|
ONE-WAY TRAF CONT (FLAGGER CONT)
|
HR
|
160.000
|
$89.900
|
$149.980
|
$150.000
|
$189.000
|
$86.480
|
$154.000
|
$150.000
|
$288.200
|
|
|
DRIVEWAYS (CONC)
|
SY
|
329.000
|
$106.200
|
$120.780
|
$175.000
|
$153.000
|
$277.500
|
$166.320
|
$250.000
|
$138.700
|
|
|
DRIVEWAYS (SURF TREAT)
|
SY
|
5,074.000
|
$33.450
|
$43.000
|
$10.000
|
$39.400
|
$27.750
|
$35.200
|
$21.000
|
$81.350
|
|
|
TURNOUTS (SURF TREAT)
|
SY
|
451.000
|
$59.600
|
$47.000
|
$10.000
|
$45.000
|
$27.750
|
$35.200
|
$77.950
|
$84.300
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
1,025.000
|
$27.330
|
$34.160
|
$40.000
|
$24.900
|
$32.470
|
$24.670
|
$29.250
|
$26.700
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
4.000
|
$3,238.180
|
$3,849.110
|
$4,500.000
|
$3,440.000
|
$3,901.650
|
$3,412.330
|
$3,515.000
|
$3,688.800
|
|
|
MAILBOX INSTALL-S (TWW-POST) TY 4
|
EA
|
25.000
|
$490.420
|
$310.560
|
$295.000
|
$264.000
|
$321.900
|
$320.230
|
$290.000
|
$283.750
|
|
|
MAILBOX INSTALL-D (TWW-POST) TY 4
|
EA
|
3.000
|
$369.780
|
$341.620
|
$315.000
|
$291.000
|
$361.860
|
$320.230
|
$325.000
|
$312.150
|
|
|
MAILBOX INSTALL-M (TWW-POST) TY 4
|
EA
|
3.000
|
$730.580
|
$683.230
|
$625.000
|
$582.000
|
$943.500
|
$713.960
|
$850.000
|
$624.250
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
33.000
|
$750.600
|
$745.340
|
$695.000
|
$634.000
|
$749.250
|
$771.710
|
$675.000
|
$681.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P-BM)
|
EA
|
2.000
|
$811.670
|
$869.560
|
$800.000
|
$740.000
|
$871.350
|
$859.910
|
$785.000
|
$794.500
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
37.000
|
$793.670
|
$776.400
|
$725.000
|
$661.000
|
$943.500
|
$818.960
|
$850.000
|
$709.400
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
|
EA
|
1.000
|
$1,063.120
|
$869.570
|
$800.000
|
$740.000
|
$1,193.250
|
$1,102.450
|
$1,075.000
|
$794.500
|
|
|
IN SM RD SN SUP&AM TYFRP(1)UA(P)
|
EA
|
6.000
|
$450.000
|
$776.400
|
$725.000
|
$661.000
|
$832.500
|
$509.230
|
$750.000
|
$709.400
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U)
|
EA
|
2.000
|
$1,238.390
|
$1,086.960
|
$1,000.000
|
$925.000
|
$1,393.050
|
$1,307.190
|
$1,255.000
|
$993.150
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U-BM)
|
EA
|
5.000
|
$1,437.640
|
$1,180.120
|
$1,000.000
|
$1,000.000
|
$1,526.250
|
$1,448.930
|
$1,375.000
|
$1,078.250
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
67.000
|
$121.000
|
$93.170
|
$90.000
|
$79.300
|
$122.100
|
$157.490
|
$110.000
|
$85.100
|
|
|
INSTL OM ASSM (OM-2Z)(WFLX)GND(BI)
|
EA
|
36.000
|
$89.680
|
$167.700
|
$155.000
|
$143.000
|
$72.150
|
$110.240
|
$65.000
|
$76.650
|
|
|
REMOVE DELIN & OBJECT MARKER ASSMS
|
EA
|
30.000
|
$40.210
|
$6.210
|
$6.000
|
$5.300
|
$20.540
|
$19.420
|
$18.500
|
$14.850
|
|
|
INSTL OM SM RD SIGN (1-OM-PW)Y
|
EA
|
72.000
|
$11.200
|
$62.110
|
$60.000
|
$52.900
|
$38.850
|
$34.120
|
$35.000
|
$21.500
|
|
|
INSTL OM SM RD SIGN (1-OM-PW)R
|
EA
|
8.000
|
$10.000
|
$62.110
|
$60.000
|
$52.900
|
$38.850
|
$34.120
|
$35.000
|
$21.500
|
|
|
WK ZN PAV MRK NON-REMOV (W)6"(SLD)
|
LF
|
55,392.000
|
$0.240
|
$0.310
|
$0.300
|
$0.280
|
$0.440
|
$0.260
|
$0.250
|
$0.950
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
3,153.000
|
$0.350
|
$0.010
|
$1.250
|
$1.600
|
$1.110
|
$1.720
|
$2.000
|
$1.600
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
986.000
|
$0.940
|
$1.240
|
$1.250
|
$1.350
|
$1.220
|
$1.260
|
$1.250
|
$1.100
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
148.000
|
$6.910
|
$6.210
|
$6.000
|
$17.700
|
$8.880
|
$16.800
|
$8.000
|
$5.650
|
|
REFL PAV MRK TY I (W)(ARROW)(100MIL)
|
EA
|
6.000
|
$140.320
|
$155.280
|
$145.000
|
$238.000
|
$177.600
|
$225.740
|
$125.000
|
$141.850
|
|
REFL PAV MRK TY I (W)(WORD)(100MIL)
|
EA
|
6.000
|
$163.490
|
$186.340
|
$175.000
|
$349.000
|
$216.450
|
$330.730
|
$150.000
|
$170.250
|
|
REF PAV MRK TY I(W)36"(YLD TRI)(100MIL)
|
EA
|
12.000
|
$53.150
|
$31.060
|
$30.000
|
$83.200
|
$66.600
|
$78.750
|
$25.000
|
$28.350
|
|
REFL PAV MRK TY I(Y)(MED NOSE)(100MIL)
|
EA
|
2.000
|
$259.770
|
$372.680
|
$345.000
|
$665.000
|
$277.500
|
$629.970
|
$450.000
|
$340.500
|
|
RE PROFILE PM TY I(W)6"(SLD)(100MIL)
|
LF
|
63,696.000
|
$0.660
|
$0.960
|
$1.000
|
$0.860
|
$1.000
|
$0.820
|
$0.950
|
$0.900
|
|
RE PROFILE PM TY I(Y)6"(SLD)(100MIL)
|
LF
|
65,810.000
|
$0.700
|
$0.960
|
$1.000
|
$0.860
|
$1.000
|
$0.820
|
$0.950
|
$0.900
|
|
|
PAVEMENT SLER 6"
|
LF
|
129,506.000
|
$0.170
|
$0.220
|
$0.250
|
$0.200
|
$0.240
|
$0.190
|
$0.250
|
$0.200
|
|
|
PAVEMENT SLER 8"
|
LF
|
986.000
|
$0.310
|
$0.310
|
$0.300
|
$0.550
|
$0.440
|
$0.520
|
$0.300
|
$0.300
|
|
|
PAVEMENT SLER 24"
|
LF
|
148.000
|
$1.520
|
$3.730
|
$3.500
|
$4.700
|
$3.110
|
$4.460
|
$4.000
|
$3.400
|
|
|
PAVEMENT SLER (ARROW)
|
EA
|
6.000
|
$54.400
|
$124.230
|
$115.000
|
$66.500
|
$96.570
|
$63.000
|
$75.000
|
$113.500
|
|
|
PAVEMENT SLER (WORD)
|
EA
|
6.000
|
$54.100
|
$124.230
|
$115.000
|
$77.600
|
$111.000
|
$73.500
|
$85.000
|
$113.500
|
|
|
PAVEMENT SLER (MED NOSE)
|
EA
|
2.000
|
$52.370
|
$186.340
|
$175.000
|
$99.800
|
$133.200
|
$94.500
|
$225.000
|
$170.250
|
|
|
PAVEMENT SLER (YLD TRI)
|
EA
|
12.000
|
$32.000
|
$18.630
|
$20.000
|
$20.000
|
$37.740
|
$18.900
|
$15.000
|
$17.000
|
|
REFL PAV MRKR TY I-C
|
EA
|
51.000
|
$3.450
|
$3.730
|
$5.000
|
$11.100
|
$5.550
|
$10.500
|
$5.000
|
$3.400
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
1,117.000
|
$3.500
|
$3.730
|
$5.000
|
$6.700
|
$5.550
|
$6.300
|
$5.000
|
$3.400
|
|
|
RELOCT RDSD FLSH BCN AM (SOLAR PWRD)
|
EA
|
1.000
|
$4,000.000
|
$9,316.780
|
$12,500.000
|
$7,400.000
|
$13,320.000
|
$7,349.640
|
$7,000.000
|
$9,534.100
|
|
|
RESIDENTIAL DRIVEWAY TEMP SIGNAL SYSTEM
|
MO
|
13.000
|
$10,000.000
|
$10,157.150
|
$8,500.000
|
$8,650.000
|
$8,880.000
|
$10,061.000
|
$9,000.000
|
$10,875.750
|
|
Totals: |
$4,070,599.474
|
$4,095,968.432
|
$4,244,813.850
|
$4,250,503.363
|
$4,427,014.686
|
$4,724,931.513
|
$4,728,410.368
|
$6,085,395.764
|