PREPARING ROW
|
STA
|
354.900
|
$3,000.000
|
$283.800
|
$200.700
|
$350.000
|
$500.000
|
$271.952
|
$75.000
|
$1,600.000
|
|
|
PREPARING ROW (TREE) (6" TO 24" DIA)
|
EA
|
55.000
|
$500.000
|
$690.000
|
$724.500
|
$1,100.000
|
$750.000
|
$710.700
|
$712.500
|
$250.000
|
|
|
PREPARING ROW(TREE)(24" TO 36" DIA.)
|
EA
|
3.000
|
$1,800.000
|
$750.000
|
$787.500
|
$2,000.000
|
$4,000.000
|
$772.500
|
$774.450
|
$2,000.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
35,753.000
|
$6.000
|
$8.720
|
$13.500
|
$9.780
|
$10.510
|
$13.621
|
$18.000
|
$15.000
|
|
|
EMBANKMENT (FINAL)(ORD COMP)(TY B)
|
CY
|
10,322.000
|
$9.000
|
$6.180
|
$10.170
|
$6.860
|
$18.000
|
$7.565
|
$1.000
|
$15.000
|
|
|
FURNISHING AND PLACING TOPSOIL (4")
|
STA
|
354.900
|
$200.000
|
$478.830
|
$438.000
|
$865.600
|
$250.000
|
$368.111
|
$1,617.950
|
$600.000
|
|
|
BLOCK SODDING
|
SY
|
17,018.000
|
$5.000
|
$3.800
|
$4.160
|
$3.850
|
$4.000
|
$3.914
|
$3.900
|
$4.050
|
|
|
DRILL SEEDING (PERM) (RURAL) (CLAY)
|
SY
|
156,317.000
|
$0.150
|
$0.140
|
$0.150
|
$0.140
|
$0.140
|
$0.094
|
$0.150
|
$0.090
|
|
|
DRILL SEED (TEMP)(WARM OR COOL)
|
SY
|
156,317.000
|
$0.100
|
$0.100
|
$0.130
|
$0.100
|
$0.070
|
$0.053
|
$0.100
|
$0.060
|
|
|
VEGETATIVE WATERING
|
MG
|
5,152.000
|
$20.000
|
$4.480
|
$17.700
|
$6.240
|
$22.010
|
$21.133
|
$17.000
|
$15.000
|
|
|
SOIL RETENTION BLANKETS (CL 1) (TY A)
|
SY
|
1,700.000
|
$1.200
|
$1.050
|
$1.250
|
$2.020
|
$0.750
|
$1.082
|
$1.100
|
$1.100
|
|
|
FL BS (RDWY DEL)(TY D GR 5)(FNAL POS)
|
CY
|
18,905.000
|
$25.000
|
$38.490
|
$42.840
|
$46.880
|
$45.000
|
$47.903
|
$47.000
|
$57.460
|
|
|
CEMENT
|
TON
|
1,021.000
|
$130.000
|
$141.190
|
$141.750
|
$150.000
|
$135.000
|
$141.045
|
$142.050
|
$135.000
|
|
|
CEMENT TREAT (EXIST MATL) (6")
|
SY
|
113,431.000
|
$1.500
|
$1.370
|
$1.600
|
$1.320
|
$2.260
|
$1.276
|
$1.250
|
$3.000
|
|
|
ASPH (AC-15P)
|
GAL
|
68,059.000
|
$3.000
|
$2.560
|
$2.680
|
$2.840
|
$2.750
|
$2.953
|
$3.200
|
$3.150
|
|
|
ASPH (RC-250)
|
GAL
|
22,686.000
|
$4.500
|
$3.280
|
$3.420
|
$3.870
|
$3.750
|
$3.756
|
$5.650
|
$4.300
|
|
|
AGGR(TY-PD GR-3 SAC-B)
|
CY
|
1,260.000
|
$70.000
|
$73.170
|
$55.800
|
$85.830
|
$80.000
|
$98.140
|
$85.700
|
$92.000
|
|
|
AGGR(TY-PD GR-4 SAC-B)
|
CY
|
1,135.000
|
$100.000
|
$77.650
|
$55.800
|
$87.890
|
$80.000
|
$81.866
|
$88.400
|
$92.000
|
|
|
AGGR(TY-PE GR-5 SAC-B)
|
CY
|
1,031.000
|
$100.000
|
$83.340
|
$65.040
|
$111.130
|
$90.000
|
$117.261
|
$82.600
|
$103.000
|
|
|
STRUCT EXCAV (PIPE)
|
CY
|
520.000
|
$15.000
|
$12.000
|
$44.200
|
$27.100
|
$50.000
|
$22.660
|
$3.400
|
$10.000
|
|
|
CEM STABIL BKFL
|
CY
|
294.000
|
$100.000
|
$125.000
|
$135.330
|
$96.040
|
$150.000
|
$185.400
|
$117.900
|
$150.000
|
|
|
CUT & RESTORING PAV
|
SY
|
452.000
|
$100.000
|
$80.000
|
$31.760
|
$34.850
|
$45.000
|
$101.970
|
$31.350
|
$65.550
|
|
|
FLOWABLE BACKFILL
|
CY
|
345.000
|
$100.000
|
$125.000
|
$117.490
|
$129.850
|
$150.000
|
$196.730
|
$117.900
|
$192.880
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
20.000
|
$4.000
|
$15.000
|
$67.090
|
$6.760
|
$150.000
|
$103.000
|
$2.550
|
$10.000
|
|
|
RIPRAP (CONC)(4 IN)
|
CY
|
1,282.000
|
$350.000
|
$330.000
|
$412.360
|
$398.210
|
$350.000
|
$375.950
|
$472.350
|
$300.000
|
|
|
RIPRAP (CONC)(5 IN)
|
CY
|
4.000
|
$300.000
|
$425.000
|
$732.840
|
$797.660
|
$450.000
|
$412.000
|
$555.400
|
$350.000
|
|
|
CONC BOX CULV (4 FT X 2 FT)
|
LF
|
300.000
|
$125.000
|
$178.300
|
$213.130
|
$213.580
|
$250.000
|
$195.700
|
$170.750
|
$258.590
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
19.000
|
$75.000
|
$86.320
|
$126.410
|
$127.730
|
$120.000
|
$48.410
|
$77.500
|
$176.890
|
|
|
RC PIPE (CL III)(21 IN)
|
LF
|
12.000
|
$60.000
|
$95.370
|
$196.330
|
$194.850
|
$160.000
|
$66.950
|
$83.150
|
$267.800
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
302.000
|
$60.000
|
$95.370
|
$84.730
|
$67.660
|
$140.000
|
$66.950
|
$68.850
|
$118.820
|
|
|
RC PIPE (CL III)(27 IN)
|
LF
|
76.000
|
$100.000
|
$108.190
|
$98.800
|
$82.890
|
$140.000
|
$84.460
|
$75.900
|
$154.580
|
|
|
RC PIPE (CL IV)(24 IN)
|
LF
|
109.000
|
$70.000
|
$103.660
|
$83.150
|
$86.280
|
$140.000
|
$87.550
|
$80.450
|
$120.070
|
|
|
RC PIPE (ARCH)(CL III)(DES 1)
|
LF
|
241.000
|
$225.000
|
$132.210
|
$103.730
|
$141.900
|
$140.000
|
$132.870
|
$148.500
|
$130.150
|
|
|
RC PIPE (ARCH)(CL III)(DES 3)
|
LF
|
71.000
|
$200.000
|
$153.430
|
$136.490
|
$192.030
|
$150.000
|
$152.440
|
$162.850
|
$163.360
|
|
|
RC PIPE (ARCH)(CL III)(DES 4)
|
LF
|
52.000
|
$200.000
|
$174.540
|
$157.490
|
$192.220
|
$160.000
|
$183.340
|
$208.650
|
$180.230
|
|
|
SET (TY I)(S= 4 FT)(HW= 4 FT)(4:1) (C)
|
EA
|
16.000
|
$6,000.000
|
$5,597.800
|
$4,602.840
|
$2,661.730
|
$3,000.000
|
$4,106.610
|
$5,325.700
|
$4,846.310
|
|
|
SET (TY II) (18 IN) (RCP) (3: 1) (P)
|
EA
|
1.000
|
$750.000
|
$1,267.500
|
$893.480
|
$1,313.360
|
$1,500.000
|
$921.850
|
$840.400
|
$1,287.180
|
|
|
SET (TY II) (18 IN) (RCP) (4: 1) (P)
|
EA
|
1.000
|
$1,000.000
|
$1,267.500
|
$1,055.170
|
$1,386.440
|
$1,500.000
|
$1,041.330
|
$924.650
|
$1,318.070
|
|
|
SET (TY II) (21 IN) (RCP) (4: 1) (C)
|
EA
|
2.000
|
$1,200.000
|
$1,300.000
|
$1,256.750
|
$1,401.430
|
$1,650.000
|
$1,483.200
|
$1,144.600
|
$1,261.070
|
|
|
SET (TY II) (24 IN) (RCP) (3: 1) (P)
|
EA
|
7.000
|
$1,000.000
|
$1,300.000
|
$1,216.860
|
$1,475.760
|
$1,650.000
|
$1,298.830
|
$1,233.940
|
$1,248.950
|
|
|
SET (TY II) (24 IN) (RCP) (4: 1) (P)
|
EA
|
24.000
|
$1,700.000
|
$1,150.500
|
$1,411.090
|
$1,260.680
|
$1,650.000
|
$1,449.210
|
$1,399.450
|
$1,373.680
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
1.000
|
$1,600.000
|
$1,365.000
|
$1,932.900
|
$2,551.000
|
$1,650.000
|
$2,097.080
|
$1,679.200
|
$2,242.610
|
|
|
SET (TY II) (27 IN) (RCP) (3: 1) (C)
|
EA
|
1.000
|
$2,000.000
|
$1,397.500
|
$1,392.190
|
$2,258.750
|
$1,500.000
|
$1,793.230
|
$2,032.750
|
$2,284.120
|
|
|
SET (TY II) (27 IN) (RCP) (4: 1) (C)
|
EA
|
3.000
|
$2,000.000
|
$1,397.500
|
$1,805.860
|
$1,935.310
|
$1,500.000
|
$1,797.350
|
$2,202.150
|
$1,775.030
|
|
|
SET (TY II) (30 IN) (RCP) (4: 1) (P)
|
EA
|
2.000
|
$4,000.000
|
$1,579.500
|
$2,196.430
|
$2,116.410
|
$2,000.000
|
$3,409.300
|
$2,750.450
|
$2,722.880
|
|
|
SET (TY II) (DES 1) (RCP) (4: 1) (P)
|
EA
|
16.000
|
$1,700.000
|
$1,397.500
|
$1,107.660
|
$1,644.840
|
$2,000.000
|
$1,905.500
|
$1,010.650
|
$1,566.490
|
|
|
SET (TY II) (DES 3) (RCP) (4: 1) (P)
|
EA
|
10.000
|
$2,000.000
|
$1,829.100
|
$1,634.720
|
$2,417.860
|
$2,500.000
|
$2,523.500
|
$1,516.600
|
$2,450.940
|
|
|
SET (TY II) (DES 4) (RCP) (6: 1) (P)
|
EA
|
4.000
|
$2,000.000
|
$3,017.400
|
$3,215.900
|
$4,366.200
|
$2,800.000
|
$4,635.000
|
$3,066.500
|
$3,655.040
|
|
|
REMOV STR (PIPE)
|
LF
|
619.000
|
$10.000
|
$11.960
|
$15.700
|
$19.190
|
$10.000
|
$4.635
|
$2.900
|
$10.170
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$539,290.640
|
$490,252.690
|
$305,802.160
|
$92,000.000
|
$500,000.000
|
$509,750.991
|
$450,000.000
|
$600,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
18.000
|
$9,000.000
|
$1,786.980
|
$2,618.470
|
$3,000.000
|
$10,000.000
|
$3,733.379
|
$5,969.750
|
$3,000.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
1,020.000
|
$25.000
|
$21.990
|
$21.990
|
$22.250
|
$25.000
|
$26.523
|
$25.800
|
$21.990
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 3)
|
LF
|
165.000
|
$40.000
|
$40.280
|
$40.280
|
$40.760
|
$36.000
|
$81.010
|
$32.550
|
$40.280
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
1,185.000
|
$7.000
|
$6.000
|
$6.000
|
$6.070
|
$7.000
|
$8.199
|
$12.900
|
$6.000
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
156.000
|
$15.000
|
$16.460
|
$16.460
|
$16.660
|
$11.000
|
$19.210
|
$13.950
|
$16.460
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
156.000
|
$6.000
|
$2.000
|
$6.000
|
$6.070
|
$2.000
|
$11.330
|
$10.350
|
$6.000
|
|
|
FRNT END LOADER WORK (ERSN & SEDM CONT)
|
HR
|
144.000
|
$70.000
|
$70.000
|
$68.400
|
$128.180
|
$30.000
|
$99.510
|
$101.800
|
$80.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
11,883.000
|
$1.750
|
$1.780
|
$2.250
|
$2.280
|
$2.000
|
$2.318
|
$2.300
|
$2.250
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
11,883.000
|
$0.400
|
$0.500
|
$0.250
|
$0.250
|
$0.500
|
$0.773
|
$0.750
|
$0.250
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
1,335.000
|
$3.000
|
$3.300
|
$4.720
|
$4.780
|
$3.300
|
$4.893
|
$3.600
|
$4.720
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (18")
|
LF
|
165.000
|
$5.000
|
$5.000
|
$5.500
|
$5.570
|
$5.000
|
$7.725
|
$4.650
|
$5.500
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
1,500.000
|
$1.500
|
$1.000
|
$2.000
|
$2.020
|
$1.000
|
$1.030
|
$0.750
|
$2.000
|
|
|
CONSTRUCTING DETOURS
|
SY
|
3,200.000
|
$55.000
|
$47.120
|
$30.570
|
$18.150
|
$28.000
|
$25.862
|
$23.000
|
$30.000
|
|
|
ONE-WAY TRAF CONT (PILOT CAR)
|
HR
|
2,000.000
|
$70.000
|
$35.840
|
$68.400
|
$94.390
|
$60.760
|
$79.983
|
$103.250
|
$90.000
|
|
|
DRIVEWAYS (CONC)
|
SY
|
923.000
|
$70.000
|
$57.160
|
$69.820
|
$85.120
|
$60.000
|
$86.005
|
$76.700
|
$63.220
|
|
|
DRIVEWAYS (ACP)
|
SY
|
182.000
|
$40.000
|
$39.310
|
$30.660
|
$59.190
|
$57.320
|
$25.905
|
$64.050
|
$69.640
|
|
|
DRIVEWAYS (SURF TREAT)
|
SY
|
828.000
|
$3.150
|
$26.960
|
$28.560
|
$26.550
|
$50.000
|
$17.013
|
$36.140
|
$35.570
|
|
|
TURNOUTS (ACP)
|
SY
|
252.000
|
$70.000
|
$39.310
|
$43.800
|
$93.680
|
$78.960
|
$29.864
|
$50.350
|
$69.650
|
|
|
TURNOUTS (SURF TREAT)
|
SY
|
112.000
|
$60.000
|
$26.960
|
$39.420
|
$63.750
|
$46.270
|
$25.252
|
$46.470
|
$35.210
|
|
|
MAILBOX INSTALL-S (TWG-POST) TY 1
|
EA
|
5.000
|
$165.000
|
$197.000
|
$235.000
|
$177.340
|
$150.000
|
$242.050
|
$154.900
|
$150.000
|
|
|
MAILBOX INSTALL-D (TWG-POST) TY 2
|
EA
|
1.000
|
$275.000
|
$275.000
|
$236.000
|
$215.040
|
$165.000
|
$243.080
|
$170.400
|
$165.000
|
|
|
MAILBOX INSTALL-S (WC-POST) TY 3
|
EA
|
6.000
|
$180.000
|
$165.000
|
$176.000
|
$161.910
|
$145.000
|
$181.280
|
$149.750
|
$145.000
|
|
|
MAILBOX INSTALL-S (TWW-POST) TY 4
|
EA
|
7.000
|
$160.000
|
$145.000
|
$205.000
|
$189.640
|
$165.000
|
$211.150
|
$170.400
|
$165.000
|
|
|
ALUMINUM SIGNS (TY A)
|
SF
|
946.000
|
$25.000
|
$16.000
|
$9.000
|
$25.300
|
$20.750
|
$9.270
|
$21.450
|
$20.750
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
52.000
|
$450.000
|
$405.000
|
$406.900
|
$414.650
|
$323.000
|
$419.107
|
$333.550
|
$323.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
31.000
|
$500.000
|
$460.000
|
$464.900
|
$459.560
|
$357.000
|
$478.847
|
$368.650
|
$357.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U-WC)
|
EA
|
1.000
|
$850.000
|
$680.000
|
$890.400
|
$629.420
|
$525.000
|
$917.112
|
$542.150
|
$525.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
70.000
|
$90.000
|
$74.000
|
$90.000
|
$65.780
|
$80.000
|
$92.700
|
$82.600
|
$80.000
|
|
|
INSTL OM ASSM (OM-2X)(WC)GND
|
EA
|
42.000
|
$40.000
|
$36.000
|
$32.000
|
$41.490
|
$45.000
|
$32.960
|
$46.450
|
$45.000
|
|
|
INSTL OM ASSM (OM-2Z)(FLX)SRF
|
EA
|
3.000
|
$70.000
|
$72.000
|
$71.000
|
$68.810
|
$85.000
|
$73.130
|
$87.750
|
$85.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
|
LF
|
70,980.000
|
$0.250
|
$0.260
|
$0.150
|
$0.150
|
$0.150
|
$0.268
|
$0.150
|
$0.260
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
|
LF
|
70,980.000
|
$0.250
|
$0.260
|
$0.270
|
$0.270
|
$0.270
|
$0.268
|
$0.300
|
$0.260
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
7,098.000
|
$1.000
|
$1.180
|
$1.550
|
$0.970
|
$0.920
|
$1.263
|
$0.600
|
$1.010
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
214.000
|
$0.750
|
$1.000
|
$1.450
|
$1.470
|
$1.450
|
$1.030
|
$1.500
|
$1.010
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
11.000
|
$5.000
|
$10.000
|
$20.000
|
$20.240
|
$20.000
|
$10.300
|
$20.650
|
$10.100
|
|
REF PAV MRK TY I(W)36"(YLD TRI)(100MIL)
|
EA
|
4.000
|
$35.000
|
$44.000
|
$40.000
|
$40.480
|
$40.000
|
$45.320
|
$41.300
|
$44.450
|
|
REFL PAV MRK TY I(Y)(MED NOSE)(100MIL)
|
EA
|
1.000
|
$250.000
|
$400.000
|
$300.000
|
$303.580
|
$300.000
|
$412.000
|
$309.800
|
$404.040
|
|
REFL PAV MRK TY II (W) 4" (SLD)
|
LF
|
71,305.000
|
$0.150
|
$0.150
|
$0.080
|
$0.080
|
$0.080
|
$0.155
|
$0.100
|
$0.150
|
|
REFL PAV MRK TY II (W) 8" (SLD)
|
LF
|
214.000
|
$0.400
|
$0.440
|
$0.250
|
$0.250
|
$0.250
|
$0.453
|
$0.250
|
$0.440
|
|
REFL PAV MRK TY II (Y) 4" (BRK)
|
LF
|
2,340.000
|
$0.200
|
$0.150
|
$0.110
|
$0.110
|
$0.110
|
$0.155
|
$0.100
|
$0.150
|
|
REFL PAV MRK TY II (Y) 4" (SLD)
|
LF
|
62,803.000
|
$0.150
|
$0.150
|
$0.080
|
$0.080
|
$0.080
|
$0.155
|
$0.100
|
$0.150
|
|
|
REF PROF PAV MRK TY I(W)4"(SLD)(090MIL)
|
LF
|
71,305.000
|
$0.500
|
$0.700
|
$0.490
|
$0.500
|
$0.490
|
$0.721
|
$0.500
|
$0.710
|
|
|
REF PROF PAV MRK TY I(Y)4"(SLD)(090MIL)
|
LF
|
62,803.000
|
$0.600
|
$0.700
|
$0.500
|
$0.510
|
$0.500
|
$0.721
|
$0.500
|
$0.710
|
|
|
REF PROF PAV MRK TY I(Y)4"(BRK)(090MIL)
|
LF
|
2,340.000
|
$0.600
|
$0.800
|
$1.200
|
$1.210
|
$1.200
|
$0.824
|
$1.250
|
$0.810
|
|
REFL PAV MRKR TY I-C
|
EA
|
63.000
|
$3.000
|
$4.000
|
$3.500
|
$3.540
|
$3.500
|
$4.120
|
$3.600
|
$4.040
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
960.000
|
$3.000
|
$3.330
|
$3.500
|
$3.540
|
$3.500
|
$3.430
|
$3.600
|
$3.360
|
|
|
ELIM EXT PAV MRK & MRKS (6")
|
LF
|
70,980.000
|
$0.600
|
$0.490
|
$0.400
|
$0.310
|
$0.450
|
$1.188
|
$0.040
|
$0.490
|
|
|
INSTL TIED CONCRETE EROSN CONTROL MATS
|
SF
|
916.000
|
$10.000
|
$10.500
|
$8.500
|
$17.490
|
$10.000
|
$12.840
|
$14.150
|
$8.500
|
|
|
PREFORMED IN-LANE(TRANS) RUMBLE STRIP
|
LF
|
80.000
|
$15.000
|
$15.000
|
$15.000
|
$15.180
|
$15.000
|
$15.450
|
$15.500
|
$15.150
|
|
Totals: |
$5,509,487.640
|
$4,456,842.617
|
$4,661,610.100
|
$4,678,968.530
|
$5,213,400.880
|
$5,245,256.343
|
$5,623,401.395
|
$6,216,820.360
|