PREPARING ROW
|
AC
|
0.490
|
$10,000.000
|
$5,500.000
|
$6,500.000
|
$200,000.000
|
$20,617.630
|
$21,100.000
|
$20,000.000
|
$11,000.000
|
|
|
REMOV CONC (RIPRAP)
|
SY
|
320.000
|
$12.000
|
$12.500
|
$10.000
|
$20.000
|
$36.900
|
$42.000
|
$30.000
|
$132.000
|
|
|
REMOVING STAB BASE AND ASPH PAV(0"-16")
|
SY
|
79.000
|
$10.000
|
$20.000
|
$55.000
|
$50.000
|
$106.000
|
$38.500
|
$25.000
|
$220.000
|
|
|
EXCAV (ROADWAY)
|
CY
|
27.000
|
$13.740
|
$50.000
|
$85.000
|
$50.000
|
$134.000
|
$77.000
|
$40.000
|
$220.000
|
|
|
EXCAV (CHANNEL)
|
CY
|
783.000
|
$12.000
|
$25.000
|
$18.000
|
$40.000
|
$46.900
|
$77.000
|
$40.000
|
$110.000
|
|
|
EMBANK (FNL)(OC)(TY C)
|
CY
|
28.000
|
$30.000
|
$55.000
|
$165.000
|
$55.000
|
$238.000
|
$77.000
|
$50.000
|
$110.000
|
|
|
BLADING
|
HR
|
10.000
|
$150.000
|
$65.850
|
$180.000
|
$65.000
|
$43.400
|
$144.000
|
$100.000
|
$1,100.000
|
|
|
STRAW/HAY MLCH SEED(PERM_RURAL_CLAY)
|
SY
|
3,096.000
|
$0.350
|
$1.500
|
$1.000
|
$5.000
|
$1.400
|
$1.360
|
$6.000
|
$1.000
|
|
|
VEGETATIVE WATERING
|
TGL
|
49.000
|
$25.000
|
$35.700
|
$300.000
|
$15.000
|
$143.000
|
$31.500
|
$50.000
|
$1.000
|
|
|
SOIL RET BLKT(CHAN_TEMP_4 PSF)
|
SY
|
526.000
|
$3.500
|
$4.750
|
$5.250
|
$8.000
|
$4.800
|
$4.640
|
$10.000
|
$11.000
|
|
|
ASPH (AC-15P OR CRS-2P)
|
GAL
|
1,070.000
|
$5.750
|
$7.500
|
$6.300
|
$22.000
|
$9.400
|
$9.200
|
$25.000
|
$22.000
|
|
|
AGGR (TY-PB, GR-4)(SAC-B)
|
CY
|
31.000
|
$125.000
|
$241.000
|
$735.000
|
$450.000
|
$652.000
|
$553.550
|
$900.000
|
$440.000
|
|
|
D-GR HMA TY-B PG64-22 (EXEMPT)
|
TON
|
195.000
|
$133.000
|
$205.000
|
$315.000
|
$210.000
|
$338.000
|
$220.000
|
$200.000
|
$330.000
|
|
|
D-GR HMA TY-C SAC-B PG70-22 (EXEMPT)
|
TON
|
112.000
|
$190.790
|
$205.000
|
$331.000
|
$235.000
|
$355.000
|
$225.500
|
$400.000
|
$330.000
|
|
|
PLANE ASPH CONC PAV(0" TO 2")
|
SY
|
973.000
|
$2.600
|
$4.500
|
$10.500
|
$14.000
|
$11.300
|
$9.040
|
$25.000
|
$12.000
|
|
|
CUT & RESTORE ASPH PAVING
|
SY
|
150.000
|
$160.000
|
$107.500
|
$140.000
|
$185.000
|
$128.000
|
$239.660
|
$350.000
|
$330.000
|
|
|
CEM STABIL BKFL
|
CY
|
154.000
|
$161.760
|
$142.500
|
$95.000
|
$250.000
|
$390.000
|
$324.000
|
$250.000
|
$440.000
|
|
|
FLOWABLE BACKFILL
|
CY
|
40.000
|
$250.000
|
$145.000
|
$150.000
|
$265.000
|
$225.000
|
$324.000
|
$300.000
|
$440.000
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
220.000
|
$5.000
|
$8.500
|
$17.000
|
$1.000
|
$156.000
|
$34.560
|
$20.000
|
$1.000
|
|
|
TEMPORARY SPL SHORING
|
SF
|
1,430.000
|
$25.000
|
$20.000
|
$106.000
|
$25.000
|
$56.400
|
$70.200
|
$75.000
|
$10.000
|
|
|
CL C CONC (CAP)
|
CY
|
1.000
|
$1,075.000
|
$850.000
|
$650.000
|
$1,200.000
|
$4,270.000
|
$1,943.990
|
$5,000.000
|
$4,400.000
|
|
|
RIPRAP (CONC)(4 IN)
|
CY
|
21.000
|
$350.000
|
$495.000
|
$645.000
|
$625.000
|
$1,060.000
|
$674.990
|
$900.000
|
$550.000
|
|
|
RIPRAP (CONC)(5 IN)
|
CY
|
105.100
|
$479.000
|
$505.000
|
$460.000
|
$600.000
|
$932.000
|
$669.590
|
$1,000.000
|
$660.000
|
|
|
RAIL (TY C1W)
|
LF
|
91.720
|
$227.240
|
$532.000
|
$550.000
|
$400.000
|
$741.000
|
$430.920
|
$600.000
|
$660.000
|
|
|
GABION MATTRESSES (GALV)(9 IN)
|
SY
|
100.000
|
$150.000
|
$120.000
|
$168.000
|
$200.000
|
$121.000
|
$136.000
|
$100.000
|
$275.000
|
|
|
GABION (1.5' X 3')(GALV)
|
CY
|
18.000
|
$300.000
|
$120.000
|
$265.000
|
$300.000
|
$480.000
|
$650.000
|
$200.000
|
$330.000
|
|
|
CONC BOX CULV (6 FT X 5 FT)
|
LF
|
73.000
|
$654.590
|
$785.000
|
$1,650.000
|
$1,000.000
|
$1,160.000
|
$944.450
|
$1,100.000
|
$1,980.000
|
|
|
CONC BOX CULV (7 FT X 3 FT)
|
LF
|
210.000
|
$800.000
|
$615.000
|
$450.000
|
$900.000
|
$1,170.000
|
$1,037.490
|
$1,300.000
|
$2,200.000
|
|
|
CONC BOX CULV (12 FT X 5 FT)
|
LF
|
73.000
|
$1,586.980
|
$3,250.000
|
$2,700.000
|
$2,000.000
|
$2,660.000
|
$3,197.860
|
$2,500.000
|
$3,300.000
|
|
|
RC PIPE (CL III)(36 IN)
|
LF
|
82.000
|
$188.740
|
$151.500
|
$165.000
|
$165.000
|
$232.000
|
$118.800
|
$300.000
|
$385.000
|
|
|
WINGWALL (PW - 1) (HW=9 FT)
|
EA
|
2.000
|
$45,871.840
|
$38,500.000
|
$40,000.000
|
$50,000.000
|
$54,300.000
|
$38,121.140
|
$60,000.000
|
$22,000.000
|
|
|
SET (TY I)(S= 7 FT)(HW= 4 FT)(4:1)(C)
|
EA
|
10.000
|
$12,500.000
|
$9,750.000
|
$5,425.000
|
$7,500.000
|
$8,340.000
|
$11,311.530
|
$20,000.000
|
$22,000.000
|
|
|
SET (TY II) (36 IN) (RCP) (6: 1) (P)
|
EA
|
2.000
|
$4,963.330
|
$4,499.950
|
$5,200.000
|
$6,000.000
|
$9,130.000
|
$6,543.670
|
$10,000.000
|
$16,500.000
|
|
|
REMOV STR (MANHOLE)
|
EA
|
1.000
|
$1,360.430
|
$500.000
|
$500.000
|
$1,800.000
|
$1,050.000
|
$782.190
|
$1,000.000
|
$2,200.000
|
|
|
REMOV STR (SET)
|
EA
|
2.000
|
$607.890
|
$350.000
|
$250.000
|
$650.000
|
$409.000
|
$669.590
|
$250.000
|
$550.000
|
|
|
REMOV STR (WINGWALL)
|
EA
|
2.000
|
$1,838.720
|
$330.750
|
$500.000
|
$1,850.000
|
$843.000
|
$1,564.390
|
$2,500.000
|
$1,320.000
|
|
|
REMOV STR (PIPE)
|
LF
|
643.000
|
$26.000
|
$21.800
|
$9.250
|
$25.000
|
$17.900
|
$59.400
|
$20.000
|
$11.000
|
|
|
REMOVE STR (RAIL)
|
LF
|
60.000
|
$15.000
|
$15.200
|
$5.750
|
$12.000
|
$22.300
|
$12.500
|
$50.000
|
$220.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$1,256,475.360
|
$137,500.000
|
$150,000.000
|
$180,000.000
|
$195,000.000
|
$230,366.920
|
$220,000.000
|
$170,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
8.000
|
$5,000.000
|
$5,500.000
|
$5,000.000
|
$20,000.000
|
$6,470.000
|
$20,270.000
|
$10,000.000
|
$1.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
DAY
|
70.000
|
$89.010
|
$80.000
|
$75.000
|
$150.000
|
$358.000
|
$169.170
|
$60.000
|
$1.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
228.000
|
$35.000
|
$47.900
|
$47.250
|
$45.000
|
$55.600
|
$53.790
|
$70.000
|
$5.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
228.000
|
$14.830
|
$5.300
|
$5.250
|
$5.000
|
$12.400
|
$12.000
|
$10.000
|
$2.000
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
314.000
|
$25.000
|
$29.800
|
$29.500
|
$28.000
|
$31.300
|
$30.300
|
$60.000
|
$1.000
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
314.000
|
$7.970
|
$2.650
|
$2.650
|
$2.500
|
$10.000
|
$9.700
|
$22.000
|
$1.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
920.000
|
$4.250
|
$4.750
|
$4.750
|
$4.450
|
$5.100
|
$4.900
|
$7.000
|
$2.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
920.000
|
$1.000
|
$0.950
|
$1.000
|
$1.000
|
$1.700
|
$1.650
|
$2.500
|
$1.000
|
|
|
CONSTRUCTING DETOURS
|
SY
|
392.000
|
$90.000
|
$56.600
|
$205.000
|
$100.000
|
$166.000
|
$253.000
|
$200.000
|
$44.000
|
|
|
ONE-WAY TRAF CONT (PORT TRAF SIG)
|
MO
|
3.000
|
$6,000.000
|
$5,000.000
|
$4,850.000
|
$3,500.000
|
$5,200.000
|
$11,588.250
|
$7,500.000
|
$11,000.000
|
|
|
PORT CTB (FUR & INST)(SGL SLOPE)(TY 1)
|
LF
|
210.000
|
$50.000
|
$26.500
|
$140.000
|
$45.000
|
$152.000
|
$115.000
|
$160.000
|
$110.000
|
|
|
PORT CTB (FUR & INST)(LOW PROF)(TY 1)
|
LF
|
360.000
|
$200.000
|
$26.800
|
$110.000
|
$30.000
|
$40.300
|
$75.000
|
$100.000
|
$110.000
|
|
|
PORT CTB (FUR & INST)(LOW PROF)(TY 2)
|
LF
|
80.000
|
$140.000
|
$25.050
|
$105.000
|
$30.000
|
$53.400
|
$85.000
|
$100.000
|
$110.000
|
|
|
PORT CTB (MOVE)(SGL SLP)(TY 1)
|
LF
|
210.000
|
$10.000
|
$10.000
|
$40.000
|
$15.000
|
$17.800
|
$70.000
|
$30.000
|
$44.000
|
|
|
PORT CTB (MOVE)(LOW PROF)(TY 1)
|
LF
|
220.000
|
$10.000
|
$10.000
|
$28.000
|
$15.000
|
$13.800
|
$80.000
|
$30.000
|
$44.000
|
|
|
PORT CTB (MOVE)(LOW PROF)(TY 2)
|
LF
|
40.000
|
$20.000
|
$10.000
|
$40.000
|
$15.000
|
$28.100
|
$125.000
|
$30.000
|
$44.000
|
|
|
PORT CTB (REMOVE)(SGL SLP)(TY 1)
|
LF
|
210.000
|
$11.000
|
$12.500
|
$62.000
|
$35.000
|
$48.800
|
$95.000
|
$105.000
|
$44.000
|
|
|
PORT CTB (REMOVE)(LOW PROF)(TY 1)
|
LF
|
360.000
|
$30.000
|
$12.500
|
$31.000
|
$25.000
|
$30.500
|
$55.000
|
$30.000
|
$44.000
|
|
|
PORT CTB (REMOVE)(LOW PROF)(TY 2)
|
LF
|
80.000
|
$23.920
|
$12.500
|
$20.000
|
$25.000
|
$51.300
|
$65.000
|
$30.000
|
$44.000
|
|
|
CONC CURB (TY I)
|
LF
|
179.000
|
$20.000
|
$12.150
|
$41.000
|
$30.000
|
$45.700
|
$34.560
|
$100.000
|
$88.000
|
|
|
DRIVEWAYS (CONC)
|
SY
|
67.000
|
$101.210
|
$99.650
|
$157.000
|
$110.000
|
$205.000
|
$128.520
|
$150.000
|
$275.000
|
|
|
DRIVEWAYS (ACP)
|
SY
|
12.000
|
$50.430
|
$325.800
|
$350.000
|
$165.000
|
$372.000
|
$101.200
|
$110.000
|
$440.000
|
|
|
CONC SIDEWALKS (4")
|
SY
|
101.000
|
$70.140
|
$62.500
|
$130.000
|
$85.000
|
$143.000
|
$97.200
|
$100.000
|
$88.000
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
2.000
|
$1,750.000
|
$750.000
|
$1,500.000
|
$2,000.000
|
$2,900.000
|
$875.000
|
$1,500.000
|
$5,500.000
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
2.000
|
$1,250.000
|
$650.000
|
$650.000
|
$2,000.000
|
$1,010.000
|
$800.000
|
$1,000.000
|
$5,500.000
|
|
|
CRASH CUSH ATTEN (INSTL)(R)(N)(TL2)
|
EA
|
1.000
|
$20,233.000
|
$20,000.000
|
$30,000.000
|
$30,000.000
|
$30,900.000
|
$25,750.000
|
$20,000.000
|
$13,200.000
|
|
|
CRASH CUSH ATTEN (INSTL)(S)(N)(TL2)
|
EA
|
2.000
|
$8,000.000
|
$6,750.000
|
$8,750.000
|
$8,500.000
|
$11,100.000
|
$7,700.000
|
$9,000.000
|
$13,200.000
|
|
|
INSTL OM ASSM (OM-2Z)(WFLX)GND(BI)
|
EA
|
2.000
|
$150.000
|
$182.900
|
$100.000
|
$200.000
|
$84.600
|
$97.580
|
$100.000
|
$550.000
|
|
|
WK ZN PAV MRK REMOV (W)4"(DOT)
|
LF
|
144.000
|
$1.660
|
$3.700
|
$3.680
|
$3.500
|
$2.550
|
$2.400
|
$4.500
|
$5.000
|
|
|
WK ZN PAV MRK REMOV (W)4"(SLD)
|
LF
|
4,424.000
|
$0.500
|
$2.050
|
$2.050
|
$1.950
|
$2.550
|
$2.400
|
$2.500
|
$4.000
|
|
|
WK ZN PAV MRK REMOV (W)24"(SLD)
|
LF
|
24.000
|
$12.000
|
$15.750
|
$15.750
|
$15.000
|
$11.300
|
$10.650
|
$18.000
|
$5.000
|
|
|
WK ZN PAV MRK REMOV (Y)4"(SLD)
|
LF
|
7,860.000
|
$0.460
|
$2.050
|
$2.050
|
$1.950
|
$2.550
|
$2.400
|
$2.500
|
$4.000
|
|
WK ZN PAV MRK SHT TERM (TAB)TY W
|
EA
|
24.000
|
$1.640
|
$3.550
|
$5.000
|
$2.260
|
$2.200
|
$1.690
|
$2.500
|
$20.000
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y
|
EA
|
40.000
|
$1.380
|
$2.750
|
$5.000
|
$2.260
|
$2.200
|
$1.690
|
$2.500
|
$20.000
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
28.000
|
$2.000
|
$3.250
|
$5.000
|
$2.260
|
$2.200
|
$1.690
|
$3.000
|
$20.000
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
237.000
|
$1.000
|
$2.150
|
$2.100
|
$2.000
|
$2.800
|
$2.660
|
$2.500
|
$5.000
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
205.000
|
$8.900
|
$13.150
|
$13.130
|
$12.500
|
$11.300
|
$10.650
|
$15.000
|
$5.000
|
|
REFL PAV MRK TY I (W)(ARROW)(100MIL)
|
EA
|
2.000
|
$186.090
|
$262.500
|
$262.500
|
$250.000
|
$225.000
|
$213.030
|
$303.000
|
$2,200.000
|
|
REFL PAV MRK TY I (W)(WORD)(100MIL)
|
EA
|
2.000
|
$232.220
|
$288.750
|
$288.750
|
$275.000
|
$254.000
|
$239.660
|
$333.000
|
$2,200.000
|
|
|
PAVEMENT SLER 6"
|
LF
|
9,134.000
|
$0.320
|
$1.000
|
$1.000
|
$1.000
|
$0.560
|
$0.530
|
$1.500
|
$2.000
|
|
|
PAVEMENT SLER 8"
|
LF
|
237.000
|
$0.430
|
$1.600
|
$1.580
|
$1.500
|
$0.850
|
$0.800
|
$2.000
|
$5.000
|
|
|
PAVEMENT SLER 24"
|
LF
|
205.000
|
$1.820
|
$5.800
|
$5.780
|
$5.500
|
$3.400
|
$3.200
|
$7.000
|
$8.000
|
|
|
PAVEMENT SLER (ARROW)
|
EA
|
2.000
|
$51.680
|
$105.000
|
$105.000
|
$100.000
|
$113.000
|
$106.520
|
$121.000
|
$1,100.000
|
|
|
PAVEMENT SLER (WORD)
|
EA
|
2.000
|
$45.710
|
$105.000
|
$105.000
|
$100.000
|
$113.000
|
$106.520
|
$121.000
|
$1,100.000
|
|
REFL PAV MRK TY I (W)6"(BRK)(100MIL)
|
LF
|
970.000
|
$0.600
|
$1.600
|
$1.580
|
$1.500
|
$1.400
|
$1.330
|
$2.000
|
$5.000
|
|
REFL PAV MRK TY I (W)6"(SLD)(100MIL)
|
LF
|
2,200.000
|
$0.600
|
$1.300
|
$1.320
|
$1.250
|
$1.400
|
$1.330
|
$1.500
|
$5.000
|
|
REFL PAV MRK TY I (Y)6"(BRK)(100MIL)
|
LF
|
1,049.000
|
$0.480
|
$1.600
|
$1.160
|
$1.500
|
$1.400
|
$1.330
|
$2.000
|
$5.000
|
|
REFL PAV MRK TY I (Y)6"(SLD)(060MIL)
|
LF
|
3,815.000
|
$0.360
|
$1.150
|
$1.160
|
$1.100
|
$1.300
|
$1.220
|
$1.500
|
$5.000
|
|
REFL PAV MRK TY I (Y)6"(SLD)(100MIL)
|
LF
|
1,100.000
|
$0.600
|
$1.300
|
$1.320
|
$1.250
|
$1.400
|
$1.330
|
$1.500
|
$5.000
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
28.000
|
$6.000
|
$10.500
|
$10.500
|
$10.000
|
$5.600
|
$5.330
|
$12.000
|
$22.000
|
|
|
ELIM EXT PM & MRKS (4")
|
LF
|
5,074.000
|
$0.750
|
$1.600
|
$1.580
|
$1.500
|
$1.150
|
$1.070
|
$2.000
|
$2.000
|
|
|
UNDERSEAL COURSE
|
GAL
|
195.000
|
$4.380
|
$4.500
|
$14.700
|
$25.000
|
$15.800
|
$5.750
|
$15.000
|
$55.000
|
|
|
HYDROSTATIC PRESSURE TEST
|
EA
|
1.000
|
$2,500.000
|
$1,500.000
|
$1,000.000
|
$6,000.000
|
$5,000.000
|
$3,500.000
|
$8,000.000
|
$5,500.000
|
|
|
REMOVE 8" WATER LINE
|
LF
|
100.000
|
$12.000
|
$15.000
|
$25.000
|
$25.000
|
$33.800
|
$25.000
|
$35.000
|
$242.000
|
|
|
TIE IN (COMPLETE)(8")
|
EA
|
2.000
|
$2,200.000
|
$2,500.000
|
$500.000
|
$4,000.000
|
$5,000.000
|
$3,500.000
|
$5,000.000
|
$22,000.000
|
|
|
PIPE WTR MAIN (PVC/C-900) (8IN.)
|
LF
|
56.000
|
$95.000
|
$80.000
|
$100.000
|
$325.000
|
$500.000
|
$125.000
|
$120.000
|
$440.000
|
|
|
DUCTILE IRON FITTINGS
|
TON
|
1.800
|
$6,500.000
|
$2,500.000
|
$1,000.000
|
$7,500.000
|
$15,000.000
|
$8,500.000
|
$9,000.000
|
$16,500.000
|
|
|
CARRIER PIPE 8" (OPEN CUT TRENCH) (8")
|
LF
|
44.000
|
$115.000
|
$85.000
|
$250.000
|
$185.000
|
$300.000
|
$100.000
|
$130.000
|
$440.000
|
|
|
TEMPORARY BLOW-OFF COMPLETE (2")
|
EA
|
2.000
|
$1,800.000
|
$2,850.000
|
$1,000.000
|
$5,000.000
|
$1,000.000
|
$3,750.000
|
$5,250.000
|
$6,600.000
|
|
|
GATE VALVE & BOX (COMPLETE) (8")
|
EA
|
2.000
|
$6,500.000
|
$2,950.000
|
$2,250.000
|
$6,500.000
|
$5,000.000
|
$27,500.000
|
$6,200.000
|
$11,000.000
|
|
|
24" STEEL CASING
|
LF
|
44.000
|
$155.000
|
$200.000
|
$100.000
|
$325.000
|
$500.000
|
$450.000
|
$400.000
|
$275.000
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
100.000
|
$5.000
|
$8.500
|
$60.000
|
$1.000
|
$30.000
|
$15.000
|
$20.000
|
$44.000
|
|
Totals: |
$2,512,371.393
|
$1,403,742.290
|
$1,730,872.440
|
$1,877,364.220
|
$2,185,879.149
|
$2,304,308.241
|
$2,421,453.000
|
$2,672,864.200
|