PREPARING ROW
|
STA
|
275.000
|
$3,000.000
|
$425.000
|
$517.500
|
$500.000
|
$390.000
|
|
|
REMOVING CONCRETE(MOW STRIP)
|
LF
|
2,395.000
|
$6.750
|
$5.280
|
$9.180
|
$10.000
|
$13.000
|
|
|
EMBANKMENT (VEHICLE)(ORD COMP)(TY B)
|
CY
|
785.000
|
$25.000
|
$51.500
|
$29.430
|
$74.000
|
$125.000
|
|
|
BACKFILL (TY A)
|
STA
|
275.420
|
$200.000
|
$150.000
|
$157.500
|
$200.000
|
$430.000
|
|
|
BACKFILLING PAVEMENT EDGES
|
CY
|
680.600
|
$100.000
|
$30.000
|
$31.680
|
$110.000
|
$99.000
|
|
|
COMPOST MANUF TOPSOIL (4")
|
SY
|
7,218.000
|
$2.000
|
$5.000
|
$1.070
|
$7.000
|
$4.750
|
|
|
DRILL SEEDING (PERM) (RURAL) (SANDY)
|
SY
|
7,218.000
|
$0.320
|
$0.220
|
$0.250
|
$0.200
|
$0.220
|
|
|
DRILL SEED (TEMP)(WARM OR COOL)
|
SY
|
3,612.000
|
$0.150
|
$0.180
|
$0.200
|
$0.200
|
$0.180
|
|
|
VEGETATIVE WATERING
|
MG
|
173.000
|
$25.000
|
$50.000
|
$23.940
|
$125.000
|
$300.000
|
|
|
SOIL RETENTION BLANKETS (CL 1) (TY D)
|
SY
|
7,218.000
|
$2.270
|
$1.100
|
$1.230
|
$1.000
|
$1.150
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(6")
|
SY
|
1,000.000
|
$56.000
|
$69.020
|
$72.470
|
$66.000
|
$95.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
356.000
|
$700.000
|
$715.770
|
$676.630
|
$675.000
|
$680.000
|
|
|
RAIL (TY T631)
|
LF
|
550.000
|
$175.000
|
$121.250
|
$84.850
|
$110.000
|
$77.750
|
|
|
CLEAN EXIST CULVERTS
|
EA
|
2.000
|
$5,000.000
|
$2,865.510
|
$1,706.580
|
$6,600.000
|
$10,500.000
|
|
|
REMOVE STR (RAIL)
|
LF
|
550.000
|
$12.000
|
$5.500
|
$15.450
|
$25.000
|
$14.250
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$470,346.190
|
$363,984.800
|
$381,700.000
|
$280,000.000
|
$282,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
5.000
|
$9,000.000
|
$6,520.000
|
$10,000.000
|
$5,000.000
|
$10,000.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 4)
|
LF
|
400.000
|
$38.000
|
$41.240
|
$39.270
|
$53.800
|
$35.250
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
400.000
|
$8.000
|
$14.140
|
$13.460
|
$7.000
|
$12.100
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
100.000
|
$25.000
|
$37.710
|
$35.900
|
$26.750
|
$32.250
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
100.000
|
$8.500
|
$2.360
|
$2.240
|
$9.000
|
$2.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
8,415.000
|
$5.000
|
$2.470
|
$2.360
|
$3.850
|
$2.150
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
8,415.000
|
$2.500
|
$0.880
|
$0.840
|
$0.500
|
$0.750
|
|
|
ONE-WAY TRAF CONT (PILOT CAR)
|
HR
|
699.000
|
$140.000
|
$103.440
|
$128.700
|
$175.000
|
$400.000
|
|
|
PORT CTB (FUR & INST)(SGL SLOPE)(TY 1)
|
LF
|
600.000
|
$45.000
|
$74.140
|
$35.000
|
$35.000
|
$103.000
|
|
|
PORT CTB (MOVE)(SGL SLP)(TY 1)
|
LF
|
1,200.000
|
$20.000
|
$6.630
|
$18.000
|
$15.000
|
$22.700
|
|
|
PORT CTB (REMOVE)(SGL SLP)(TY 1)
|
LF
|
600.000
|
$25.000
|
$18.850
|
$20.000
|
$22.000
|
$20.150
|
|
|
RUMBLE STRIPS (SHOULDER) ASPHALT
|
LF
|
52,168.000
|
$0.200
|
$0.350
|
$0.270
|
$0.200
|
$0.200
|
|
|
RUMBLE STRIPS (CENTERLINE) ASPHALT
|
LF
|
26,084.000
|
$0.200
|
$0.350
|
$0.270
|
$0.250
|
$0.250
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
4,875.000
|
$32.000
|
$22.600
|
$27.100
|
$27.250
|
$26.800
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
21.000
|
$1,700.000
|
$1,200.000
|
$1,401.170
|
$1,500.000
|
$1,385.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
4,875.000
|
$3.000
|
$0.500
|
$2.040
|
$2.000
|
$2.000
|
|
|
REMOVE TERMINAL ANCHOR SECTION
|
EA
|
21.000
|
$238.000
|
$145.000
|
$260.580
|
$200.000
|
$260.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
20.000
|
$3,300.000
|
$3,150.000
|
$3,268.890
|
$3,050.000
|
$3,230.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
20.000
|
$300.000
|
$225.000
|
$260.580
|
$200.000
|
$260.000
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
4.000
|
$1,200.000
|
$1,500.000
|
$2,862.820
|
$4,750.000
|
$2,830.000
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
4.000
|
$1,500.000
|
$600.000
|
$1,277.420
|
$1,500.000
|
$1,260.000
|
|
|
CRASH CUSH ATTEN (INSTL)(L)(N)(70)
|
EA
|
4.000
|
$30,000.000
|
$30,800.000
|
$32,325.070
|
$40,000.000
|
$31,925.000
|
|
|
INSTL DEL ASSM (D-SY)SZ (BRF)CTB (BI)
|
EA
|
32.000
|
$20.000
|
$20.000
|
$31.000
|
$50.000
|
$12.800
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
|
EA
|
194.000
|
$37.000
|
$25.000
|
$31.000
|
$50.000
|
$18.850
|
|
WK ZN PAV MRK SHT TERM (TAB)TY W
|
EA
|
1,083.000
|
$1.900
|
$1.080
|
$1.490
|
$5.000
|
$1.000
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
2,456.000
|
$1.500
|
$1.080
|
$1.490
|
$5.000
|
$1.000
|
|
REFL PAV MRK TY I (W)4"(DOT)(100MIL)
|
LF
|
1,000.000
|
$1.400
|
$0.650
|
$0.660
|
$0.650
|
$0.650
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
1,970.000
|
$0.970
|
$0.900
|
$0.920
|
$0.900
|
$0.900
|
|
REFL PAV MRK TY I (W)(ARROW)(100MIL)
|
EA
|
8.000
|
$160.000
|
$435.000
|
$443.700
|
$435.000
|
$475.000
|
|
REFL PAV MRK TY I (W)(WORD)(100MIL)
|
EA
|
8.000
|
$165.000
|
$435.000
|
$443.700
|
$435.000
|
$475.000
|
|
REFL PAV MRK TY I(Y)(MED NOSE)(100MIL)
|
EA
|
4.000
|
$450.000
|
$435.000
|
$443.700
|
$435.000
|
$475.000
|
|
REFL PAV MRK TY II (W) 4" (DOT)
|
LF
|
1,000.000
|
$0.750
|
$0.260
|
$0.270
|
$0.260
|
$0.250
|
|
|
PAVEMENT SEALER 4"
|
LF
|
63,660.000
|
$0.220
|
$0.120
|
$0.120
|
$0.120
|
$0.140
|
|
|
PAVEMENT SEALER 6"
|
LF
|
54,702.000
|
$0.230
|
$0.150
|
$0.150
|
$0.150
|
$0.150
|
|
|
PAVEMENT SEALER 8"
|
LF
|
1,970.000
|
$0.470
|
$0.310
|
$0.320
|
$0.310
|
$0.310
|
|
|
PAVEMENT SEALER (ARROW)
|
EA
|
4.000
|
$67.000
|
$90.000
|
$91.800
|
$90.000
|
$91.000
|
|
|
PAVEMENT SEALER (WORD)
|
EA
|
8.000
|
$67.000
|
$90.000
|
$91.800
|
$90.000
|
$91.000
|
|
|
PAVEMENT SEALER (MED NOSE)
|
EA
|
4.000
|
$200.000
|
$90.000
|
$91.800
|
$90.000
|
$91.000
|
|
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
|
LF
|
4,760.000
|
$1.000
|
$0.400
|
$0.410
|
$0.400
|
$0.400
|
|
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
|
LF
|
54,702.000
|
$1.000
|
$0.500
|
$0.510
|
$0.500
|
$0.500
|
|
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
|
LF
|
6,802.000
|
$1.000
|
$0.400
|
$0.410
|
$0.400
|
$0.400
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
110,760.000
|
$0.500
|
$0.300
|
$0.310
|
$0.300
|
$0.300
|
|
REFL PAV MRKR TY I-C
|
EA
|
421.000
|
$3.950
|
$4.000
|
$4.080
|
$4.000
|
$4.000
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
951.000
|
$3.950
|
$4.000
|
$4.080
|
$4.000
|
$4.000
|
|
|
SP MIXES SP-C SAC-B PG70-22
|
TON
|
19,864.000
|
$107.000
|
$112.000
|
$111.960
|
$114.000
|
$120.000
|
|
|
UNDERSEAL COURSE
|
GAL
|
34,546.000
|
$5.000
|
$3.900
|
$4.790
|
$3.500
|
$3.300
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
DAY
|
180.000
|
$100.000
|
$60.000
|
$100.000
|
$150.000
|
$185.000
|
|
|
TMA (STATIONARY)
|
DAY
|
90.000
|
$350.000
|
$150.000
|
$220.000
|
$100.000
|
$275.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
90.000
|
$1,000.000
|
$500.000
|
$230.000
|
$100.000
|
$275.000
|
|
Totals: |
$5,249,703.320
|
$4,178,288.490
|
$4,252,527.588
|
$4,373,420.600
|
$4,783,118.920
|