|
|
|
BACKFILL (TY B)
|
STA
|
1,466.800
|
$40.000
|
$50.000
|
$25.000
|
$95.550
|
|
|
|
BLADING
|
HR
|
25.000
|
$100.000
|
$95.000
|
$110.000
|
$85.500
|
|
|
|
DRILL SEEDING (PERM) (RURAL) (CLAY)
|
AC
|
60.000
|
$575.000
|
$650.000
|
$510.000
|
$871.000
|
|
|
|
EMULS ASPH (EROSN CONT)(MULTI)
|
GAL
|
13,130.000
|
$2.500
|
$2.500
|
$5.500
|
$3.520
|
|
|
|
ASPH (AC-20XP)
|
GAL
|
225,490.000
|
$3.000
|
$3.000
|
$3.250
|
$3.470
|
|
|
|
AGGR(TY-PB GR-4 SAC-B)
|
CY
|
6,276.000
|
$70.000
|
$70.000
|
$65.000
|
$75.850
|
|
|
|
LRA PAV TY-I GR-D
|
TON
|
737.000
|
$100.000
|
$100.000
|
$95.000
|
$97.530
|
|
|
|
PFC (ASPHALT) A-R-BNDR
|
TON
|
3,639.000
|
$95.210
|
$0.000
|
$0.000
|
$0.000
|
|
|
|
PFC-C (AGGREGATE)(PG76 MIX) SAC-A
|
TON
|
39,033.000
|
$92.000
|
$0.000
|
$0.000
|
$0.000
|
|
|
|
SUPERPAVE MIXTURES SP-C SAC-B PG70-22
|
TON
|
16,446.000
|
$37.750
|
$0.000
|
$0.000
|
$0.000
|
|
|
|
SUPERPAVE MIXTURES SP-D SAC-B PG70-22
|
TON
|
5,726.000
|
$80.000
|
$100.000
|
$80.000
|
$91.470
|
|
|
|
PLANE ASPH CONC PAV(0" TO 2")
|
SY
|
2,620.000
|
$1.500
|
$1.000
|
$3.450
|
$1.490
|
|
|
|
PLANE ASPH CONC PAV(0" TO 3")
|
SY
|
5,068.000
|
$1.500
|
$1.000
|
$2.000
|
$1.490
|
|
|
|
PLANE ASPH CONC PAV(0" TO 4")
|
SY
|
20,268.000
|
$1.500
|
$1.000
|
$1.850
|
$1.650
|
|
|
|
PLANE CONC PAV(0" TO 1-1/2")
|
SY
|
20,268.000
|
$0.750
|
$1.000
|
$1.250
|
$1.490
|
|
|
|
PLANE ASPH CONC PAV (1.5")
|
SY
|
171,823.000
|
$1.000
|
$1.000
|
$1.000
|
$1.590
|
|
|
|
PLANE ASPH CONC PAV (2")
|
SY
|
13,679.000
|
$1.250
|
$1.000
|
$1.750
|
$1.700
|
|
|
|
PLANE ASPH CONC PAV (2")
|
SY
|
149,450.000
|
$1.250
|
$0.000
|
$0.000
|
$0.000
|
|
|
|
PLANE ASPH CONC PAV (3")
|
SY
|
2,044.000
|
$1.250
|
$1.500
|
$2.750
|
$2.330
|
|
|
|
PLANE ASPH CONC PAV (4")
|
SY
|
6,984.000
|
$2.000
|
$1.750
|
$2.500
|
$3.380
|
|
|
|
CLEANING EXISTING JOINTS
|
LF
|
4,186.660
|
$16.500
|
$7.000
|
$6.300
|
$9.000
|
|
|
|
HEADER TYPE EXPANSION JOINT
|
LF
|
4,186.660
|
$180.000
|
$55.000
|
$73.000
|
$58.000
|
|
|
|
JOINT SEALANT
|
LF
|
4,186.660
|
$10.000
|
$15.000
|
$10.500
|
$16.000
|
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$347,491.000
|
$235,000.000
|
$400,000.000
|
$705,666.000
|
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
9.000
|
$6,000.000
|
$4,500.000
|
$13,000.000
|
$9,381.180
|
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
78.000
|
$20.000
|
$20.000
|
$15.900
|
$35.710
|
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
78.000
|
$10.000
|
$5.000
|
$6.360
|
$13.000
|
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
1,000.000
|
$2.500
|
$3.500
|
$2.650
|
$3.750
|
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
1,000.000
|
$0.500
|
$1.500
|
$0.530
|
$1.500
|
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (18")
|
LF
|
3,041.000
|
$3.000
|
$5.000
|
$7.000
|
$4.710
|
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
3,041.000
|
$0.500
|
$1.000
|
$1.060
|
$0.840
|
|
|
|
RUMBLE STRIPS (SHOULDER)
|
LF
|
284,385.000
|
$0.150
|
$0.100
|
$0.110
|
$0.120
|
|
|
|
WK ZN PAV MRK SHT TERM (TAB)TY W
|
EA
|
10,680.000
|
$0.500
|
$0.500
|
$1.650
|
$1.760
|
|
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
672.000
|
$0.500
|
$0.500
|
$1.700
|
$1.760
|
|
|
|
REFL PAV MRK TY I (W)8"(SLD)(090MIL)
|
LF
|
9,452.000
|
$0.750
|
$0.700
|
$0.670
|
$0.630
|
|
|
|
REFL PAV MRK TY II (W) 4" (BRK)
|
LF
|
106,710.000
|
$0.140
|
$0.100
|
$0.110
|
$0.100
|
|
|
|
REFL PAV MRK TY II (W) 4" (SLD)
|
LF
|
450,395.000
|
$0.140
|
$0.100
|
$0.100
|
$0.090
|
|
|
|
REFL PAV MRK TY II (W) 8" (SLD)
|
LF
|
9,452.000
|
$0.300
|
$0.350
|
$0.350
|
$0.330
|
|
|
|
REFL PAV MRK TY II (Y) 4" (BRK)
|
LF
|
480.000
|
$0.140
|
$0.200
|
$0.210
|
$0.200
|
|
|
|
REFL PAV MRK TY II (Y) 4" (SLD)
|
LF
|
314,650.000
|
$0.140
|
$0.100
|
$0.100
|
$0.090
|
|
|
|
RE PM W/RET REQ TY I (W)4"(BRK)(090MIL)
|
LF
|
35,570.000
|
$0.260
|
$0.300
|
$0.300
|
$0.280
|
|
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(090MIL)
|
LF
|
158,992.000
|
$0.260
|
$0.300
|
$0.300
|
$0.280
|
|
|
|
RE PM W/RET REQ TY I (Y)4"(BRK)(090MIL)
|
LF
|
240.000
|
$0.260
|
$0.300
|
$0.300
|
$0.280
|
|
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(090MIL)
|
LF
|
158,080.000
|
$0.260
|
$0.300
|
$0.300
|
$0.280
|
|
|
|
PREFAB PAV MRK TY C (W) (24") (SLD)
|
LF
|
203.000
|
$20.000
|
$10.000
|
$11.660
|
$11.000
|
|
|
|
PREFAB PAV MRK TY C (W) (NUMBER)
|
EA
|
5.000
|
$200.000
|
$300.000
|
$305.280
|
$288.000
|
|
|
|
PREFAB PAV MRK TY C (W) (36")(YLD TRI)
|
EA
|
28.000
|
$35.000
|
$35.000
|
$34.980
|
$33.000
|
|
|
|
REFL PAV MRKR TY I-R
|
EA
|
84.000
|
$3.250
|
$8.500
|
$8.480
|
$8.000
|
|
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
101.000
|
$3.250
|
$3.000
|
$3.180
|
$3.000
|
|
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
2,280.000
|
$3.250
|
$3.000
|
$3.180
|
$3.000
|
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
DAY
|
212.000
|
$100.000
|
$65.000
|
$43.000
|
$106.950
|
|
|
|
TMA (STATIONARY)
|
DAY
|
248.000
|
$200.000
|
$150.000
|
$200.000
|
$75.000
|
|
|
|
TMA (MOBILE OPERATION)
|
HR
|
780.000
|
$15.000
|
$75.000
|
$85.000
|
$45.000
|
|
1
|
|
PFC (ASPHALT) PG76-22
|
TON
|
2,701.000
|
$96.330
|
$100.000
|
$111.250
|
$113.340
|
|
1
|
|
PFC-C (AGGREGATE)(PG76 MIX) SAC-A
|
TON
|
39,971.000
|
$92.000
|
$100.000
|
$111.250
|
$113.340
|
|
2
|
|
HIR (SURFACE) (2")
|
SY
|
149,450.000
|
$4.400
|
$4.500
|
$4.250
|
$5.930
|
|
2
|
|
HIR (RECYCLING AGENT)
|
GAL
|
74,760.000
|
$2.010
|
$3.500
|
$3.250
|
$3.150
|
|
Totals: |
$13,179,859.480
|
$8,342,120.020
|
$9,051,810.368
|
$9,946,893.880
|