PREPARING ROW
|
STA
|
11.000
|
$1,000.000
|
$6,000.000
|
$3,140.000
|
$2,000.000
|
$4,141.510
|
$1,200.000
|
|
|
REMOVING CONC (PAV)
|
SY
|
1,681.000
|
$10.000
|
$10.000
|
$12.400
|
$24.000
|
$19.330
|
$15.250
|
|
|
REMOVING CONC (RIPRAP)
|
SY
|
1,098.000
|
$15.000
|
$10.000
|
$10.500
|
$9.000
|
$17.950
|
$11.000
|
|
|
REMOVING CONC (CURB)
|
LF
|
1,212.000
|
$10.000
|
$8.000
|
$12.500
|
$5.000
|
$1.380
|
$15.500
|
|
|
REM STAB BASE & ASPH (6"-12")
|
SY
|
1,192.000
|
$10.000
|
$6.500
|
$9.700
|
$7.000
|
$5.520
|
$8.900
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
142.000
|
$15.000
|
$20.000
|
$30.000
|
$10.000
|
$41.420
|
$20.000
|
|
|
EXCAVATION (CHANNEL)
|
CY
|
556.000
|
$20.000
|
$18.000
|
$20.100
|
$10.000
|
$41.420
|
$25.000
|
|
|
EMBANKMENT (FINAL)(ORD COMP)(TY B)
|
CY
|
8,137.000
|
$10.000
|
$23.000
|
$21.100
|
$42.000
|
$50.000
|
$20.000
|
|
|
FURNISHING AND PLACING TOPSOIL (4")
|
SY
|
5,534.000
|
$2.000
|
$4.000
|
$2.600
|
$7.000
|
$5.520
|
$4.500
|
|
|
BROADCAST SEED (PERM) (RURAL) (CLAY)
|
SY
|
5,534.000
|
$1.000
|
$0.470
|
$0.460
|
$1.000
|
$0.590
|
$0.480
|
|
|
BROADCAST SEED (TEMP) (WARM)
|
SY
|
2,767.000
|
$0.500
|
$0.470
|
$0.790
|
$1.000
|
$1.040
|
$0.840
|
|
|
BROADCAST SEED (TEMP) (COOL)
|
SY
|
2,767.000
|
$0.500
|
$0.470
|
$0.800
|
$1.000
|
$1.050
|
$0.850
|
|
|
PROOF ROLLING
|
HR
|
3.000
|
$100.000
|
$150.000
|
$63.900
|
$150.000
|
$110.440
|
$125.000
|
|
|
LRA PAV TY-I GR-C
|
TON
|
571.000
|
$105.000
|
$105.000
|
$107.000
|
$150.000
|
$207.080
|
$125.000
|
|
|
CONC PVMT (CONT REINF - CRCP) (7")
|
SY
|
2,714.000
|
$95.000
|
$92.230
|
$109.000
|
$110.000
|
$118.030
|
$90.000
|
|
|
CEM STABIL BKFL
|
CY
|
96.300
|
$150.000
|
$165.000
|
$125.000
|
$165.000
|
$117.340
|
$230.000
|
|
|
TEMPORARY SPL SHORING
|
SF
|
1,063.000
|
$20.000
|
$20.000
|
$35.000
|
$15.500
|
$15.190
|
$35.000
|
|
|
DRILL SHAFT (36 IN)
|
LF
|
404.000
|
$250.000
|
$435.000
|
$332.000
|
$325.000
|
$295.200
|
$542.700
|
|
|
CL C CONC (ABUT)
|
CY
|
45.300
|
$1,200.000
|
$1,052.180
|
$1,000.000
|
$1,100.000
|
$984.310
|
$1,200.000
|
|
|
CL C CONC (CAP)
|
CY
|
31.400
|
$1,400.000
|
$1,164.410
|
$1,200.000
|
$1,100.000
|
$1,097.090
|
$1,250.000
|
|
|
CL C CONC (COLUMN)
|
CY
|
29.800
|
$1,400.000
|
$1,096.200
|
$1,200.000
|
$1,100.000
|
$981.370
|
$1,250.000
|
|
|
REINF CONC SLAB
|
SF
|
7,820.000
|
$35.000
|
$19.110
|
$26.000
|
$25.000
|
$28.930
|
$25.000
|
|
|
APPROACH SLAB
|
CY
|
72.800
|
$450.000
|
$784.000
|
$602.000
|
$1,000.000
|
$737.040
|
$650.000
|
|
|
PRESTR CONC GIRDER (TX40)
|
LF
|
913.920
|
$150.000
|
$165.000
|
$240.000
|
$200.000
|
$235.340
|
$234.250
|
|
|
RIPRAP (STONE PROTECTION)(18 IN)
|
CY
|
439.000
|
$125.000
|
$108.440
|
$149.000
|
$135.000
|
$138.050
|
$150.000
|
|
|
RIPRAP (STONE PROTECTION) (36 IN)
|
CY
|
4,380.000
|
$175.000
|
$88.840
|
$142.000
|
$185.000
|
$124.250
|
$220.000
|
|
|
RIPRAP (MOW STRIP)(6 IN)
|
CY
|
39.000
|
$350.000
|
$616.000
|
$750.000
|
$600.000
|
$613.090
|
$550.000
|
|
|
RAIL (TY C66)
|
LF
|
500.000
|
$150.000
|
$110.000
|
$219.000
|
$100.000
|
$260.830
|
$158.000
|
|
|
ARMOR JOINT
|
LF
|
62.000
|
$75.000
|
$134.400
|
$121.000
|
$180.000
|
$107.580
|
$125.000
|
|
|
REMOV STR (BOX CULVERT)
|
EA
|
1.000
|
$15,000.000
|
$18,000.000
|
$12,000.000
|
$12,500.000
|
$27,517.580
|
$23,100.000
|
|
|
REMOV STR (WINGWALL)
|
EA
|
2.000
|
$3,000.000
|
$5,000.000
|
$2,000.000
|
$2,500.000
|
$2,070.760
|
$2,500.000
|
|
|
REMOV STR (SMALL FENCE)
|
LF
|
62.000
|
$10.000
|
$100.000
|
$5.000
|
$100.000
|
$6.900
|
$15.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$135,000.000
|
$250,000.000
|
$235,000.000
|
$200,000.000
|
$255,000.000
|
$405,310.300
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
9.000
|
$8,000.000
|
$4,000.000
|
$2,290.000
|
$2,500.000
|
$948.120
|
$1,500.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 1)
|
LF
|
175.000
|
$30.000
|
$31.420
|
$30.200
|
$125.000
|
$39.430
|
$31.990
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 3)
|
LF
|
160.000
|
$60.000
|
$100.730
|
$96.900
|
$125.000
|
$126.410
|
$102.560
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
335.000
|
$10.000
|
$17.050
|
$16.400
|
$20.000
|
$21.400
|
$17.360
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
224.000
|
$30.000
|
$29.440
|
$28.300
|
$60.000
|
$36.930
|
$29.960
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
224.000
|
$10.000
|
$7.980
|
$7.700
|
$15.000
|
$10.010
|
$8.120
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
422.000
|
$3.000
|
$3.610
|
$3.450
|
$7.000
|
$4.530
|
$3.670
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
422.000
|
$1.000
|
$1.290
|
$1.250
|
$1.000
|
$1.620
|
$1.310
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
2,077.000
|
$5.000
|
$4.630
|
$4.450
|
$8.000
|
$5.810
|
$4.720
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
2,077.000
|
$1.000
|
$0.940
|
$0.900
|
$1.000
|
$1.170
|
$0.950
|
|
|
CONSTRUCTING DETOURS
|
SY
|
3,342.000
|
$50.000
|
$60.000
|
$95.400
|
$100.000
|
$100.780
|
$150.000
|
|
|
PORT CTB (FUR & INST)(F-SHAPE)(TY 1)
|
LF
|
1,780.000
|
$25.000
|
$25.000
|
$40.500
|
$65.000
|
$47.220
|
$79.360
|
|
|
PORT CTB (REMOVE)(F-SHAPE)(TY 1)
|
LF
|
1,780.000
|
$6.000
|
$18.000
|
$6.800
|
$10.000
|
$25.990
|
$14.000
|
|
|
MTL W-BEAM GD FEN (STEEL POST)
|
LF
|
200.000
|
$30.000
|
$30.820
|
$42.600
|
$45.000
|
$55.570
|
$34.720
|
|
|
MTL BEAM GD FEN TRANS (TL2)
|
EA
|
2.000
|
$1,200.000
|
$2,420.000
|
$1,380.000
|
$1,500.000
|
$1,794.660
|
$1,568.000
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
2.000
|
$1,320.000
|
$3,520.000
|
$1,590.000
|
$2,000.000
|
$2,070.760
|
$1,428.000
|
|
|
MTL BM GD FEN TRANS (NON - SYM)
|
EA
|
2.000
|
$775.000
|
$2,750.000
|
$1,060.000
|
$1,000.000
|
$1,380.500
|
$896.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
2.000
|
$2,600.000
|
$3,520.000
|
$3,280.000
|
$3,250.000
|
$4,279.570
|
$3,360.000
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
2.000
|
$900.000
|
$800.000
|
$185.000
|
$2,000.000
|
$241.590
|
$1,120.000
|
|
|
CRASH CUSH ATTEN (INSTL)(S)(N)(TL2)
|
EA
|
2.000
|
$6,500.000
|
$7,500.000
|
$9,520.000
|
$10,000.000
|
$12,424.540
|
$11,200.000
|
|
|
GATE (REMOVE)
|
EA
|
1.000
|
$300.000
|
$600.000
|
$529.000
|
$400.000
|
$552.200
|
$500.000
|
|
|
WIRE FENCE (TY C)
|
LF
|
62.000
|
$20.000
|
$25.000
|
$10.600
|
$20.000
|
$19.330
|
$22.500
|
|
|
GATE (TY 1)
|
EA
|
1.000
|
$1,500.000
|
$2,500.000
|
$1,060.000
|
$1,500.000
|
$1,656.600
|
$1,500.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
14.000
|
$700.000
|
$641.300
|
$617.000
|
$700.000
|
$773.080
|
$980.000
|
|
|
IN SM RD SN SUP&AM TYFRP(1)UA(P)
|
EA
|
2.000
|
$600.000
|
$739.200
|
$711.000
|
$800.000
|
$897.330
|
$1,120.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
14.000
|
$115.000
|
$101.200
|
$97.400
|
$102.000
|
$124.250
|
$112.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
|
EA
|
10.000
|
$20.000
|
$26.400
|
$25.400
|
$30.000
|
$14.570
|
$16.800
|
|
|
INSTL OM ASSM (OM-2Y)(WC)GND
|
EA
|
4.000
|
$75.000
|
$97.900
|
$94.200
|
$100.000
|
$90.770
|
$50.400
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
|
EA
|
5.000
|
$30.000
|
$30.800
|
$29.600
|
$32.000
|
$36.930
|
$28.000
|
|
|
INSTL OM ASSM (OM-3L)(WFLX)SRF)SRF
|
EA
|
2.000
|
$530.000
|
$247.500
|
$238.000
|
$250.000
|
$111.130
|
$550.000
|
|
|
INSTL OM ASSM (OM-3R)(WFLX)SRF)SRF
|
EA
|
2.000
|
$640.000
|
$247.500
|
$238.000
|
$250.000
|
$111.130
|
$550.000
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(090MIL)
|
LF
|
4,807.000
|
$0.350
|
$0.830
|
$1.050
|
$1.000
|
$1.380
|
$1.120
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(090MIL)
|
LF
|
4,865.000
|
$0.400
|
$0.830
|
$1.050
|
$1.000
|
$1.380
|
$1.120
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
95.000
|
$4.000
|
$11.000
|
$5.300
|
$11.000
|
$6.900
|
$5.600
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
394.000
|
$1.000
|
$11.000
|
$1.300
|
$11.000
|
$1.730
|
$1.400
|
|
|
PAV SURF PREP FOR MRK (4")
|
LF
|
4,916.000
|
$0.250
|
$0.550
|
$0.320
|
$1.000
|
$0.410
|
$0.340
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
DAY
|
300.000
|
$70.000
|
$200.000
|
$42.500
|
$125.000
|
$121.480
|
$52.500
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
2.000
|
$100.000
|
$350.000
|
$410.000
|
$750.000
|
$345.130
|
$975.000
|
|
Totals: |
$2,705,633.450
|
$2,649,387.408
|
$3,068,068.440
|
$3,482,474.000
|
$3,488,928.702
|
$3,878,615.060
|