PREPARING ROW
|
STA
|
9.000
|
$2,500.000
|
$1,100.000
|
$1,110.000
|
$20,000.000
|
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
313.000
|
$12.000
|
$33.000
|
$21.000
|
$45.000
|
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY B)
|
CY
|
347.000
|
$25.000
|
$55.000
|
$20.000
|
$65.000
|
|
|
|
BROADCAST SEED (PERM) (RURAL) (SANDY)
|
SY
|
1,042.000
|
$2.000
|
$2.200
|
$3.000
|
$1.000
|
|
|
|
BROADCAST SEED (TEMP) (WARM)
|
SY
|
570.000
|
$1.000
|
$2.200
|
$1.000
|
$1.000
|
|
|
|
BROADCAST SEED (TEMP) (COOL)
|
SY
|
570.000
|
$1.000
|
$2.200
|
$1.000
|
$1.000
|
|
|
|
VEGETATIVE WATERING
|
MG
|
19.000
|
$90.000
|
$110.000
|
$200.000
|
$225.000
|
|
|
|
SOIL RETENTION BLANKETS (CL 1) (TY B)
|
SY
|
1,140.000
|
$1.250
|
$11.000
|
$3.000
|
$2.000
|
|
|
|
FL BS (RDWY DEL)(TY A GR 5)
|
TON
|
427.000
|
$20.000
|
$0.000
|
$0.000
|
$0.000
|
|
|
|
CEMENT TREAT (NEW BASE) (10")
|
SY
|
845.000
|
$20.000
|
$0.000
|
$0.000
|
$0.000
|
|
|
|
PRIME COAT (MC-30)
|
GAL
|
140.000
|
$12.000
|
$5.500
|
$57.000
|
$25.000
|
|
|
|
ASPH (MULTI OPTION)
|
GAL
|
627.000
|
$4.400
|
$11.000
|
$18.000
|
$35.000
|
|
|
|
AGGR (MULTI OPTION)
|
CY
|
12.000
|
$220.530
|
$550.000
|
$1,720.000
|
$150.000
|
|
|
|
CEM STABIL BKFL
|
CY
|
148.000
|
$170.000
|
$165.000
|
$220.000
|
$200.000
|
|
|
|
TEMPORARY SPL SHORING (COFFERDAM)
|
SF
|
1,168.000
|
$62.000
|
$27.500
|
$79.000
|
$0.010
|
|
|
|
DRILL SHAFT (18 IN)
|
LF
|
140.000
|
$600.000
|
$253.000
|
$245.000
|
$200.000
|
|
|
|
DRILL SHAFT (36 IN)
|
LF
|
280.000
|
$550.000
|
$308.000
|
$455.000
|
$220.000
|
|
|
|
CL C CONC (ABUT)(HPC)
|
CY
|
61.800
|
$1,350.000
|
$1,100.000
|
$1,560.000
|
$2,000.000
|
|
|
|
REINF CONC SLAB
|
SF
|
2,600.000
|
$25.000
|
$33.000
|
$37.000
|
$30.000
|
|
|
|
APPROACH SLAB
|
CY
|
59.700
|
$730.000
|
$1,100.000
|
$665.000
|
$1,000.000
|
|
|
|
RETAINING WALL (TEMP WALL)
|
SF
|
1,041.000
|
$75.000
|
$55.000
|
$36.000
|
$0.010
|
|
|
|
PRESTR CONC GIRDER (TX40)
|
LF
|
397.170
|
$180.000
|
$275.000
|
$246.000
|
$250.000
|
|
|
|
RIPRAP (CONC)(5 IN)
|
CY
|
20.000
|
$640.000
|
$165.000
|
$595.000
|
$800.000
|
|
|
|
RIPRAP (STONE PROTECTION)(15 IN)
|
CY
|
484.000
|
$210.000
|
$165.000
|
$200.000
|
$220.000
|
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
37.000
|
$625.000
|
$550.000
|
$587.000
|
$1,200.000
|
|
|
|
RAIL (TY T223)(HPC)
|
LF
|
288.000
|
$155.000
|
$275.000
|
$180.000
|
$200.000
|
|
|
|
TYPE A JOINT
|
LF
|
70.000
|
$70.000
|
$440.000
|
$40.000
|
$20.000
|
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
34.000
|
$140.000
|
$550.000
|
$135.000
|
$115.000
|
|
|
|
RC PIPE (CL III)(36 IN)
|
LF
|
54.000
|
$280.000
|
$550.000
|
$550.000
|
$230.000
|
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
2.000
|
$1,800.000
|
$3,300.000
|
$2,300.000
|
$1,400.000
|
|
|
|
REMOV STR (BRIDGE 0 - 99 FT LENGTH)
|
EA
|
1.000
|
$30,000.000
|
$27,500.000
|
$61,600.000
|
$120,000.000
|
|
|
|
REMOV STR (PIPE)
|
EA
|
3.000
|
$1,500.000
|
$1.100
|
$500.000
|
$2,000.000
|
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$135,910.160
|
$260,000.000
|
$227,000.000
|
$250,000.000
|
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
9.000
|
$5,300.000
|
$4,400.000
|
$1,500.000
|
$5,000.000
|
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
45.000
|
$45.000
|
$110.000
|
$70.000
|
$75.000
|
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
45.000
|
$15.000
|
$11.000
|
$20.000
|
$40.000
|
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
67.000
|
$29.000
|
$82.500
|
$70.000
|
$85.000
|
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
67.000
|
$8.000
|
$1.100
|
$20.000
|
$35.000
|
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
1,115.000
|
$4.500
|
$16.500
|
$5.500
|
$5.000
|
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
1,115.000
|
$1.400
|
$1.100
|
$1.000
|
$2.000
|
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (18")
|
LF
|
30.000
|
$7.000
|
$55.000
|
$10.000
|
$12.000
|
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
30.000
|
$2.300
|
$1.100
|
$5.000
|
$7.000
|
|
|
|
CONSTRUCTING DETOURS
|
SY
|
882.000
|
$110.000
|
$82.500
|
$396.000
|
$1,172.000
|
|
|
|
ONE-WAY TRAF CONT (PORT TRAF SIG)
|
MO
|
9.000
|
$4,700.000
|
$4,400.000
|
$7,000.000
|
$6,000.000
|
|
|
|
PORT CTB (FUR & INST)(LOW PROF)(TY 1)
|
LF
|
540.000
|
$60.000
|
$220.000
|
$92.000
|
$70.000
|
|
|
|
PORT CTB (FUR & INST)(LOW PROF)(TY 2)
|
LF
|
80.000
|
$60.000
|
$220.000
|
$36.000
|
$70.000
|
|
|
|
PORT CTB (MOVE)(LOW PROF)(TY 1)
|
LF
|
460.000
|
$12.000
|
$55.000
|
$19.000
|
$10.000
|
|
|
|
PORT CTB (MOVE)(LOW PROF)(TY 2)
|
LF
|
40.000
|
$12.000
|
$55.000
|
$37.000
|
$10.000
|
|
|
|
PORT CTB (REMOVE)(LOW PROF)(TY 1)
|
LF
|
540.000
|
$26.000
|
$110.000
|
$25.000
|
$30.000
|
|
|
|
PORT CTB (REMOVE)(LOW PROF)(TY 2)
|
LF
|
80.000
|
$26.000
|
$55.000
|
$35.000
|
$30.000
|
|
|
|
DRIVEWAYS (SURF TREAT)
|
SY
|
37.000
|
$43.000
|
$330.000
|
$90.000
|
$450.000
|
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
325.000
|
$38.000
|
$44.000
|
$29.000
|
$35.000
|
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
3.000
|
$2,500.000
|
$3,300.000
|
$2,500.000
|
$2,000.000
|
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
3.000
|
$3,800.000
|
$4,400.000
|
$3,500.000
|
$3,500.000
|
|
|
|
CRASH CUSH ATTEN (INSTL)(R)(N)(TL2)
|
EA
|
1.000
|
$17,500.000
|
$38,500.000
|
$22,000.000
|
$26,000.000
|
|
|
|
MAILBOX INSTALL-S (WC-POST) TY 3
|
EA
|
1.000
|
$250.000
|
$220.000
|
$500.000
|
$1,500.000
|
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
2.000
|
$150.000
|
$220.000
|
$75.000
|
$225.000
|
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
|
EA
|
4.000
|
$35.000
|
$33.000
|
$40.000
|
$40.000
|
|
|
|
REMOVE DELIN & OBJECT MARKER ASSMS
|
EA
|
4.000
|
$25.000
|
$1.100
|
$25.000
|
$30.000
|
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
|
EA
|
7.000
|
$50.000
|
$11.000
|
$40.000
|
$45.000
|
|
|
|
WK ZN PAV MRK NON-REMOV (W)24"(SLD)
|
LF
|
40.000
|
$10.000
|
$11.000
|
$38.500
|
$50.000
|
|
|
|
ANTI - GRAFFITI COATNG(PERMNENT-TY III)
|
SF
|
2,424.000
|
$2.000
|
$5.500
|
$12.000
|
$1.800
|
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
DAY
|
540.000
|
$75.000
|
$165.000
|
$55.000
|
$65.000
|
|
|
|
TMA (STATIONARY)
|
DAY
|
30.000
|
$230.000
|
$275.000
|
$130.000
|
$200.000
|
|
|
|
TMA (MOBILE OPERATION)
|
HR
|
8.000
|
$68.000
|
$550.000
|
$125.000
|
$0.010
|
|
1
|
|
FL BS (CMP IN PLC)(TYA GR1-2)(FNAL POS)
|
CY
|
193.000
|
$131.810
|
$110.000
|
$182.000
|
$350.000
|
|
Totals: |
$1,520,451.750
|
$1,830,905.050
|
$1,919,892.820
|
$2,762,823.870
|