|
|
PREPARING ROW
|
STA
|
22.000
|
$2,875.000
|
$800.000
|
$1,567.000
|
$5,000.000
|
|
|
REMOVING STAB BASE & ASPH PAV (8"-10")
|
SY
|
4,818.000
|
$5.500
|
$6.250
|
$21.230
|
$10.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
2,500.000
|
$25.000
|
$10.000
|
$16.000
|
$17.000
|
|
|
SUBGRADE WIDENING (ORD COMP)
|
STA
|
22.000
|
$400.000
|
$400.000
|
$1,409.000
|
$500.000
|
|
|
EMBANKMENT (FINAL)(ORD COMP)(TY B)
|
CY
|
2,500.000
|
$30.000
|
$10.000
|
$16.000
|
$20.000
|
|
|
BACKFILL (TY B)
|
STA
|
22.000
|
$175.000
|
$400.000
|
$1,409.000
|
$400.000
|
|
|
ROAD GRADER WORK (ORD COMP)
|
STA
|
22.000
|
$165.000
|
$400.000
|
$1,409.000
|
$600.000
|
|
|
BLOCK SODDING
|
SY
|
14,454.000
|
$7.000
|
$6.000
|
$4.230
|
$6.000
|
|
|
BROADCAST SEED (TEMP) (WARM)
|
SY
|
7,227.000
|
$0.650
|
$0.300
|
$0.130
|
$0.150
|
|
|
BROADCAST SEED (TEMP) (COOL)
|
SY
|
7,227.000
|
$0.650
|
$0.300
|
$0.100
|
$0.150
|
|
|
VEGETATIVE WATERING
|
MG
|
87.000
|
$110.000
|
$100.000
|
$60.000
|
$25.000
|
|
|
PROOF ROLLING
|
HR
|
4.000
|
$150.000
|
$500.000
|
$75.000
|
$100.000
|
|
|
CEMENT
|
TON
|
211.000
|
$200.000
|
$250.000
|
$275.000
|
$275.000
|
|
|
CEMENT TREAT (SUBGRADE)(12")
|
SY
|
10,599.000
|
$4.000
|
$8.000
|
$18.000
|
$4.500
|
|
|
PLANE ASPH CONC PAV(0" TO 12")
|
SY
|
89.000
|
$10.000
|
$100.000
|
$67.000
|
$20.000
|
|
|
PLANE ASPH CONC PAV (0" TO 1 1/2")
|
SY
|
482.000
|
$3.000
|
$20.000
|
$28.000
|
$20.000
|
|
|
CUT & RESTORE ASPH PAVING
|
SY
|
39.000
|
$160.000
|
$150.000
|
$200.000
|
$100.000
|
|
|
CUT AND RESTORE PAV (FLEX BASE)
|
SY
|
240.000
|
$150.000
|
$50.000
|
$100.000
|
$50.000
|
|
|
CONC BOX CULV (6 FT X 5 FT)(EXTEND)
|
LF
|
17.000
|
$900.000
|
$1,500.000
|
$700.000
|
$1,500.000
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
456.000
|
$80.000
|
$60.000
|
$57.000
|
$100.000
|
|
|
WINGWALL (PW - 2) (HW=6 FT)
|
EA
|
2.000
|
$15,607.000
|
$15,000.000
|
$18,500.000
|
$22,000.000
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
28.000
|
$880.000
|
$800.000
|
$875.000
|
$1,000.000
|
|
|
REMOV STR (HEADWALL)
|
EA
|
2.000
|
$1,350.000
|
$5,000.000
|
$450.000
|
$1,200.000
|
|
|
REMOV STR (PIPE)
|
EA
|
14.000
|
$400.000
|
$200.000
|
$250.000
|
$700.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$177,615.000
|
$100,000.000
|
$205,500.000
|
$235,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
5.000
|
$6,000.000
|
$3,000.000
|
$9,920.000
|
$10,000.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
60.000
|
$35.000
|
$60.000
|
$50.000
|
$35.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
60.000
|
$10.000
|
$20.000
|
$10.000
|
$12.000
|
|
|
BACKHOE WORK (EROSION & SEDMT CONT)
|
HR
|
20.000
|
$60.000
|
$100.000
|
$50.000
|
$100.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
120.000
|
$5.000
|
$5.000
|
$4.000
|
$5.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
120.000
|
$2.000
|
$5.000
|
$1.000
|
$1.000
|
|
|
TURNOUTS (ACP)
|
SY
|
62.000
|
$65.000
|
$110.000
|
$110.000
|
$100.000
|
|
|
RUMBLE STRIPS (SHOULDER)
|
LF
|
4,336.000
|
$2.000
|
$3.000
|
$7.000
|
$1.250
|
|
|
RUMBLE STRIPS (CENTERLINE)
|
LF
|
1,829.000
|
$2.000
|
$3.000
|
$7.000
|
$1.250
|
|
|
MAILBOX INSTALL-S (TWG-POST) TY 2
|
EA
|
10.000
|
$255.000
|
$500.000
|
$500.000
|
$350.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
10.000
|
$800.000
|
$1,000.000
|
$1,500.000
|
$750.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
5.000
|
$1,000.000
|
$1,000.000
|
$1,900.000
|
$900.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U)
|
EA
|
2.000
|
$1,700.000
|
$2,000.000
|
$2,500.000
|
$1,100.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
16.000
|
$105.000
|
$500.000
|
$150.000
|
$135.000
|
|
|
INSTL OM ASSM (OM-2Y)(WC)GND
|
EA
|
2.000
|
$70.000
|
$500.000
|
$300.000
|
$100.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
|
LF
|
16,128.000
|
$1.250
|
$0.300
|
$0.250
|
$0.280
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
|
LF
|
16,128.000
|
$1.250
|
$0.300
|
$0.250
|
$0.280
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
1,613.000
|
$3.000
|
$5.000
|
$1.750
|
$2.000
|
|
REFL PAV MRK TY I (W)8"(SLD)(090MIL)
|
LF
|
3,500.000
|
$1.000
|
$1.250
|
$1.000
|
$1.150
|
|
REFL PAV MRK TY I (W)24"(SLD)(090MIL)
|
LF
|
10.000
|
$6.500
|
$15.000
|
$10.000
|
$12.000
|
|
REFL PAV MRK TY I (W)(ARROW)(090MIL)
|
EA
|
4.000
|
$150.000
|
$200.000
|
$150.000
|
$170.000
|
|
REFL PAV MRK TY I (W)(WORD)(090MIL)
|
EA
|
4.000
|
$200.000
|
$200.000
|
$160.000
|
$180.000
|
|
REF PAV MRK TY I(W)18"(YLD TRI)(090MIL)
|
EA
|
5.000
|
$80.000
|
$200.000
|
$100.000
|
$120.000
|
|
REFL PAV MRK TY I (Y)12"(SLD)(090MIL)
|
LF
|
14,094.000
|
$3.500
|
$3.250
|
$3.200
|
$3.600
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(090MIL)
|
LF
|
10,752.000
|
$2.000
|
$0.550
|
$0.500
|
$0.600
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(090MIL)
|
LF
|
10,752.000
|
$2.000
|
$0.550
|
$0.500
|
$0.600
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
109.000
|
$7.500
|
$5.000
|
$4.000
|
$4.500
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
16,128.000
|
$3.500
|
$0.350
|
$0.300
|
$0.350
|
|
|
TRACKLESS TACK COAT
|
GAL
|
482.000
|
$10.000
|
$6.500
|
$6.400
|
$20.000
|
|
|
REINFORMT GRID FOR ASPHALT PVMT OVERLAY
|
SY
|
2,409.000
|
$20.000
|
$11.000
|
$14.000
|
$12.000
|
|
|
D-GR HMA TY-B PG64-22
|
TON
|
5,722.000
|
$140.000
|
$114.900
|
$129.900
|
$155.000
|
|
|
D-GR HMA TY-C SAC-A PG64-22(EXEMPT)
|
TON
|
1,735.000
|
$150.000
|
$117.620
|
$132.620
|
$160.000
|
|
|
D-GR HMA TY-D SAC-A PG64-22(EXEMPT)
|
TON
|
121.000
|
$150.000
|
$160.000
|
$160.000
|
$250.000
|
|
|
BONDING COURSE
|
GAL
|
771.000
|
$5.000
|
$6.500
|
$6.400
|
$15.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$7,500.000
|
$10,000.000
|
$22,000.000
|
$25,000.000
|
|
|
TMA (STATIONARY)
|
DAY
|
79.000
|
$200.000
|
$300.000
|
$200.000
|
$300.000
|
|
|
TMA (MOBILE OPERATION)
|
HR
|
40.000
|
$50.000
|
$100.000
|
$85.000
|
$75.000
|
|
Totals: |
$2,228,124.600
|
$1,751,101.000
|
$2,304,752.420
|
$2,397,745.630
|