PREPARING ROW
|
STA
|
262.810
|
$1,000.000
|
$450.000
|
$450.000
|
$430.000
|
$449.000
|
$750.000
|
$2,000.000
|
$1,100.000
|
|
|
REMOVING CONC (DRIVEWAYS)
|
SY
|
1,126.000
|
$15.000
|
$12.600
|
$10.000
|
$12.000
|
$17.000
|
$12.000
|
$20.000
|
$15.000
|
|
|
REMOVING STAB BASE & ASPH PAV (8")
|
SY
|
3,811.000
|
$15.000
|
$6.270
|
$5.000
|
$3.200
|
$20.500
|
$4.500
|
$20.000
|
$6.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
816.000
|
$8.500
|
$13.710
|
$10.000
|
$15.000
|
$18.000
|
$21.000
|
$20.000
|
$12.000
|
|
|
EMBANKMENT (FINAL)(ORD COMP)(TY B)
|
CY
|
375.000
|
$15.000
|
$31.230
|
$20.000
|
$30.000
|
$38.000
|
$60.000
|
$30.000
|
$12.000
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY B)
|
CY
|
8,640.000
|
$10.000
|
$14.100
|
$17.000
|
$20.000
|
$21.000
|
$18.000
|
$30.000
|
$12.000
|
|
|
BACKFILL (TY B)
|
STA
|
828.590
|
$165.000
|
$89.700
|
$150.000
|
$150.000
|
$330.000
|
$190.000
|
$250.000
|
$400.000
|
|
|
ROAD GRADER WORK (ORD COMP)
|
STA
|
238.060
|
$185.000
|
$218.800
|
$200.000
|
$200.000
|
$575.000
|
$320.000
|
$450.000
|
$400.000
|
|
|
FURNISHING AND PLACING TOPSOIL (4")
|
SY
|
3,811.000
|
$1.350
|
$5.510
|
$3.000
|
$3.000
|
$4.500
|
$4.000
|
$4.500
|
$3.000
|
|
|
BROADCAST SEED (TEMP) (WARM)
|
SY
|
115,646.000
|
$0.100
|
$0.110
|
$0.100
|
$0.100
|
$0.100
|
$0.090
|
$0.250
|
$0.130
|
|
|
BROADCAST SEED (TEMP) (COOL)
|
SY
|
115,646.000
|
$0.100
|
$0.120
|
$0.110
|
$0.110
|
$0.110
|
$0.100
|
$0.250
|
$0.130
|
|
|
STRAW/HAY MLCH SEED(PERM)(RURAL)(SANDY)
|
SY
|
231,284.000
|
$0.250
|
$0.240
|
$0.230
|
$0.230
|
$0.230
|
$0.240
|
$0.250
|
$0.300
|
|
|
VEGETATIVE WATERING
|
MG
|
1,388.000
|
$10.000
|
$19.490
|
$5.000
|
$18.000
|
$30.000
|
$24.850
|
$50.000
|
$15.000
|
|
|
FL BS (CMP IN PLC)(TY A GR 4)(10")
|
SY
|
50,930.000
|
$16.200
|
$14.540
|
$17.000
|
$17.690
|
$18.250
|
$14.000
|
$16.500
|
$17.000
|
|
|
REWORK BS MATL (TYB)(20")(OC)
|
SY
|
27,193.000
|
$4.000
|
$6.300
|
$3.920
|
$4.100
|
$7.850
|
$13.000
|
$3.000
|
$8.000
|
|
|
CEMENT
|
TON
|
825.000
|
$150.000
|
$147.000
|
$140.000
|
$140.000
|
$132.000
|
$155.000
|
$171.000
|
$150.000
|
|
|
CEMENT TREAT(EXIST MATL)(8")
|
SY
|
50,930.000
|
$3.500
|
$2.040
|
$3.750
|
$4.000
|
$4.350
|
$2.450
|
$3.500
|
$3.000
|
|
|
ASPH (AC-20-5TR)
|
GAL
|
24,989.000
|
$4.000
|
$3.410
|
$3.500
|
$3.500
|
$4.800
|
$3.200
|
$5.000
|
$4.000
|
|
|
ASPH (RC-250)
|
GAL
|
15,212.000
|
$4.000
|
$4.410
|
$4.000
|
$4.200
|
$5.700
|
$4.800
|
$5.000
|
$5.000
|
|
|
AGGR (TY-B GR-5 OR TY-L GR-5)
|
CY
|
388.000
|
$100.000
|
$120.720
|
$137.000
|
$137.000
|
$125.000
|
$114.500
|
$125.000
|
$105.000
|
|
|
AGGR (TY-B GR-3 OR TY-L GR-3)(SAC-B)
|
CY
|
518.000
|
$90.000
|
$114.230
|
$110.000
|
$110.000
|
$113.000
|
$93.000
|
$125.000
|
$100.000
|
|
|
D-GR HMA TY-D SAC-A PG64-22
|
TON
|
56,638.000
|
$85.000
|
$72.750
|
$72.550
|
$72.550
|
$72.750
|
$81.650
|
$76.500
|
$85.000
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(24")
|
SY
|
567.000
|
$130.000
|
$130.000
|
$180.000
|
$195.000
|
$120.000
|
$175.000
|
$150.000
|
$165.000
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(20")
|
SY
|
7,300.000
|
$40.000
|
$88.500
|
$111.000
|
$115.000
|
$87.740
|
$136.000
|
$105.000
|
$100.000
|
|
|
PLANE ASPH CONC PAV(0" TO 8")
|
SY
|
9,765.000
|
$5.000
|
$3.640
|
$3.500
|
$4.200
|
$4.360
|
$8.000
|
$12.500
|
$5.000
|
|
|
DRILL SHAFT (SIGN MTS) (12 IN)
|
LF
|
14.000
|
$110.000
|
$89.250
|
$85.000
|
$150.000
|
$200.000
|
$85.000
|
$150.000
|
$250.000
|
|
|
DRILL SHAFT (RDWY ILL POLE) (30 IN)
|
LF
|
6.000
|
$210.000
|
$231.000
|
$220.000
|
$220.000
|
$175.000
|
$220.000
|
$250.000
|
$250.000
|
|
|
RIPRAP (CONC) (CL B) (4")
|
CY
|
0.350
|
$417.000
|
$525.000
|
$1,000.000
|
$1,000.000
|
$950.000
|
$3,000.000
|
$650.000
|
$5,000.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
706.700
|
$475.000
|
$393.750
|
$380.000
|
$400.000
|
$375.000
|
$488.000
|
$550.000
|
$400.000
|
|
|
CLEANING AND SEALING JOINTS
|
LF
|
568.000
|
$35.000
|
$29.400
|
$30.000
|
$30.000
|
$26.000
|
$40.000
|
$100.000
|
$38.000
|
|
|
CONC BOX CULV (3 FT X 2 FT)(EXTEND)
|
LF
|
5.000
|
$400.000
|
$409.500
|
$500.000
|
$525.000
|
$390.000
|
$460.000
|
$650.000
|
$800.000
|
|
|
CONC BOX CULV (3 FT X 3 FT)(EXTEND)
|
LF
|
20.000
|
$475.000
|
$420.000
|
$500.000
|
$525.000
|
$400.000
|
$410.000
|
$750.000
|
$800.000
|
|
|
CONC BOX CULV (4 FT X 3 FT)(EXTEND)
|
LF
|
13.000
|
$500.000
|
$472.500
|
$500.000
|
$525.000
|
$450.000
|
$510.000
|
$750.000
|
$800.000
|
|
|
CONC BOX CULV (5 FT X 5 FT)(EXTEND)
|
LF
|
12.000
|
$500.000
|
$551.250
|
$500.000
|
$525.000
|
$525.000
|
$615.000
|
$850.000
|
$1,000.000
|
|
|
CONC BOX CULV (6 FT X 4 FT)(EXTEND)
|
LF
|
4.000
|
$550.000
|
$551.250
|
$700.000
|
$700.000
|
$525.000
|
$765.000
|
$950.000
|
$1,000.000
|
|
|
WINGWALL (PW - 2) (HW=5 FT)
|
EA
|
2.000
|
$9,000.000
|
$8,400.000
|
$7,000.000
|
$7,500.000
|
$8,000.000
|
$13,800.000
|
$8,000.000
|
$8,000.000
|
|
|
SET (TY I)(S=3 FT)(HW= 4 FT)(3:1)(C)
|
EA
|
1.000
|
$6,800.000
|
$4,725.000
|
$4,500.000
|
$500.000
|
$4,500.000
|
$10,715.000
|
$6,000.000
|
$3,000.000
|
|
|
SET (TY I)(S= 4 FT)(HW= 3 FT)(3:1) (C)
|
EA
|
1.000
|
$7,000.000
|
$5,040.000
|
$5,000.000
|
$5,000.000
|
$4,800.000
|
$8,700.000
|
$6,000.000
|
$6,000.000
|
|
|
SET (TY I)(S= 5 FT)(HW= 6 FT)(3:1) (C)
|
EA
|
1.000
|
$4,500.000
|
$7,875.000
|
$7,000.000
|
$7,000.000
|
$7,500.000
|
$14,100.000
|
$10,000.000
|
$11,000.000
|
|
|
SET (TY I)(S= 6 FT)(HW= 5 FT)(3:1) (C)
|
EA
|
1.000
|
$10,000.000
|
$7,875.000
|
$7,500.000
|
$7,500.000
|
$7,500.000
|
$12,760.000
|
$12,000.000
|
$8,000.000
|
|
|
REMOV & RE - LAY PIPE (18 IN)
|
LF
|
478.000
|
$75.000
|
$23.100
|
$30.000
|
$30.000
|
$22.000
|
$77.000
|
$30.000
|
$45.000
|
|
|
REMOV & RE - LAY PIPE (24 IN)
|
LF
|
116.000
|
$90.000
|
$28.350
|
$40.000
|
$40.000
|
$27.000
|
$97.000
|
$30.000
|
$55.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$525,728.010
|
$500,000.000
|
$500,000.000
|
$626,698.000
|
$668,000.000
|
$1,025,000.000
|
$1,000,000.000
|
$1,100,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
14.000
|
$4,000.000
|
$1,051.380
|
$2,000.000
|
$2,500.000
|
$5,239.000
|
$5,000.000
|
$8,500.000
|
$12,000.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
705.000
|
$30.000
|
$29.400
|
$28.000
|
$28.000
|
$28.000
|
$34.530
|
$30.000
|
$35.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
705.000
|
$10.000
|
$8.400
|
$8.000
|
$8.000
|
$8.000
|
$9.710
|
$15.000
|
$5.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
390.000
|
$3.000
|
$3.150
|
$3.000
|
$3.000
|
$3.000
|
$5.780
|
$4.000
|
$5.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
390.000
|
$0.750
|
$15.000
|
$1.000
|
$1.000
|
$1.000
|
$3.060
|
$2.000
|
$1.000
|
|
|
INTERSECTIONS (ACP)
|
SY
|
2,597.000
|
$30.000
|
$14.600
|
$12.900
|
$12.900
|
$19.650
|
$22.000
|
$25.000
|
$42.000
|
|
|
DRIVEWAYS (CONC)
|
SY
|
1,032.000
|
$70.000
|
$89.500
|
$65.000
|
$75.000
|
$85.000
|
$98.000
|
$95.000
|
$115.000
|
|
|
DRIVEWAYS (ACP)
|
SY
|
2,995.000
|
$27.000
|
$35.000
|
$13.200
|
$13.200
|
$48.250
|
$38.000
|
$25.000
|
$42.000
|
|
|
DRIVEWAYS (BASE)
|
SY
|
1,416.000
|
$14.000
|
$28.390
|
$25.000
|
$20.000
|
$25.000
|
$33.000
|
$18.000
|
$8.000
|
|
|
DRIVEWAYS (ACP) (TYPE 2)
|
SY
|
1,644.000
|
$20.000
|
$25.000
|
$30.500
|
$30.500
|
$25.350
|
$72.000
|
$45.000
|
$42.000
|
|
|
RUMBLE STRIPS (SHOULDER)
|
LF
|
213,734.000
|
$0.150
|
$0.110
|
$0.079
|
$0.120
|
$0.120
|
$0.160
|
$0.150
|
$0.150
|
|
|
RUMBLE STRIPS (CENTERLINE)
|
LF
|
102,077.000
|
$0.200
|
$0.110
|
$0.079
|
$0.120
|
$0.120
|
$0.170
|
$0.150
|
$0.150
|
|
|
MTL W-BEAM GD FEN (STEEL POST)
|
LF
|
7,825.000
|
$25.000
|
$17.060
|
$16.250
|
$22.250
|
$16.250
|
$16.250
|
$22.000
|
$22.000
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
20.000
|
$1,900.000
|
$1,359.750
|
$1,295.000
|
$1,575.000
|
$1,545.000
|
$1,295.000
|
$1,850.000
|
$1,800.000
|
|
|
MTL BEAM GD FEN TRANS (T6)
|
EA
|
22.000
|
$700.000
|
$488.250
|
$465.000
|
$775.000
|
$465.000
|
$465.000
|
$2,850.000
|
$600.000
|
|
|
SHORT RADIUS
|
LF
|
25.000
|
$40.000
|
$33.600
|
$32.000
|
$35.000
|
$32.000
|
$32.000
|
$35.000
|
$40.000
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
1.000
|
$1,100.000
|
$918.750
|
$875.000
|
$1,250.000
|
$875.000
|
$875.000
|
$1,850.000
|
$1,200.000
|
|
|
MTL BM GD FEN (LONG SPAN SYSTEM)
|
LF
|
200.000
|
$25.000
|
$23.100
|
$22.000
|
$30.000
|
$22.000
|
$22.000
|
$35.000
|
$25.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
9,475.000
|
$2.500
|
$1.580
|
$1.500
|
$3.000
|
$1.500
|
$1.500
|
$3.000
|
$3.000
|
|
|
REMOVE TERMINAL ANCHOR SECTION
|
EA
|
1.000
|
$250.000
|
$105.000
|
$100.000
|
$110.000
|
$100.000
|
$100.000
|
$500.000
|
$250.000
|
|
|
GUARDRAIL END TREATMENT (MOVE & RESET)
|
EA
|
86.000
|
$1,200.000
|
$945.000
|
$900.000
|
$1,000.000
|
$900.000
|
$900.000
|
$1,250.000
|
$1,100.000
|
|
|
MAILBOX INSTALL-S (TWG-POST) TY 4
|
EA
|
1.000
|
$350.000
|
$204.750
|
$195.000
|
$650.000
|
$110.000
|
$195.000
|
$650.000
|
$500.000
|
|
|
MAILBOX INSTALL-D (TWG-POST) TY 4
|
EA
|
1.000
|
$400.000
|
$257.250
|
$245.000
|
$750.000
|
$150.000
|
$245.000
|
$650.000
|
$500.000
|
|
|
REMOVE RD IL ASM (TRANS-BASE)
|
EA
|
1.000
|
$535.000
|
$1,575.000
|
$1,500.000
|
$1,500.000
|
$500.000
|
$1,500.000
|
$50.000
|
$2,000.000
|
|
|
IN RD IL AM (TY SA) 50T-8 (400W) S
|
EA
|
1.000
|
$3,700.000
|
$5,460.000
|
$5,200.000
|
$5,200.000
|
$3,700.000
|
$5,200.000
|
$3,600.000
|
$7,000.000
|
|
|
CONDT (RM) (3") (BORE)
|
LF
|
85.000
|
$38.000
|
$44.100
|
$42.000
|
$42.000
|
$35.000
|
$42.000
|
$65.000
|
$45.000
|
|
|
DCT CBL (3 NO.8) (2 INSULATED 1 BARE)
|
LF
|
250.000
|
$12.660
|
$18.900
|
$18.000
|
$18.000
|
$16.000
|
$18.000
|
$20.000
|
$25.000
|
|
|
ALUMINUM SIGNS (TY G)
|
SF
|
50.000
|
$24.000
|
$26.250
|
$25.000
|
$30.000
|
$30.000
|
$25.000
|
$50.000
|
$30.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
75.000
|
$500.000
|
$435.750
|
$415.000
|
$550.000
|
$370.000
|
$415.000
|
$650.000
|
$700.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
11.000
|
$600.000
|
$488.250
|
$465.000
|
$575.000
|
$420.000
|
$465.000
|
$650.000
|
$800.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
|
EA
|
6.000
|
$650.000
|
$687.750
|
$655.000
|
$650.000
|
$540.000
|
$655.000
|
$650.000
|
$900.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U)
|
EA
|
1.000
|
$800.000
|
$813.750
|
$775.000
|
$650.000
|
$590.000
|
$775.000
|
$650.000
|
$1,000.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U-1EXT)
|
EA
|
1.000
|
$900.000
|
$876.750
|
$835.000
|
$725.000
|
$750.000
|
$835.000
|
$650.000
|
$1,300.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
111.000
|
$95.000
|
$78.750
|
$75.000
|
$110.000
|
$45.000
|
$75.000
|
$50.000
|
$115.000
|
|
|
INSTALL LRSS (STRUCT STEEL)
|
LB
|
570.800
|
$4.750
|
$5.200
|
$5.000
|
$5.250
|
$15.000
|
$4.950
|
$8.500
|
$10.000
|
|
|
INSTL OM ASSM (OM-2Z)(FLX)GND
|
EA
|
98.000
|
$65.000
|
$39.900
|
$38.000
|
$65.000
|
$38.000
|
$38.000
|
$100.000
|
$50.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
|
EA
|
163.000
|
$35.000
|
$19.950
|
$19.000
|
$42.000
|
$19.000
|
$19.000
|
$100.000
|
$25.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
|
LF
|
150,576.000
|
$0.150
|
$0.160
|
$0.150
|
$0.100
|
$0.150
|
$0.150
|
$0.200
|
$0.120
|
|
WK ZN PAV MRK SHT TERM (TAB)TY W
|
EA
|
12,327.000
|
$0.800
|
$0.800
|
$0.500
|
$1.100
|
$0.780
|
$1.000
|
$2.000
|
$2.000
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
11,526.000
|
$0.750
|
$0.800
|
$0.500
|
$1.100
|
$0.780
|
$1.000
|
$2.000
|
$2.000
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
1,795.000
|
$0.800
|
$0.780
|
$0.740
|
$0.880
|
$0.740
|
$0.740
|
$1.000
|
$1.000
|
|
REFL PAV MRK TY I (W)18"(SLD)(100MIL)
|
LF
|
208.000
|
$4.000
|
$7.040
|
$6.700
|
$4.500
|
$6.700
|
$6.700
|
$5.000
|
$5.000
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
82.000
|
$5.000
|
$7.460
|
$7.100
|
$5.500
|
$7.100
|
$7.100
|
$10.000
|
$6.000
|
|
REFL PAV MRK TY I (W)(ARROW)(100MIL)
|
EA
|
9.000
|
$115.000
|
$123.900
|
$118.000
|
$145.500
|
$118.000
|
$118.000
|
$165.000
|
$170.000
|
|
REFL PAV MRK TY I (W)(WORD)(100MIL)
|
EA
|
11.000
|
$150.000
|
$148.050
|
$141.000
|
$180.500
|
$141.000
|
$141.000
|
$200.000
|
$200.000
|
|
REF PAV MRK TY I(W)36"(YLD TRI)(100MIL)
|
EA
|
15.000
|
$25.000
|
$77.700
|
$74.000
|
$48.500
|
$74.000
|
$74.000
|
$100.000
|
$60.000
|
|
REFL PAV MRK TY I (Y)24"(SLD)(100MIL)
|
LF
|
2,120.000
|
$5.000
|
$6.410
|
$6.100
|
$5.250
|
$6.100
|
$6.100
|
$6.000
|
$6.000
|
|
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
|
LF
|
5,440.000
|
$0.300
|
$0.370
|
$0.350
|
$0.420
|
$0.350
|
$0.350
|
$0.500
|
$0.460
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
|
LF
|
213,720.000
|
$0.250
|
$0.320
|
$0.300
|
$0.350
|
$0.300
|
$0.300
|
$0.400
|
$0.380
|
|
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
|
LF
|
14,510.000
|
$0.280
|
$0.370
|
$0.350
|
$0.420
|
$0.350
|
$0.350
|
$0.500
|
$0.460
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
143,355.000
|
$0.250
|
$0.320
|
$0.300
|
$0.350
|
$0.300
|
$0.300
|
$0.400
|
$0.380
|
|
REFL PAV MRKR TY I-C
|
EA
|
387.000
|
$3.000
|
$5.250
|
$5.000
|
$3.300
|
$5.000
|
$5.000
|
$5.000
|
$4.000
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
3,417.000
|
$3.000
|
$3.150
|
$3.000
|
$3.300
|
$3.000
|
$3.000
|
$5.000
|
$4.000
|
|
|
GEOGRID BASE REINFORCEMENT (TY II)
|
SY
|
50,930.000
|
$1.250
|
$3.740
|
$1.750
|
$2.400
|
$2.540
|
$1.950
|
$2.250
|
$2.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$10,000.000
|
$16,154.960
|
$6,000.000
|
$13,000.000
|
$25,000.000
|
$24,000.000
|
$16,500.000
|
$20,000.000
|
|
|
TMA (STATIONARY)
|
DAY
|
120.000
|
$115.000
|
$262.500
|
$300.000
|
$225.000
|
$950.000
|
$330.000
|
$400.000
|
$200.000
|
|
|
TMA (MOBILE OPERATION)
|
HR
|
20.000
|
$128.000
|
$26.250
|
$100.000
|
$110.000
|
$1,130.000
|
$75.000
|
$150.000
|
$200.000
|
|
Totals: |
$9,586,977.310
|
$8,915,686.636
|
$9,007,814.559
|
$9,483,086.800
|
$9,999,211.730
|
$11,000,559.740
|
$11,389,779.150
|
$11,415,622.430
|