|
|
PREPARING ROW
|
STA
|
218.000
|
$665.000
|
$180.000
|
$180.000
|
$1,354.000
|
$1,471.080
|
|
|
REMOVING STAB BASE AND ASPH PAV (6")
|
SY
|
21,516.000
|
$4.300
|
$1.270
|
$10.000
|
$11.500
|
$2.420
|
|
|
SUBGRADE WIDENING (ORD COMP)
|
STA
|
90.000
|
$200.000
|
$234.580
|
$250.000
|
$336.000
|
$494.400
|
|
|
EMBANKMENT (FINAL)(ORD COMP)(TY B)
|
CY
|
20.000
|
$26.000
|
$183.750
|
$50.000
|
$75.000
|
$26.480
|
|
|
BACKFILL (TY A)
|
STA
|
219.000
|
$200.000
|
$337.410
|
$450.000
|
$402.000
|
$205.550
|
|
|
ROAD GRADER WORK (ORD COMP)
|
STA
|
219.000
|
$225.000
|
$241.000
|
$250.000
|
$456.000
|
$306.910
|
|
|
BROADCAST SEED (TEMP) (WARM)
|
SY
|
38,687.000
|
$0.110
|
$0.040
|
$0.040
|
$0.040
|
$0.280
|
|
|
BROADCAST SEED (TEMP) (COOL)
|
SY
|
38,687.000
|
$0.130
|
$0.060
|
$0.060
|
$0.060
|
$0.250
|
|
|
STRAW/HAY MLCH SEED(PERM)(RURAL)(CLAY)
|
SY
|
77,373.000
|
$0.250
|
$0.200
|
$0.200
|
$0.200
|
$0.370
|
|
|
VEGETATIVE WATERING
|
MG
|
1,393.000
|
$11.250
|
$3.850
|
$10.000
|
$22.000
|
$26.510
|
|
|
PROOF ROLLING
|
HR
|
21.750
|
$60.000
|
$107.240
|
$50.000
|
$75.000
|
$211.690
|
|
|
FL BS (CMP IN PLC)(TY D GR 4)
|
TON
|
250.000
|
$100.000
|
$45.950
|
$100.000
|
$35.000
|
$155.190
|
|
|
FL BS (CMP IN PL)(TY D GR 4)(8")
|
SY
|
23,360.000
|
$11.050
|
$10.770
|
$12.650
|
$20.150
|
$16.670
|
|
|
PRIME COAT (RC-250)
|
GAL
|
6,540.000
|
$4.450
|
$4.490
|
$4.500
|
$12.000
|
$6.240
|
|
|
ASPH (AC-20-5TR)
|
GAL
|
36,855.000
|
$4.200
|
$3.700
|
$3.500
|
$6.000
|
$3.010
|
|
|
AGGR(TY-PB GR-4 SAC-A)
|
CY
|
496.000
|
$106.000
|
$148.360
|
$150.000
|
$185.000
|
$161.060
|
|
|
AGGR(TY-B GR-3 SAC-B)
|
CY
|
321.000
|
$95.000
|
$108.540
|
$130.000
|
$155.000
|
$171.110
|
|
|
AGGR(TY-B GR-5 SAC-B)
|
CY
|
165.000
|
$93.500
|
$140.020
|
$100.000
|
$155.000
|
$130.310
|
|
|
D-GR HMA(SQ) TY-B PG64-22
|
TON
|
4,341.000
|
$87.000
|
$106.590
|
$120.000
|
$79.000
|
$120.960
|
|
|
D-GR HMA(SQ) TY-F SAC-A PG64-22
|
TON
|
1,210.000
|
$115.000
|
$171.490
|
$160.000
|
$94.000
|
$305.680
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(20")
|
SY
|
2,000.000
|
$65.000
|
$135.320
|
$160.000
|
$163.590
|
$21.160
|
|
|
PLANE ASPH CONC PAV(0" TO 8")
|
SY
|
9,330.000
|
$4.750
|
$3.030
|
$10.000
|
$5.100
|
$2.070
|
|
|
RIPRAP (STONE PROTECTION)(12 IN)
|
CY
|
26.000
|
$215.000
|
$96.380
|
$180.000
|
$220.000
|
$140.240
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
161.000
|
$480.000
|
$400.000
|
$400.000
|
$275.000
|
$707.760
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$196,866.450
|
$256,700.000
|
$250,000.000
|
$178,000.000
|
$297,317.340
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
8.000
|
$5,000.000
|
$3,800.000
|
$2,500.000
|
$7,499.080
|
$14,164.580
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 1)
|
LF
|
480.000
|
$26.000
|
$35.000
|
$35.000
|
$35.000
|
$40.740
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
480.000
|
$9.250
|
$8.000
|
$8.000
|
$8.000
|
$11.130
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
6,315.000
|
$2.800
|
$2.500
|
$2.500
|
$2.500
|
$3.670
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
6,315.000
|
$1.100
|
$1.000
|
$1.000
|
$1.000
|
$1.440
|
|
|
DRIVEWAYS (ACP)
|
SY
|
863.000
|
$30.000
|
$31.750
|
$35.000
|
$57.000
|
$57.520
|
|
|
TURNOUTS (ACP)
|
SY
|
740.000
|
$45.000
|
$82.490
|
$75.000
|
$59.000
|
$58.550
|
|
|
MTL W-BEAM GD FEN (STEEL POST)
|
LF
|
800.000
|
$24.000
|
$17.000
|
$17.000
|
$17.000
|
$42.970
|
|
|
MTL BEAM GD FEN TRANS (T6)
|
EA
|
8.000
|
$1,300.000
|
$525.000
|
$525.000
|
$535.000
|
$1,881.100
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
1,050.000
|
$3.500
|
$2.000
|
$2.000
|
$2.000
|
$10.290
|
|
|
REMOVE TERMINAL ANCHOR SECTION
|
EA
|
10.000
|
$180.000
|
$200.000
|
$200.000
|
$200.000
|
$513.580
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
10.000
|
$2,350.000
|
$2,050.000
|
$2,500.000
|
$2,050.000
|
$3,577.690
|
|
|
GUARDRAIL END TREATMENT (MOVE & RESET)
|
EA
|
2.000
|
$1,000.000
|
$1,100.000
|
$1,100.000
|
$1,100.000
|
$2,004.920
|
|
|
MAILBOX INSTALL-S (TWG-POST) TY 4
|
EA
|
18.000
|
$285.000
|
$245.000
|
$250.000
|
$212.000
|
$391.030
|
|
|
MAILBOX INSTALL-D (TWG-POST) TY 4
|
EA
|
1.000
|
$300.000
|
$280.000
|
$300.000
|
$302.000
|
$844.130
|
|
|
MAILBOX INSTALL-M (TWG-POST) TY 4
|
EA
|
3.000
|
$375.000
|
$425.000
|
$500.000
|
$550.000
|
$1,114.640
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
3.000
|
$450.000
|
$675.000
|
$700.000
|
$622.000
|
$1,038.810
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
1.000
|
$580.000
|
$825.000
|
$800.000
|
$747.000
|
$1,686.190
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
|
EA
|
1.000
|
$710.000
|
$375.000
|
$900.000
|
$1,002.000
|
$1,880.770
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
3.000
|
$75.000
|
$360.000
|
$400.000
|
$3,000.000
|
$186.530
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)GF1 (BI)
|
EA
|
36.000
|
$50.000
|
$24.000
|
$40.000
|
$24.000
|
$55.060
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(BRK)
|
LF
|
2,600.000
|
$0.200
|
$0.250
|
$0.400
|
$0.250
|
$0.500
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
|
LF
|
30,402.000
|
$0.200
|
$0.250
|
$0.400
|
$0.250
|
$0.510
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
2,428.100
|
$1.000
|
$2.110
|
$1.000
|
$3.000
|
$1.760
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
432.000
|
$0.750
|
$0.810
|
$1.000
|
$0.810
|
$1.840
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
249.000
|
$5.500
|
$5.900
|
$6.000
|
$5.900
|
$13.190
|
|
REF PAV MRK TY I(W)36"(YLD TRI)(100MIL)
|
EA
|
19.000
|
$30.000
|
$65.000
|
$42.000
|
$65.000
|
$73.530
|
|
|
REF PROF PAV MRK TY I(W)4"(SLD)(100MIL)
|
LF
|
44,118.000
|
$0.550
|
$0.640
|
$1.000
|
$0.640
|
$0.580
|
|
|
REF PROF PAV MRK TY I(Y)4"(BRK)(100MIL)
|
LF
|
2,600.000
|
$0.550
|
$0.800
|
$1.500
|
$0.800
|
$0.980
|
|
|
REF PROF PAV MRK TY I(Y)4"(SLD)(100MIL)
|
LF
|
30,402.000
|
$0.550
|
$0.640
|
$1.000
|
$0.640
|
$0.680
|
|
REFL PAV MRKR TY I-C
|
EA
|
22.000
|
$2.750
|
$5.000
|
$3.600
|
$5.000
|
$8.980
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
566.000
|
$3.000
|
$3.000
|
$4.000
|
$3.000
|
$6.700
|
|
|
GEOGRID BASE REINFORCEMENT (TY II)
|
SY
|
23,360.000
|
$1.580
|
$2.760
|
$2.000
|
$2.520
|
$2.190
|
|
Totals: |
$2,235,988.430
|
$2,447,924.561
|
$2,880,140.900
|
$3,208,009.510
|
$3,248,021.494
|