|
|
PREPARING ROW
|
STA
|
28.000
|
$2,000.000
|
$1,700.000
|
$2,500.000
|
$2,200.000
|
|
|
REMOV STAB BASE AND ASPH PAV (0"-12")
|
SY
|
3,297.000
|
$5.000
|
$10.000
|
$15.000
|
$9.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
967.000
|
$20.000
|
$20.000
|
$25.000
|
$25.000
|
|
|
EXCAVATION (CHANNEL)
|
CY
|
3,147.000
|
$40.000
|
$15.000
|
$15.000
|
$25.000
|
|
|
EMBANKMENT (FINAL)(ORD COMP)(TY B)
|
CY
|
7,213.000
|
$30.000
|
$18.000
|
$30.000
|
$25.000
|
|
|
BROADCAST SEED (TEMP) (WARM)
|
SY
|
6,465.000
|
$0.200
|
$0.010
|
$0.900
|
$1.000
|
|
|
BROADCAST SEED (TEMP) (COOL)
|
SY
|
6,465.000
|
$0.200
|
$0.010
|
$0.900
|
$1.000
|
|
|
STRAW/HAY MLCH SEED(PERM)(RURAL)(CLAY)
|
SY
|
10,456.000
|
$0.330
|
$1.070
|
$0.650
|
$0.750
|
|
|
CELL FBR MLCH SEED(PERM)(RURAL)(CLAY)
|
SY
|
2,474.000
|
$1.000
|
$1.712
|
$1.000
|
$1.500
|
|
|
VEGETATIVE WATERING
|
MG
|
158.600
|
$17.000
|
$10.000
|
$10.000
|
$1.000
|
|
|
FL BS (CMP IN PLC)(TY A GR 4) (6")
|
SY
|
775.000
|
$32.000
|
$36.000
|
$55.000
|
$50.000
|
|
|
REWORK BS MTL (TY B) (8") (ORD COMP)
|
SY
|
424.000
|
$5.000
|
$40.000
|
$15.000
|
$30.000
|
|
|
CEM STABIL BKFL
|
CY
|
237.800
|
$225.000
|
$324.000
|
$350.000
|
$350.000
|
|
|
FLOWABLE BACKFILL
|
CY
|
0.520
|
$1,000.000
|
$5,000.000
|
$1,000.000
|
$800.000
|
|
|
DRILL SHAFT (18 IN)
|
LF
|
320.000
|
$100.000
|
$129.070
|
$180.000
|
$115.000
|
|
|
DRILL SHAFT (36 IN)
|
LF
|
1,093.680
|
$300.000
|
$212.170
|
$347.000
|
$200.000
|
|
|
CL C CONC (ABUT)
|
CY
|
137.300
|
$1,400.000
|
$1,100.000
|
$1,658.000
|
$1,800.000
|
|
|
CL C CONC (CAP)
|
CY
|
40.600
|
$900.000
|
$1,100.000
|
$1,977.000
|
$1,800.000
|
|
|
CL C CONC (COLUMN)
|
CY
|
72.080
|
$800.000
|
$850.000
|
$1,000.000
|
$1,800.000
|
|
|
CL C CONC (MISC)
|
CY
|
2.090
|
$1,500.000
|
$2,000.000
|
$1,000.000
|
$1,000.000
|
|
|
REINF CONC SLAB
|
SF
|
10,500.000
|
$25.000
|
$28.000
|
$28.610
|
$35.000
|
|
|
APPROACH SLAB
|
CY
|
149.300
|
$600.000
|
$650.000
|
$700.000
|
$1,200.000
|
|
|
SHEAR KEY
|
CY
|
1.000
|
$250.000
|
$2,000.000
|
$1,000.000
|
$800.000
|
|
|
PRESTR CONC GIRDER (TX28)
|
LF
|
1,014.620
|
$230.000
|
$258.000
|
$300.000
|
$260.000
|
|
|
PRESTR CONC GIRDER (TX40)
|
LF
|
398.000
|
$306.000
|
$282.000
|
$300.000
|
$275.000
|
|
|
RIPRAP (STONE PROTECTION)(18 IN)
|
CY
|
1,874.000
|
$192.000
|
$142.000
|
$180.000
|
$180.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
96.000
|
$575.000
|
$700.000
|
$500.000
|
$650.000
|
|
|
STR STEEL (MISC NON - BRIDGE)
|
LB
|
1,540.000
|
$12.000
|
$13.000
|
$15.000
|
$4.000
|
|
|
RAIL (TY T223)
|
LF
|
514.000
|
$168.000
|
$160.000
|
$180.000
|
$180.000
|
|
|
RAIL (TY T631LS)
|
LF
|
260.000
|
$73.000
|
$69.550
|
$73.000
|
$80.000
|
|
|
ARMOR JOINT (SEALED)
|
LF
|
147.200
|
$230.000
|
$250.000
|
$180.000
|
$220.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
70.000
|
$90.000
|
$120.000
|
$90.000
|
$130.000
|
|
|
SET (REMOV & REINSTALL)
|
EA
|
2.000
|
$1,275.000
|
$1,000.000
|
$1,000.000
|
$2,000.000
|
|
|
REMOV STR (BRIDGE 0 - 99 FT LENGTH)
|
EA
|
2.000
|
$12,500.000
|
$15,000.000
|
$20,000.000
|
$60,000.000
|
|
|
REMOV STR (BRIDGE 100 - 499 FT LENGTH)
|
EA
|
1.000
|
$20,000.000
|
$25,000.000
|
$30,000.000
|
$80,000.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$240,942.500
|
$330,000.000
|
$373,000.000
|
$400,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
12.000
|
$7,500.000
|
$2,518.070
|
$2,000.000
|
$6,000.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
263.000
|
$43.000
|
$48.150
|
$35.000
|
$1.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
263.000
|
$12.000
|
$10.700
|
$10.000
|
$1.000
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
156.000
|
$40.000
|
$37.450
|
$1.000
|
$1.000
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
156.000
|
$7.000
|
$7.490
|
$1.000
|
$1.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
3,708.000
|
$4.000
|
$4.820
|
$4.000
|
$1.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
3,708.000
|
$1.110
|
$1.097
|
$1.000
|
$1.000
|
|
|
DRIVEWAYS (BASE)
|
SY
|
262.000
|
$45.000
|
$40.000
|
$35.000
|
$60.000
|
|
|
MTL W-BEAM GD FEN (STEEL POST)
|
LF
|
1,250.000
|
$34.000
|
$27.820
|
$31.000
|
$26.000
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
8.000
|
$1,775.000
|
$2,113.250
|
$2,250.000
|
$2,000.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
1,100.000
|
$3.000
|
$2.140
|
$4.000
|
$2.000
|
|
|
REMOVE DOWNSTREAM ANCHOR TERMINAL
|
EA
|
4.000
|
$300.000
|
$2,942.500
|
$250.000
|
$500.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
8.000
|
$3,100.000
|
$1,070.000
|
$2,800.000
|
$2,800.000
|
|
|
GUARDRAIL END TREATMENT (MOVE & RESET)
|
EA
|
4.000
|
$1,100.000
|
$1,500.000
|
$1,500.000
|
$1,000.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
6.000
|
$671.000
|
$800.000
|
$900.000
|
$1,500.000
|
|
|
RELOCATE SM RD SN SUP&AM TY 10BWG
|
EA
|
1.000
|
$500.000
|
$500.000
|
$350.000
|
$1,500.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
8.000
|
$129.000
|
$26.750
|
$100.000
|
$50.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
|
EA
|
6.000
|
$45.000
|
$26.750
|
$18.000
|
$25.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
|
EA
|
20.000
|
$45.000
|
$26.750
|
$35.000
|
$25.000
|
|
|
INSTL DEL ASSN (OM-2Z)(FLX)(WAP)
|
EA
|
1.000
|
$125.000
|
$5.350
|
$100.000
|
$300.000
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(BRK)
|
LF
|
180.000
|
$0.350
|
$2.680
|
$5.000
|
$5.000
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
|
LF
|
3,677.000
|
$0.350
|
$0.100
|
$2.500
|
$4.500
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
251.000
|
$1.000
|
$10.700
|
$1.000
|
$5.000
|
|
REFL PAV MRK TY I (W)24"(SLD)(090MIL)
|
LF
|
24.000
|
$6.500
|
$3.750
|
$10.000
|
$10.000
|
|
|
REF PROF PAV MRK TY I(W)6"(SLD)(090MIL)
|
LF
|
2,606.000
|
$1.370
|
$3.750
|
$3.500
|
$5.000
|
|
|
REF PROF PAV MRK TY I(Y)6"(SLD)(090MIL)
|
LF
|
1,870.000
|
$1.370
|
$5.350
|
$3.500
|
$5.000
|
|
|
REF PROF PAV MRK TY I(Y)6"(BRK)(090MIL)
|
LF
|
180.000
|
$1.370
|
$2.140
|
$5.000
|
$5.000
|
|
RE PM W/RET REQ TY I (W)6"(SLD)(090MIL)
|
LF
|
1,807.000
|
$1.370
|
$2.140
|
$2.000
|
$3.000
|
|
RE PM W/RET REQ TY I (Y)6"(SLD)(090MIL)
|
LF
|
1,807.000
|
$1.370
|
$10.700
|
$2.000
|
$3.000
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
79.000
|
$4.000
|
$179.930
|
$10.000
|
$15.000
|
|
|
D-GR HMA TY-B PG64-22 (EXEMPT)
|
TON
|
3,060.000
|
$157.750
|
$181.190
|
$180.000
|
$190.000
|
|
|
D-GR HMA TY-C SAC-A PG64-22(EXEMPT)
|
TON
|
1,147.000
|
$150.000
|
$195.190
|
$180.000
|
$190.000
|
|
|
BONDING COURSE
|
GAL
|
304.000
|
$5.000
|
$16.050
|
$10.000
|
$8.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
4.000
|
$10,500.000
|
$19,000.000
|
$16,000.000
|
$25,000.000
|
|
|
TMA (STATIONARY)
|
DAY
|
115.000
|
$300.000
|
$300.000
|
$100.000
|
$300.000
|
|
Totals: |
$3,736,834.510
|
$3,732,598.350
|
$4,241,889.460
|
$4,504,625.300
|