PREPARING ROW
|
AC
|
0.500
|
$5,000.000
|
$4,000.000
|
$10,000.000
|
$522.300
|
$10,000.000
|
$10,000.000
|
$25,817.120
|
$50,000.000
|
$100,000.000
|
|
|
REMOVING CONC (RIPRAP)
|
SY
|
194.000
|
$15.000
|
$10.000
|
$25.000
|
$23.500
|
$10.000
|
$15.500
|
$22.370
|
$20.000
|
$40.000
|
|
|
REMOVING CONC (FOUNDATIONS)
|
CY
|
5.000
|
$40.000
|
$400.000
|
$100.000
|
$261.150
|
$100.000
|
$475.000
|
$1,051.440
|
$500.000
|
$400.000
|
|
|
REMOVING CONC (DRIVEWAYS)
|
SY
|
3,961.000
|
$20.000
|
$10.000
|
$10.000
|
$10.970
|
$10.000
|
$13.500
|
$15.870
|
$20.000
|
$30.000
|
|
|
REMOVING CONC (CURB OR CURB & GUTTER)
|
LF
|
4,436.000
|
$10.000
|
$6.000
|
$5.000
|
$15.670
|
$5.000
|
$7.750
|
$6.730
|
$12.500
|
$20.000
|
|
|
REMOVING CONC (SIDEWALK OR RAMP)
|
SY
|
857.000
|
$15.000
|
$1.000
|
$15.000
|
$33.950
|
$10.000
|
$15.000
|
$19.630
|
$20.000
|
$20.000
|
|
|
REMOVE CONC (RAIL)
|
LF
|
6.000
|
$15.000
|
$25.000
|
$50.000
|
$417.850
|
$100.000
|
$15.000
|
$65.790
|
$200.000
|
$50.000
|
|
|
REMOVING CONC (PAVERS)
|
SY
|
5.000
|
$18.000
|
$40.000
|
$25.000
|
$26.120
|
$100.000
|
$16.000
|
$50.200
|
$200.000
|
$50.000
|
|
|
REMOVING STAB BASE AND ASPH PAV(0"-16")
|
SY
|
2,391.000
|
$12.000
|
$1.000
|
$7.000
|
$6.270
|
$10.000
|
$4.500
|
$7.720
|
$20.000
|
$20.000
|
|
|
EXCAVATION (CHANNEL)
|
CY
|
8.000
|
$8.000
|
$1.000
|
$50.000
|
$117.520
|
$100.000
|
$50.000
|
$43.820
|
$20.000
|
$30.000
|
|
|
EXCAVATION (SPECIAL)
|
CY
|
500.000
|
$12.000
|
$1.000
|
$20.000
|
$12.010
|
$15.000
|
$15.500
|
$18.790
|
$30.000
|
$20.000
|
|
|
EMBANKMENT (VEHICLE)(ORD COMP)(TY B)
|
CY
|
400.000
|
$20.000
|
$1.000
|
$30.000
|
$32.680
|
$20.000
|
$28.500
|
$30.030
|
$35.000
|
$40.000
|
|
|
BLOCK SODDING
|
SY
|
13,937.000
|
$6.000
|
$4.000
|
$5.000
|
$4.640
|
$7.000
|
$9.250
|
$11.700
|
$5.500
|
$4.000
|
|
|
CELL FBR MLCH SEED(TEMP)(COOL)
|
SY
|
13,937.000
|
$0.450
|
$1.000
|
$1.000
|
$0.300
|
$1.500
|
$0.750
|
$1.280
|
$1.000
|
$1.000
|
|
|
FERTILIZER
|
TON
|
10.000
|
$600.000
|
$200.000
|
$500.000
|
$480.000
|
$500.000
|
$700.000
|
$1,308.930
|
$200.000
|
$1,000.000
|
|
|
VEGETATIVE WATERING
|
MG
|
2,073.000
|
$30.000
|
$1.000
|
$25.000
|
$2.000
|
$20.000
|
$60.000
|
$128.320
|
$38.000
|
$1.000
|
|
|
D-GR HMA(SQ) TY-C PG76-22
|
TON
|
183.000
|
$95.000
|
$165.000
|
$250.000
|
$192.000
|
$200.000
|
$125.000
|
$226.300
|
$120.000
|
$200.000
|
|
|
D-GR HMA TY-C PG76-22 (LEVEL-UP)
|
TON
|
3.000
|
$110.000
|
$300.000
|
$250.000
|
$310.950
|
$500.000
|
$200.000
|
$228.840
|
$120.000
|
$300.000
|
|
|
FLEX PAVE STRUCTURE REPAIR (8"-10")
|
SY
|
737.000
|
$65.000
|
$50.000
|
$75.000
|
$92.120
|
$50.000
|
$85.000
|
$75.160
|
$80.000
|
$100.000
|
|
|
CONC PAV (JOINT REINF) (10")
|
SY
|
250.000
|
$50.000
|
$120.000
|
$100.000
|
$130.250
|
$200.000
|
$85.000
|
$114.370
|
$125.000
|
$160.000
|
|
|
DRILL SHAFT (RDWY ILL POLE) (24 IN)
|
LF
|
6.000
|
$150.000
|
$300.000
|
$1,000.000
|
$118.300
|
$300.000
|
$150.000
|
$388.910
|
$280.000
|
$200.000
|
|
|
CL A CONC (MISC)
|
CY
|
20.000
|
$500.000
|
$750.000
|
$500.000
|
$225.000
|
$800.000
|
$655.000
|
$564.250
|
$1,100.000
|
$800.000
|
|
|
CL C CONC (MISC)
|
CY
|
19.000
|
$600.000
|
$750.000
|
$1,000.000
|
$236.000
|
$800.000
|
$1,050.000
|
$896.740
|
$1,100.000
|
$800.000
|
|
|
CL A CONC (STEPS)
|
CY
|
18.000
|
$550.000
|
$800.000
|
$1,000.000
|
$765.000
|
$800.000
|
$1,400.000
|
$1,420.680
|
$1,100.000
|
$1,200.000
|
|
|
RETAINING WALL (CAST - IN - PLACE)
|
SF
|
75.000
|
$50.000
|
$45.000
|
$30.000
|
$67.300
|
$50.000
|
$75.000
|
$105.800
|
$85.000
|
$160.000
|
|
|
RIPRAP (CONC)(6 IN)
|
CY
|
63.000
|
$450.000
|
$750.000
|
$450.000
|
$359.000
|
$600.000
|
$700.000
|
$503.790
|
$650.000
|
$500.000
|
|
|
RAIL (HANDRAIL)(TY A)
|
LF
|
187.000
|
$75.000
|
$85.000
|
$100.000
|
$82.000
|
$100.000
|
$125.000
|
$93.000
|
$150.000
|
$120.000
|
|
|
RAIL (HANDRAIL)(TY B)
|
LF
|
32.000
|
$95.000
|
$85.000
|
$110.000
|
$76.500
|
$100.000
|
$80.000
|
$175.790
|
$210.000
|
$140.000
|
|
|
GRATE & FRAME
|
EA
|
55.000
|
$1,200.000
|
$800.000
|
$1,000.000
|
$360.000
|
$1,500.000
|
$900.000
|
$1,298.490
|
$1,000.000
|
$1,200.000
|
|
|
ADJUSTING MANHOLES
|
EA
|
3.000
|
$1,000.000
|
$600.000
|
$500.000
|
$705.000
|
$1,000.000
|
$1,100.000
|
$2,136.100
|
$1,500.000
|
$1,200.000
|
|
|
REMOV STR (PIPE)
|
LF
|
6.000
|
$200.000
|
$15.000
|
$50.000
|
$79.000
|
$50.000
|
$17.500
|
$89.990
|
$30.000
|
$20.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$185,000.000
|
$55,000.000
|
$250,000.000
|
$200,000.000
|
$375,000.000
|
$200,000.000
|
$319,163.510
|
$300,000.000
|
$215,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
20.000
|
$2,200.000
|
$1,200.000
|
$5,000.000
|
$4,305.000
|
$4,000.000
|
$8,200.000
|
$6,185.520
|
$8,500.000
|
$6,000.000
|
|
|
SANDBAGS FOR EROSION CONTROL
|
EA
|
2,000.000
|
$4.000
|
$0.100
|
$1.000
|
$4.500
|
$1.000
|
$1.750
|
$6.320
|
$5.000
|
$5.000
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
2,000.000
|
$4.000
|
$0.100
|
$2.000
|
$6.000
|
$5.000
|
$4.000
|
$8.850
|
$18.000
|
$10.000
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
2,000.000
|
$2.250
|
$0.100
|
$1.000
|
$0.550
|
$1.000
|
$1.500
|
$2.130
|
$12.000
|
$1.000
|
|
|
LANDSCAPE PAVERS
|
SY
|
10.000
|
$25.000
|
$55.000
|
$100.000
|
$146.500
|
$100.000
|
$75.000
|
$140.690
|
$200.000
|
$80.000
|
|
|
REMOVE AND RELAY PAVERS
|
SY
|
33.000
|
$50.000
|
$100.000
|
$100.000
|
$26.150
|
$100.000
|
$90.000
|
$151.340
|
$200.000
|
$30.000
|
|
|
CONC CURB (TY I)
|
LF
|
224.000
|
$15.000
|
$20.000
|
$25.000
|
$28.000
|
$10.000
|
$11.000
|
$11.060
|
$25.000
|
$20.000
|
|
|
CONC CURB (TY II)
|
LF
|
3,107.000
|
$20.000
|
$15.000
|
$15.000
|
$28.000
|
$15.000
|
$13.500
|
$19.410
|
$25.000
|
$20.000
|
|
|
CONC CURB & GUTTER (TY I)
|
LF
|
62.000
|
$25.000
|
$40.000
|
$30.000
|
$50.000
|
$35.000
|
$25.000
|
$27.040
|
$35.000
|
$30.000
|
|
|
CONC CURB & GUTTER (TY II)
|
LF
|
2,615.000
|
$30.000
|
$25.000
|
$25.000
|
$50.000
|
$35.000
|
$22.000
|
$25.430
|
$30.000
|
$30.000
|
|
|
CONC CURB (SLOTTED)
|
LF
|
20.000
|
$50.000
|
$40.000
|
$75.000
|
$38.000
|
$40.000
|
$27.000
|
$28.470
|
$45.000
|
$40.000
|
|
|
CONC CURB & GUTTER (ARMOR CURB)
|
LF
|
28.000
|
$150.000
|
$400.000
|
$100.000
|
$252.000
|
$400.000
|
$300.000
|
$227.190
|
$200.000
|
$40.000
|
|
|
DRIVEWAYS (CONC)
|
SY
|
6,115.000
|
$50.000
|
$65.000
|
$65.000
|
$61.000
|
$60.000
|
$70.000
|
$80.050
|
$85.000
|
$80.000
|
|
|
DRIVEWAYS (ACP)
|
SY
|
1,007.000
|
$40.000
|
$45.000
|
$30.000
|
$57.000
|
$40.000
|
$41.000
|
$37.160
|
$42.000
|
$60.000
|
|
|
CONC SIDEWALKS (4")
|
SY
|
11,320.000
|
$50.000
|
$70.000
|
$47.000
|
$45.000
|
$40.000
|
$49.000
|
$45.350
|
$52.500
|
$60.000
|
|
|
CURB RAMPS (TY 1)
|
EA
|
55.000
|
$1,400.000
|
$1,200.000
|
$1,100.000
|
$1,780.000
|
$1,500.000
|
$1,660.000
|
$1,478.620
|
$1,850.000
|
$2,000.000
|
|
|
CURB RAMPS (TY 2)
|
EA
|
13.000
|
$1,600.000
|
$1,200.000
|
$1,500.000
|
$1,880.000
|
$1,500.000
|
$1,660.000
|
$1,478.620
|
$1,850.000
|
$2,000.000
|
|
|
CURB RAMPS (TY 3)
|
EA
|
6.000
|
$1,800.000
|
$1,200.000
|
$1,800.000
|
$1,980.000
|
$1,500.000
|
$1,660.000
|
$1,478.620
|
$1,850.000
|
$2,400.000
|
|
|
CURB RAMPS (TY 5)
|
EA
|
4.000
|
$1,500.000
|
$1,200.000
|
$2,500.000
|
$2,075.000
|
$1,500.000
|
$2,025.000
|
$2,112.310
|
$1,850.000
|
$3,600.000
|
|
|
CURB RAMPS (TY 6)
|
EA
|
15.000
|
$1,500.000
|
$1,200.000
|
$1,200.000
|
$2,400.000
|
$1,500.000
|
$1,750.000
|
$2,270.740
|
$1,850.000
|
$3,600.000
|
|
|
CURB RAMPS (TY 7)
|
EA
|
140.000
|
$1,300.000
|
$1,000.000
|
$1,000.000
|
$1,470.000
|
$1,500.000
|
$1,575.000
|
$1,848.280
|
$1,850.000
|
$3,000.000
|
|
|
CURB RAMPS (TY 10)
|
EA
|
14.000
|
$1,300.000
|
$1,200.000
|
$1,000.000
|
$1,850.000
|
$2,000.000
|
$1,450.000
|
$1,689.850
|
$1,850.000
|
$3,000.000
|
|
|
CURB RAMPS (TY 21)
|
EA
|
2.000
|
$2,200.000
|
$2,000.000
|
$2,500.000
|
$2,250.000
|
$3,000.000
|
$3,125.000
|
$1,795.470
|
$1,850.000
|
$2,000.000
|
|
|
CONC SIDEWALKS (SPECIAL) (TYPE A)
|
SY
|
22.000
|
$65.000
|
$85.000
|
$75.000
|
$1,450.000
|
$200.000
|
$115.000
|
$248.200
|
$65.000
|
$100.000
|
|
|
CONC SIDEWALKS (SPECIAL) (TYPE B)
|
SY
|
1,960.000
|
$70.000
|
$85.000
|
$75.000
|
$90.600
|
$90.000
|
$102.000
|
$89.780
|
$75.000
|
$100.000
|
|
|
MAILBOX INSTALL-M (TWG-POST) TY 1
|
EA
|
1.000
|
$250.000
|
$175.000
|
$500.000
|
$568.000
|
$500.000
|
$500.000
|
$766.850
|
$650.000
|
$200.000
|
|
|
RELOCATE RD IL ASM (SHOE-BASE)
|
EA
|
1.000
|
$1,400.000
|
$1,500.000
|
$2,000.000
|
$1,700.000
|
$500.000
|
$1,150.000
|
$2,461.700
|
$500.000
|
$500.000
|
|
|
CONDT (PVC) (SCH 80) (3")
|
LF
|
90.000
|
$15.000
|
$13.000
|
$20.000
|
$16.650
|
$50.000
|
$12.000
|
$28.000
|
$15.000
|
$50.000
|
|
|
ELEC CONDR (NO.6) BARE
|
LF
|
20.000
|
$1.500
|
$15.000
|
$5.000
|
$1.450
|
$10.000
|
$2.000
|
$3.650
|
$2.000
|
$5.000
|
|
|
GROUND BOX TY D (162922)
|
EA
|
12.000
|
$500.000
|
$600.000
|
$1,000.000
|
$414.000
|
$500.000
|
$800.000
|
$1,115.770
|
$650.000
|
$1,000.000
|
|
|
GROUND BOX TY D (162922)W/APRON
|
EA
|
2.000
|
$800.000
|
$800.000
|
$1,200.000
|
$595.000
|
$1,000.000
|
$950.000
|
$1,720.840
|
$650.000
|
$1,600.000
|
|
|
REMOVE GROUND BOX
|
EA
|
9.000
|
$200.000
|
$50.000
|
$500.000
|
$52.000
|
$50.000
|
$310.000
|
$554.680
|
$100.000
|
$400.000
|
|
|
RELOCATE SM RD SN SUP&AM TY S80
|
EA
|
64.000
|
$300.000
|
$250.000
|
$350.000
|
$460.000
|
$300.000
|
$385.000
|
$339.160
|
$450.000
|
$800.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
10.000
|
$50.000
|
$150.000
|
$200.000
|
$26.000
|
$100.000
|
$80.000
|
$186.190
|
$50.000
|
$200.000
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
24.000
|
$3.500
|
$1.000
|
$1.000
|
$1.200
|
$12.000
|
$10.000
|
$1.840
|
$6.000
|
$1.000
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
1,973.000
|
$7.000
|
$5.000
|
$5.000
|
$6.000
|
$7.000
|
$5.200
|
$6.900
|
$10.000
|
$2.500
|
|
REFL PAV MRK TY II (W) 4" (SLD)
|
LF
|
204.000
|
$0.600
|
$1.000
|
$1.000
|
$1.200
|
$0.400
|
$0.500
|
$0.310
|
$1.000
|
$5.000
|
|
REFL PAV MRK TY II (W) 8" (SLD)
|
LF
|
24.000
|
$0.850
|
$1.000
|
$1.000
|
$1.200
|
$0.700
|
$0.500
|
$0.990
|
$2.000
|
$1.000
|
|
REFL PAV MRK TY II (W) 24" (SLD)
|
LF
|
1,973.000
|
$1.250
|
$3.000
|
$2.500
|
$3.000
|
$1.750
|
$1.250
|
$4.460
|
$1.000
|
$3.000
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
|
LF
|
204.000
|
$3.000
|
$5.000
|
$5.000
|
$6.000
|
$3.000
|
$2.000
|
$1.060
|
$2.000
|
$5.000
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
8.000
|
$3.000
|
$1.000
|
$5.000
|
$6.000
|
$10.000
|
$5.000
|
$1.110
|
$2.000
|
$5.000
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
158.000
|
$1.250
|
$2.000
|
$1.000
|
$1.200
|
$6.000
|
$3.000
|
$1.720
|
$1.000
|
$1.000
|
|
|
ELIM EXT PAV MRK & MRKS (8")
|
LF
|
74.000
|
$2.250
|
$2.000
|
$2.000
|
$2.400
|
$12.000
|
$6.000
|
$3.140
|
$4.000
|
$2.000
|
|
|
ELIM EXT PAV MRK & MRKS (24")
|
LF
|
2,089.000
|
$3.000
|
$1.000
|
$2.000
|
$2.400
|
$8.000
|
$4.000
|
$5.270
|
$10.000
|
$2.000
|
|
|
PAV SURF PREP FOR MRK (4")
|
LF
|
220.000
|
$0.200
|
$1.000
|
$1.000
|
$1.200
|
$1.000
|
$0.100
|
$0.220
|
$2.000
|
$1.000
|
|
|
PAV SURF PREP FOR MRK (8")
|
LF
|
24.000
|
$0.350
|
$1.000
|
$1.000
|
$1.200
|
$1.000
|
$0.200
|
$0.690
|
$6.000
|
$1.000
|
|
|
PAV SURF PREP FOR MRK (24")
|
LF
|
1,973.000
|
$0.650
|
$1.000
|
$0.750
|
$1.000
|
$1.000
|
$0.600
|
$3.170
|
$10.000
|
$1.000
|
|
|
PED DETECT PUSH BUTTON (STANDARD)
|
EA
|
60.000
|
$400.000
|
$250.000
|
$300.000
|
$195.000
|
$300.000
|
$425.000
|
$737.820
|
$850.000
|
$600.000
|
|
|
INSTALL OF VEHICLE DETECTORS
|
LF
|
10,000.000
|
$2.000
|
$0.010
|
$5.000
|
$2.250
|
$0.010
|
$4.750
|
$5.290
|
$9.000
|
$5.000
|
|
|
REMOVAL OF PEDESTRIAN PUSH BUTTONS
|
EA
|
60.000
|
$75.000
|
$50.000
|
$100.000
|
$95.000
|
$100.000
|
$85.000
|
$134.230
|
$250.000
|
$100.000
|
|
|
RETROFIT DET WARN SURF(SURF APP OR CIP)
|
EA
|
2.000
|
$350.000
|
$250.000
|
$350.000
|
$290.000
|
$400.000
|
$370.000
|
$1,330.700
|
$6,500.000
|
$600.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$5,000.000
|
$300.000
|
$10,000.000
|
$500.000
|
$10,000.000
|
$18,000.000
|
$13,428.440
|
$16,500.000
|
$14,000.000
|
|
Totals: |
$2,483,645.550
|
$2,370,334.000
|
$2,591,331.250
|
$2,709,501.090
|
$2,776,111.650
|
$3,014,111.950
|
$3,464,248.790
|
$3,544,884.500
|
$3,633,798.500
|