PREPARING ROW
|
STA
|
531.840
|
$950.000
|
$250.000
|
$100.000
|
$112.000
|
$369.630
|
$125.000
|
|
|
REMOVING STAB BASE & ASPH PAV (12")
|
SY
|
217,404.000
|
$4.000
|
$5.200
|
$4.000
|
$3.710
|
$1.670
|
$4.750
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
11,643.000
|
$8.000
|
$10.000
|
$8.750
|
$8.440
|
$11.130
|
$15.000
|
|
|
EMBANKMENT (FINAL)(ORD COMP)(TY D)
|
CY
|
15,964.000
|
$10.000
|
$8.000
|
$6.500
|
$4.370
|
$11.130
|
$7.500
|
|
|
DRILL SEEDING (PERM) (RURAL) (CLAY)
|
AC
|
106.800
|
$600.000
|
$555.000
|
$350.000
|
$621.600
|
$624.750
|
$1,000.000
|
|
|
FL BS (CMP IN PLC)(TYA GR1-2)(FNAL POS)
|
CY
|
59,030.000
|
$60.000
|
$55.000
|
$55.750
|
$47.820
|
$72.880
|
$63.000
|
|
|
CEMENT
|
TON
|
1,522.000
|
$160.000
|
$160.000
|
$163.000
|
$160.160
|
$149.100
|
$150.000
|
|
|
CEMENT TREAT (EXIST MATL) (6")
|
SY
|
229,177.000
|
$1.800
|
$2.200
|
$0.750
|
$0.960
|
$1.140
|
$1.350
|
|
|
PRIME COAT (MC-30)
|
GAL
|
62,270.000
|
$4.500
|
$4.500
|
$3.500
|
$3.470
|
$4.360
|
$3.950
|
|
|
PLAN & TEXT ASPH CONC PAV(0" TO 3")
|
SY
|
783.000
|
$2.000
|
$10.000
|
$4.500
|
$10.770
|
$8.400
|
$7.500
|
|
|
FLOWABLE BACKFILL
|
CY
|
204.000
|
$150.000
|
$200.000
|
$160.000
|
$224.000
|
$162.560
|
$195.000
|
|
|
CL A CONC (COLLAR)
|
EA
|
1.000
|
$1,000.000
|
$2,000.000
|
$975.000
|
$2,168.320
|
$1,176.240
|
$1,050.000
|
|
|
RIPRAP (CONC)(5 IN)
|
CY
|
18.000
|
$440.000
|
$500.000
|
$600.000
|
$548.860
|
$839.990
|
$600.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
82.000
|
$430.000
|
$525.000
|
$615.000
|
$500.640
|
$651.150
|
$575.000
|
|
|
CLEANING AND SEALING EXISTING JOINTS
|
LF
|
369.000
|
$25.000
|
$34.000
|
$40.000
|
$42.560
|
$36.340
|
$37.000
|
|
|
RETROFIT RAIL (TY SSTR)
|
LF
|
482.000
|
$150.000
|
$190.000
|
$145.000
|
$207.790
|
$126.340
|
$150.000
|
|
|
CONC BOX CULV (6 FT X 3 FT)
|
LF
|
138.000
|
$550.000
|
$415.000
|
$425.000
|
$464.170
|
$480.550
|
$525.000
|
|
|
CONC BOX CULV (6 FT X 4 FT)
|
LF
|
47.000
|
$640.000
|
$447.000
|
$575.000
|
$501.760
|
$511.120
|
$525.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
156.000
|
$70.000
|
$74.000
|
$82.000
|
$81.920
|
$107.070
|
$150.000
|
|
|
RC PIPE (CL III)(36 IN)
|
LF
|
12.000
|
$110.000
|
$120.000
|
$95.000
|
$134.400
|
$137.730
|
$265.000
|
|
|
RC PIPE (CL IV)(24 IN)
|
LF
|
360.000
|
$90.000
|
$200.000
|
$75.000
|
$222.880
|
$115.690
|
$90.000
|
|
|
RC PIPE (ARCH)(CL V)(DES 3)
|
LF
|
57.000
|
$300.000
|
$264.000
|
$150.000
|
$295.680
|
$228.760
|
$185.000
|
|
|
HEADWALL (CH - PW - 0) (DIA= 36 IN)
|
EA
|
1.000
|
$8,000.000
|
$6,500.000
|
$12,000.000
|
$7,280.000
|
$11,310.430
|
$9,000.000
|
|
|
SET (TY I)(S= 6 FT)(HW= 5 FT)(4:1) (C)
|
EA
|
2.000
|
$12,000.000
|
$8,800.000
|
$15,000.000
|
$9,856.000
|
$9,556.440
|
$10,500.000
|
|
|
SET (TY I)(S= 6 FT)(HW= 6 FT)(4:1) (C)
|
EA
|
6.000
|
$12,000.000
|
$13,500.000
|
$6,000.000
|
$14,616.000
|
$9,594.260
|
$9,000.000
|
|
|
SET (TY II) (24 IN) (RCP) (4: 1) (C)
|
EA
|
10.000
|
$2,000.000
|
$1,200.000
|
$1,975.000
|
$1,344.000
|
$2,235.040
|
$1,350.000
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
14.000
|
$1,400.000
|
$1,200.000
|
$1,975.000
|
$1,344.000
|
$2,435.840
|
$1,350.000
|
|
|
SET (TY II) (30 IN) (RCP) (4: 1) (C)
|
EA
|
10.000
|
$2,000.000
|
$2,100.000
|
$2,175.000
|
$2,296.000
|
$2,928.740
|
$2,400.000
|
|
|
SET (TY II) (36 IN) (RCP) (4: 1) (C)
|
EA
|
3.000
|
$6,000.000
|
$3,000.000
|
$2,175.000
|
$3,304.000
|
$5,114.940
|
$3,200.000
|
|
|
SET (TY II) (DES 3) (RCP) (6: 1) (P)
|
EA
|
4.000
|
$2,400.000
|
$4,750.000
|
$2,500.000
|
$5,320.000
|
$4,730.800
|
$4,000.000
|
|
|
CLEAN EXIST CULVERTS
|
EA
|
30.000
|
$1,600.000
|
$2,100.000
|
$375.000
|
$2,296.000
|
$1,841.010
|
$2,100.000
|
|
|
REMOV STR (SET)
|
EA
|
32.000
|
$800.000
|
$585.000
|
$120.000
|
$655.200
|
$874.980
|
$375.000
|
|
|
REMOV STR (BOX CULVERT)
|
LF
|
185.000
|
$50.000
|
$33.000
|
$40.000
|
$36.960
|
$112.420
|
$85.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$1,025,866.280
|
$956,000.000
|
$750,000.000
|
$877,980.320
|
$1,556,000.000
|
$1,200,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
25.000
|
$6,000.000
|
$1,200.000
|
$1,600.000
|
$2,800.000
|
$6,000.000
|
$3,000.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 3)
|
LF
|
330.000
|
$48.000
|
$44.000
|
$21.000
|
$49.000
|
$60.900
|
$90.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
330.000
|
$9.500
|
$30.000
|
$10.500
|
$33.600
|
$10.500
|
$15.000
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
156.000
|
$21.000
|
$39.000
|
$10.500
|
$43.400
|
$15.750
|
$20.000
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
156.000
|
$8.000
|
$27.000
|
$5.250
|
$28.000
|
$2.100
|
$5.000
|
|
|
BACKHOE WORK (EROSION & SEDMT CONT)
|
HR
|
163.000
|
$68.000
|
$60.000
|
$63.000
|
$50.400
|
$79.800
|
$100.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
6,461.000
|
$2.250
|
$2.700
|
$2.000
|
$3.020
|
$1.880
|
$2.850
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
6,461.000
|
$0.750
|
$1.500
|
$1.000
|
$1.680
|
$0.890
|
$0.250
|
|
|
ONE-WAY TRAF CONT (PILOT CAR)
|
HR
|
80.000
|
$80.000
|
$200.000
|
$115.000
|
$120.910
|
$102.600
|
$100.000
|
|
|
ONE-WAY TRAF CONT (PORT TRAF SIG)
|
MO
|
26.000
|
$5,600.000
|
$6,000.000
|
$2,850.000
|
$3,920.000
|
$4,894.290
|
$3,800.000
|
|
|
PTB (FRN&INSTL)(SGL SLP)(TY 1) OR (STL)
|
LF
|
5,130.000
|
$40.000
|
$25.000
|
$42.000
|
$48.650
|
$36.310
|
$32.000
|
|
|
PTB (MOVE)(SGL SLP)(TY 1) OR (STL)
|
LF
|
112,860.000
|
$6.000
|
$4.000
|
$1.750
|
$8.300
|
$4.360
|
$7.000
|
|
|
PTB (REMOVE)(SGL SLP)(TY 1) OR (STL)
|
LF
|
5,130.000
|
$5.500
|
$12.000
|
$4.000
|
$23.790
|
$11.810
|
$10.000
|
|
|
DRIVEWAYS (CONC)
|
SY
|
1,283.000
|
$100.000
|
$88.000
|
$92.000
|
$98.560
|
$120.110
|
$95.000
|
|
|
DRIVEWAYS (ACP)
|
SY
|
5,923.000
|
$35.000
|
$50.000
|
$20.000
|
$26.600
|
$32.850
|
$37.000
|
|
|
RUMBLE STRIPS (SHOULDER) ASPHALT
|
LF
|
106,383.000
|
$0.200
|
$0.300
|
$0.150
|
$0.140
|
$0.130
|
$0.250
|
|
|
RUMBLE STRIPS (CENTERLINE) ASPHALT
|
LF
|
53,184.000
|
$0.200
|
$0.300
|
$0.200
|
$0.310
|
$0.150
|
$0.500
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
1,200.000
|
$20.000
|
$21.000
|
$23.000
|
$24.640
|
$21.290
|
$32.000
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
8.000
|
$1,500.000
|
$2,000.000
|
$1,500.000
|
$1,607.200
|
$1,428.000
|
$2,500.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
1,200.000
|
$2.250
|
$1.800
|
$1.000
|
$1.680
|
$1.840
|
$5.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
8.000
|
$2,500.000
|
$2,750.000
|
$2,875.000
|
$3,065.440
|
$2,751.000
|
$3,200.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
8.000
|
$250.000
|
$100.000
|
$275.000
|
$414.400
|
$99.750
|
$250.000
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
98.000
|
$900.000
|
$760.000
|
$475.000
|
$1,694.050
|
$761.250
|
$800.000
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
14.000
|
$850.000
|
$370.000
|
$275.000
|
$2,305.230
|
$367.500
|
$800.000
|
|
|
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
|
EA
|
14.000
|
$8,500.000
|
$7,190.000
|
$7,600.000
|
$3,948.130
|
$7,192.500
|
$7,000.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
32.000
|
$650.000
|
$540.000
|
$475.000
|
$498.400
|
$467.250
|
$515.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(P)
|
EA
|
4.000
|
$625.000
|
$680.000
|
$700.000
|
$756.000
|
$708.750
|
$650.000
|
|
|
INSTL OM ASSM (OM-2Z)(FLX)GND(BI)
|
EA
|
74.000
|
$85.000
|
$80.000
|
$100.000
|
$106.400
|
$99.750
|
$77.000
|
|
|
REMOVE DELIN & OBJECT MARKER ASSMS
|
EA
|
52.000
|
$25.000
|
$11.000
|
$16.000
|
$16.800
|
$15.750
|
$10.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
|
EA
|
24.000
|
$30.000
|
$26.000
|
$29.000
|
$31.360
|
$29.400
|
$25.000
|
|
|
WK ZN PAV MRK REMOV (REFL) TY II-A-A
|
EA
|
2,880.000
|
$3.000
|
$2.600
|
$6.250
|
$6.720
|
$6.300
|
$2.500
|
|
|
WK ZN PAV MRK REMOV (W)4"(SLD)
|
LF
|
16,800.000
|
$0.700
|
$0.500
|
$0.850
|
$0.900
|
$0.840
|
$0.500
|
|
|
WK ZN PAV MRK REMOV (W)24"(SLD)
|
LF
|
576.000
|
$8.750
|
$5.250
|
$14.700
|
$15.680
|
$14.700
|
$5.000
|
|
|
WK ZN PAV MRK REMOV (Y)4"(SLD)
|
LF
|
141,360.000
|
$0.700
|
$0.500
|
$0.800
|
$0.840
|
$0.790
|
$0.480
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
10,700.000
|
$0.800
|
$1.400
|
$0.500
|
$1.120
|
$1.780
|
$0.800
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
30.000
|
$6.200
|
$8.000
|
$21.000
|
$22.400
|
$21.000
|
$8.000
|
|
|
PAVEMENT SEALER 4"
|
LF
|
156,266.000
|
$0.150
|
$0.120
|
$0.170
|
$0.180
|
$0.170
|
$0.110
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
|
LF
|
106,383.000
|
$0.300
|
$0.300
|
$0.300
|
$0.320
|
$0.300
|
$0.320
|
|
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
|
LF
|
10,815.000
|
$0.300
|
$0.400
|
$0.350
|
$0.340
|
$0.320
|
$0.340
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
39,068.000
|
$0.300
|
$0.400
|
$0.300
|
$0.340
|
$0.320
|
$0.340
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
802.000
|
$3.000
|
$3.500
|
$4.000
|
$4.200
|
$3.940
|
$3.330
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
14,000.000
|
$0.400
|
$0.400
|
$0.800
|
$0.840
|
$0.790
|
$0.370
|
|
|
D-GR HMA TY-B SAC-B PG70-22
|
TON
|
60,065.000
|
$73.000
|
$66.000
|
$89.250
|
$84.550
|
$75.900
|
$82.750
|
|
|
SP MIXES SP-C SAC-A PG76-22
|
TON
|
21,845.000
|
$94.000
|
$80.000
|
$102.500
|
$107.000
|
$92.700
|
$94.000
|
|
|
BONDING COURSE
|
GAL
|
19,094.000
|
$3.000
|
$3.600
|
$3.000
|
$3.360
|
$2.980
|
$2.700
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
4.000
|
$10,500.000
|
$37,370.000
|
$14,000.000
|
$12,320.000
|
$8,063.290
|
$11,000.000
|
|
|
TMA (STATIONARY)
|
DAY
|
120.000
|
$250.000
|
$170.000
|
$300.000
|
$336.000
|
$215.020
|
$265.000
|
|
|
TMA (MOBILE OPERATION)
|
HR
|
300.000
|
$45.000
|
$22.000
|
$26.000
|
$72.800
|
$107.510
|
$53.000
|
|
Totals: |
$16,533,178.980
|
$15,239,642.920
|
$15,466,310.970
|
$16,298,483.800
|
$16,923,720.599
|
$17,116,968.850
|